Loading...
HomeMy WebLinkAboutAgenda Report - January 19, 1994 (30)OR CITY OF LODI COUNCIL COMMUNICATION AGENDA TITLE: Parks, Recreation and Open Space Master Plan MEETING DATE: January 19, 1994 PREPARED BY: Parks and Recreation Director RECOMMENDED ACTION: That the City Council review the final points of the Master Plan and approve the direction of the plan and support for eventual implementation. BACKGROUND INFORMATION: We have been dealing with the Parks, Recreation and Open Space Master Plan for approximately a year and a half. This hasn't been by staff or commission's choice. but generally due to timing and items of concern in the plan. You will recall a committee was appointed by Mayor Pinkerton to help with direction of the plan. as well as to conduct and be a part of public meetings. A meeting was held on the eastside at the parks and Recreation Annex and on the westside at the Lodi High School cafeteria. A phone surrey was conducted, six to eight committee meetings were held (open to the public, acknowledged in the Lodi News Sentinel and Stockton Record, and posted). The Parks and Recreation Commission then held a shirtsleeve session and a final public hearing to address the plan and prepare it for Council action. The City Council held a shirtsleeve session and a public hearing. Issues were brought to light, and now there are basically three that remain: 1. Trailfbicycle paths in and around Lodi. 2. The indoor facility money for a community center.' 3. Woodbridge area park (Exhibit A). As to the community center issue, please see Exhibit B as a representation of what we view as a local community center, this includes the Renton, Washington Center as an example. Another meeting was held, at the request of the City Council, October 5, 1993 by the Parks and Recreation Commission, which addressed Consultant Jerry Dragoo's concerns (Exhibit C). The commission communication (Exhibit D), and the minutes of that meeting (Exhibit E) are also attached for your information. I forwarded a copy of the most current update of the Parks, Recreation and Open Space Master Plan to all the members of the City Council. I hope you have been able to review this and will bring it to the council meeting on January 19. It is my ,pope, as well as the Parks and Recreation Commission's. that we can finish the review of the plan and call it complete, enabling us to move toward implementation. Your support and interest, in our efforts to provide opportunities, enrichment. environmental qualifies, and space for people to breath, participate, and enjoy themselves in a very challenging and complex world, as always, is appreciated. FUNDING: At this time it is development impact fees, and I'm sure later we will need general fund dollars as well as grant monies to fulfill the master plan. Respectfully submitted on behalf of the Parks and Recreltion C.fn 4 -,ion and staff./ (ton Williamson Parks and Recreation Director RW/sh cc. City Attorney i APPROVED. too* A PETERSON City Manager ecyuao Paw cc -1 XCC,SC..M )W -V 12 1%4 J C ORAGGOO & ASSOCIATES J URBAN PLANNING & DESIGN CD PARK/RECREATION PLANNING MEMO TO: Lodi City Council FROM: Jerry Draggoo SUBJECT: Updated Park and Recreation Plan DATE: November 16,1993 EXHIBIT A 0 1730 B W. SKYLINE 9LY0. PORTLAND. OREGON 97221 15031 297 -1005 Enclosed is an updated copy of the park and recreation plan. I have incorporated all of the changes you have made to date. There are still several issues yet to be resolved. 1. At the last meeting, the Council seemed inclined to allocate a certain amount of the park impact fees to Hutchins Street Square. While 1 don't agree with this idea because this project is not strictly recreation related, you, nonetheless, can make that decision. In a memo dated August 31, 1993, from Rich Prima, he concluded that up to $2,100,000 of the $4,329,600 reserved for community center buildings could be allocated to Hutchins Street Square. While there are a number of potential methodologies to determine how the community center money could be allocated, Rich's approach is a reasonable one. However, talongg out the $2.1 million that would be allocated to Hutchins Street Square leaves tF1e park development fund short. On Table 34, page IX -6 of the plan, we have listed all of the project cost including those to be paid by park impact fees. In order to keep the amount devoted to impact fees at the same level as what was developed in the Nolte/McDonald report ($18.3 million), we have had to remove some projects. According to Table 34, projects that are eligible for impact fees but not listed are: o minor park improvements to most new parks o Park maintenance shop 0 indoor recreation center 0 outdoor swimming pool o a portion of Pixley Park Regarding this issue, I believe your choices are: 2 ,�9g9 ��y 2 Page 2 November 16, 1443 Memo 1. Change the amount of money reserved for Hutchins Street Square. 2. Change the listing of projects eligible for impact fees listed in Table 3. Raise the cost of park impact fees. 2. Trails Pian: My recommendation is that you remove the trails element and conduct a separate trails plan at a later time. I understand the County is currently developing a trails plan at the present time. You might be able to piggy -back onto that study. I have removed the trails element from the plan and suggested you develop a separate study (page VIII -25). If you agree with this idea, we can leave the report as it is. 3. Woodbridge Park: There appeared to be a concern on the part of the City Council about developing a large community park up in the northwest corner of the Lodi planning area. While there is a need for such a park of this type in this area, locating a site will be difficult. The most feasible location would be outside the planning area and to the west of the irrigation canal. Because of my concern for cutting cost on projects eligible for park impact fees, I downgraded Woodbridge Park from a 20 acre community park to a 7 acre neighborhood park. To make up space lost for sport facilities, I moved the youth baseball fields from this proposed park to DeBenedetti Park and the adult softball fields to Pixley ?ark. Do you agree with this change? 1 believe the above represents the loose ends unless you have new issues. I am prepared to meet with you when you can work me into your agenda. 0 EXHIBIT B City ef Lodi Park and Recreation Plan Rrcornmendadons S. INDOOR REClMn0N CENTER The survey and workshop meetings revealed considerable interest for an indoor recreation center. The needs assessment indicated a specific need for a gymnasium and places for the city to conduct recreation classes. Currently the City has no indoor facilities and access to school gyms and classrooms is very restricted. The City now leases a portion of the Grape Festival and a small building next to their department for basketball, volleyball and other recreation classes. Design Requirements for a Successful Indoor Recreation Facility 1. A recreation center should be somewhat centralized to the community and be very visible to the passing public 2. The faclih/ should provide a wide range of facilities and activities of interest to all age groups. 3. Spaces should be provided for competitive and active sports, passive activities. receptions and general :eisure. 4. MuRI-use spaces should be favored over single purpose spaces. Flexibility is very important. 6. The building should be attractive with a comfortable environment suitable for both active and leisure activitles. Active recreation spaces shoed be dearly separated from passive spaces. 6. if lease space is developed as part of the facliry, it should be considered as temporary and a place for future expansion. 7. Activities and spaces that generate revenue is very important This will help to offset the operating Cosi An analysis of facility needs and requirements to generate adequate revenue revealed that in order for a center to be reasonably financially successful, the center would compete with Hutchins Street Square. Two alternative locations for a recreation center were studied. The first was to locate the proposed facility at Hutchins Street Square. From an operational and financial F of view, this option has many positive features. At the same time, a master plan for exclusive senior and cultural arts activities has been developed for this site and is bein&, implemented. Placing a recreation center in this location would require inodification to the masterplan. With this in mind, it is recommended that Hutchins Street Square not be considered as the site for the proposed indoor recreation center. The second location was at Needham School. For this site, a joint use agreement with the Lodi Unified School District would be required. Because of the anticipated high VTIl - 29 -11 � I, • J i 'g � J O ' T KP 1 cost to remodel the existing buildings, it is recommended that the portion of the building now used for adnunistrative purposes be removed to make way for a new recreation structure. The existing classroom section would remain and be either used by the School District or by the City for recreation purposes. A sketch of how this site could be utilized is shown below. R Cj4UW-J6q ItT M -t SCw-r Ave- V711- 30 c ABOUT THZ CENTER River att7'ts epleDutks� He�hGwdar the Renton S5 MMCorrxr ui* Car>lar is idea for area meetings. b•rqueb. parties. athletic events and mon. Open from 6:00am to 1o:00pn, morda dwouph Friday and Saturday from 8'OOam floe 8:000m, the Cornnwnity Center offers tits •tlnldevartetyafaWAes andbtsuri tints pleawree. FdbwMq b a list of rooms and sample activities: Gyrmsslum - Bask". voileybal, Racquetball��kCouds-Racque�.hff eventin- Game Room - Videoames. pool, foosbaA, screen televlslon; Arts & Crafts Area • dassps rentals; Pre-Sdxoof Room - ChiidreWs classes. rontdBarque Room - Aerobb and dans dosses, banquets. receptlons, eta Fitness Ara• - SeNrdorized and free weight equipment, cardiovascular apparatus. stretching area: When not scheduledfot Renton Partes BRoaoatkmacavlties.mod areas of the are avallabte on • rental basis. For ormatfon on how to rent theRenton Con isunIty Center eall Harley Holt at 235.2590. Rental Rates: Resident Ratee: Weekand Banquet Roam S500(10hotn) Weelcilly ClBanquet Roam ns $1 Volt (/W 3 Gats Room or Kids Keaton) Non-Reefdent Rates: Weekend Banquet Room =5a0(101ous) tw eekd3y ft" Cassrocrnss Room t (pits & Crab Room or Kids Kerner) (Fat Sunday rentele an additional tee of $70 we be kr �.ea e.� �' taac++«+ we Gym Rental Rates Event Haff Gymo Full Double G-pn S60Jhokr Special EventFull _ Oce le Gym S90/t+ow Friday. Saturday and Sunday fnWmwe 10 hoax rental. ?he gym is avallaWe for s evert rental P.O. wade shows, craft etc.) and requires an addillwat too for carpet setup and take -dower. Drop M 8as"cossi Monday uesday a Thu<Wednesday Fliday Saturday pvt D Center Drop /n Gym Schedule September 7,1593 through December 31, I'M (Noun are Monde -Friday tun -i s SaturdaysSunlpm) subret:t to ohanpe notion, 7:30am - 4m emism 7.301111111 - 0 - PM Drop In Volleybei Wednesday • (Sdwdub Is buf*d lo diarige. For updated Intorrnatlon. please cal 2352580.) Openr Drop In Fitness Room Monday. oMepub Friday enlor hours of operation with Ow foAowtrg exceptlons. Wednesday Sr ay SFitness Program Sam430sm (Free weights available �sr�rat Friday (Free we � general oultMl )pass 6:34T:30pm is avallable b Monday -Saturday 6an}10pm CMdren may not be left unetbnded while perenta perddpete M drop in actividee. Child care is not provided. Gym Rentals (Basketbas. VotleybeA or Sports) (Gym r�� e uP b two M wMb b ad www For H rffwdm criday all 236,2M.) Spedai Closures a 11 Od Umbor91 S ` 116 November 12.13. 19 b 20 November 24 November 25 November 26 December 3.4. 10 d 11 December 24.25 li 31 b January 1 BIRTHDAY PARTY RENTALS The Renton Parks i Roassitlan Do. partment offers two difforent birthday pacWages avallable during non- pro-grammed hogs. The bklh&y child re - calves a CCnnmkxdty Center hat, visor or t -shirt Set up and dean up required bbyy renter. For more information, call 23S 2560. Pre -School Package: Rent the Kid's Cornertl Des" for dvldren six yews and under, the room Includes tables. chairs,toys d much morin. The fee 6- a 2 an � party is $25 and lor a 3 tour party is M. Sports Package: Children 7 years to rx+q teen an w4oy a oombinatton of her gym rental and 1- 112 hex dess. room romal for cake, pizza or packages_ The gym rental can W set up tot voeey ball orbasketball. Parry size is flmfted to 25 guests and the cost Is =30 RCC Closed Ged Gym dosed Gym dosed RGO CC dosed Closed RCC Open Sam -" Closed y m dosed RCC Closed PASS CARD INFORMATION Renton Community Center 30 - Day Fitness Pass Cards mint be shown when entering the facility. Shidents,Msfw+gto purchase a pass card mustpre$Ord Current student Identification (student body card or equivalent) when purchas- "pass Card. dw AdultR$27.25 Senior/Students -$17.36 Definitions: Seniors: 55 or Wet Student Under 18 or Aril time student BUSINESS OR CORPORATE PACKAGES Are you interested In getting your employees Involved in fitness rotated acovkies7 Caff Jrti Dia* at M2560 for Information ROOM KEY 1 W% nWalW s ARTR a CRAFTS U STC;IA OR a LO■EY 3 PATIO 40 GAME ROOM 4 WANGUET WCOM 11 CH■CK-IN•ONSK S WoMENU RUSTROOM 18 RECREATION OPPICES 6 MENU RUUTROOM 13 JACUZZI 7 PRESCHOOL 44 WOMUNE LOCKUROOM 16 MENU LOCKRROOM 16 POTM6E8 ARRA 17 RAOOURTOALL COURT 1 is BaUt MENT ROOM 212 RO OYM 4 d .... .............. E 10 4 B 14 Its 3 4 Lr 9 11 2 7 8 8 ,. r 12 20 so 2 19 19 18 16 17 1'" 17 2 L "+5 K� �°w''�x N k � ...�'� ,�."_ ' ♦ 1,t��f sem` �',. �W � W T Y OF RENTON 1992 STAFF A FINANCIAL APPROPRIATIONS Gnnmunity SeMms/Pafks CommirW CMAn Person Responsible: Bill NutsJnpiller, Recreation SuperOlendem. TOTAL REGULAR STAFFING 0.0 1990 1991 I 1901 1902 1002 own" % Changs POSITION ALLOCATIONS; Actual AdWed Projected P44u R Budget 0-1--' 91 Adopted 01 Adopted Grads Tift 14.41 13.4 13.3 13-5 ^'r: -0.1% Overtime 10 Recreation Program Coordinator 2.0 2.0 3.0 3.0 .3.0 1.0 50.0% 8 Aso Spee It (Pronated 1a Coord) 1.0 1.0 oA 0.0 ,' <OA (1.0) -1rA.0% ,c Maintsn4ace Custodian 2.0 2.0 2.0 --xW ZO 0.0 0.0% 3 Administrative Clerk W 1.0 1.0 1.0 1.0 to 0.0 0.0% 1 AdminiatraliwGlark 1 1 0.0 10, 1-01 1.0 ,TO e n a er TOTAL REGULAR STAFFING 0.0 7.0 7.0 7.0 7.0 0.0 0. TEMPORARY PART TIME 7.9 7.4 0.4 0.9 6.3 (0.9) -t2. TOTAL STAFFING 13.0 14.41 13.4 13.3 13-5 (61) -0.1% BUDGETARY APPROPRIATION: 1990 Actual 1991 Adopted 1991 oTojected 1902 Request 1992 Budge/ change 91 Adopted % znart0e 91 Adopted Regular Salwiss 130,811 229.630 231,030 240.010 240,010 11,3110 5.0% Part Time Salaries 98.722 102.720 90.720 16.800 102,050 (61) -0.1% Overtime 2.282 2.000 2.000 2.134 2,134 134 6.7% Personnel Benefits 46.1127 60.241 67.803 70.040 79.403 10.252 11.8% Uniform Allowance 0 0 0 0 0 0 WA Supplies 22.889 21.107 21.107 21,529 20.053 (1.054) -S.0% Professional Seeks$ 0 0 0 0 0 0 WA PouagwrolephOns/Other 0 0 0 0 0 0 WA TraveUTraW WV 2.584 1.800 1.800 2.000 t 000 200 11.1% Advertising 1.308 2.000 2.000 2.070 2.070 70 3.5% Rentals and Leases 0 0 0 0 0 0 WA Equipment Rental 0 0 0 0 0 0 WA Public Utility Services 54.180 64.237 64,237 66.788 72.788 8.551 13.3% Repairs b Maintenance 8.660 '8.200 18.200 17.200 132W (3.000) -16.S% 1)Misceltainsous 98.732 130.500 142-M 130.693 211.003 81.193 622% Intergovernmental Services 0 0 O 0 ; Y'0 0 WA Capital Ouuay, 0 1.700 1.700 0 :~0 (1.700) -100.0% Exotinditure Credits 01 0 1 0 0 1 0 0 WA TOTAL EXPENDITURES 473.101 642.141 542.034 0.59.282 748.106 105.965 10.5 Item 1990 Actual 1991 Adopted 1991 oTojected 1902 Request 1992 Budge/ change 91 Adopted % znart0e 91 Adopted 1) MISCELLANEOUS' 49 C6 Printing d Binding 0 3.000 3.000 3.105 3.105 105 3.5% 49 37 Vandalism 0 S00 S00 S18 Sig is 1644 49 114 Tax L.ab.tuy 0 2.000 2.000 2,070 2-3.070 24.070 1203 S;s 49 85 Sod-Susta,n,ng Programs 98.732 i 125.000 ( 136.769 ( 125.000 I 182.000 1 $7.200 1 456% TOTAL MISCELLANEOUS 1 98.732 ( 130.500 1 142.269 1 130.693 1 211,693 1 81,193 1 62 2041 i Q�7C�1�. 1.1 . t G.,�.�' 1. C.� i- Ll:. �,Cti-�1 i ., �u�r ,. Zi'l C� Jw�.t►. -7 c pv6v.�,J� c.�ctift,ack.l-t`i T } ��' c. .-� L it��,.�... c.. ,t-J--Gj`�-t l.C..a�_[ t...-+-,. t��'':--c.-a` fit„<'..' v♦ 1.��CI��--- Leri_ '� 136 EXHIBIT C J C ORAGGOO & ASSOCIATES J URBAN PLANNING s DESIGN CD PARK/ RECREATION PLANNING September 3, 1993 City of LA Department of Parks and Recreation 125 N. Stockton St. Lodi, California 95240 Attn: Ron Williamson Dear Ron, '2730 I& W. SKYLINE 8LV0. PORTLAND. OREGON 97221 t 603) 297 -1003 I left the meeting with the City Council more confused than ever. Frankly, I didn't get any direction from them and am afraid that if we attempted to hold a public hearing with them, it would get continued again. I believe we have the following unresolved issues: 1. The trails system: Frankly at this point, my recommendation is that we take the trails element out of the plan and just state that a specific trails plan should be developed. 2. Indoor recreation center o where to put it o the amount of i:: act fees to be divided between Hutchins Street Square and the Parks Department 3. Swimming pool: We need clarification about the type. I have been told that it is to be an outdoor pool but the Council minutes state that they did not determine the type. We naed clarification 4. The north side of Mokelumne River: Do we should it as open space on the facility plan? 5. Proposed Woodbridge Community Park: What type of park will this be? If it's a neighborhood park, we then need to distribute the fields and acres among the other parks. 6. Proposed Village Street Park: Does it stay in? 7. The CIP: Exactly how are we to show this table? 8. Population forecast: Does the City agree with my forecast? ,90,5 1 CP Page 2 September 3, 1943 At this point, I believe we are two meetings away from adoption. My recommendation is that we ask the Parks Board for recommendations on the above issues and then go back to the Council. Would you talk to Tom and Bob to see how we should proceed. Two of the issues - the Trails Plan and converting Woodbridge Park to a neighborhood facility could involve considerable time in making the changes. The last item is our fees. While it is a little subjective, I feel that we have gone the normal distance in the development of the plan. I would like to be compensated for any major additions or corrections that occur: While I am not going to make a big issue out of this, I really would like a little help. I can be more precise on the cost once I know how we are going to proceed. Ron, I am afraid we have lost the momentum of the plan and would to keep the process moving. With that in mind, I would to meet again as soon as we can. Would you let me know how you want to proceed. I need to make some changes to the cost estimates but have been holding off until we decide what to do about Woodbridge Park and the recreation center. incerely, Jer�oo JCDJgd cc: City Manager Mayor Parks S Rec Commission Members Task Force Committee Members Richard Prima David Morimoto EXHIBIT D PARKS AND RECREATION COMMISSION COMMUNICATION TO: The Lodi Parks & Recreation Commission DATE OF MEETING: 10/5/93 FROM: The Director's Office SUBJECT: Parks and Recreation Open Space Master Plan, Revisited TYPE ACTION NEEDED: Review and recommendation of Commission. PREPARED BY: Ron Williamson, Parks and Recreation Director q�, rid RECOMMENDED ACTION: Readdress issues of the plan as presented in Mr. Dragoo's correspondence and make suggestions as to where we should go with each. BACKGROUND INFORMATION: For over a year we have been putting together a Parks and Recreation Open Space Master Plan. Recently at a shirtsleeve session of the City Council, various issues were discussed and suggestions where made by the Council as to their thoughts on direction. They would like the Commission to readdress their position and direct them again on the attached items. You may agree, disagree, or establish new direction. Please see the attached items for discussion and consideration. FUNDING CONSIDERATION OR IMPACT: Provided by Development Impact Fees. Yes, some changes in the plan will alter costs, either higher or lower. Impact fees will cover about $18,000,000 in new construction. RW/sh Attachment PRcomm _com4l oc-r EXHIBIT E MINUTES, PARKS AND K. 4XEATION COMMISSION OCTOBER 8, 1993 Noes- None Motion carried 5 - 0. IV. Correspondence A. Letter from Mayor regarding City of Lodi Policies on Employment Issues B. Westgate Park - Westside Fire Station No discussion on above, both self-explanatory. C. Letter from Robert_Sternfels to Supervisor Barber It was requested that Director Williamson contact Mr. Sternfels and ask him to give a presentation to the Commission in layman's terms regarding the ordinance discussed in the letter. V. Action Items A. Request to Name Point at Lodi Lake Park, "Chuck Parsons Point" Director Williamson explained that Mr. Tony Segale had made this request at last month's meeting. Commissioner Wall asked where the funds for the sign would come from and how much it was anticipated to cost. Director Williamson described several options ranging in price from $50 up and possibilities of funding from memorials, contributions, or by the City. Speaking on the subject was - Tony Segale - 215 Palomar, Lodi - Mr. Segale stated that no memorial was in place, but he would speak to the family about their feelings on the subject and return to the next meeting with same. He also would bring some design and price ideas. On a motion by Commissioner Melby and a second by Commissioner Casalegno the idea was approved and decided to go further with report from Mr. Segale on details at next meeting. Ayes - Commissioners Melby, Casalegno, Wall, Johnson, Meyer Noes- None Motion Carried 5 - 0 B. Parks and Recreation Open Space Master Plan Director Williamson explained that the eight questions raised in Mr. Jerry Dragoo's letter of September 3, 1993 needed to be addressed and recommendations made. The trails system - Jack Ronsko, Public Works Director was in attendance and shared with the Commission the county -wide bike PAC DkOWMINU TE S OCT -3- MINUTES. PARKS AND "EATION COMMISSION OCTOBER 5, 19939 �, trail, proposing the City work with the same. On a motion by Commissioner Wall and second by Commissioner Johnson, it was recommended to revise the text of the Plan to recommend that a specific trails plan be done to comply with citizen survey and countylcity plan. Ayes - Commissioners Melby. Wall, Meyer, Casalegno, Johnson Noes - None Motion carried 5 - 0 2. Indoor recreation center. On a motion by Commissioner Johnson and second by Commissioner Wall it was recommended the feasibility study go forward and ask City Council to let the Commission know what Parks and Recreation's share of the impact fees will be before it can make any concrete recommendations. Ayes - Commissioners Melby, Wall, Meyer, Casalegno, Johnson Noes - None Motion Carried 5 - 0 3. Swimming Pool, indoor or outdoor? It was agreed that an outdoor pool located on the west side was the intention. 4. North side of Mokelumne River - should we use it as open space on the facility plan? It was agreed to continue to consider it as open space/green belt area. 5. Proposed Woodbridge Community Park On a motion by Commissioner Melby and a second by commissioner Johnson it was recommended that this park remain in the Plan. Ayes - Commissioners Melby, Wall, Meyer, Casalegno, Johnson Noes - None Motion Carried 5 - 0 PRCONAMW1NUTES OCT -4- MfNUTES, PARKS AND Ri TION COMMISSION: OCTOBER 5, 1993 6. Proposed Village Street Park, does it stay in? On a motion by Commissioner Wall and a second by Commissioner Johnson it was recommended this park remain in the Plan. Ayes - Commissioners Melby, Wall, Meyer, Casalegno, Johnson Noes- None Motion Carried 5 - 0 7. The CIP - How are we to show this table? Director Williamson will further discuss the CIP with Richard Prima, Public Works Department, and report same back to the Commission. 8. Population forecast On a motion by Commissioner Johnson and a second by Commissioner Wall it was recommended to go with the estimate to the year 2007, provided by the Mr. Dragoo of 102,850 . Ayes - Commissioners Melby, Wall, Meyer, Casalegno, Johnson Noes- None Motion Carried 5 - 0 Note: At this point, Chairman Johnson announced he would rearrange the Agenda to allow Mr. Ronsko to speak on Regular Agenda, Item D. VI. Recrular_Agenda - Other Reports or Updates D. Information - Golf Course, RV Center and Wetlands Grant Proposal Public Works Director, Jack Ronsko gave an overview of the plan, although he expressed concerns over funding of a feasibility study, he felt the concept is basically good and if the commission feels it is feasible. then turn it over to the City Council's discretion. On a motion by Commissioner Wall and a second by Commissioner Johnson, it was recommended to request a feasibility study for a golf course,!only. Ayes - Commissioners Wall, Johnson Noes - Commissioners Melby, Meyer. Casalegno Motion defeated 2 -3 On a motion by Commissioner Casalegno and a second by Commissioner Johnson, it was recommended to request a feasibility study for a golf course, RV center, and wetlands area. PRCOMMI,MINUTES OCT -5- RESOLUTION NO. 94-10 s..xassssaaassa=axis A RESOLUTION OF THE LODI CITY COUNCIL ADOPTING BY REFERENCE AS ZF FULLY SST FORTH HEREIN THE PARKS, RECREATION AND OPEN SPACE MASTER PLAN =x__x_xxxxxxxxaxxxxxxaxxxxxxxxxxxxxaaa.xxsssssaaa=xsxssxssss3as:3xs=sxas WHEREAS, a number of public hearings and meetings were held on the issue of the City's Parks, Recreation and Open Space Master Plan as required by law; and NOW, THEREFORE, BE IT RESOLVED, by the Lodi City Council that the Parks, Recreation and Open Space Master Plan, as amended (copies of which are on file in the office of the City Clerk), SAVE AND EXCEPT Article 5, Section VIII, page 29 (Indoor Recreation Center) are hereby adopted: Ayes: Council Members - Davenport, Mann, Pennino, Snider, and Sieglock (Mayor) Noes: Council Members - None Absent: Council Members - None BE IT FURTHER RESOLVED by the Lodi City Council that Article 5, Section VIII, page 29 (Indoor Recreation Center), incorporated in the above -referenced Parks, Recreation & Open Space Master Plan, is hereby adopted: Ayes. Council Members - Davenport, Mann, Pennino, and Sieglock (Mayor) Noes: Council Membei.s - None Absent: Council Members - None Abstain: Council Members - Snider Dated: January 19, 1994 -1- I hereby certify that Resolution No. 94-10 was passed and adopted by the Lodi City Council in a regular meeting held January 19, 1994 by the vote set forth above. i�tit ifer M Perrin y Clerk 94-10 -2-