HomeMy WebLinkAboutAgenda Report - August 16, 1995 (42)G`OF CITY OF LODI COUNCIL COMMUNICATION C4I RN4 AGENDA TITLE: Plans and Specifications and Advertisement for Bids for White Slough Water Pollution Control Facility Holding Pond No. 2 Embankment Rehabilitation MEETING DATE: August 16, 1995 PREPARED BY: Public Works Director RECOMMENDED ACTION: That the City Council approve the plans and specifications for the above project and authorize advertising for bids. BACKGROUND INFORMATION: Since the four holding ponds at the White Slough Water Pollution Control Facility were constructed in 1967, the levee embankments have been eroding into the bottom of the ponds. The severity of k winter's storms have also accelerated the erosion of the levees. This project will reconstruct the east, south and north levee embankments of Pond No. 2 and reface them with riprap. Pond No. 2's west levee does not need to be rehabilitated at this time. This is the first phase of a four-year project. The City will be rehabilitating one pond each year until all four ponds have been reconstructed. The total project estimate for rehabilitating three sides of Pond No. 2 is $280,000 and only $82,000 has been budgeted. The east levee of Pond No. 2 faces the prevailing wind and was the only levee slated for rehabilitation when the project was originally budgeted. Since the time the work was budgeted, and because of the additional erosion from last winter's storms, the south and north levees have been included in the scope of work. The unit prices in the bid proposal are on a "per foot" basis so adjustments can be made if the City needs to reduce the size of the project. Staff has added alternate bid items in an attempt to reduce the cost of the project and is also looking for additional funding to pay for the project. A recommendation regarding the funding for this project will be made at the time the contract is awarded. FUNDING: Originally Budgeted: 1994/95 Budgeted Fund: Sewer Capital Outlay Current Appropriation: $ 82,000 Total Project Estimate: $ 280,000 Planned Bid Opening Date: September 6, 199 JackL. Ronsko Publ' Works Director Prepared by Wesley K. Fujitani, Senior Civil Engineer cc: Purchasing Officer City Engineer Water/Wastewater Superintendent Assistant Wastewater Treatment Superintendent DJH Engineering APPROVED: THOMAS A.`PliTERSON recycled paper City Manager CPS&A.DOC CW/95