Loading...
HomeMy WebLinkAboutAgenda Report - September 5, 2001 E-06AGENDA TITLE: Approve Specifications and Authorize Advertisement for Bids for Landscape and Irrigation Installation on the South Hutchins Street Median, from Kettleman Lane to Vineyard Drive MEETING DATE: September 5, 2001 PREPARED BY: Public Works Director RECOMMENDED ACTION: That the City Council approve specifications and authorize advertisement for bids for landscape and irrigation installation on the South Hutchins Street median, from Kettleman Lane to Vineyard Drive. BACKGROUND INFORMATION: The South Hutchins Street median has not been landscaped since it was installed in 1974. As this is one of the main entrances to Lodi, the City has had many requests from the public to have it landscaped. Besides the aesthetics, the installation of landscaping will suppress dust and increase the shade on South Hutchins Street and thereby reduce the urban -heat-island effect. In addition to landscaping the center median, also included in this project is the east side frontage from Century Boulevard to Mendocino Drive. Access to the Vineyard Shopping Center will be increased with installation of a median opening for a left -turn lane for northbound traffic. Staff has been in contact with the property management staff to encourage them to rebuild the drive approach opposite the proposed left -turn lane on Hutchins Street. Although not included in this bid project, staff is reviewing alternatives for improving the tree plantings in the sidewalk area. Presently, there are 210 tree wells between Kettleman Lane and Harney Lane. Only 76 of these tree wells house trees that are in good condition. Staff is currently considering three options to deal with these tree wells: 1) replace vacant tree wells (87) and those in poor condition (47) with new crepe myrtles; 2) replace vacant tree wells (87) with a different species; or 3) replace all the existing crepe myrtles and plant all tree wells (210) with the same species. Staff is working with a service club on possible participation in this tree planting effort and will discuss this further with the Council at the time of award of the median project. FUNDING: The money for this project will be coming from the Street, Public Benefit and TDA funds, as shown in the Capital Improvement Budget (Page E-7). A request for appropriation of funds will be made at contract award. Project Estimate: Budgeted: Planned Bid Opening Date $182,000 2001/02 fiscal year September 19, 2001 Richard C. Prima, Public Works Director Prepared by George M. Bradley, Street Superintendent RCP/GMB/CJ/dsg cc: Joel Harris, Purchasing Officer Curt Juran, Street Contracts Administrator APPROVED: H. DN4 Flynn -- Ci(y Manager