AGENDA TITLE: Approve City Participation in the Funding for the Undergrounding of Existing Overhead Facilities
on Stockton Street, North of Harney Lane ($31,660)
MEETING DATE: September 19, 2001
PREPARED BY: Public Works Director
RECOMMENDED ACTION: Approve City participation in the funding for the undergrounding of existing overhead
facilities on Stockton Street, north of Harney Lane, and authorize the City Manager to
sign the Pacific Bell request for payment on behalf of the City.
BACKGROUND INFORMATION: The existing utility pole line on the east side of Stockton Street between
Kettleman Lane and Harney Lane belongs to Pacific Bell and supports
Pacific Bell telephone and AT&T cable TV facilities. These facilities are
adjacent to residential developments that have either been completed or are
currently involved in the development process. The proposed utility alignment and various developments are shown
on Exhibit A.
In an effort to improve the aesthetics of this corridor, the City, utility companies, and developers propose to join forces
to complete the undergrounding of these remaining overhead utilities. City staff from the Public Works and Electric
Utility departments have been working with Pacific Bell, AT&T, and the developers for some time to reach consensus
on shared funding between the parties. At Colvin Ranch, the underground facilities are complete and relocation of
the AT&T cable will be completed with this project. At Bangs Ranch, which was developed prior to undergrounding
requirements, Pacific Bell and AT&T have agreed to fund the undergrounding along that frontage. The Arcadia Place
project is conditioned to fund the undergrounding of utilities along its frontage. For the Parisis Ranch project, a cost-
sharing arrangement between the developer and the City has been reached with the developer paying the cost for
relocation (aerial to aerial) and the City contributing the incremental additional cost (aerial to underground).
Pacific Bell has provided a summary of charges showing the costs attributable to the Parisis Ranch developer
($16,222.05) and the City ($31,658.86) for the work adjacent to Parisis Ranch, as well as a request for payment for
the City -funded portion of the work. Pacific Bell will schedule and coordinate with AT&T and complete the work within
approximately four to six weeks from receipt of payment by the City. Staff recommends that Council approve the
request for payment and authorize the City Manager to sign the request for payment on behalf of the City.
FUNDING: IMF - Street Improvements (Local) $ 5,000
Electric Capital Fund $ 26,660
Funding Available: , i `v+.,., eel CK-Zv' ,
Vicky McAthie, Fi ance Director
Richard C. Prima,
Alan Vallow
Public Works Director Electric Utility Director
Prepared by Sharon A. Welch, Senior Civil Engineer
RCP/SAW/lm
Attachment
cc: Electric Utility Director
City Engineer
Senior Civil Engineer Welch
Pacific Bell
Jane Thomas, R. Thomas Development
APPROVED: �f)'c4
%-Di-*on Flynn -- City Manager
CUTILUNDERGROUNDINGCOST 09/11/01
Stockton
Harney Ln--Almond Dr
Utilit Under roundin
M: OREK�i H IITS\FHARONSTOCKTON
I
CITY COUNCIL
ALAN S. NAKANISHI, Mayor
PHILLIP A. PENNINO
Mayor Pro Tempore
SUSAN HITCHCOCK
EMILY HOWARD
KEITH LAND
CITY OF LODI
PUBLIC WORKS DEPARTMENT
CITY HALL, 221 WEST PINE STREET
P.O. BOX 3006
LODI, CALIFORNIA 95241-1910
(209) 333-6706
FAX (209) 333-6710
EMAIL pwdept@lodi.gov
http:llwww.lodi.gov
September 14, 2001
H. DIXON FLYNN
City Manager
SUSAN J. BLACKSTON
City Clerk
RANDALL A. HAYS
City Attorney
RICHARD C. PRIMA, JR.
Public Works Director
Ms. Jane Thomas Mr. Jeffrey Kirst Mr. Sean Crawford
R. Thomas Development, Inc. Tokay Development Pacific Bell Engineering
P. O. Box 1598 P. O. Box 1259 2300 E. Eight Mile Rd.
Lodi, CA 95241-1598 Woodbridge, CA 95258 Stockton, CA 95210
SUBJECT: Approve City Participation in the Funding for the Undergrounding of
Existing Overhead Facilities on Stockton Street, North of Harney Lane
Enclosed is a copy of background information on an item on the City Council
agenda of Wednesday, September 19, 2001. The meeting will be held at 7 p.m.
in the City Council Chamber, Carnegie Forum, 305 West Pine Street.
This item is on the consent calendar and is usually not discussed unless a
Council Member requests discussion. The public is given an opportunity to address
items on the consent calendar at the appropriate time.
If you wish to write to the City Council, please address your letter to City Council,
City of Lodi, P. O. Box 3006, Lodi, California, 95241-1910. Be sure to allow time for the
mail. Or, you may hand -deliver the letter to City Hall, 221 West Pine Street.
If you wish to address the Council at the Council Meeting, be sure to fill out a speaker's
card (available at the Carnegie Forum immediately prior to the start of the meeting) and
give it to the City Clerk. If you have any questions about communicating with the
Council, please contact Susan Blackston, City Clerk, at 333-6702.
If you have any questions about the item itself, please call Sharon Welch at 333-6800,
ext. 2659.
Richard C. Prima, Jr.
Public Works Director