HomeMy WebLinkAboutAgenda Report - November 1, 1995� OF CITY OF LODI COUNCIL COMMUNICATION AGENDA TITLE: Main Street Fire Station Study MEETING DATE: November 1, 1995 PREPARED BY: Parks and Recreation Director RECOMMENDED ACTION: That the City Council review the study and its findings and follow the recommendation of the Lodi Parks and Recreation Commission as follows: 1) that the Parks and Recreation offices not be located in the Main Street Fire Station, but directed to the new Indoor Sports Center when constructed (see conclusion of feasibility study pages 4-5 attached); 2) that the building be saved and turned over to non-profit groups or other city uses; 3) that if in fact with the saving of the Fire Station building, the Parks Division Corporation Yard should follow the study as to development and could be located within the space allotted with the possible exception that the main Parks Division office be relocated to the southeast corner of the facility to take advantage of the current Hale Park parking lot which could be used day hours for employee parking and evening hours for the community center building/citizen parking needs; 4) that when and if the Parks and Recreation administrative office is relocated to the new sports center the current administrative building be converted to an Eastside Community Center facility for general public uses. BACKGROUND INFORMATION: Some time ago, staff as well as the City Council requested and authorized a study to address possible uses of the Main Street Fire Station as Parks and Recreation administrative offices, the effects on the Parks Division corporation yard, and the use of the current Parks and Recreation offices (125 N. Stockton St.) as a possible Eastside Community Center facility. The study was put together (scope of work) by the Public Works Department. Wenell, Mattheis, Bowe Architectural Firm was hired to conduct the study and relate their findings and conclusions. Larry Wenell, a principle in the firm, did just that - conducted various meetings with Parks and Recreation, Public Works, and general review of the site. His findings may be found in the study booklet. It should be noted that the Lodi Historical Society has an interest in the building, both historically and for use by non-profit groups to encourage occupancy. Susanne Benbrook has been our contact and will most likely be present at the City Council meeting to express her and the Historical Society's views and recommendation. They basically have no funds, but want the building saved and used by various non-profit groups who most likely would be responsible for building remodel and code concerns with the City contracting with these groups for use. APPROVED: -' % J l' H. DIXON FLYNN recycled paper City Manager cc -1 Main Street Fire Station Study September 6, 1995 Page 2 FUNDING: Please refer to the study appendix, Schematic Cost Estimate Summary, which addresses cost if it were to be developed into Parks and Recreation administrative facilities and possibly those that would be needed for general public uses. • Main Street Fire Station Remodel $467,895.00 Parks and Recreation Corp. Yard $694,398.00 Parking Lot Purchase and Development $145,350.00 Please see the remaining pages for itemized breakdown of related costs. Ron Williamson, Director Parks and Recreation RW/sr Part-time Employee Work Area - 4 Work Stations .... 100 Storage Room.................................E& Subtotal ................................... 2,920 20% Ancillary and Circulation ................... 5844 Total Administration/Recreation Office ........ 3,504 Design: The remodeled Fire House is proposed to be used with public functions on the first floor including a public lobby, registration desk, public conference room, recreation supervisors' office, and part-time staff office, clerical support (registration) and clerical workroom. A unisex single occupancy toilet room will be available for public use. The second floor is proposed to house the Parks and Recreation Director, department secretary, three recreation supervisors' offices ( or optionally four), staff conference room, coffee area and men and womens toilet rooms. There are two access stairways to the second floor, one existing and one new, and a new elevator. The cost estimate for the Fire House Building remodel is $ 467,895.00 or $129.00/sq. ft. See Appendix for Schematic Cost Estimate. Conclusions and Comparisons: Concurrent with this study are formative discussions regarding an indoor sports center at another site. Does it make more logistic and economical sense to locate the Administration/Recreation offices in the proposed center rather than remaining at the present site? The first question to ask is if the Administration/ Recreation group can operate on a separate site than the Parks group. We would conclude that the two work groups are distinct and differently tasked to an extend that separation would be feasible. Management of recreation storage would have to be addressed. Perhaps it would be moved to the Recreation Center, Feasibility Study - Page 4 i An option would be for the City to provide incentives for a private group to renovate and creatively use the building. Incentives might include a low cost or no cost sale of the property, waived fees and community block grant funds. Feasibility Study - Page.5 freeing up Corporation Yard site area for on-site parking and/or open storage. From a functional standpoint, the Administration/ Recreation staff would fit well into a Recreation Center in that the Center would be the hub of recreation activity in the community. -Common staffing of the reception/registration function could result in potential savings over staffing these functions in two locations. Finally construction costs differentials would lead to the conclusion that a new Administration/Recreation office would be economically advantageous. A new office facility could be constructed for approximately $80/sf, a savings of approximately $165,000 over the renovation of the Main Street Fire Station building. In addition, parking lot development could be multiple use in that the highest Recreation Center usage would be in the evenings when staff parking would be at the lightest. These arguments are balanced by the question of the value to the community of maintaining and making use of historic building stock. If the City will not take the lead in this regard, can we logically expect the private sector to do so? An option would be for the City to provide incentives for a private group to renovate and creatively use the building. Incentives might include a low cost or no cost sale of the property, waived fees and community block grant funds. Feasibility Study - Page.5 Main Street Fire Station Possible Uses ♦ General city storage (problem with upstairs/downstairs issue) ♦ Public meeting space/rooms ♦ Safety and general employee exercise center/meetings ♦ Non-profit distribution center (food bank) ♦ Business office center for small business needs ♦ Rehabilitation center (A.A. or homeless) ♦ Historical Society Building (like Hill House) for tours, firehouse memorabilia ♦ L.U.S.D. uses ♦ Child abuse drop in center ♦ Lodi Sports Hall of Fame display and museum November 1, 1995 Feasibility Study Main Street Fire House Reuse and- Parks ndParks & Recreation Corporation Yard Master Plan June,1995 Feasibility Study Main Street Fire House Reuse and Parks and Recreation "Corporation Yard" Master Plan TABLE OF CONTENTS MAIN STREET FIRE HOUSE REUSE Purpose.................................................... 1 Existing Conditions ........................................... 1 Design Approach ............................................ 2 Design Program ............................................. 2 Program.................................................... 3 Design..................................................... 4 Conclusions and Comparisons .................................. 4 Main Street Fire House Rendering ............................... 5 Existing Floor Plans .......................................... 6 Proposed Floor Plans ......................................... 7 CORPORATION YARD MASTER PLAN Purpose............................................ Existing Conditions ................................... Design Program ..................................... Site Program ........................................ Design Approach ..................................... Design............................................. Existing Site Plan .................................... Proposed Site Plan ................................... APPENDIX Schematic Cost Estimate Summary Main Street Fire House Remodel Schematic Cost Estimate Parks & Recreation Corporation Yard Schematic Cost Estimate MAIN STREET FIRE HOUSE REUSE Purpose: The Main Street Fire House is a two-story brick structure with a rich history in Lodi, serving as the original City Hall facility and Fire House and serving as a Fire Station until the 1960's. More recently it has been rented for an alcohol rehabilitation program until being abandoned in 1994. The City wishes to determine the feasibility of reusing the facility to meet the needs of Parks and Recreation administrative functions. Existing Conditions: The existing building is a two-story structure with unreinforced masonry exterior bearing walls and composite interior framing consisting of wood and steel load bearing interior walls and columns, wood floors and wood roof framing system. Portions of the first floor have raised wood foundation system and some portions are concrete slab. The building has metal roll up doors in the former engine bays and double hung wood window sash. There is a wood and concrete hose drying tower in the rear of the building in very poor condition. There is also a more recently constructed kitchen lean-to addition on the rear of the building of concrete block wall and wood roof construction. The building received a partial remodel in the 1960's, mostly confined to the restroom/shower facilities, none of which meet current standards. Both the HVAC and electrical systems are in need of complete replacement. Feasibility Study -Page 1 Design Approach: The design approach is similar to the strategy used on several other City of Lodi projects; Hutchins Street Square is a prominent example. The building will be demolished down to its bare structural components including the complete demolition of the hose drying tower and lean-to kitchen addition. The structure will be strengthened by tying wood floor and roof systems into the masonry walls to prevent separation and collapse during a seismic event. New plywood shear diaphragms will be added to the floor and roof planes as well as interior shear walls as needed. New footings, beams and columns will be added as required for the proposed reuse floor plan configuration. A new addition will be constructed on the rear (east side) of the building to accommodate a new entrance, staircase and elevator. The exterior brick will be sandblasted, repointed as required, and repainted. New roofing, flashings and rainwater drain system will be installed as well as new exterior window and door systems. Existing decorative metal cornice will be stripped, repaired as needed, and repainted. Decorative canvas awnings over the "engine bay" windows will be added. All new infrastructure systems will be installed; HVAC, electrical, plumbing and data and communications as well as interior finishes. A new entrance walkway will be provided from the Main Street sidewalk with landscaping and decorative "historic" light standards. Design Program: A design program was developed to identify the needs and potential uses of the facility. The information was gathered by several individual and group interviews with the Parks and Recreation staff and Public Works staff. There are two distinct, but connected work groups in the Parks and Recreation Department; 1) Administration /Recreation Office and 2) Parks Office. Feasibility Study - Page 2 The Administration/Recreation Office current occupies the existing building on the corner of Locust Street and Stockton Street and the Parks Office occupies a three - module portable building facility in the center of the site. Both functions require about the same square footage, approximately 3,500 square feet. Of the two offices, the Administration/Recreation Office is best suited to reuse the remodeled Fire House Building. This work group needs a street side for convenient public access, while the Parks Group needs direct access to the Corporation Yard. The Administration/ Recreation group can more easily adapt to a two-story arrangement with public and registration functions on the first floor and administration on the second floor. In contrast, the Parks group needs large "ready room" and locker/restroom facilities for the Parks workers, not easily adaptable to the existing two-story floor plan. For these reasons the conclusion is to have the Parks group remain in the portable trailer, but relocated onto a permanent foundation adjacent to the rear of the Fire House building, sharing a common patio linkage. Additionally, it is proposed that an additional 12'x 60' module be purchased and added to the portable building to meet the functional needs of the Parks Office. Program: Administration/Recreation Office Approximate Square Feet Parks & Recreation Director's Office .............. 210 Recreation Superintendent's Office ................ 170 (4) Recreation Supervisor's Offices ................ 600 Staff Conference Room ......................... 220 Coffee Area...................................50 Work Room ..................................170 Department Secretary ........................... 120 Clerical Area .................................400 Public Conference ............................. 150 Public Lobby ................................. 430 Toilet Rooms (Public and Office) ................. 200 Feasibility Study - Page 3 Part-time Employee Work Area - 4 Work Stations .... 100 Storage Room ................................ 100 Subtotal ................................... 2,920 20% Ancillary and Circulation...................8844 Total Administration/Recreation Office ........ 3,504 Design: The remodeled Fire House is proposed to be used with public functions on the first floor including a public lobby, registration desk, public conference room, recreation supervisors' office, and part-time staff office, clerical support (registration) and clerical workroom. A unisex single occupancy toilet room will be available for public use. The second floor is proposed to house the Parks and Recreation Director, department secretary, three recreation supervisors' offices ( or optionally four), staff conference room, coffee area and men and womens toilet rooms. There are two access stairways to the second floor, one existing and one new, and a new elevator. The cost estimate for the Fire House Building remodel is $ 467,895.00 or $129.00/sq. ft. See Appendix for Schematic Cost Estimate. Conclusions and Comparisons: Concurrent with this study are formative discussions regarding an indoor sports center at another site. Does it make more logistic and economical sense to locate the Administration/Recreation offices in the proposed center rather than remaining at the present site? The first question to ask is if the Administration/ Recreation group can operate on a separate site than the Parks group. We would conclude that the two work groups are distinct and differently tasked to an extend that separation would be feasible. Management of recreation storage would have to be addressed. Perhaps it would be moved to the Recreation Center, Feasibility Study - Page 4 freeing up Corporation Yard site area for on-site parking and/or open storage. From a functional standpoint, the Administration/ Recreation staff would fit well into a Recreation Center in that the Center would be the hub of recreation activity in the community. Common staffing of the reception/registration function could result in potential savings over staffing these functions in two locations. Finally construction costs differentials would lead to the conclusion that a new Administration/Recreation office would be economically advantageous. A new office facility could be constructed for approximately $80/sf, a savings of approximately $165,000 over the renovation of the Main Street Fire Station building. In addition, parking lot development could be multiple use in that the highest Recreation Center usage would be in the evenings when staff parking would be at the lightest. These arguments are balanced by the question of the value to the community of maintaining and making use of historic building stock. If the City will not take the lead in this regard, can we logically expect the private sector to do so? An option would be for the City to provide incentives for a private group to renovate and creatively use the building. Incentives might include a low cost or no cost sale of the property, waived fees and community block grant funds. Feasibility Study - Page .5 e EXISTING FIRST FLOOR PLAN EXISTING SECOND FLOOR PLAN Feasibility Study - Page 6 E) REMODELED FIRST FLOOR PLAN �^ REMODELED SECOND FLOOR PLAN Feasibility Study - Page 7 "CORPORATION YARD" MASTER PLAN Purpose: In 1987, Morris and Wenell Architects and Planners prepared a master plan study of the same site as this study to accommodate the Parks and Recreation Department offices and Corporation Yard. This study proposed converting the existing offices building into a meeting area, demolishing the existing shop and constructing a new two-story office building for both the Administration/Recreation offices and the Parks offices. The proposal included a new wall around the site and new covered storage, shops and equipment parking structures. Two master plan concepts were developed; one with the Main Street Fire House remaining (undefined usage) and one with it demolished. The purpose of this study is to update the design program for the site functions and re-evaluate the master plan concepts. Existing Conditions: The site consists of a chain link fenced yard partially paved, much of it utilized for used parks equipment and materials storage. There is a large water tower and water well/pump system with its own fenced enclosure. The buildings on the site consist of the Parks and Recreation office building, shop maintenance building, a covered metal shed, a 36'x 60' portable trailer for Parks Offices and the Main Street Fire House. Landscaping is limited to Stockton Street, and much of the offsite improvements (sidewalk, curb and gutter) need replacement. Design Program: The design program for the site was established using the 1987 study as a guideline, updating the needs for all uses including shops, enclosed storage, covered parking and open storage. The program was reviewed in individual and group meetings with Parks and Recreation staff and Public Feasibility Study - Page 8 Site Program: Works staff. It became apparent early in the program development process that there would not be space available on-site for open storage needs. These needs could be met offsite at the Grape Bowl storage yard; thus, open storage was removed from the listed program requirements. Approximate Square Feet Administration & Recreation Office Main Street Fire House Footprint ............... 2,000 Parks Offices Existing and New Office Trailers ............... 2,880 Eastside Community Center (Remodeled Office Building) Lobby.......................................300 Large Meeting Room ......................... 1,600 Small Meeting Room ........................... 800 Subtotal ............................. 2,700 20% Ancillary and Circulation 540 Total Community Center ...................... 3,240 Maintenance Shop (Remodeled Maintenance Building) Office.......................................150 Parts Storage .................................150 Equipment Storage ............................. 400 Shop...................................... 1.200 Total Maintenance Shop ...................... 1,900 Carpentry Shop ............................. 1,000 Plumbing Shop .............................. 1,000 Recreation Storage ........................... 3,000 Parks Storage ............................... 1,500 Chemical Storage .............................. 240 Paint Storage .................................240 Weekend Crew Equipment Storage ................ 240 Basketball Standard Storage ..................... 400 Equipment Storage ............................. 800 Covered Fertilizer Storage ....................... 600 Covered Parking ............................. 7,918 Cushman Scooters (15) ................. 1,350 Boats (2) ............................... 576 Feasibility Study - Page 9 Fork Lift (1) ............................ 288 Mower Trailers (2) ....................... 960 Tractor (1) ............................. 240 Mowers (3) ............................. 600 Parks & Recreation Trucks (10) ........... 3,908 Wash down...................................400 Gas Pump....................................400 OpenStorage ............................... 5,000 Onsite Parking .............................. 4,000 Site Circulation ............................ 11,247 Total (160'X 320') ......................... 51,200 Offsite Employee Parking Lot (45 @ 400 sf.) ..... 18,000 Design Approach: Each proposed use on the site was evaluated with the following criteria: 1. If the use is presently on-site, is its facility meeting its needs? • If so, should it remain or is there another need better suited for the space. • If not, where could it be housed, and what need would be suited for its space or should it be moved off-site. 2. If the use is presently off-site, should it remain so or would it be best to move it on-site. 3. Where should the use be ideally placed on the site in regard to: • Adjacent uses • Traffic circulation • Public access • Staff access • Materials/supply deliveries • Storage needs 4. What is the physical condition of existing facilities? Can they be rehabilitated or is it more cost effective to demolish and replace. Feasibility Study - Page 10 Design: Following are the design conclusions moving clockwise around the site starting with the existing Parks and Recreation office building. The existing Parks and Recreation office building is proposed to be remodeled into an East side Community Center accommodating several meeting room sizes with remodeled accessible restroom facilities, a new catering kitchen and storage rooms. The entrance would remain on Stockton Street and be served by the Hale Park parking lot across the street. Continuing south along Stockton Street is a carpentry shop and plumbing shop. Turning west along the alley is a Parks storage building accessed from the yard for storage of Parks equipment and materials, a covered fertilizer storage, paint storage and chemical storage. The first three have yard access as well as direct access off the alley for deliveries. Continuing west are the relocated portable trailers housing the Parks group and the Main Street Fire House housing the Administration/ Recreation group. Turning north is a covered recreation storage building located convenient to the Recreation staff and from Main Street for public access to Recreation equipment. Turning east is covered equipment storage, basketball equipment storage and weekend crew storage. Next is the existing fuel island, the main yard entrance and the existing maintenance shop. The maintenance shop will require a minor interior remodel for office and parts storage. The building is adequate for its needs, but aesthetically disparate. Preferably it would be demolished and replaced with a new building. In the center of the site are proposed two covered parking structures and a wash down area with separate wash areas for oil/grease removal and general water washdown. On-site space for employee parking is not available. Parking would be required on curb -side street parking spaces or by purchasing and developing a parking lot. Feasibility Study - Page 11 W W m To meet the long term parking requirements for both employees and public, a parking lot would be essential. It is proposed to purchase and develop the existing lot directly across Main Street, currently an electric motor junkyard. Schematic Cost Estimate for the Parks and Recreation Corporation Yard is $694,398. The estimate is included in the Appendix. k T EXISTING SITE PLAN LOCUST STREET GAS ISLAND LJI III II 1 � � Y 1 0 MIli(9 OFF1@ liWpid 11 F ALLEY Feasibility Study - Page 12 0 0 0 m 0 D X A ^Z^ C) T- 0 LOCUST STREET �' ■ ..�,.. -' ESTOR GE S.D. T EOUIP. E. ••JE eee Y. STORAGE E0. 1W14TENANCi SHOP *- yy V)GO Y. A n b EAST SIDE - ___ ___ ___r - COMM. CENTER A=PEC.-..F n Y. STORAGE TC00 v. wm Tn I{ T T -(- -- -- -- _______ ^` TO.FR M M r • i TT T T T M �T T wjT g I _ N z b R 4 - �I CARPENTRY J. �^- rm «I PEUAIEING SHOP PARKS OovO Y' ADMINISTRATION OFFICES ' k RECREATION 1�,y PNNT FOFFICESStYH- 'y"y. — • r� WE FERT. PARKS STORAGE CNQtlCN- STbR�E OA]O v. ' 'V, I . c a•r — - - ALLEY • ® PROPOSED. SITE PLAN LEGEND C 4 C O'2:al_ 574-0RA6e PT PAM STORA6E A FMCLFT SPACE TR TRACTOR SPACE rT ear¢ SPACE t'7 PTOI./EP3 TRA4E4 O OFJ,-GE 5'u� s�S,RETAFTT T PARKS d FW<A:L-_.Teri TRICK S CLS44AM SCOOTSS SPACE 6 X b VSYLE PAFIQ% F= II FEKTU-1-9 SiORA6E - STOR STORA6c WMi BT MAt•TTEAME BOAT E<T EXTRA PARKING BREAKDOWN FOM-Fi 1 SPACE II x 2t TRACTOR I SPACE II X w BOAT 2 SPACE M X24 r ISCL 3 SPACES 17 X w MOS/ TRAL-t 2 S'ACM II X 24 PARKS d MCPEATIM TFq= D SPACE: II X 24 Ctst,%AM SCS Y. SPACES 6 X b VSYLE PAFIQ% 1 SPACE 9 X w Feasibility Study - Page 13 F w LU cyN z�` 0 Y U 0 Appendix SCHEMATIC COST ESTIMATE SUMMARY Main Street Fire House Remodel ............................. $ 467,895.00 Parks & Recreation Corporation Yard ......................... $ 694,398.00 Parking Lot ......................................... $ 145,350.00 1CITY OF LODI MAIN STREET FIRE HOUSE REMODEL 114 N Main Street, Lodi Project #9519 SCHEMATIC COST ESTIMATE of Description I Qty Unit $/Quantity Subtotal Division Subtotal 1 DIVISION 1 -GENERAL REQUIREMENTS $ 21,650 5.9% 21 1 3 Superintendent (working) 6 mo $ 2,150.00 $ 12,900 3.5% 4 Plan Check Fee estimate $ 2,000 0.5% 5 Water Service estimate $ 2,500 0.7% 6 Sewer Service estimate $ 2,500 0.7% 7!Tern porary Power ills S 250.00 $ 250 0.1% 8;Chemical Toilets 6 mo $ 100.00 $ 600 0.2% 91 Telephone 6 mo $ 150.00 $ 900 0.2% 10 111 DIVISION 2 - SITE WORK $ 33,345 9.1% 12' 13Demolition 141 Lean-to Addition 208 sf $ 8.25 $ 1,716 0.5% 151 Hose Tower 200 sf $ 11.75 S 2,350 0.6% 161 Wood Floors 1224 sf j S 1.88 $ 2,301 0.6% 171 Plaster Walls 3760 sf 1 $ 0.75 $ 2,820 0.8% 18; Plaster Ceilings 32601st 1 $ 0.75 S 2,445 0.7% 191 Roof Demolition 16801sf Is 0.60 1 S 1,008 0.3% 201 South Exterior Plaster Wall 720'sf S 0.75 S 540 0.1% 211 Sandblast Exterior Brick 3440 sf $ 0.50 $ 1,720 0.5% 22' Electrical l 3260 sf $ 1.00 $ 3,260 0.9% 231 Plumbing 1 7 fixtures 1 $ 200.00 $ 1,400 0.4% 24 HVAC 1 ! Is S 500.00 1$ 500 0.1 25: Misc. Asbestos Removal I ills 1 $ 5,000.00 5,000 1.4% 26•, Exterior Concrete ! 1000!sf ; $ ES 1.66 1,660 0.5% 271 i ! 0.0% 28 New Concrete Sidewalks 250:sf $ 2.50 ; S 625 0.2% _ 29!Handicap Signage 1 ils 1 $ 150.00 1 S 150 0.0% 30! Building Signage_ ills 1 $ 1,000.00 $ 1,000 0.3% 31 !Plaque ills 1 $ 500.00 $ 500 0.1% 3218ike Rack 1 ills 1 S 350.00 15 350 0.1% 1Light Standards 2 ea 1 S 2,000.00 S 4,000 1.1% 331 1 1 34, 351DIVISION 3 - CONCRETE I 1 $ 5,440 1.5% 36; l 1 371 New Concrete Floor & Fill 408 sf 1 $ 5.00 S 2,040 0.6% 38;NewAddition Floor& Footings 340isf ! $ 10.00 S 3,400 0.9% 39i l 40; 1 1 1 6114/95 Main Street Fire House Remodel Cost Estimate Page 1 6114/95 Main Street Fire House Remodel Cost Estimate Page 2 % of Description Qty Unit $/Quantity Subtotal Division Subtotal 41 DIVISION 4 - MASONRY $ 3,440 0.9% _421 431Patching & Repointing 34401sf " $ 1.00 $ 3,440 0.9% 44' 45 46 DIVISION 5 - METALS $ 11,900 3.3% 47 48 Structural Strengthening: 491 Ties @ Floors & Roofs to Masonry 340 If $ 25.00 $ 8,500 2.3% 501 Strut Ties 140 If $ 10.00 $ 1,400 0.4% 511 Parapet Ties 1 Is $ .1,000.00 $ 1,000 0.3% 521 Miscellaneous 1 Is $ 1,000.00 $ 1,000 0.3% 531 541 551 DIVISION 6 - CARPENTRY/MILLWORK $ 37,210 10.2% 561, 57; Interior Walls & Finish 1420 sf $ 6.00 $ 8,520 2.3% 58 Exterior Walls & Finish 1000 sf $ 8.00 $ 8,000 2.2% 59 Wood Floors 340 sf $ 12.00 $ 4,080 1.1% 60 Wood Roof I 340 sf I $ 8.00 $ 2,720 0.7% 61Wood Subfloor 1 16301 sf $ 1.50 $ 2,445 0.7% 62 Misc Framing/Blocking j 1 jls $ 2,500.00 $ 2,500 0.7% 63!Roof Sheathing 1630;sf_ $ 1.50 j $ 2,445 0.7% _ 64; Finish Carpentry i 1IIs ; $ 1,500.00 $ 1,500 0.4% 65.Misc. Dry Rot Repair ^111f j $ 5,000.00 $ 5,000 1.4% _ 67! j 681DIVISION 7 - THERMAL & MOISTURE PROTECTION $ 9,878 2.7% 69 70!Waterproof Elevator Well I 150 sf $ 3.00 $ 450 0.1% 71 1New Roof I 1970 sf $ 2.35 S 4,630 1.3% 72! Roof Insulation I 1970 sf S 1.00 $ 1,970 0.5% 73iWall Insulation 3880 sf I $ 0.60 $ 2,328 0.6% 74!Misc. Caulking/Sealing ills $ 500.00 $ 500 0.1°x6 75: 76 77 DIVISION 8 - DOORS & WINDOWS j --78 $ 27,700 7.6% 79 Doors &Hardware i 15 ea ! $ 800.00 $ 12,000 3.3% 80;Windows 17!ea $ 500.00 $ 8,500 2.3% 81 'Storefront 240 sf I $ 30.00 $ 7,200 2.0% 82, I 83 i 84 DIVISION 9 - FINISHES j $ 52,370 14.3% _ 85 86 Walls_- Gypsum Board & Paint _ i 87 Floors - Carpeting 8100isf 3740isf _ $ $ 1.50 3.00 $ $ 12,150 11,220 3.3% 3.1% 88 Floors - Tile 2001sf ! $ 8.00 S 1,600 0.4% 6114/95 Main Street Fire House Remodel Cost Estimate Page 2 6/14/95 Main Street Fire House Remodel Cost Estimate Page 3 % of Description Qty Unit $/Quantity Subtotal Division Subtotal 89 1 Tile Walls 600 sf $ 6.00 $ 3,600 1.0% 90 Ceilings 3940 sf $ 3.00 S 11,820 3.2% 911 Exterior Paint 6800 sf $ 1.10 $ 7,480 2.0% _ 92 Misc. Painting 1 Is _ $ 1,500.00 $ 1,500 0.4°k Awnings 21s $ 1,500.00 $ 3,000 0.8% 93 94 95 DIVISION 10 -SPECIALITIES $ 3,950 1.1% 96 97 Toilet Accessories 21 ea $ 150.00 $ 3,150 0.9% 98 Fire Extinguishers 2 ea $ 400.00 $ 800 0,2% 99 100 101 DIVISION 11 - NO WORK UNDER THIS DIVISION 0.0% 1021 103 DIVISION 12 - FURNISHINGS $ 10,400 2.8°x6 104 105 Mini Blinds 600 ea S 4.00 $ 2,400 0.7% 106 Cabinetry 32 sf $ 250.00 $ 8,000 2.2% 107 108 109 DIVISION 13 - NO WORK UNDER THIS DIVISION 0.0% 110, 111 1121DIVISION 14 -CONVEYING SYSTEMS I $ 35,000 9.6% 1131 1141 Elevator I ills $ 35,000.00 S 35,000 1151 1171DIVISION 15- MECHANICAUPLUMBING $ 65,980 18.0% 1181 ! 1191PIumbing 11 ea $ 1,700.00 $ 18,700 5.1% 120 Mechanical 3940 sf $ 12.00 $ 47,280 12.9% 1211 1 1221 DIVISION 16 -ELECTRICAL SYSTEM $ 47,280 12,9% 1231 124 1 Electrical I 3940 sf S 12.00 $ 47,280 12.9% 1251 126' 127 SUBTOTAL $ 365,543 1281 129f MARKUP @ 28% $ 102,352 1301 I 131! ! 1321TOTAL COST ESTIMATE FOR MAIN STREET FIRE HOUSE REMODEL $ 467,895 6/14/95 Main Street Fire House Remodel Cost Estimate Page 3 CITY OF LODI PARKS & RECREATION CORPORATION YARD Project #9519 SCHEMATIC COST ESTIMATE % of Description Qty Unit S/Quantity Subtotal Division Subtotal 1 JEASTSIDE COMMUNITY CENTER $ 72,400 13.3% 2 Remodel Existing Building 3240 sf $ 10.00 $ 32,400 3 Remodel Restrooms 1 Is $ 20,000.00 $ 20,000 4Catering Kitchen 1 Is $ 20,000.00 S 20,000 5 61 71 MAINTENANCE SHOP $ 10,000 1.8% 8Remodel Existing/Add Office & Storage 1 Is j $ 10,000.00 S 10,000 9" 101 11 !PARKS OFFICES $ 41,440 7.6% 121720 sf Addition 1 Is ; $ 21,600.00 S 21,600 131 Footings S 275.00 $ 8,800 14jRamps & Stairs _321cy 240 sf S 10.00 S 2,400 15; Remodel Existing _ j 2160sf S 4.00 S 8,640 16 I 1 I 1 17I 18; STEEL FRAME ENCLOSED BUILDINGS 10800 sf 1$ 13.00 1 $ 140,400 25.9% 201 I 211 STEEL FRAME COVERED PARKING 6160 sf 1 S 9.00 $ 55,440 10.2% 22! 23�i 1 24 !MASONRY WALLS 600 If S 168.00 $ 100,800 18.6% 25; j 26; 4 27 !,CORNER "DECOR" TOWERS I 21 EA S 2,000.00 $ 4,000 0.7% 281 29; I 301WASH DOWN $ 4,828 0.9% 31 Wash Down 576 sf 1 S 3.00 S 1,728 32' Oil Separator 1 Is $ 3,100.00 S 3,100 331 1 34; I 351 CHAIN LINK GATES S 7,400 1.4% 36iMain ---37125' Leaf -- -- - 2,ea -j - - 1 lea S $ 500.00 S 1,600.00 $ 1,000 1,600 38125' Sliding 2jea S 2,400.00 $ 4,800 39 401 6/14/95 Parks and Recreation Corporation Yard Cost Estimate Page 1 6/14/95 Parks and Recreation Corporation Yard Cost Estimate Page 2 I I I I I % of (Description QtyF Unit' $/Quantity Subtotal Division Subtotal _ 1 i I 41 SITE WORK $ 90,600 16.7% 421 Demolition/Preparation 45000 sf S 0.50 $ 22,500 43jA/C Paving 25000 sf S 1.80 $ 45,000 44 Drainage 700 If I S 33.00 $ 23,100 45 Water & Hydrants 1 Is 1 S 10,000.00 S 10,000 46 Electrical Main Service 111s j S 7,500.00 S 7,500 47 Site Lighting I 25000 sf S 0.75 $ 18,750 48 Landscaping & Irrigation 77001sf S 2.00 $ 15,400 49 Trees 331ea S 350.00 $ 11,550 50i j 51 STREET IMPROVEMENTS j j $ 15,190 2.8% 52 Remove Sidewalk 1547.5 sf j S 2.00 $ 3,095 53 Remove Curb & Gutter 146 If I $ 5.00 $ 730 541 Concrete Subgrade Compaction 1083.3 sf S 1.75 S 1,896 55; Install Alley Approach 2 ea I S 2,500.00 S 5,000 56 Install Sidewalk 3551sf S 2.50 S 888 571 Install Commercial Driveway 527 sf S 3.00 S 1,581 581 Install Curb & Gutter 11511f j S 10.00 S 1,150 591 Install Commercial Curb & Gutter 31 if S 11.00 $ 341 601 Patch Paving 170 i sf $ 3.00 S 510 -------- - 611 1 i I I 621 I 63. 641SUBTOTAL S 542,498 651 66;, MARKUP @ 28% ---Y' - -- -^ — j $ 151,899 681 691TOTAL COST ESTIMATE FOR CORPORATION YARD $ 694,398 I I PARKING LOT 75 X 170 j I I (Land Acquisition @ S5/sf I j $ 63,750 (Site Improvements @ $5/sf $ 63,750 I, li j 1 $ 127,500 ;Markup @ 28% on Site Improvements $ 17,850 I I i (TOTAL PARKING LOT COST ESTIMATE ! $ 145,350 6/14/95 Parks and Recreation Corporation Yard Cost Estimate Page 2