Loading...
HomeMy WebLinkAboutAgenda Report - September 6, 1995 (80)OF CITY OF LODI COUNCIL COMMUNICATION AGENDA TITLE: Contract Award for White Slough Water Pollution Control Facility Holding Pond No. 2 Embankment Rehabilitation ($55,530) MEETING DATE: September 6, 1995 PREPARED BY: Public Works Director RECOMMENDED ACTION: That the City Council adopt the attached resolution awarding the contract for the above project to Don Lawley Company of Stockton in the amount of $55,530 (Base Bid plus Bid Alternates 1 and 2). BACKGROUND INFORMATION: This project consists of reconstructing the east, south and north levee embankments of Pond No. 2 and refacing them with riprap, and other incidental and related work as shown on the plans and specifications for the project. Three bid alternates were included in this bid proposal. Bid Alternate 1 reduced the thickness of the dprap by 6 inches, Bid Alternate 2 asked for a price to furnish and install a geotextile fabric under the riprap, and Bid Alternate 3 was to install 6 inches of sand and gravel under the riprap. Staff is recommending that Bid Alternates 1 and 2 be included in the award of this contract. A copy of the bid tabulation sheet is attached showing the base bids and alternate bid prices for each of the contractors. Plans and specifications for this project were approved on August 16, 1995. The City received the following three bids for this project: Bidder Engineer's Estimate Don Lawley, Inc. Wolin & Sons, Inc. Cimarron Construction Location Base Bid + Bid Alt. 1 & 2 $ 166,312 Stockton Sutter Creek Modesto FUNDING: Originally Budgeted: 1994/95 Budgeted Fund: Sewer Capital Outlay Fund Current Appropriation: $82,000 Total Project Estimate: $70,000 Bid Opening Date: August 29, 1995 ack Ronsko l; i orks Director Prepared by Wesley K Fujitani, Senior Civil Engineer Attachments cc: City Attorney Purchasing Officer Water/Wastewater Superintendent Assistant Wastewater Treatment Superintendent DJH Engineering $ 55,530 $ 147,150 $ 253,050 APPROVED: THOMAS A. PETERS N recycled paper City Manager CAWARD.DOC 09/95 CITY OF LODI Public Works Department Tabulation of bids received August 29, 1995 PROJECT: WSWPCF Holding Pond No.2 Embankment Rehabilitation Item Description 1 Excavate, Place, and Compact Eroded Soil on Embankment 2 Furnish and Install Rip Rap (18 -inches thick) 3 Other Miscellaneous Work Engineer's Estimate oty Unit Price Total 2,050 LF $14.00 $28,700.00 2,050 LF 100.00 205,000.00 LS LS 10,000.00 10,000.00 BID ALTERNATES 1 Deduct for Reduction of 6 -inches in Rip -Rap 2,050 LF Thickness 2 Furnish and Place Geotextile Fabric 2,050 LF 3 Furnish and Place Sand/Gravel (6 -inches thick) 2,050 LF Base Bid 243,700.00 (40.00) (82,000.00) 2.25 4,612.50 40.00 82.000.00 DON LAWLEY INC. Stockton Price Total $6.40 $13,120.00 31.50 64,575.00 1,000.00 1,000.00 78,695.00 (14.20) (29,110.00) 2.90 5,945.00 12.85 26.342.50 WOLIN & SONS, INC. Sutter Creak Price Total $25.00 $51,250.00 41.50 85,075.00 8,000.00 18,000.00 154,325.00 (11.50) (23,575.00) 8.00 16,400.00 11.00 22.550.00 CIMARRON CONST. Modesto Price Total $30.00 $61,500.00 95.00 194,750.00 261,250.00 (15.00) (30,750.00) 11.00 22,550.00 15.00 30.750.00 Base Bid Plus Bid Alternates 1 A 2 $166,312.50 $55,530.00 $147,150.00 $253,050.00 RESOLUTION NO. 95-109 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE CONTRACT FOR WHITE SLOUGH WATER POLLUTION CONTROL FACILITY HOLDING POND NO. 2 EMBANKMENT REHABILITATION WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council sealed bids were received and publicly opened on August 29, 1995 at 11:00 a.m. for the bid for White Slough Water Pollution Control Facility Holding Pond No. 2 Embankment Rehabilitation, described in the specifications therefore approved by the City Council on August 16, 1995; and WHEREAS, said bids have been compared, checked, and tabulated and a report thereof filed with the City Manager as follows: Bidder Location Base Bid + Bid Alt. 1 & 2 Engineer's Estimate $ 166,312 Don Lawley, Inc. Stockton $ 55,530 Wolin & Sons, Inc. Sutter Creek $ 147,150 Cimarron Construction Modesto $ 253,050 WHEREAS, the City Manager recommends award of the contract for White Slough Water Pollution Control Facility Holding Pond No. 2 Embankment Rehabilitation, be made to the low bidder, Don Lawley Company of Stockton, CA; and NOW, THEREFORE, BE IT RESOLVED by the Lodi City Council that the award of the contract for White Slough Water Pollution Control Facility Holding Pond No. 2 Embankment Rehabilitation, be and the same is hereby awarded to Don Lawley Company of Stockton, CA, the low bidder, in the amount of $55,530.00 (Base Bid plus Bid Alternates 1 and 2). Dated: September 6, 1995 I hereby certify that Resolution No. 95-109 was passed and adopted by the City Council of the City of Lodi in a regular meeting held September 6, 1995, by the following vote: AYES: COUNCIL MEMBERS - Davenport, Pennino, Sieglock, Warner and Mann (Mayor) NOES: COUNCIL MEMBERS - None ABSENT: COUNCIL MEMBERS - None ABSTAIN: COUNCIL MEMBERS - None JIFE PERRIN ity Clerk 95-109 0) MEMORANDUM, City of Lodi, Public Works Department To: City Manager City Council From: Public Works Director Date: September 11, 1995 Subject: Engineering Costs on the White Slough Pond Embankment Rehabilitation Project At the Council Meeting of September 6, 1995, Councilman Davenport requested the amount paid to DJH Engineering for the preparation of plans and specifications for the subject project. The amount expended for engineering was $3,900. This amount is approximately two percent of the engineers estimate, or seven percent of the low bid, as shown on the attached Council Communication. The engineering work, i.e., pians and specifications, can also be used on future embankment reha_ 'litation projects at White Slough. Jack Ronsko Public orks Director JLRAm attachment MCMCCENG.00C 44'1 OR ��i CITY OF LO D I COUNCIL COMMUNICATION AGENDA TITLE: Conrad Award for Whits Slough Water Pollution Control Facility Holding Pond No. 2 Embankment Rehabilitation (555,530) MEETING DATE. September ti, 1995 PREPARED BY: Public Works Director RECOMMENDED ACTION: That the City Council adopt the attached resolution awarding the contract for the above project to Don Lawley Company of Stockton in the amount of S53,530 (Base Bid plus Bid Alternates 1 and 2). BACKGROUND INFORMATION: This project consists of reconstructing the east, south and north levee embankments of Pond No. 2 and refacing them with riprap, and other incidental and related work as shown on the plans and specifications for the project Three bid aitemates were included in this bid proposal. Bid Alternate 1 reduced the thickness of the riprap by 6 inches, Bid Altemate 2 asked for a price to furnish and install a geotextiie fabric under the riprap, and Bid Alternate 3 was to install 6 inches of sand and gravel under the riprap. Staff is recommending that Bid Altemates 1 and 2 be included in the award of this contrza A copy of the bid tabulation sheet is attached showing the base bids and alternate bid prices for each of the contractors. Plans and specifications for this project were approved on August 16, 1995. The City received the following three bids for this project: Bidder EnginMW3 Estimate Dan Lawley, Inc. Wolin & Sons, Inc Cimarron Construction FUNDING. Originally Budgeted: Budgeted Fund Current Appropriation: Total Pmject Estimate: Bid Opening Date: Stockton Sutter Creek Modesto 1994M Sewer Capital Outlay Fund $82.000 $70,000 August 29, 1995 v adi Ronsko arks Director Prhpared by Wesley K Fujihra, Senior Civil Engineer Attachments ca City Atterney Purchasing Officer WetwiWasumater Supennoendent Assistant Wastewater Treetinent Superintendent O JH Engineering Base Bid + Bid Alt. 1 & 2 S 166,312 S 55,530 S 147,150 S 253,050 APPRCVEO: phi THOMAS A. PETERSON .,�,,. �,,.► City mane w CAWARD_oOC ods