AGENDA TITLE: Contract Award for White Slough Water Pollution Control Facility
Holding Pond No. 2 Embankment Rehabilitation ($55,530)
MEETING DATE: September 6, 1995
PREPARED BY: Public Works Director
RECOMMENDED ACTION: That the City Council adopt the attached resolution awarding the contract for
the above project to Don Lawley Company of Stockton in the amount of
$55,530 (Base Bid plus Bid Alternates 1 and 2).
BACKGROUND INFORMATION: This project consists of reconstructing the east, south and north levee
embankments of Pond No. 2 and refacing them with riprap, and other
incidental and related work as shown on the plans and specifications for
the project.
Three bid alternates were included in this bid proposal. Bid Alternate 1 reduced the thickness of the dprap by
6 inches, Bid Alternate 2 asked for a price to furnish and install a geotextile fabric under the riprap, and
Bid Alternate 3 was to install 6 inches of sand and gravel under the riprap. Staff is recommending that Bid
Alternates 1 and 2 be included in the award of this contract. A copy of the bid tabulation sheet is attached
showing the base bids and alternate bid prices for each of the contractors.
Plans and specifications for this project were approved on August 16, 1995. The City received the following
three bids for this project:
Bidder
Engineer's Estimate
Don Lawley, Inc.
Wolin & Sons, Inc.
Cimarron Construction
Location Base Bid + Bid Alt. 1 & 2
$ 166,312
Stockton
Sutter Creek
Modesto
FUNDING: Originally Budgeted: 1994/95
Budgeted Fund: Sewer Capital Outlay Fund
Current Appropriation: $82,000
Total Project Estimate: $70,000
Bid Opening Date: August 29, 1995
ack Ronsko
l; i orks Director
Prepared by Wesley K Fujitani, Senior Civil Engineer
Attachments
cc: City Attorney
Purchasing Officer
Water/Wastewater Superintendent
Assistant Wastewater Treatment Superintendent
DJH Engineering
$ 55,530
$ 147,150
$ 253,050
APPROVED:
THOMAS A. PETERS N recycled paper
City Manager
CAWARD.DOC 09/95
CITY OF LODI
Public Works Department
Tabulation of bids received August 29, 1995
PROJECT: WSWPCF Holding Pond No.2 Embankment Rehabilitation
Item Description
1 Excavate, Place, and Compact Eroded Soil on
Embankment
2 Furnish and Install Rip Rap (18 -inches thick)
3 Other Miscellaneous Work
Engineer's Estimate
oty
Unit
Price
Total
2,050
LF
$14.00
$28,700.00
2,050
LF
100.00
205,000.00
LS
LS
10,000.00
10,000.00
BID ALTERNATES
1 Deduct for Reduction of 6 -inches in Rip -Rap 2,050 LF
Thickness
2 Furnish and Place Geotextile Fabric 2,050 LF
3 Furnish and Place Sand/Gravel (6 -inches thick) 2,050 LF
Base Bid 243,700.00
(40.00) (82,000.00)
2.25 4,612.50
40.00 82.000.00
DON LAWLEY INC.
Stockton
Price Total
$6.40 $13,120.00
31.50 64,575.00
1,000.00 1,000.00
78,695.00
(14.20) (29,110.00)
2.90 5,945.00
12.85 26.342.50
WOLIN & SONS, INC.
Sutter Creak
Price Total
$25.00 $51,250.00
41.50 85,075.00
8,000.00 18,000.00
154,325.00
(11.50) (23,575.00)
8.00 16,400.00
11.00 22.550.00
CIMARRON CONST.
Modesto
Price Total
$30.00 $61,500.00
95.00 194,750.00
261,250.00
(15.00) (30,750.00)
11.00 22,550.00
15.00 30.750.00
Base Bid Plus Bid Alternates 1 A 2 $166,312.50 $55,530.00 $147,150.00 $253,050.00
RESOLUTION NO. 95-109
A RESOLUTION OF THE LODI CITY COUNCIL
AWARDING THE CONTRACT FOR WHITE SLOUGH WATER POLLUTION
CONTROL FACILITY HOLDING POND NO. 2 EMBANKMENT REHABILITATION
WHEREAS, in answer to notice duly published in accordance with law and the order of
this City Council sealed bids were received and publicly opened on August 29, 1995 at 11:00 a.m.
for the bid for White Slough Water Pollution Control Facility Holding Pond No. 2 Embankment
Rehabilitation, described in the specifications therefore approved by the City Council on August
16, 1995; and
WHEREAS, said bids have been compared, checked, and tabulated and a report thereof
filed with the City Manager as follows:
Bidder Location
Base Bid + Bid Alt. 1 & 2
Engineer's Estimate
$ 166,312
Don Lawley, Inc. Stockton
$ 55,530
Wolin & Sons, Inc. Sutter Creek
$ 147,150
Cimarron Construction Modesto
$ 253,050
WHEREAS, the City Manager recommends award of the contract for White Slough Water
Pollution Control Facility Holding Pond No. 2 Embankment Rehabilitation, be made to the low
bidder, Don Lawley Company of Stockton, CA; and
NOW, THEREFORE, BE IT RESOLVED by the Lodi City Council that the award of the
contract for White Slough Water Pollution Control Facility Holding Pond No. 2 Embankment
Rehabilitation, be and the same is hereby awarded to Don Lawley Company of Stockton, CA, the
low bidder, in the amount of $55,530.00 (Base Bid plus Bid Alternates 1 and 2).
Dated: September 6, 1995
I hereby certify that Resolution No. 95-109 was passed and adopted by the City Council of
the City of Lodi in a regular meeting held September 6, 1995, by the following vote:
AYES: COUNCIL MEMBERS - Davenport, Pennino, Sieglock, Warner
and Mann (Mayor)
NOES: COUNCIL MEMBERS - None
ABSENT: COUNCIL MEMBERS - None
ABSTAIN: COUNCIL MEMBERS - None
JIFE PERRIN
ity Clerk
95-109
0) MEMORANDUM, City of Lodi, Public Works Department
To: City Manager
City Council
From: Public Works Director
Date: September 11, 1995
Subject: Engineering Costs on the White Slough Pond
Embankment Rehabilitation Project
At the Council Meeting of September 6, 1995, Councilman Davenport requested the
amount paid to DJH Engineering for the preparation of plans and specifications for the
subject project. The amount expended for engineering was $3,900. This amount is
approximately two percent of the engineers estimate, or seven percent of the low bid,
as shown on the attached Council Communication.
The engineering work, i.e., pians and specifications, can also be used on future
embankment reha_ 'litation projects at White Slough.
Jack Ronsko
Public orks Director
JLRAm
attachment
MCMCCENG.00C
44'1 OR ��i
CITY OF LO D I COUNCIL COMMUNICATION
AGENDA TITLE: Conrad Award for Whits Slough Water Pollution Control Facility
Holding Pond No. 2 Embankment Rehabilitation (555,530)
MEETING DATE. September ti, 1995
PREPARED BY: Public Works Director
RECOMMENDED ACTION: That the City Council adopt the attached resolution awarding the contract for
the above project to Don Lawley Company of Stockton in the amount of
S53,530 (Base Bid plus Bid Alternates 1 and 2).
BACKGROUND INFORMATION: This project consists of reconstructing the east, south and north levee
embankments of Pond No. 2 and refacing them with riprap, and other
incidental and related work as shown on the plans and specifications for
the project
Three bid aitemates were included in this bid proposal. Bid Alternate 1 reduced the thickness of the riprap by
6 inches, Bid Altemate 2 asked for a price to furnish and install a geotextiie fabric under the riprap, and
Bid Alternate 3 was to install 6 inches of sand and gravel under the riprap. Staff is recommending that Bid
Altemates 1 and 2 be included in the award of this contrza A copy of the bid tabulation sheet is attached
showing the base bids and alternate bid prices for each of the contractors.
Plans and specifications for this project were approved on August 16, 1995. The City received the following
three bids for this project:
Bidder
EnginMW3 Estimate
Dan Lawley, Inc.
Wolin & Sons, Inc
Cimarron Construction
FUNDING. Originally Budgeted:
Budgeted Fund
Current Appropriation:
Total Pmject Estimate:
Bid Opening Date:
Stockton
Sutter Creek
Modesto
1994M
Sewer Capital Outlay Fund
$82.000
$70,000
August 29, 1995
v
adi Ronsko
arks Director
Prhpared by Wesley K Fujihra, Senior Civil Engineer
Attachments
ca City Atterney
Purchasing Officer
WetwiWasumater Supennoendent
Assistant Wastewater Treetinent Superintendent
O JH Engineering
Base Bid + Bid Alt. 1 & 2
S 166,312
S 55,530
S 147,150
S 253,050
APPRCVEO: phi
THOMAS A. PETERSON .,�,,. �,,.►
City mane w
CAWARD_oOC ods