CITY OF LODI COUNCIL COMMUNICATION
AGENDA TITLE: East San Joaquin Parties/East Bay Municipal Utility District
Joint Conjunctive Use Project (Information Only)
MEETING DATE: June 7, 1995
PREPARED BY: Public Works Director
RECOMMENDED ACTION: This material is being presented to the City Council for its information.
BACKGROUND INFORMATION: A committee, appointed by Supervisor Barber, has been working
with East Bay Municipal Utility District (EBMUD) for approximately a
year to develop the Water Banking/ Conjunctive Use Project. A
copy of the Agreement initiating preliminary study is attached as
Exhibit 1. The City of Lodi will be asked to sign this Agreement at a later date. All costs under this
Agreement will be the responsibility of EBMUD and San Joaquin County. The major principles of the
Project include:
• stop the overdraft of the East San Joaquin groundwater basin
• restore this groundwater basin to a reasonable level
• stop saline intrusion
• provide the water needs to the East San Joaquin Parties (ESJP)
supply EBMUD with dry -year water
The ESJP include the following agencies:
• Woodbridge Irrigation District (WID)
• North San Joaquin Water Conservation District (NSJWCD)
• Central San Joaquin County Water Conservation District (CSJCWCD)
• Stockton East Water District (SEWD)
• City of Lodi
• City of Stockton
• San Joaquin County Flood Control and Water Conservation District
The ESJP Technical Committee, a subcommittee of the Water Policy Committee, is presently working
with EBMUD engineers to develop a formal work plan. As part of the work plan, some of the major
water sources to be considered are:
• wet -year Mokelumne River water supply
• existing entitlements of ESJP from the Mokelumne and Calaveras rivers
• EBMUD's American River supply
APPROVED:
THOMAS A. PETERSON recycled paper
161. City Manager
CONJUSEMOC ER116
East San Joaquin Parties/East Bay Municipal Utility District Joint Conjunctive Use Project
(Information Only)
June 7, 1995
Page 2
• USBR/SEWD/CSJWCD contracts
• 1485 Water (treated wastewater from Stockton released to Delta)
• reclaimed wastewater from City of Lodi and City of Stockton
Some of the needed facilities include an unlined canal between Folsom Canal and Farmington Canal,
and new irrigation distribution systems to serve surface water in lieu of groundwater. A plan showing
the canal alignment is attached as Exhibit 2.
The total preliminary study project costs are approximately $630,000. These costs are to be shared
equally between EBMUD and San Joaquin County. The majority of the work will be performed by
Montgomery Watson consulting engineers. The ESJP Technical Committee has also retained
Boyle Engineering as its consultant to work with them. The total County's share is approximately
$315,000 and will be funded by the County using its Water Zone Investigation 11 funds. A time
schedule for this work is attached as Exhibit 3.
Also attached for your information is a document entitled "Undercurrents Developed by EBMUD
and ESJP" which provides more general information on this joint project.
Andy Christensen, from WID, is the Chairman of the ESJP Technical Committee. He will be at the
Council Meeting to help answer any questions you may have related to this project.
FUNDING: San Joaquin County funds.
'�-
Jack Ronsko
ublic orks Director
JLR/Im
Attachments
cc: WID, Attn: Andy Christensen, Manager
Water/Wastewater Superintendent
CONJUSEAOC 5/31/95
P.02
EXHIBIT 1
aGINr PROgICT S'ftMY AGREEMEW
San Joaquin conjunctive Use Project
East Ban Joaquin Parties (EBJP)
and East Bay Municipal. Utility District
THIS AGREEMENT is, made and entered into this day of
1,995, by and between Easc Bay Municipal utility District, a
public corporation, hereinafter called "DISTRICT," and the
Eastern San Joaquin Parties, consisting of Woodbridge Irrigation
District, North San Joaquin Water conservation District, Central
San Joaquin Water Conservation District, Stockton East water
District, City of Lodi, city of Stockton, San Joaquin County, and
the San Joaquin County Flood Control and Water Conservation
District, hereinafter collectively referred to as "ESJP".
WITNESSETH
WHEREAS DISTRICT's Board of Directors adopted a Water Supply
Management Action Plan on January 24, 1995, that inCludes
eval.iauion of conjunctive use project alternatives with ESJP that
incorporate the Mokelumne River and the District's Amer1can R-iver
entitlement into a San Joaquin County based conjunctive use
program: and
WHEREAS ESJP and DISTRICT•aesires to develop alternatives for a
joint project (said development of alternatives being referred to
herein for purposes of this agreement as "Project") to meet the
present and future water needs of ESJP while meeting DISTRICT's
future dry year water needs; and
WHEREAS DISTRICT and ESJP require professional services to assist
with the formulation of Project alternatives, said services to be
provided by MONTGOMERY WATSON AMERICA (hereinafter called ":KWA")
BOYLE ENGINEERING (hereinafter called "BOYLE"), and a
GEOTECHNICAL firm (hereinafter called "GEOTECHI#ICAL"); and
WHEREAS DISTRICT and ESJP intend to share the costs of
processional services for this Project on an equal basis;
IOW, THEREFORE., IT IS MUTUALLY AGREED by ESJP and DISTRICT as
follows:
1: MWA Contract: DISTRICT will enter into a contract with MWA
to develop Project alternatives for an amount not -to -exceed
$549,907. Said MWA services are described in the Scope of
work attached hereto as Exhibit A and incorporated herein.
MWA will provide copies of all reports. correspondence,
invoices and work products for this Project to ESJP unless
otherwise specified by ESJP. payment by DISTRICT to MWA for
said services will contribute to DISTRICT's Share of Total
Costs as defined herein. DISTRICT shall provide copies of
all, invoices received from MWA for this Project to ESJP.
33369-6
MAY -30-1995 10:23 92% P.02
Joint Project Agrg4ment
ESJP and EaSt BaY Municipal. Utility District
Pg. 2
P.03
2. SQY E oatraer: ESJP will enter into a contract with BOYLE
to provide toChnical services for this Project for on amount
not to exceed S50,000, BOYLE shall have access to
information being developed for each engineering task's
development to the satisfaction of the ESJP's Technical
Team. Said services are described in the Scope of work
attached hereto as Exhibit 8 and incorporated herein..
Payment by E$JP to BOYLE for said services will contribute
to ESJP's Share of Total Costs as defined herein. ESJP
shall provide copies of all invoices received from BOYLE for
this Project to DISTRICT.
3. GEOTECHNICAL Co tract: ESJP will enter into a contract with
GEOTECIiNICAL Car soil exploration to evaluate percolation
along the extension of the Folsom South Canal alignment, for
an amount not to exceed $30,000. Payment by ESJP to
GEOTECHNICAL for said services will contribute to ESJP'S
Share of Total costs as defined herein. ESJP shall provide
copies of alb invoices received from GEOTECHNICAL for this
Project to DISTRICT.
1. Total Costs: Total Costs for MWA, BOYLE. and GEOTECHNICAL
shall not exceed 3629,907 and shall be borne equally as
follows:
Not -to -exceed Limits District ESP
5549,907 MWA services $274,954 $274,954
S 50,000 BOYLE services S 25,000 S 25,000
S 30-000 GF_OTECHNICAL services S 15,QQQ 9 15,000
$629,947 Maximum Total Costs $314,954 $314,954
S. Cost to DISTRICT- DISTRICT's Share of Total Costs Shall be
504 of the sum of costs payable to MWA, BOYLE, and
GEOTECHNICAL for this Project up to a maximum of $314,954.
DISTRICT will, satisfy its responsibility for costs through
payments to MWA for services specified in Exhibit A of this
Agreement. DISTRICT and ESJP recognize that costs for MWA
are expected to exceed costs for BOYLE and GEOTECHNICAL. If
the sum of DISTR.T.CT payments to MWA exceed DISTRICT's Share
of Total Costs, DISTRICT will be entitled to reimbursement
frost ESJP as defined herein.
6. C!cst to ES,TP: ESJP's Share of Total Costs shall be 50% of
the sum of Costs payable to MWA, BOYLE, and GEOTECHNICAL. for
this Project up to a Ynaximum or $314,954. The San Joaquin
County Flood Control and Water Conservation District shall
be biped for and shad pay the share of the ESJP. ESJP
through the San Joaquin County Flood Control and water
Conservation District will satisfy their responsibility for
17Q4J/i21651TJS/*ct/05-03-95/3
35569-6
MAY -30--1995 10:23 91: � P.03
Jo. At Project Agreement
ESJP and East Hay Municipal Utility District
Pg. 3
P. 04
costs through payments t0 BOYLE and GEOTECHNICAL for
services specified in this Agreement, and through
reimbursement to DISTRICT as needed to equalize ESJP's and
DISTRICT's Total Costs.
7. Ag=gJ9menc: If reimbursement is needed to equalize Total
Costs for ESJP and DISTRICT, such reimbursement shall
commence on a mutually acceptable schedule, however, in no
event shall such schedule extend beyond 36 months from the
effective date of this Agreement, unless agreed to in
writing by ESJP and DISTRICT. if such reimbursement has not
been completed within 19 months of the effective date of
this Agreement, interest shall then accrue on the unpaid
balance at that time at the rate of eight percent per annum.
8. Other Terms:, This Agreement shall be effective upon
execution by DISTRICT and Board of Supervisors, San Joaquin
County and the San Joaquin County Flood Control and Water
Conservation District and shall continue through the
completion of Project studies and the reimbursement period.
This Agreement constitutes the entire understanding of ESJP
and DISTRICT with respect to cost sharing for this Project.
All amendments to this Agreement shall be in writing and
shall be effective upon execution by DISTRICT and Board of
Supervisors, San Joaquin County and the San Joaquin County
Flood Control and water Conservation District.
I,1 WITNESS WHEREOF the parties hereto execute this AGREEMENT in
duplicate.
EAST BAY MUNIC12AL UTILITY DISTRICT
Date: _ By:
Jorge Carrasco
GENERAL MANAGER
*•• SIGNATURES CONTINUED ON NEXT PAGE***
n045122►631Td5/ect/05-03-95/3
13569-6
MAY -30-1995 19:24 92e P.04
SLNI by: Xerox lelecopier 9021 ; 5-30-95 : 9:56AM
Joint Project Agreement
E5JP and East Say Municipal. Utility District
Py. 4
EAST SAN JOA UIN PARTIES
Lute:
tACtest: )
H
By:
George L. Barber
Ci-AXi2MAN
Board of Supervisors
County of San Joaquin
and the
Board of Supervisors of the
San Joaquin County Flood
Control and Water
Conservation District
Date• BY:
(A.ttes4: } Woodbridge irrigation District
iJSzia
(Attest:
Date:
(Attest: ?
Date:
(Attest: )
By:
Board of Directors
North San Joaquin water
Conservation District
By:�
City of Lodi
By.
Board of Directors
Stockton East Water District
P.05
;# 5
t7G�SrZ2�651td5fectr05-(}i-9513
MAY -30-1995 10:24 92`4 P.05
Joint Projact Agreement
ESJP and East Say Municipal Utility District
Pg. 5
Date*
(Attest:
Date:
P.06
BAST SAN JOADU2N PART ES_ (cont, )
By:
} C -icy of Stockton
By:
(Attest: } Board of Directors
Central San Joaquin water
Conservation District
n0�5iza�6s�Trsreccio5-o3-9si3
33569-Q
MAY -30-1995 10 25 92Z. P.06
P.07
EXHIBIT A
ITEM 2 - EBMUD WATER SUPPLY ACTION PLAN
SCOPE OF WORK
The project objective is to meet the present and future water needs of the Eastem San
Joaquin Parties (ESJP) while meeting E9MUD's future dry year water needs. The
ubjecdve of this scope of work is to identify a short list of one or more alternative plans that
would achieve the project objectives. Data, tools and analytical results developed In Phase
1 of the Mokelumne Aquifer Recharge and Storage Project (MARS) will be used to the
ascent possible and practicable In this work to minimize costs and provide consistency of
analyses and results between the two efforts. In. particular, the San Joaquin County IGSIi
and the GIS originally developed for Phase 1 MARS will serve as the basic analytical tools
for this work.
STAG$ I - DEVELOP PROJECT BASIS
Activities completed in this stage aro intended to provide the fundamental knowledge and
understanding required to support subsequent formulation of coherent alternative plans that
would achieve the project objectives.
Task A Evaluate Water Needs and Potential Water Sources
1. Using the San Joaquin County IGSM, evaluate the following:
- Total yearly quantity of water required to stop saline intrusion and initiate
basin storage recovery,
- Minimum groundwater elevation(s) required to have no further saline
intrusion (threshold elevation),
Annual average volume of water required to achieve threshold elevation in
5 years, 10 years
• Annual average quantity of water required to meet joint project goals with
groudwater elevations always above threshold elevation,
- Dry year water supply if 300,000 aflyr is available in wet years, dry year
water supply if 400,000 of/yr is available in wet years.
Describe the basis and evaluate the following potendal water sources:
2. EBMUD American River water service contract delivered from the Folsom South
Canal (FSC), as conditioned by the Hodge Decision.
3. Mokelumne Rivor water unwed within MY= entitlements, assuming EBMM's
settlement offer to FERC defines instreetn flow requirements.
4. Stanislaus River water associated with USBR water service contracts with Central
San Joaquin Water Conservation District (49,000 acre-feet firm) and Stockton East
Water District (106,000 acre-feet Interim), assuming USBR operates New Melones
to meet D 1422.
S. Existing ESJF entideracnts, including those for water from the Mokelutnne and
Calaveras Rivers.
MAY -30-1995 10.25 - 91% P.07
P.08
6. San Joaquin County American River permit application 29657, alternative B,
diversion at Nimbus Dam.
7. Potential diversion of currently unregulated flows from the Mokelumno. American,
Calaveras, and Stanislaw Rivers, and the streams flowing into Farrtington
Reservoir, assuming EBMUD offer to FERC instream flows for the Mokelumne,
and D 1422 compliance for the Stanislaw,
3. Reclaimed wastewater from Lodi and Stockton, other than Section 1483.
9. Diversions fiorri the Sacramento River/Delta.
10. Possible assignment or transfer of state filings or reserved water rights on the
Mokelumae, assuming instream flows as specified in EBMUD's July 16, 1993
offer of settlement to FERC.
For each potential source, describe existing water right conditions, p baseline
monthly water availability hydrographs. and identify relevantreliability and
implementability issues associated with water right priority, related regional water
management initiatives, and apparent statutory and institutional constraints. Ali analyses
will assume no change In OAdale I.D. and South San Joaquin I.D. service area or
consumptive use.
Deliverable: Task report presenting the results of this task.
Task B Establish Design Criteria
Supplement Task Report 2. 1, p pared under the original contact, as required to serve as
the design criteria basis for subsequent. facilities layout and cost estimating work.
Supplemental criteria are expected to include right-of-way dimensions associated with large
canals and large diameter pipe, tunnel design and cost criteria, and assumptions regarding
facilities design capacities based on Task A results.
Deliverable: Revised Task Repots 2.1
Task C Establish Evaluation Criteria
Prepare a brief memorandum describing the four general evaluation criteria developed
under Task 2.1 of the ori'&incl contract scope of services and their applicability to this
work. Present this evalustionlscreening approach to EBMUn and ESJP representatives,
intake necessary corrections, and finalize the criteria to be used subsequently.
Deliverable: Brief draft memorandum presenting criteria. finalized to reflect
ESJPIEBMUD consensus.
Task D Lay Out Facilities
Through field investigation, establish an apparently viable alignment and location for ewh
of the major facilities associated with each alternative and display each alignment and the
location of key facilities on USGS 7.5 minute quad map p�.ng and GIS mapping. Input the
corridors to the project GIS and perform constraints analyses as merited to test the validity
of each corridor (it is assumed that the coverage of the GTS will be expanded by others to
cover the required project area). Verify the resulting siting in the field. Conduct a group
MAY -30-1995 10:26 91% P.08
P.09
tout of the alignments. facility locations. And points of interest to elicit local comment and
confirm routing and siting assumptions. Size each facility and develop hydraulic profiles
for each facility,
1. Unlined flat lanal from terminus of FSC to Peters along the original FSC
alignment. sized to:
• deliver water for direct and in -lieu recharge to irrigators,
• convey' available streamflows for groundwater recharge by means of canal
seepage,and
• supply various potential and existing storage reservoirs.
Analyses and c$dmaies will differentiate reaches from Dry Creek to Peters and Dry
Creek to FSC terminus. to provide for consideration of phased construction.
2. Camanche diversion to Rear Creek as evaluated under Task 2.3 of the original
contract scope of services.
3. Diversion facilities from Dry Creek, Mokelumme River, Calaveras River, and
(typical) lesser water courses into the unlined flat canal.
4. Improvement and expansion of irrigation distribution systems and on-farm
irrigation systems to reasonably maxindze in -lieu recharge (switching groundwater
pumpers to surface water in wet years), direct recharge (infiltration or injection.),
and indirect recharge through increased irrigation efficiencies in:
a, Central San Joaquin Water Conservation District,
b. Stockton Fast Water District,
C. North San Joaquin Water Conservation District, and
d. NVoodbtid a Irrigation District (agricultural exchange not considered
in WM).
S. Direct to aqueduct extraction well system as evaluated under Task 2,3 of the
original contract scope of services.
6. Sacramento River diversion upstream of the Sacramento Regional Wastewater
Treatment plant disch*rge from the vicinity of Freeport to the unlined flat canal
described above
7, Diversion from Beaver Slough to unlined flat canal.
$ . Mokelumne Aqueduct delivery to portions of ESJP as evaluated under Task 2.3 of
the original contract scope of services.
9. Pipeline from existing EBNF D turnout from the FSC to Iiia Mokelumne Aqueducts
to free up tike volumes of Mokelumne Rivet water for the ESMEBMUD
conjunctive use project.
10. Pi tine from the terminus of the FSC to the Mokelumne Aqueduct to free up like
Vol of Mokelumne River water for the ESIP/EBI1UD conjunctive use project.
11. )✓lairs for diverting water from the flat, unlined canal described in (1) above, to the
i'vlokelumne Aqueducts.
3
MAY -30-1995 10:27 91% P.09
P. 10
Dellvemble: Layout of each facility with listing of key design assumptions and facility
characteristics.
Task F Identify Environmental Effects
Based on field review of the alignment corridors identified in Task D, identify siting
constraints based on environmental and regulatory considerations, Identify and evaluate
issues associated with siting new diversion facilities on the Sacramento River upstream of
the Saa mento Regional Wastewater Treatment Plant discharge. And at Beaver SIough.
Review issues associated with impacts on instream flows in the Lower American River.
Deliverable: Task report presenting the insults of this task.
Task G Prepare Cost Estimates
Prepare reconnaissance -level estimates of capital and rccurrfng costs associated with each
of the facilities listed wider Task n.
Deliverables: Task report presenting the results of this task.
STAGE tl - ALTERNATIVES FORMULATION AND EVALUATION
Activities completed in this stage aro intended to result in identification of a small number of
the best viable alternative pians that would achieve the project objectives.
'ask H Assemble Alternatives
Based on the results of Tasks i through 7, screen potential water sources and facilities
defined under Task D against the four general evaluation criteria used for Task 2.1 of the
original contract scope of servicos. Assemble the remaining sources and facilities;
including conveyance, recharge, extraction, and storage facilities; into approximately three
alte�ve plans for further analyses and evaluation. A;ricultural exchange with
Woodbridge Irrigation District not considered.
Deliverable: Task report presenting the results of this task.
Task I Evaluate Project Performance
Using the San Joaquin County IGSM developed under Task 1.6 of the original scope of
services, evaluate quantity and quality Impacts on groundwater and surface water rasources
resulting from operation of approximately three alternatives identified in Task H iincluding
consideration of oenerali4ed offstteam storage options. Use PROSIM to evaluate impacts
on CVP deliveries. SWP deliveries, and Delta outflows. Quantify benefits accruing to
project participants and #oundivater pumpers in the project area resulting from operation of
each alternative,
Deliverable: Task report presenting the results of this task.
Task J Evaluate Implementation issues
Identify and discuss institutional and regulatory issues associated with implementation of
approximately three alternatives. Develop recommended strategies for configuring and/or
implementing alternatives to enhance implementability,
4
MAY -30-1995 10:28 92% P.10
Deliverable: Task report presendn; the results of this task.
Tacit K Compare/Rank 'Alternatires
Compare and rank the altemarives on the bases of completeness, efficiency (including cost
estimates), effectiveness and acceptability as defined under Taste 2.1 of the original contract
Scope of services.
Deliverable: Task report presenting the results of this task.
Task L Develop' Cost Sharing Strategies
Identify and develop various means for quantifying benefits and identifying cost share
responsibilities for a joint program. Identify potential project participants' "ability to pay"
Ifoor project water service. Apply each identified means to the alternatives assembled in Task
Deliverable; Task report presenting the results of this task.
Task M Prepare Draft Report
Prepare a draft report documenting the alternatives identification. evaluation and
comparison work.
Deliverable: Draft repots.
Task Y Coordinate Project Activities
Coordinate and manage all project Activiries, arrange and conduct project meetings: prepare
monthly invoices, progress reports, and schedule updates; and make presentations to the
EBMUD Board and to the San Joaquin County Yater Advisory Commission and/or its
Technical Advisory Committee. Assume the following meetings:
- 10 biweekly meetings in Stockton
- S monthly TAC n�eedngs in Stockton.
Assume the following presentations:
- two EBMUD Board workshops
• two ESJP Board -equivalent workshops.
Deliverables: Agenda and advance written materials for each formal meeting and
presentation: minutes for each formal meeting; presentations,
Task 0 Prepare Final Report
Incorporate client comments into the draft report and finalize the document.
Deliverable: Final report.
S
P. 11
MAY -30-1995 10=29 92o P.11
P.12
OMITS
S
San Joaquin Conjunctive Use Project
Scope of Work
The primary role of Boyle Engineering Corporation (Boyle) during the project investigation shall be as
trcbnical advisor to the East San Joaquin Parties (ESJP). The genual tastes of Boyle consist of the
following:
1. Provide engineering gWdanco and conuneats to data and other technical information that is to be
developed by Montgomery Watson America (MWA) (i.e., alternative development schemok
agriculhu-jl distribution system. etc.).
2. Assist the ESJP Technical Committee in providing review comments to Task Reports and Draft
Report prepared by MBNA.
3. • Participate in biweekly project and monthly TAC meetings.
4. Pardelpata in ESJP Technical Committee and ESJP board meetings for the purpose of further
defining the potential benffits andlor deficiencies in &Itemati`ve project plants.
FROO919700119 April, 1695
MAY -30-1995 10=29 91% P.12
EXHIBIT 2
A g C D E F
.� K
V47E
IONS 1
o . Escl.wl EI• { SGNNYt3R
� AY 0.: •.. .__ _
` - BRUCEVILL-E
+O
r
4 t
( C nIN'ti HERALD Ra„ :c �1{�-r 1. r%4srA .
.,NUI C1TIE5 RO ES , Ro .�..../_ : w i ... __ . �•�.y..
N a
.. J ... ... - ITIES
{ , R
O R x UKK FU RG
+ti'^
ill R RVEY
1
1 « ■ GAL
1
'tCRAM EATD co
i
iOFitVTIJt1'; o DOG T OWN ,
IG{ LU£RVILLE
Wanace
ements BUT
L
RD' r ,
.t. A .., 001MV
1 - --{ __`ice »� »..---•»
Ck
VIN
1 ENF3ER 0 1 i
JENN
ilAfffs� 1 -UNO
-_•_ .., TSN• p _.._. - __! _ .- , ..---.. •t - -__ }d�
t�' r' jpy� -- Q.. - » � V <'.. ..;;6 V � - i /` - -�4 � �.'�'rh •i 4 ..r4 1
.1' _
—0~ ELCOTA
- ` fNA1tA I/RM 1 I • �.K
--- .pfy •}
� LN WN1DA1 1 Elly
VIUAGE
t ' TOC
Re ;
0 1 ]-IO.LT :.� ;: �--^----t- - --------gig--- -. _ -•�j' '"'�����=�;��i•
COLLEGEVILLE i3T
- ti •
i- - FREN
r -•.P
i
CAM 1• A'Ar. a I
1 f+1016 l^ Qj� Y ' L7i•rr ^,
A 8 C INa AP F
56/L/51ONISi0 NOUVOINal 3JOMEI000M Aq pajedaJd
poda2l leUld a�edaad
sal;ingoy;oafo1d a;eulpJoo0
■ Malna2l paeo9 anwag
■ :podw8 }}eiQ ejedaJd
salfia;e�;S aie4S POO
sant;euja;ly )luea/9jedwo0
uoge;uaweldwl e;enlen3
aoueuuo}Jed 94enlen3
san;BUJG;Id elgwassy
sa;ewl;s3 ;so0
9408"3 leivawuoJlnu3
uol;eal}uaA pleld V ;noft-I pent)
eue;lio uol;enlen3 4sllgs}s3
OUGM.10 ufilsa0 4slige;s3
■ spaaN T seoanoS 94enlen3
;afipng/odo*S ezlieUlj
I. Lsnonv I
Ainr 3Nnr AM
"llddV
I
5664
1210-4-43 Aan1S 1Nlor annewdrs3
37n03HOS 3/1VI1103fOdd
S-ITa"I1
�� UNDERCURRENTS ESJP
EBINUD East San Joaquin
County Parties
SAN JOAQUIN COUNTY/EAST BAY MUNICIPAL
UTILITY DISTRICT JOINT WATER PLANNING
PROGRAM
May, 1995
Background
On May 2, 1995, the San Joaquin County
Board of Supervisors approved a
cooperative program with the East Bay
Municipal Utility District (EBMUD) to
identify ways to meet the future water needs
of both the County and EBMUD. The
objective of the program is to formulate, by
August 1995, one or more water supply
plans that would meet the parties' mutual
needs and to assess the benefits and costs of
these plans. Currently underway, the study
program is considering several sources of
water and various major water conveyance
facilities as possible parts of an overall plan
to bring additional water to San Joaquin
County.
Has the County committed to a water
project with EBMUD?
No, at this time the Board of Supervisors has
approved a study program intended to
develop alternative specific water supply
plans for further consideration.
What are the goals of the water supply
plan?
The goals of the plan are to satisfy eastern
San Joaquin County's long-term water
supply needs while supplementing
EBMUD's water supply in dry years to
prevent rationing levels in excess of 25
percent.
How will the plan meet these needs?
The basic concept is that in wet years,
surplus water would be used to recharge the
eastern San Joaquin County groundwater
basin. In dry years, water previously stored
in the basin would be pumped for use in the
County and to firm up EBMUD's
Mokelumne River supply.
Is EBMUD's American River water
supply being considered?
Yes, several means of incorporating
EBMUD's federal American River Water
Service Contract into the plan are being
considered.
Are other new water supplies being
looked at as sources of groundwater
recharge?
Surplus supplies from the Mokeiumne,
Calaveras and Stanislaus Rivers are all being
considered along with reclaimed wastewater
from Lodi and Stockton, San Joaquin
County's American River water rights
permit application, potential new diversions
from the Sacramento River, and various
potential water transfers.
May 1995 * undercurrents • 1
What facilities are being looked at?
Major facilities being considered. include an
unlined canal between the Folsom South
Canal and the Farmington Canal, new
irrigation distribution systems serving areas
currently dependent solely on groundwater,
a large diameter pipeline from the
Sacramento River near Freeport to the
Folsom South Canal, a large diameter
pipeline from Beaver Slough west of Lodi to
the unlined canal listed above, and a large
diameter pipeline from the Folsom South
Canal to the Mokelumne Aqueducts.
What will the alternative plans include?
Each alternative will consist of a
combination of the water sources and
facilities described above configured to meet
the future water needs of both San Joaquin
County and EBMUD. The operation, costs,
benefits, and major impacts of each
alternative will be described.
What about environmental impacts?
The study program approved by the Board
of Supervisors is intended to identify a range
of reasonable water supply plans for further
consideration. identification and
preliminary evaluation of major
environmental issues is central to this effort
and is included in the study program.
However, should the County, or any other
public entity, elect to further consider the
plans for implementation, additional
environmental review will be required
pursuant to law.
Who is conducting the joint study
program?
EBMUD staff, together with a technical
committee consisting of representatives of
San Joaquin County water agencies, are
conducting the technical work. These water
professionals are being assisted by a team of
consultants with specialized expertise in
water supply, conjunctive use, and irrigation
engineering.
How much will this program cost and
who will pay for it?
The study program will cost $630,000. San
Joaquin County and EBMUD are sharing the
cost equally.
What is the schedule?
Alternative plans will be identified by
August, 1995. At this time, San Joaquin
County and EBMUD will consider whether
to pursue any of the alternatives.
Who can provide further information?
For additional information, contact
Tom Shephard, Special Water
Counsel for San Joaquin County
(209) 948-8200
Charles Hardy, EBMUD Senior
Public Information Officer
(510) 287-0141
May 1995 • undercurrents • 2