HomeMy WebLinkAboutAgenda Report - June 7, 1995 (69)4,OF CITY OF LODI COUNCIL COMMUNICATION AGENDA TITLE: East San Joaquin Parties/East Bay Municipal Utility District Joint Conjunctive Use Project (Information Only) MEETING DATE: June 7, 1995 PREPARED BY: Public Works Director RECOMMENDED ACTION: This material is being presented to the City Council for its information. BACKGROUND INFORMATION: A committee, appointed by Supervisor Barber, has been working with East Bay Municipal Utility District (EBMUD) for approximately a year to develop the Water Banking/ Conjunctive Use Project. A copy of the Agreement initiating preliminary study is attached as Exhibit 1. The City of Lodi will be asked to sign this Agreement at a later date. All costs under this Agreement will be the responsibility of EBMUD and San Joaquin County. The major principles of the Project include: • stop the overdraft of the East San Joaquin groundwater basin • restore this groundwater basin to a reasonable level • stop saline intrusion • provide the water needs to the East San Joaquin Parties (ESJP) supply EBMUD with dry -year water The ESJP include the following agencies: • Woodbridge Irrigation District (WID) • North San Joaquin Water Conservation District (NSJWCD) • Central San Joaquin County Water Conservation District (CSJCWCD) • Stockton East Water District (SEWD) • City of Lodi • City of Stockton • San Joaquin County Flood Control and Water Conservation District The ESJP Technical Committee, a subcommittee of the Water Policy Committee, is presently working with EBMUD engineers to develop a formal work plan. As part of the work plan, some of the major water sources to be considered are: • wet -year Mokelumne River water supply • existing entitlements of ESJP from the Mokelumne and Calaveras rivers • EBMUD's American River supply APPROVED: THOMAS A. PETERSON recycled paper 161. City Manager CONJUSEMOC ER116 East San Joaquin Parties/East Bay Municipal Utility District Joint Conjunctive Use Project (Information Only) June 7, 1995 Page 2 • USBR/SEWD/CSJWCD contracts • 1485 Water (treated wastewater from Stockton released to Delta) • reclaimed wastewater from City of Lodi and City of Stockton Some of the needed facilities include an unlined canal between Folsom Canal and Farmington Canal, and new irrigation distribution systems to serve surface water in lieu of groundwater. A plan showing the canal alignment is attached as Exhibit 2. The total preliminary study project costs are approximately $630,000. These costs are to be shared equally between EBMUD and San Joaquin County. The majority of the work will be performed by Montgomery Watson consulting engineers. The ESJP Technical Committee has also retained Boyle Engineering as its consultant to work with them. The total County's share is approximately $315,000 and will be funded by the County using its Water Zone Investigation 11 funds. A time schedule for this work is attached as Exhibit 3. Also attached for your information is a document entitled "Undercurrents Developed by EBMUD and ESJP" which provides more general information on this joint project. Andy Christensen, from WID, is the Chairman of the ESJP Technical Committee. He will be at the Council Meeting to help answer any questions you may have related to this project. FUNDING: San Joaquin County funds. '�- Jack Ronsko ublic orks Director JLR/Im Attachments cc: WID, Attn: Andy Christensen, Manager Water/Wastewater Superintendent CONJUSEAOC 5/31/95 P.02 EXHIBIT 1 aGINr PROgICT S'ftMY AGREEMEW San Joaquin conjunctive Use Project East Ban Joaquin Parties (EBJP) and East Bay Municipal. Utility District THIS AGREEMENT is, made and entered into this day of 1,995, by and between Easc Bay Municipal utility District, a public corporation, hereinafter called "DISTRICT," and the Eastern San Joaquin Parties, consisting of Woodbridge Irrigation District, North San Joaquin Water conservation District, Central San Joaquin Water Conservation District, Stockton East water District, City of Lodi, city of Stockton, San Joaquin County, and the San Joaquin County Flood Control and Water Conservation District, hereinafter collectively referred to as "ESJP". WITNESSETH WHEREAS DISTRICT's Board of Directors adopted a Water Supply Management Action Plan on January 24, 1995, that inCludes eval.iauion of conjunctive use project alternatives with ESJP that incorporate the Mokelumne River and the District's Amer1can R-iver entitlement into a San Joaquin County based conjunctive use program: and WHEREAS ESJP and DISTRICT•aesires to develop alternatives for a joint project (said development of alternatives being referred to herein for purposes of this agreement as "Project") to meet the present and future water needs of ESJP while meeting DISTRICT's future dry year water needs; and WHEREAS DISTRICT and ESJP require professional services to assist with the formulation of Project alternatives, said services to be provided by MONTGOMERY WATSON AMERICA (hereinafter called ":KWA") BOYLE ENGINEERING (hereinafter called "BOYLE"), and a GEOTECHNICAL firm (hereinafter called "GEOTECHI#ICAL"); and WHEREAS DISTRICT and ESJP intend to share the costs of processional services for this Project on an equal basis; IOW, THEREFORE., IT IS MUTUALLY AGREED by ESJP and DISTRICT as follows: 1: MWA Contract: DISTRICT will enter into a contract with MWA to develop Project alternatives for an amount not -to -exceed $549,907. Said MWA services are described in the Scope of work attached hereto as Exhibit A and incorporated herein. MWA will provide copies of all reports. correspondence, invoices and work products for this Project to ESJP unless otherwise specified by ESJP. payment by DISTRICT to MWA for said services will contribute to DISTRICT's Share of Total Costs as defined herein. DISTRICT shall provide copies of all, invoices received from MWA for this Project to ESJP. 33369-6 MAY -30-1995 10:23 92% P.02 Joint Project Agrg4ment ESJP and EaSt BaY Municipal. Utility District Pg. 2 P.03 2. SQY E oatraer: ESJP will enter into a contract with BOYLE to provide toChnical services for this Project for on amount not to exceed S50,000, BOYLE shall have access to information being developed for each engineering task's development to the satisfaction of the ESJP's Technical Team. Said services are described in the Scope of work attached hereto as Exhibit 8 and incorporated herein.. Payment by E$JP to BOYLE for said services will contribute to ESJP's Share of Total Costs as defined herein. ESJP shall provide copies of all invoices received from BOYLE for this Project to DISTRICT. 3. GEOTECHNICAL Co tract: ESJP will enter into a contract with GEOTECIiNICAL Car soil exploration to evaluate percolation along the extension of the Folsom South Canal alignment, for an amount not to exceed $30,000. Payment by ESJP to GEOTECHNICAL for said services will contribute to ESJP'S Share of Total costs as defined herein. ESJP shall provide copies of alb invoices received from GEOTECHNICAL for this Project to DISTRICT. 1. Total Costs: Total Costs for MWA, BOYLE. and GEOTECHNICAL shall not exceed 3629,907 and shall be borne equally as follows: Not -to -exceed Limits District ESP 5549,907 MWA services $274,954 $274,954 S 50,000 BOYLE services S 25,000 S 25,000 S 30-000 GF_OTECHNICAL services S 15,QQQ 9 15,000 $629,947 Maximum Total Costs $314,954 $314,954 S. Cost to DISTRICT- DISTRICT's Share of Total Costs Shall be 504 of the sum of costs payable to MWA, BOYLE, and GEOTECHNICAL for this Project up to a maximum of $314,954. DISTRICT will, satisfy its responsibility for costs through payments to MWA for services specified in Exhibit A of this Agreement. DISTRICT and ESJP recognize that costs for MWA are expected to exceed costs for BOYLE and GEOTECHNICAL. If the sum of DISTR.T.CT payments to MWA exceed DISTRICT's Share of Total Costs, DISTRICT will be entitled to reimbursement frost ESJP as defined herein. 6. C!cst to ES,TP: ESJP's Share of Total Costs shall be 50% of the sum of Costs payable to MWA, BOYLE, and GEOTECHNICAL. for this Project up to a Ynaximum or $314,954. The San Joaquin County Flood Control and Water Conservation District shall be biped for and shad pay the share of the ESJP. ESJP through the San Joaquin County Flood Control and water Conservation District will satisfy their responsibility for 17Q4J/i21651TJS/*ct/05-03-95/3 35569-6 MAY -30--1995 10:23 91: � P.03 Jo. At Project Agreement ESJP and East Hay Municipal Utility District Pg. 3 P. 04 costs through payments t0 BOYLE and GEOTECHNICAL for services specified in this Agreement, and through reimbursement to DISTRICT as needed to equalize ESJP's and DISTRICT's Total Costs. 7. Ag=gJ9menc: If reimbursement is needed to equalize Total Costs for ESJP and DISTRICT, such reimbursement shall commence on a mutually acceptable schedule, however, in no event shall such schedule extend beyond 36 months from the effective date of this Agreement, unless agreed to in writing by ESJP and DISTRICT. if such reimbursement has not been completed within 19 months of the effective date of this Agreement, interest shall then accrue on the unpaid balance at that time at the rate of eight percent per annum. 8. Other Terms:, This Agreement shall be effective upon execution by DISTRICT and Board of Supervisors, San Joaquin County and the San Joaquin County Flood Control and Water Conservation District and shall continue through the completion of Project studies and the reimbursement period. This Agreement constitutes the entire understanding of ESJP and DISTRICT with respect to cost sharing for this Project. All amendments to this Agreement shall be in writing and shall be effective upon execution by DISTRICT and Board of Supervisors, San Joaquin County and the San Joaquin County Flood Control and water Conservation District. I,1 WITNESS WHEREOF the parties hereto execute this AGREEMENT in duplicate. EAST BAY MUNIC12AL UTILITY DISTRICT Date: _ By: Jorge Carrasco GENERAL MANAGER *•• SIGNATURES CONTINUED ON NEXT PAGE*** n045122►631Td5/ect/05-03-95/3 13569-6 MAY -30-1995 19:24 92e P.04 SLNI by: Xerox lelecopier 9021 ; 5-30-95 : 9:56AM Joint Project Agreement E5JP and East Say Municipal. Utility District Py. 4 EAST SAN JOA UIN PARTIES Lute: tACtest: ) H By: George L. Barber Ci-AXi2MAN Board of Supervisors County of San Joaquin and the Board of Supervisors of the San Joaquin County Flood Control and Water Conservation District Date• BY: (A.ttes4: } Woodbridge irrigation District iJSzia (Attest: Date: (Attest: ? Date: (Attest: ) By: Board of Directors North San Joaquin water Conservation District By:� City of Lodi By. Board of Directors Stockton East Water District P.05 ;# 5 t7G�SrZ2�651td5fectr05-(}i-9513 MAY -30-1995 10:24 92`4 P.05 Joint Projact Agreement ESJP and East Say Municipal Utility District Pg. 5 Date* (Attest: Date: P.06 BAST SAN JOADU2N PART ES_ (cont, ) By: } C -icy of Stockton By: (Attest: } Board of Directors Central San Joaquin water Conservation District n0�5iza�6s�Trsreccio5-o3-9si3 33569-Q MAY -30-1995 10 25 92Z. P.06 P.07 EXHIBIT A ITEM 2 - EBMUD WATER SUPPLY ACTION PLAN SCOPE OF WORK The project objective is to meet the present and future water needs of the Eastem San Joaquin Parties (ESJP) while meeting E9MUD's future dry year water needs. The ubjecdve of this scope of work is to identify a short list of one or more alternative plans that would achieve the project objectives. Data, tools and analytical results developed In Phase 1 of the Mokelumne Aquifer Recharge and Storage Project (MARS) will be used to the ascent possible and practicable In this work to minimize costs and provide consistency of analyses and results between the two efforts. In. particular, the San Joaquin County IGSIi and the GIS originally developed for Phase 1 MARS will serve as the basic analytical tools for this work. STAG$ I - DEVELOP PROJECT BASIS Activities completed in this stage aro intended to provide the fundamental knowledge and understanding required to support subsequent formulation of coherent alternative plans that would achieve the project objectives. Task A Evaluate Water Needs and Potential Water Sources 1. Using the San Joaquin County IGSM, evaluate the following: - Total yearly quantity of water required to stop saline intrusion and initiate basin storage recovery, - Minimum groundwater elevation(s) required to have no further saline intrusion (threshold elevation), Annual average volume of water required to achieve threshold elevation in 5 years, 10 years • Annual average quantity of water required to meet joint project goals with groudwater elevations always above threshold elevation, - Dry year water supply if 300,000 aflyr is available in wet years, dry year water supply if 400,000 of/yr is available in wet years. Describe the basis and evaluate the following potendal water sources: 2. EBMUD American River water service contract delivered from the Folsom South Canal (FSC), as conditioned by the Hodge Decision. 3. Mokelumne Rivor water unwed within MY= entitlements, assuming EBMM's settlement offer to FERC defines instreetn flow requirements. 4. Stanislaus River water associated with USBR water service contracts with Central San Joaquin Water Conservation District (49,000 acre-feet firm) and Stockton East Water District (106,000 acre-feet Interim), assuming USBR operates New Melones to meet D 1422. S. Existing ESJF entideracnts, including those for water from the Mokelutnne and Calaveras Rivers. MAY -30-1995 10.25 - 91% P.07 P.08 6. San Joaquin County American River permit application 29657, alternative B, diversion at Nimbus Dam. 7. Potential diversion of currently unregulated flows from the Mokelumno. American, Calaveras, and Stanislaw Rivers, and the streams flowing into Farrtington Reservoir, assuming EBMUD offer to FERC instream flows for the Mokelumne, and D 1422 compliance for the Stanislaw, 3. Reclaimed wastewater from Lodi and Stockton, other than Section 1483. 9. Diversions fiorri the Sacramento River/Delta. 10. Possible assignment or transfer of state filings or reserved water rights on the Mokelumae, assuming instream flows as specified in EBMUD's July 16, 1993 offer of settlement to FERC. For each potential source, describe existing water right conditions, p baseline monthly water availability hydrographs. and identify relevantreliability and implementability issues associated with water right priority, related regional water management initiatives, and apparent statutory and institutional constraints. Ali analyses will assume no change In OAdale I.D. and South San Joaquin I.D. service area or consumptive use. Deliverable: Task report presenting the results of this task. Task B Establish Design Criteria Supplement Task Report 2. 1, p pared under the original contact, as required to serve as the design criteria basis for subsequent. facilities layout and cost estimating work. Supplemental criteria are expected to include right-of-way dimensions associated with large canals and large diameter pipe, tunnel design and cost criteria, and assumptions regarding facilities design capacities based on Task A results. Deliverable: Revised Task Repots 2.1 Task C Establish Evaluation Criteria Prepare a brief memorandum describing the four general evaluation criteria developed under Task 2.1 of the ori'&incl contract scope of services and their applicability to this work. Present this evalustionlscreening approach to EBMUn and ESJP representatives, intake necessary corrections, and finalize the criteria to be used subsequently. Deliverable: Brief draft memorandum presenting criteria. finalized to reflect ESJPIEBMUD consensus. Task D Lay Out Facilities Through field investigation, establish an apparently viable alignment and location for ewh of the major facilities associated with each alternative and display each alignment and the location of key facilities on USGS 7.5 minute quad map p�.ng and GIS mapping. Input the corridors to the project GIS and perform constraints analyses as merited to test the validity of each corridor (it is assumed that the coverage of the GTS will be expanded by others to cover the required project area). Verify the resulting siting in the field. Conduct a group MAY -30-1995 10:26 91% P.08 P.09 tout of the alignments. facility locations. And points of interest to elicit local comment and confirm routing and siting assumptions. Size each facility and develop hydraulic profiles for each facility, 1. Unlined flat lanal from terminus of FSC to Peters along the original FSC alignment. sized to: • deliver water for direct and in -lieu recharge to irrigators, • convey' available streamflows for groundwater recharge by means of canal seepage,and • supply various potential and existing storage reservoirs. Analyses and c$dmaies will differentiate reaches from Dry Creek to Peters and Dry Creek to FSC terminus. to provide for consideration of phased construction. 2. Camanche diversion to Rear Creek as evaluated under Task 2.3 of the original contract scope of services. 3. Diversion facilities from Dry Creek, Mokelumme River, Calaveras River, and (typical) lesser water courses into the unlined flat canal. 4. Improvement and expansion of irrigation distribution systems and on-farm irrigation systems to reasonably maxindze in -lieu recharge (switching groundwater pumpers to surface water in wet years), direct recharge (infiltration or injection.), and indirect recharge through increased irrigation efficiencies in: a, Central San Joaquin Water Conservation District, b. Stockton Fast Water District, C. North San Joaquin Water Conservation District, and d. NVoodbtid a Irrigation District (agricultural exchange not considered in WM). S. Direct to aqueduct extraction well system as evaluated under Task 2,3 of the original contract scope of services. 6. Sacramento River diversion upstream of the Sacramento Regional Wastewater Treatment plant disch*rge from the vicinity of Freeport to the unlined flat canal described above 7, Diversion from Beaver Slough to unlined flat canal. $ . Mokelumne Aqueduct delivery to portions of ESJP as evaluated under Task 2.3 of the original contract scope of services. 9. Pipeline from existing EBNF D turnout from the FSC to Iiia Mokelumne Aqueducts to free up tike volumes of Mokelumne Rivet water for the ESMEBMUD conjunctive use project. 10. Pi tine from the terminus of the FSC to the Mokelumne Aqueduct to free up like Vol of Mokelumne River water for the ESIP/EBI1UD conjunctive use project. 11. )✓lairs for diverting water from the flat, unlined canal described in (1) above, to the i'vlokelumne Aqueducts. 3 MAY -30-1995 10:27 91% P.09 P. 10 Dellvemble: Layout of each facility with listing of key design assumptions and facility characteristics. Task F Identify Environmental Effects Based on field review of the alignment corridors identified in Task D, identify siting constraints based on environmental and regulatory considerations, Identify and evaluate issues associated with siting new diversion facilities on the Sacramento River upstream of the Saa mento Regional Wastewater Treatment Plant discharge. And at Beaver SIough. Review issues associated with impacts on instream flows in the Lower American River. Deliverable: Task report presenting the insults of this task. Task G Prepare Cost Estimates Prepare reconnaissance -level estimates of capital and rccurrfng costs associated with each of the facilities listed wider Task n. Deliverables: Task report presenting the results of this task. STAGE tl - ALTERNATIVES FORMULATION AND EVALUATION Activities completed in this stage aro intended to result in identification of a small number of the best viable alternative pians that would achieve the project objectives. 'ask H Assemble Alternatives Based on the results of Tasks i through 7, screen potential water sources and facilities defined under Task D against the four general evaluation criteria used for Task 2.1 of the original contract scope of servicos. Assemble the remaining sources and facilities; including conveyance, recharge, extraction, and storage facilities; into approximately three alte�ve plans for further analyses and evaluation. A;ricultural exchange with Woodbridge Irrigation District not considered. Deliverable: Task report presenting the results of this task. Task I Evaluate Project Performance Using the San Joaquin County IGSM developed under Task 1.6 of the original scope of services, evaluate quantity and quality Impacts on groundwater and surface water rasources resulting from operation of approximately three alternatives identified in Task H iincluding consideration of oenerali4ed offstteam storage options. Use PROSIM to evaluate impacts on CVP deliveries. SWP deliveries, and Delta outflows. Quantify benefits accruing to project participants and #oundivater pumpers in the project area resulting from operation of each alternative, Deliverable: Task report presenting the results of this task. Task J Evaluate Implementation issues Identify and discuss institutional and regulatory issues associated with implementation of approximately three alternatives. Develop recommended strategies for configuring and/or implementing alternatives to enhance implementability, 4 MAY -30-1995 10:28 92% P.10 Deliverable: Task report presendn; the results of this task. Tacit K Compare/Rank 'Alternatires Compare and rank the altemarives on the bases of completeness, efficiency (including cost estimates), effectiveness and acceptability as defined under Taste 2.1 of the original contract Scope of services. Deliverable: Task report presenting the results of this task. Task L Develop' Cost Sharing Strategies Identify and develop various means for quantifying benefits and identifying cost share responsibilities for a joint program. Identify potential project participants' "ability to pay" Ifoor project water service. Apply each identified means to the alternatives assembled in Task Deliverable; Task report presenting the results of this task. Task M Prepare Draft Report Prepare a draft report documenting the alternatives identification. evaluation and comparison work. Deliverable: Draft repots. Task Y Coordinate Project Activities Coordinate and manage all project Activiries, arrange and conduct project meetings: prepare monthly invoices, progress reports, and schedule updates; and make presentations to the EBMUD Board and to the San Joaquin County Yater Advisory Commission and/or its Technical Advisory Committee. Assume the following meetings: - 10 biweekly meetings in Stockton - S monthly TAC n�eedngs in Stockton. Assume the following presentations: - two EBMUD Board workshops • two ESJP Board -equivalent workshops. Deliverables: Agenda and advance written materials for each formal meeting and presentation: minutes for each formal meeting; presentations, Task 0 Prepare Final Report Incorporate client comments into the draft report and finalize the document. Deliverable: Final report. S P. 11 MAY -30-1995 10=29 92o P.11 P.12 OMITS S San Joaquin Conjunctive Use Project Scope of Work The primary role of Boyle Engineering Corporation (Boyle) during the project investigation shall be as trcbnical advisor to the East San Joaquin Parties (ESJP). The genual tastes of Boyle consist of the following: 1. Provide engineering gWdanco and conuneats to data and other technical information that is to be developed by Montgomery Watson America (MWA) (i.e., alternative development schemok agriculhu-jl distribution system. etc.). 2. Assist the ESJP Technical Committee in providing review comments to Task Reports and Draft Report prepared by MBNA. 3. • Participate in biweekly project and monthly TAC meetings. 4. Pardelpata in ESJP Technical Committee and ESJP board meetings for the purpose of further defining the potential benffits andlor deficiencies in &Itemati`ve project plants. FROO919700119 April, 1695 MAY -30-1995 10=29 91% P.12 EXHIBIT 2 A g C D E F .� K V47E IONS 1 o . Escl.wl EI• { SGNNYt3R � AY 0.: •.. .__ _ ` - BRUCEVILL-E +O r 4 t ( C nIN'ti HERALD Ra„ :c �1{�-r 1. r%4srA . .,NUI C1TIE5 RO ES , Ro .�..../_ : w i ... __ . �•�.y.. N a .. J ... ... - ITIES { , R O R x UKK FU RG +ti'^ ill R RVEY 1 1 « ■ GAL 1 'tCRAM EATD co i iOFitVTIJt1'; o DOG T OWN , IG{ LU£RVILLE Wanace ements BUT L RD' r , .t. A .., 001MV 1 - --{ __`ice »� »..---•» Ck VIN 1 ENF3ER 0 1 i JENN ilAfffs� 1 -UNO -_•_ .., TSN• p _.._. - __! _ .- , ..---.. •t - -__ }d� t�' r' jpy� -- Q.. - » � V <'.. ..;;6 V � - i /` - -�4 � �.'�'rh •i 4 ..r4 1 .1' _ —0~ ELCOTA - ` fNA1tA I/RM 1 I • �.K --- .pfy •} � LN WN1DA1 1 Elly VIUAGE t ' TOC Re ; 0 1 ]-IO.LT :.� ;: �--^----t- - --------gig--- -. _ -•�j' '"'�����=�;��i• COLLEGEVILLE i3T - ti • i- - FREN r -•.P i CAM 1• A'Ar. a I 1 f+1016 l^ Qj� Y ' L7i•rr ^, A 8 C INa AP F 56/L/51ONISi0 NOUVOINal 3JOMEI000M Aq pajedaJd poda2l leUld a�edaad sal;ingoy;oafo1d a;eulpJoo0 ■ Malna2l paeo9 anwag ■ :podw8 }}eiQ ejedaJd salfia;e�;S aie4S POO sant;euja;ly )luea/9jedwo0 uoge;uaweldwl e;enlen3 aoueuuo}Jed 94enlen3 san;BUJG;Id elgwassy sa;ewl;s3 ;so0 9408"3 leivawuoJlnu3 uol;eal}uaA pleld V ;noft-I pent) eue;lio uol;enlen3 4sllgs}s3 OUGM.10 ufilsa0 4slige;s3 ■ spaaN T seoanoS 94enlen3 ;afipng/odo*S ezlieUlj I. Lsnonv I Ainr 3Nnr AM "llddV I 5664 1210-4-43 Aan1S 1Nlor annewdrs3 37n03HOS 3/1VI1103fOdd S-ITa"I1 �� UNDERCURRENTS ESJP EBINUD East San Joaquin County Parties SAN JOAQUIN COUNTY/EAST BAY MUNICIPAL UTILITY DISTRICT JOINT WATER PLANNING PROGRAM May, 1995 Background On May 2, 1995, the San Joaquin County Board of Supervisors approved a cooperative program with the East Bay Municipal Utility District (EBMUD) to identify ways to meet the future water needs of both the County and EBMUD. The objective of the program is to formulate, by August 1995, one or more water supply plans that would meet the parties' mutual needs and to assess the benefits and costs of these plans. Currently underway, the study program is considering several sources of water and various major water conveyance facilities as possible parts of an overall plan to bring additional water to San Joaquin County. Has the County committed to a water project with EBMUD? No, at this time the Board of Supervisors has approved a study program intended to develop alternative specific water supply plans for further consideration. What are the goals of the water supply plan? The goals of the plan are to satisfy eastern San Joaquin County's long-term water supply needs while supplementing EBMUD's water supply in dry years to prevent rationing levels in excess of 25 percent. How will the plan meet these needs? The basic concept is that in wet years, surplus water would be used to recharge the eastern San Joaquin County groundwater basin. In dry years, water previously stored in the basin would be pumped for use in the County and to firm up EBMUD's Mokelumne River supply. Is EBMUD's American River water supply being considered? Yes, several means of incorporating EBMUD's federal American River Water Service Contract into the plan are being considered. Are other new water supplies being looked at as sources of groundwater recharge? Surplus supplies from the Mokeiumne, Calaveras and Stanislaus Rivers are all being considered along with reclaimed wastewater from Lodi and Stockton, San Joaquin County's American River water rights permit application, potential new diversions from the Sacramento River, and various potential water transfers. May 1995 * undercurrents • 1 What facilities are being looked at? Major facilities being considered. include an unlined canal between the Folsom South Canal and the Farmington Canal, new irrigation distribution systems serving areas currently dependent solely on groundwater, a large diameter pipeline from the Sacramento River near Freeport to the Folsom South Canal, a large diameter pipeline from Beaver Slough west of Lodi to the unlined canal listed above, and a large diameter pipeline from the Folsom South Canal to the Mokelumne Aqueducts. What will the alternative plans include? Each alternative will consist of a combination of the water sources and facilities described above configured to meet the future water needs of both San Joaquin County and EBMUD. The operation, costs, benefits, and major impacts of each alternative will be described. What about environmental impacts? The study program approved by the Board of Supervisors is intended to identify a range of reasonable water supply plans for further consideration. identification and preliminary evaluation of major environmental issues is central to this effort and is included in the study program. However, should the County, or any other public entity, elect to further consider the plans for implementation, additional environmental review will be required pursuant to law. Who is conducting the joint study program? EBMUD staff, together with a technical committee consisting of representatives of San Joaquin County water agencies, are conducting the technical work. These water professionals are being assisted by a team of consultants with specialized expertise in water supply, conjunctive use, and irrigation engineering. How much will this program cost and who will pay for it? The study program will cost $630,000. San Joaquin County and EBMUD are sharing the cost equally. What is the schedule? Alternative plans will be identified by August, 1995. At this time, San Joaquin County and EBMUD will consider whether to pursue any of the alternatives. Who can provide further information? For additional information, contact Tom Shephard, Special Water Counsel for San Joaquin County (209) 948-8200 Charles Hardy, EBMUD Senior Public Information Officer (510) 287-0141 May 1995 • undercurrents • 2 ri Mokulumne /Aquifer Recharge and Storage Project Project Arca 2 0 2 Miles I E.L..a�rcyi�gprl6wpar,•pr SI1995 May 1995 • undcratrrents • g