CITY OF LODI
COUNCIL COMMUNICATION
AGENDA TITLE: Professional Services and Appropriation for Traffic Signal at Mills Avenue
and Turner Road ($130,680)
MEETING DATE: March 15, 1995
PREPARED BY: Public Works Director
RECOMMENDED ACTION: That the City Council authorize the City Manager to execute the
agreement for professional engineering services on behalf of the City
appropriate Federal and Development Impact Fee Program funds for
Mills Avenue and Turner Road.
BACKGROUND INFORMATION: A few years ago, the City was notified by the California Public
Utilities Commission that the crossing at Mills Avenue and
Turner Road was eligible for crossing protection improvements. At
a field meeting with Southern Pacific and State engineers, it was
determined that a preempted traffic signal similar to the one at the Cherokee Lane and Lodi Avenue
intersection would be appropriate instead of crossing gates and lights. This determination allowed us to
utilize Federal rail crossing protection funds for the signal, which was already on our priority list.
In April 1991, the City executed agreements with the State for the installation of a traffic signal at the
Mills Avenue and Turner Road intersection. The City has an agreement (RRS-Y308-003) to install a
preempted traffic signal and SPRR has a separate agreement (59R321) to install the necessary track
improvements and preemption circuits for the signal. Just recently, SPRR began installing the circuit
equipment.
Staff requested TJKM Consultants provide an estimate for professional engineering services for the
preparation of plans, specifications and estimates for the Mills Avenue and Turner Road signal
installation. In the past, TJKM Consultants has prepared plans and specifications for the
Kettleman Lane/Tienda Drive, Kettleman Lane/Mills Avenue, and Hutchins StreettVine Street
intersections. The cost for professional engineering services for the design work is $7,950. A copy of
the agreement, including a detailed scope of services, is attached.
Staff recommends City Council authorize the City Manager to execute the agreement with
TJKM Consultants for professional engineering services and appropriate Federal funds and a portion
of the cost using funds from the Development Impact Fee Program.
FUNDING: $ 85,680 - Federal Funds
45,000 - Development Impact Fee
Prm
$130,680 -TOTAL
i
Jack L. Ronsko
Public Works Director
Prepared by Paula J. Fernandez, Associate Traffic Engineer
Attachments
cc: Associate Traffic Engineer
APPROVED:
THOMAS A. PETERSON recycled paper
City Manager
CC -1
CMLLTRN.DOC 3/7//95
CONTRACT AGREEMENT TO ENGAGE THE SERVICES OF
TJKM TRANSPORTATION CONSULTANTS
Project No.
THIS AGREEMENT, entered into on 19. by and between TJKM Transportation Consultants, whose
corporate headquarters is boated at 4837 Chabot Drive, Suite 214, Pleasanton, California, 94588, hereinafter called 'TJKM' and the
party whose name and address is:
Firm Name: City of Lodi
Street Address: 221 West Pine Street
City and State: Lodi, CA 95241-1910
Telephone: (209) 333-6800 x. 667
Fax: (209) 333-6807
Attention: Ms. Paula Fernandez
Hereinafter called 'CLIENT- concerns the proposed project of CLIENT. The following is a general description of the proposed project
which is hereinafter referred to as'PROJEcr: Provide traffic engineering services for the preparation
of plans, specifications and estimates (PS&E) for the installation of a traffic signal at the
Intersection of Turner Road and Mills Avenue in the City of Lodi.
Regarding the PROJECT, the CLIENT and TJKM agree as follows:
A. TJKM agrees to perform certain consulting, design, investigation or other services for CLIENT as detailed on our attached
scope of services and letter dated February 13, 1995.
B. CLIENT agrees to pay TJKM as compensation for its services as follows:
An hourly basis in accordance with the attached fee schedule up to an estimated amount of $ 7,950
NOTE: Under the provisions of this agreement, a late payment FINANCE CHARGE will be computed at the periodic rate of 1
1/2% per month, which is an ANNUAL PERCENTAGE RATE OF 18% and will be applied to any unpaid balance commencing 30
days after the date of the original invoice.
C. The standard provisions set forth upon the reverse side hereof are incorporated into and made a part of this agreement.
IN WITNESS WHEREOF, the parties hereto have accepted, made and executed this agreement upon the terms, conditions and
provisions above stated and on the reverse side hereof, the day and year first above written.
TJKM, A California Corporation
By: 6L-
V. ��p
President 2113/95
TITLE DATE
CLIENT
By:
AUTHORIZED TITLE DATE
CONTOOI.MAS
STANDARD PROVISIONS OF AGREEMENT
The CLIENT and TJKM agree that the following provisions shall be a part of their agreement:
1. The CLIENT binds himself„ his partners, successors, executors, administrator, and assigns to TJKM this agreement in
respect to all of the terms and conditions of this agreement
2. In the event that the PROJECT covered by this contract is required by a governmental agency or the CLIENT and in the
event that due to change of policy of said agency or CLIENT after the date of this agreement, additional office or field work
is required, the said additional work shall be paid for by CLIENT as extra work.
3. The CLIENT shall pay as extra work the costs of any fees, aerial photography, costs for attendance at public hearings and
meetings, mileage costs, blueprints and reproductions, and all other charges not specif cally covered by the terms of this
agreement.
4. Should litigation be necessary to enforce any term or provisions of this agreement or to collect any portion of the amount
payable under this agreement, then all litigation and collection expense witness fees and court costs, and attorney's fees
shall be paid by CLIENT to TJKM.
5. Fees and all other charges will be billed monthly as the work progresses, and the net amount shall be due at the time of
bilfing. If the invoice is not paid within 30 days, TJKM may without waiving any claim or right against the CLIENT, and
without liability whatsoever to the CLIENT terminate the performance of the service.
S. A late payment FINANCE CHARGE will be computed at the periodic rate of 1 1!2% per month, which is an ANNUAL
PERCENTAGE RATE OF 18% and may be applied to any unpaid balance commencing 30 days after the date of the original
invoice at the sole election of TJKM. In the event any portion or all of an account remains unpaid 90 days atter billing, the
CLIENT shad pay all costs of collection and reasonable attorney's fees.
7. In the event all or any portion of the work prepared or partially prepared by TJKM be suspended, abandoned, or terminated,
ft CLIENT shad pay TJKM for the work performed on an hourly basis, not to exceed any maximum contract amount
specified herein, to the date of termination, all reimbursable expenses, and reimbursable termination expenses.
8. In the event that CLIENT institutes a suit against TJKM because of any failure or alleged failure to perform, error, omission
or negligence, and if such suit is not successfully prosecuted, or if it is dismissed, or if verdict is rendered or TJKM, CLIENT
agrees to pay TJKM any and all costs of defense, inducing attorney's tees, expert witnesses' fees, and court costs and any
and all other expenses of defense which may be needful, immediately following dismissal of the case or immediately upon
verdict being rendered in behalf of TJKM.
9. TJKM makes no representation concerning the cost figures made in connection with maps, plans, specifications, or drawings
other than that all cost figures are estimates only and TJKM shall not be responsible for fluctuations in cost factors.
10. No conditions or representations altering, detracting from, or adding to the terms hereof shad be valid unless printed or
written hereon or evidenced in writing by either party to this agreement and accepted in writing by the other.
11. TJKM shall not be responsible for damages resulting from delays in performance caused by any factors beyond TJKM's
reasonable control. In the case of the happening of any such cause of delay, the time of completion shag be extended
accordingly.
12. TJKM makes no warrant, either express or implied, as to its findings, recommendations, specifications, or professional
advice except that they were promulgated after being prepared in accordance with generally accepted engineering practices
and under the direction of registered professional engineers.
13. The CLIENT agrees to limit TJKM's liability to the CLIENT and/or the owner, and to all construction contractors and
subcontractors on the PROJECT, due to TJKM's negligent acts, errors or omissions, such that the total aggregate liability
of TJKM to all those named shall not exceed $50,000 or TJKM's total fee for services rendered on this PROJECT,
whichever amount is greater.
14. In the event any provision of this agreement shall be held to be invalid and unenforceable, the other provisions of this
agreement shall be valid and binding on the parties hereto.
15. Services provided within this agreement are for the exclusive use of the CLIENT.
16. 3iiling rates are subject to increase annually effeczve January 1st of each calendar year. It the project is not completed
wiamin the calendar year, compensation shall be re -negotiated between TJKM and the client
DETAILED SCOPE OF SERVICES
DESIGN OF NEW TRAFFIC SIGNAL
INSTALLATIONISIGNING AND STRIPING
Intersection:
Review Agency:
Client:
Project Director:
Project Engineer:
Prepared By:
Date:
1. Project Definition
Turner Road and Mills Avenue
City of Lodi
City of Lodi
Don Costa
Sharri Ehlert
Sham Ehlert
February 13, 1995
A. Attend start up meeting and obtain base plans in AutoCAD from the
City.
B. Obtain available information such as utility information, title blocks,
etc.
C. Conduct field review of site, photographs, verification of existing
equipment, etc.
2. Preliminary Plans and Specifications
A. Draft conceptual layout of proposed design.
B. Prepare detailed design of traffic signal including conductor and
equipment schedules.
C. Draft detailed design (normally 20 -scale for traffic signal installation
and 40 -scale for signing and striping).
D. Prepare Special Provisions using WordPerfect 5.1. Specifications will
be based on Caltrans Standard Specifications with modifications to
conform to the City of Lodi's requirements.
E. Attend one status meeting to discuss comments and progress if needed.
Work not included:
Traffic signal interconnect plans
Construction staging plans
Street improvement or utility improvement plans
TJKM Transportation Consultants
Turner Road/Mills Avenue Page 1 of 2
3. Final Design
A. Revise plans to comments of review agency.
B. Prepare construction cost estimate ("Lump Sum" for traffic signal
installation, signing and striping).
C. Draft finalized detailed design and submit to review agency.
Work not included:
More than two reviews by the review agency
Detailed estimates (unit cost estimates for traffic signal equipment)
Attendance at more than two meetings during the design period
4. Contracting and Construction Services
A. Provide reproducible drawings.
B. Provide initial timing for the traffic signal.
Work not included:
Evaluation of bids
Inspection of traffic signal construction
Locating signal equipment in the field
"As Built" drawings
Obtaining permits from the railroad
Items listed as "Work not included" are not included in the estimated fee or
hours and will be billed as extra work on a Time and Materials basis. Such
work will be done only with the written approval of the client.
TJKM Transportation Consultants
Turner Road/Mills Avenue Page 2 of 2
Transportation Consultants
February 13, 1995 r
Ms. Paula Fernandez
City of Lodi
Public Works Department
221 West Pine Street
Lodi, CA 95241-1920
Dear Ms. Fernandez:
Pursuant to your request and our subsequent telephone conversations, TJKM
Transportation Consultants is pleased to present this proposal to provide traffic
engineering services for the preparation of plans, specifications and estimates (PS&E) for
the installation of a traffic signal at the intersection of Turner Road and Mills Avenue in
the City of Lodi. The proposal also includes the preparation of signing and striping plans
necessary to accommodate the proposed signal. We have designed numerous traffic
signal installations in the City of Lodi (including the Kettleman Lane/Trienda Drive,
Kettleman Lane/Mills Avenue and Vine Street/Hutchins Street intersections) and are well
qualified to satisfy the needs and requirements of both Southern Pacific and the City of
Lodi.
The existing intersection is currently unsignalized with a Southern Pacific railroad track
crossing diagonally across the intersection. The traffic signal design will require railroad
preemption along with special traffic signal timing. For this project, TJKM is proposing
to use a design team composed of a project manager and a project engineer. Don Costa
will be the project manager for the signal design. Mr. Costa will direct the preparation of
the detailed plans, specifications, and estimates for the signal design. Mr. Costa has many
years of experience in traffic signal design, timing and operations. His previous
experience with the City of Woodland has provided him with a practical, hands-on
approach to traffic signal design, timing and operations. Shard Bender Ehlert,
Transportation Engineer, will be the project engineer for this project. Ms. Men will
perform the actual design tasks related to the project. Ms. Elden has been the project
engineer for numerous traffic signal installations in the Bay Area. Resumes for both Mr.
Costa and Ms. Ehlert are attached for your reference.
The traffic signal design will require three sheets, a title sheet, a 20 -scale plan sheet and a
schedule sheet. We estimate that one 40 -scale sheet will be needed for the signing and
striping. We estimate a total of four sheets for the design.
A detailed scope of services is attached to this letter proposal. Our estimated maximum
fee for the design work is $7,950. We will bill on a monthly basis for the actual hours
worked in accordance with the enclosed contract agreement and the hourly rate schedule.
1637 Uha hot Drier. Suite 214. Plea%anton. California 94598-27.54. 15101 .163-0611. Fax t5!0l 463-3 690
Pleasanton. Sacramento. Fresno . Santa Rosa
Ms. Paula Fernandes, Page 2 February 13, 1995
Our fee is based upon two plan reviews by the City of Lodi. Reviews beyond those
described above will be considered extra work and would require a revision to our
contract and budget. This will remain a firm offer for 90 days from the date of this letter.
Enclosed with this letter are two copies of our contract agreement for your approval. If
you agree with the terms of this proposal, please sign and return one copy to us for our
files. We expect to make our first submittal within three weeks of the receipt of the
signed agreement and the base plans.
Thank you for the opportunity to provide these services. We look forward to working
closely with you and other staff members at the City. If you wish to discuss further the
proposed scope or fee, please do not hesitate to contact me.
Sincerely,
,4"- 'o"t
SUM Bender Ehlett
Transportation Engineer
pip
Attachments
087-4P.1SB
Transportation consul
HOURLY RATE SCHEDULE
Principal Level $140
Associate Level 120
Senior Level 85
Assistant Level 65
Technical Staff 60
Production Support 35
The above rates include standard overhead items. Travel costs are billed at 30¢ per mile. Each
project may be subject to initial set up and coordination fees. All outside services are billed at
cost, plus ten percent for handling.
Invoices are due and payable within 30 days. Invoices paid after 30 days will be subject to
separate billings of one and one-half percent per month of unpaid balance. Late charges are not
included in any agreement for maximum charges.
Expert witness charges available on request.