HomeMy WebLinkAboutAgenda Report - March 1, 1995 (85)y OF CITY OF LODI COUNCIL COMMUNICATION aqI a�P AGENDA TITLE: Plans and Specifications and Advertisement for Bids for Civic Center Improvements (Phase II), City Hall Remodel MEETING DATE: March 1, 1995 PREPARED BY: Public Works Director RECOMMENDED ACTION: That the City Council approve the plans and specifications for the above project, authorize advertising for bids, and appropriate the funds as outlined on Exhibit B. The planned bid opening is set for April 12, 1995. BACKGROUND INFORMATION: This project is one of the last major phases of the Civic Center improvements. The work under this project includes the overall interior remodel (saving as many existing walls and offices as possible), structural upgrade, reroofing, installation of new energy-efficient HVAC system, windows and lighting, and ADA upgrades, including elevator and restrooms. Exhibit A shows the planned layout of the three floors in City Hall. The architect's estimate for this construction is $1,800,000. This amount includes anticipated change orders. Attached as Exhibit B is a breakdown of the total Civic Center project estimate and recommended funding. On this Exhibit, we have also shown the previous estimates presented to Council. This shows the cost estimates do change as the plans become more complete. The major increases in the construction estimate are due to: • Structural increases due to final Building Code requirements set by the Building Division; • Complete reroofing of building; • HVAC increases based on detailed evaluation of energy and zonal issues; • Replacing and relocation of existing electrical service transformers; • installing all new windows and frames; • Adding additional second floor fire exit; • Increase in elevator size due to final ADA requirements. This breakdown also shows, as the final construction and the actual move draw nearer, there are many little items and expenses which become apparent that were not contemplated at the time of prior estimates. The only other format contract to be let is the Front Entry Plaza and Handicap Ramps. This project is fully funded with Federal Block Grant funds and will be advertised and let during the summer of this year. Exhibit C is the updated construction schedule for the Civic Center Improvements Project. The Building and Equipment Maintenance Superintendent, architect and I will be at the Council Meeting to. answer any questions you may have conceming the project or its funding. r FUNDING: Refer to Exhibit B. Jack L. Ronsko Public Works Director Attachments cc: Finance Director Purchasing Officer Building and Equipment Maintenance Superintendent Wenell Mattheis Bowe APPROVED: / ' ��• THOMAS A. PETERSON 1�► recycled paper City Manager CPSdA.DOC 02/22/95.1 EXHIBIT A z a J CL I - z W W W Q m z O', to z, Li m W I 00 W J d U V) N A ®DIMENSION FIRST FLOOR PLAN SCALE: 1/8"=i'-0" Z Q J CL m O O J LL - 0 Z O U LTJ V) ml N Z Li EXHIBIT B TOTAL PROJECT ESTIMATE PROJEST.DOC February 1995 April 1994 November 1993 Estimate Estimate Architectural Services $ 290,000 $ 286,000 $ 276,000 First Phase (Trailers, Beckman Renovation, 122,353 122,353 122,353 Investigate City Hall/Carnegie) Second Phase (Carnegie Design, PS&E) 18,360 18,360 18,360 Third Phase (City Hall Design, PS&E) 135,089 135,089 135,089 (4) Changes in Scope (Approved April 9,580 9,580 -0- 1994) (2) Additional Changes in Scope 3,760 -0- -0- 289,142 285,382 275,802 Construction Contracts (Formal Bids) $3,007,000 $2,617,000 $ 2,556,000 City Hall Remodel 1,800,000 1,443,000 1,443,000 City Hall Annex and Carnegie 695,000 623,000 585,000 City Hall Annex Parking Lot 32,000 50,000 50,000 Entry Plaza and Handicap Ramps 90,000 90,000 109,000 Conduit Installation -0- 33,000 15,000 Data Communications 125,000 90,000 53,000 Trailer Lease 100,000 118,000 118,000 Office System Furniture 165,000 170,000 183,000 Miscellaneous Contracts/Expenses $ 86,000 $ 21,000 $ 16,000 Security Systems 10,000 5,000 -0- Moving Company (Phase 1) 20,000 -0- -0- Moving Company (Phase II) 10,000 -0- -0- Computer Move 7,000 -0- -0- Copier Move 1,000 -0- -0- Furniture Painting 3,000 -0- -0- Site and Interior Signage 4,000 -0- -0- Emergency Alarm System for Finance 1,000 -0- -0- Relandscaping Trailer Area 2,000 -0- -0- PROJEST.DOC Plan Check (Structural Only) 3,000 -0- -0- Miscellaneous 25,000 16,000 16,000 Contract Personnel $ 70,000 $ -0- $ -0- Contract Inspector 66,000 -0- -0- Contract Clerical 4.000 -0- -0- TOTAL PROJECT ESTIMATE $3,453,000 $2,924,000 $ 2,848,000 FINANCES Amounts Spent or Encumbered Architectural Services $ 285,000 Parking Lot 32,000 City Hall Annex and Carnegie 684,000 TOTAL SPENT/ENCUMBERED $1,001,000 (through January) ADDITIONAL FUNDING NEEDS $ 2,452,000 Funding Projection Unencumbered Balance (through January) $ 752,000 Block Grant Funds/94-95 (Plaza) 90,000 City Hall Litigation to Date** 105,000 Dial -a -Ride Reimbursement (TDA) 30,000 Development Impact Fees (GFI) 94-95 General City (121.8 fund balance) 724,000 * Police (121.5 fund balance) 170,000 * General Fund Capital Improvement Budget 581,000 * FUNDING AVAILABLE $2,452,000 *Needs to be formally appropriated by Council to Civic Center Improvement Project (121.0-350.61). **Additional litigation funds may be forthcoming. PROJEST.DOC CIVIC CENTER IMPROVEMENTS PROJECT SCHEDULE 19" ,995 n J F M A M J J A S 1 O 1 N D J F I M I A M J