HomeMy WebLinkAboutAgenda Report - June 6, 2001 E-09AGENDA TITLE: Adopt resolution awarding the contract for installation of streetlights on Streetlight Completion
Project Phase 2 to Tim Paxin's Pacific Excavation, Inc. ($367,221.00)
MEETING DATE: June 6, 2001
SUBMITTED BY: Electric Utility Director
RECOMMENDED ACTION: That the City Council award the contract for installation of streetlights on
Streetlight Completion Project Phase 2 to the low bidder, Tim Paxin's Pacific
Excavation, Inc. in the amount of $367,221.00.
BACKGROUND INFORMATION: On May 1, 2001, eight bids were received and opened for this project. The
bid results are tabulated below:
BIDDER
AMOUNT
Tim Paxin's Pacific Excavation, Inc., Elk Grove, CA
$367,221.00
Arrow Construction, Sacramento, CA
367,370.00
Richard Heaps, Electrical Contractor, Inc., Sacramento, CA
388,546.00
Tennyson Electric, Inc., Livermore, CA
394,950.00
Cla born Contracting Group, Inc., Auburn, CA
398,134.00
Collins Electrical Company, Inc., Stockton, CA
460,000.00
Steiny and Co., Inc., Vallejo, CA
489,110.00
Summit Electrical Construction, Clovis, CA
435,730.00-
* Did not submit addendum
This project will install streetlights in various locations throughout the City. The involved streets are shown darkened
within the circles on the attached map. It is estimated that the Streetlight Completion Project, when completed, will
have installed 1,000 - 1,200 lights during the next 3 - 5 years.
Plans and Specifications for this project were approved by the City Council at the meeting of March 21, 2001. During
the bidding process, one addendum was issued. In order to be considered a qualified bidder a prospective bidder was
required to return a signed acknowledgement indicating receipt of the addendum or include such acknowledgement
with the bid.
One bidder did not submit the acknowledgement. The addenda were mailed via FedEx. Fed Ex's records indicate
delivery of the addendum to Summit Electrical Construction.
Funding: Business Unit # 161672 Streetlight Completion Project
Funding Approval: •A" n .x''71 •+
Vicky M Athie, Finance Director
Alan N. Vallow, Electric Utility Director
PREPARED BY: Hans Hansen, Manager, Engineering and Operations
ANWHH/Ist
APPROVED:
H. Dixon ynn --city mpr ager
DI� I
mil
W
,I
1
l
I' it
J�LUL
u
J I �; Wl 33H02l3H� li �
';
1mrnT',T..T,T,,
±Fil a
�0ej`�u
RESOLUTION NO. 2001-144
A RESOLUTION OF THELOD1 CITY COUNCIL. AWARDING THE
CONTRACT FOR INSTALLATION OF STREETLIGHTS UNDER
STREETLIGHT COMPLETION PROJECT PHASE 2
WHEREAS, in answer to notice duly published in accordance with law and the order
of this City Council sealed bids were received and publicly opened May 1, 2001 at 11:00
a.m. for Installation of Streetlights under Streetlight Completion Project Phase 2, described
in the specifications therefore approved by the City Council on March 21, 2001; and
WHEREAS, said bids have been compared, checked, and tabulated and a report
thereof filed with the City Manager as shown on as follows:
BIDDER/LOCATION
AMOUNT
Tim Paxin's Pacific Excavation Inc. Elk Grove CA
$367,221.00
Arrow Construction Sacramento CA
367 370.00
Richard Heaps, Electrical Contractor Inc. Sacramento CA
388 546.00
Tennyson Electric Inc. Livermore CA
394 950.00
Cla born Contracting Group, Inc. Auburn, CA
398 134.00
Collins Electrical Company, Inc. Stockton CA
460 000.00
Steiny and Co. Inc. Valle'o CA
489 110.00
Summit Electrical Construction Clovis CA
435,730.00*
* Did not submit addendum
WHEREAS, the City Manager recommends awarding the contract for the Installation
of Streetlights under Streetlight Completion Project Phase 2, to Tim Paxin's Pacific
Excavation, of Elk Grove, California.
NOW, THEREFORE, BE IT RESOLVED, that the Lodi City Council does hereby
award the contract for the Installation of Streetlights under Streetlight Completion Project
Phase 2, to Tim Paxin's Pacific Excavation, of Elk Grove, California, in the amount of
$367,221.00.
Dated: June 6, 2001
I hereby certify that Resolution No. 2001-144 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held June 6, 2001, by the following vote:
AYES: COUNCIL MEMBERS — Hitchcock, Howard, Land, Pennino and
Mayor Nakanishi
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — None
ABSTAIN: COUNCIL MEMBERS — None
SUSAN J. BLACKSTON
City Clerk
2001-144
CITY COUNCIL
ALAN NAKANISHI, Mayor
PHILLIP A. PENNINO
Mayor Pro Tempore
SUSAN HITCHCOCK
EMILY HOWARD
KEITH LAND
May 24, 2001
CITY ,OF LODI
Nexans Energy USA Inc.
c/o Isberg Nott Company
Attn Steve Kanty
8 Crow Canyon Court Suite 210
San Ramon CA 94583
CITY HALL, 221 WEST PINE STREET
P.O. BOX 3006
LODI, CALIFORNIA 95241-1910
(209) 333-6778
FAX (209) 333-6791
Re: Formal bid: #1/0 and #350 600V XLPE Underground Triplex
Dear Mr. Kanty:
H. DIXON FLYNN
City Manager
SUSAN BLACKSTON
City Clerk
RANDALL A. HAYS
=;City Attorney
This letter provides formal notification to you of the plan by City of Lodi staff to recommend that
the Lodi City Council award the bid for 25,000 feet of #1/0 and 24,000 feet of #350 600V
underground triplex to the second -low bidder, Western States Electric, instead of the low bidder,
Nexans Energy USA, Inc.
The reasons for the recommendation are as follows:
1) The 24 -week leadtime indicated on the proposal would delay installations at several
subdivisions which are planned for this summer. Second -low bidder quoted a leadtime
of four to six weeks; other bidders quoted two to seven -week leadtimes. The
"Information to Bidders" section of the bid instructions, subsection entitled "Delivery",
indicates that "delivery time will be part of the bid evaluation." Staff has determined that
the cost of delay of the projects would exceed the increase in cost of award to the
second -low bidder, and that it is in the City's best interest to obtain timely delivery.
2) The exceptions taken on Item #2, i.e.,
Full hard conductor instead of % to'/ hard as specified,
No sequential footage markings instead of sequential footage markings every
two feet, as specked, and
No wood lagging instead of wood lagging on the reels, as specified,
are not acceptable to the Engineering Division of the Electric Utility Department.
If you do not agree with staffs recommendation to award to the second -low bidder, and believe
that the City should award to you, points 1) and 2) above notwithstanding, you may file a letter
of protest with the City of Lodi. Your letter should indicate why you believe the City should
award to you, and it should address the issues of leadtime and exceptions to the specifications.
Nexans Energy USA, Inc.
May 24, 2001
Page 2
Your letter should be addressed to
Mr. Alan Vallow
Director, Electric Utility Department
City of Lodi
1331 South Ham Lane
Lodi CA 95242-3995
and it must be received by 8:00 a.m. Friday, June 1, 2001.
The director or his designated representative will respond to you prior to June 6, 2001. If you do
not agree with the response, you will have the opportunity to address the Lodi City Council in
opposition to staffs recommendation and in support of your proposal. The City Council meets
at 7:00 p.m. Wednesday, June 6, 2001. The decision of the Lodi City Council will be final.
If you require details regarding the recommendation or procedure, please contact me.
Sincerely,
J --4
E Harris
Purchasing Officer
City of Lodi
cc: Electric Utility Director
City Clerk
May 30 01 11:20a P.1
ISBERG NOTT COMPANY 8 CROW CANYON COURT • SWE 210
FAX COVER SHEET SAN RAMON , CA. 84683
DATE: 5/30/01
TO: Lodi Municipal Electric System RECEIVED
Joel Hams .153-
Phone:
3).Phone: 209-333-6777 Fax: 209-39-6791 JUN - 2001
FROM: lsberg Nott Company City Clerk
Bob Sheridan City of Lodi
Phone: 925-820-8102 or 925426-4718
Fax: 925-820-0532 or 925426-0323
PAGES TO FOLLOW: C::' REPLY: URGENT _ ASAP 2f -NONE _ FYI
SUBJECT: Nexans Energy USA
Per your letter of 5/24 please be advised we will not be protesting the bid resufts in any manner and
understand the reason for the award going to a supplier with much better lead tinier in ref. to the City
of Lodi formal bid for the 110 and #350 600V XLPE Underground Triplex cable.
CITY COUNCIL
ALAN S. NAKAMISHI, Mayor
PHILLIP A. PENNINO
Mayor Pro Tempore
SUSAN HITCHCOCK
EMILY HOWARD
KEITH LAND
CITY OF LODI
ELECTRIC UTILITY DEPARTMENT
ALAN N. VALLOW, DIRECTOR
1331 S HAM LANE
LODI, CALIFORNIA 95242-3995
(209)333-6762
FAX (209) 339-6839
June 7, 2001
Mr. Tim Paxin, President
Tim Paxin's Pacific Excavation Inc
9701 Dino Drive Suite 110
Elk Grove CA 95624
Re: Streetlight Completion Project — Phase II
H. DIXON FLYNN
City Manager
RANDALL A. HAYS
City Attorney
SUSAN J. BLACKSTON
City Clerk
At the City Council meeting of June 6, 2001, your firm was awarded the contract for Streetlight
Completion Project -Phase II in the amount of $367,221.00. The bids received for the project
are tabulated below:
Bidder
Amount ($)
Tim Paxin's Pacific Excavation, Elk Grove, CA
367,221.00
Arrow Construction, Sacramento, CA
367,370.00
Richard Heaps, Sacramento, CA
388,546.00
Tennyson Electric, Livermore, CA
394,950.00
Cla born Contracting, Auburn, CA
398,134.00
Collins Electrical, Stockton, CA
460,000.00
Steiny and Company, Vallejo, CA
489,110.00
Summit Electrical Construction, Clovis, CA
435,730.00
' Did not submit addendum
At this time various documents need to be completed and/or provided by you in order to finalize
the Contract for this project. Therefore, enclosed with this letter you will find:
Contract, 3 copies.
Please execute each copy on page 4.4 under CONTRACTOR and return the three
copies to the City for execution. The effective date of this contract will be the date the
City executes the Contract.
Mr. Tim Paxin, President
Tim Paxin's Pacific Excavation Inc
9701 Dino Drive Suite 110
Elk Grove CA 95624
Contract Surety Bonds (Labor and Materials, Faithful Performance) 1 copy of each.
Please have these bonds completed and submitted with the Contract. See section
2.900 of "Information to Bidders". The bonds must be executed on the forms enclosed
with this letter in addition to any other documents your Surety Company may wish to
supply. The "California All -Purpose Acknowledgment" must also be completed for each
Bond.
Insurance Certificate
Please provide and include the insurance certificates with the Contract, as required per
section 2.1100 and 2.1200 of "Information to Bidders". The "Certificate Holder's"
address should be City of Lodi, 221 West Pine, Lodi, California, 95240.
Please return all documents to:
Hans Hansen, Manager, Engineering and Operations
City of Lodi, Electric Utility Department
1331 South Ham Lane
Lodi CA 95242-3995
Upon execution of the contract a pre construction meeting will be scheduled at the Electric
Utility Service Center, 1331 S. Ham Lane, Lodi CA. Please indicate the name or names of the
individual(s) in your organization we should contact regarding the specific date and time of the
pre construction meeting.
A copy of the "Specifications" for this project has been enclosed for your reference.
Upon execution of the contract by the City your Bid Bond will be returned.
Should you have any questions, please do not hesitate to contact me at (209) 333-6769.
4, X&
Hans Hansen
Manager, Engineering and Operations
Enclosures
c: Electric Utility Director
City Clerk
Purchasing Officer
Award Notice.doc
CITY COUNCIL
ALAN S. NAKANISHI, Mayor
PHILLIP A. PENNINO
Mayor Pro Tempore
SUSAN HITCHCOCK
EMILY HOWARD
KEITH LAND
Mr Michael Wegener
Arrow Construction
7307 Roseville Road #6
Sacramento CA 95842
CITY OF LODI
ELECTRIC UTILITY DEPARTMENT
ALAN N. VALLOW, DIRECTOR
1331 S HAM LANE
LODI, CALIFORNIA 95242-3995
(209)333-6762
FAX (209) 339-6839
June 7, 2001
Re: Streetlight Completion Project — Phase 11
H. DIXON FLYNN
City Manager
RANDALL A. HAYS
City Attorney
SUSAN J. BLACKSTON
City Clerk
At the City Council meeting of June 6, 2001, the City Council awarded the bid referenced above
to Tim Paxin's Pacific Excavation Inc., Elk Grove, CA, the lowest responsible bidder. The bids
received for this project are tabulated below:
Bidder
Amount ($)
Tim Paxin's Pacific Excavation, Elk Grove, CA
367,221.00
Arrow Construction, Sacramento, CA
367,370.00
Richard Heaps, Sacramento, CA
388,546.00
Tennyson Electric, Livermore, CA
394,950.00
Cla born Contracting, Auburn, CA
398,134.00
Collins Electrical, Stockton, CA
460,000.00
Steiny and Company, Vallejo, CA
489,110.00
Summit Electrical Construction, Clovis, CA
435,730.00
" Did not submit addendum
The bid bond you submitted with your bid proposal will be returned to you once the contract for
this project has been executed, expected within 30 days.
The City of Lodi wishes to thank you for your interest in this project, and assures you that we
welcome proposals from you in the future.
.7C11zJ [,�r�
Hans Hansen
Manager, Engineering and Operations
c: Electric Utility Director
City Clerk
Purchasing Officer
Award Notice 1.doc
CITY COUNCIL
ALAN S. NAKANISHI, Mayor
PHILLIP A. PENNINO
Mayor Pro Tempore
SUSAN HITCHCOCK
EMILY HOWARD
KEITH LAND
Ms Diane Meehan, President
Richard A. Heaps
8909 Florin Road
Sacramento CA 95829
CITY OF LODI
ELECTRIC UTILITY DEPARTMENT
ALAN N. VALLOW, DIRECTOR
1331 S HAM LANE
LODI, CALIFORNIA 95242-3995
(209)333-6762
FAX (209) 339-6839
June 7, 2001
Re: Streetlight Completion Project -Phase II
H. DIXON FLYNN
City Manager
RANDALL A. HAYS
City Attorney
SUSAN J. BLACKSTON
City Clerk
At the City Council meeting of June 6, 2001, the City Council awarded the bid referenced above
to Tim Paxin's Pacific Excavation, Elk Grove, CA, the lowest responsible bidder. The bids
received for this project are tabulated below:
Bidder
Amount ($)
Tim Paxin's Pacific Excavation, Elk Grove, CA
367,221.00
Arrow Construction, Sacramento, CA
367,370.00
Richard Heaps, Sacramento, CA
388,546.00
Tennyson Electric, Livermore, CA
394,950.00
Cla born Contracting, Auburn, CA
398,134.00
Collins Electrical, Stockton, CA
460,000.00
Steiny and Company, Vallejo, CA
489,110.00
Summit Electrical Construction, Clovis, CA
435,730.00
* Did not submit addendum
The bid bond you submitted with your bid is herewith returned to you.
The City of Lodi wishes to thank you for your interest in this project, and assures you that we
welcome proposals from you in the future.
Hans Hansen
Manager, Engineering and Operations
Enclosure (1)
c: Electric Utility Director
City Clerk
Purchasing Officer
%1EUDPDC1200031EUD-DATAIUSER\ENG18id SpeCSWREETLIGHT 21Hward Notice2.doc
CITY COUNCIL
ALAN S. NAKANISHI, Mayor
PHILLIP A. PENNING
Mayor Pro Tempore
SUSAN HITCHCOCK
EMILY HOWARD
KEITH LAND
CITY OF LODI
ELECTRIC UTILITY DEPARTMENT
ALAN N. VALLOW, DIRECTOR
1331 S HAM LANE
LODI, CALIFORNIA 95242-3995
(209)333-6762
FAX (209) 339-6839
June 7, 2001
Mr. Michael A. Tennyson, President
Tennyson Electric Inc.
7275 National Drive Suite A
Livermore CA 94550
Re: Streetlight Completion Project -Phase II
H. DIXON FLYNN
City Manager
RANDALL A. HAYS
City Attorney
SUSAN J. BLACKSTON
City Clerk
At the City Council meeting of June 6, 2001, the City Council awarded the bid referenced above
to Tim Paxin's Pacific Excavation, Elk Grove, CA, the lowest responsible bidder. The bids
received for this project are tabulated below:
Bidder
Amount ($)
Tim Paxin's Pacific Excavation, Elk Grove, CA
367,221.00
Arrow Construction, Sacramento, CA
367,370.00
Richard Heaps, Sacramento, CA
388,546.00
Tennyson Electric, Livermore, CA
394,950.00
Cla born Contracting, Auburn, CA
398,134.00
Collins Electrical, Stockton, CA
460,000.00
Steiny and Company, Vallejo, CA
489,110.00
Summit Electrical Construction, Clovis, CA
435,730.00
" Did not submit addendum
The bid bond you submitted with your bid is herewith returned to you.
The City of Lodi wishes to thank you for your interest in this project, and assures you that we
welcome proposals from you in the future.
X1 4) oeewe/
Hans Hansen
Manager, Engineering and Operations
Enclosure (1)
c: Electric Utility Director
City Clerk
Purchasing Officer
11EUDPDC1200031EUD-DATAWSERIENGIBid SpecsISTREETLIGHT 2lAward Notice2a.doc
CITY COUNCIL
ALAN S. NAKANISHI, Mayor
PHILLIP A. PENNINO
Mayor Pro Tempore
SUSAN HITCHCOCK
EMILY HOWARD
KEITH LAND
CITY OF LODI
ELECTRIC UTILITY DEPARTMENT
Mr. David G. Gove, President
Claybom Contracting Group, Inc.
10556 Combie Road
Auburn, CA 95602-8908
ALAN N. VALLOW, DIRECTOR
1331 S HAM LANE
LODI, CALIFORNIA 95242-3995
(209)333-6762
FAX (209) 339-6839
June 7, 2001
Re: Streetlight Completion Project -Phase 11
H. DIXON FLYNN
City Manager
RANDALL A. HAYS
City Attorney
SUSAN J. BLACKSTON
City Clerk
At the City Council meeting of June 6, 2001, the City Council awarded the bid referenced above
to Tim Paxin's Pacific Excavation, Elk Grove, CA, the lowest responsible bidder. The bids
received for this project are tabulated below:
Bidder
Amount ($)
Tim Paxin's Pacific Excavation, Elk Grove, CA
367,221.00
Arrow Construction, Sacramento, CA
367,370.00
Richard Heaps, Sacramento, CA
388,546.00
Tennyson Electric, Livermore, CA
394,950.00
Cla born Contracting, Auburn, CA
398,134.00
Collins Electrical, Stockton, CA
460,000.00
Steiny and Company, Vallejo, CA
489,110.00
Summit Electrical Construction, Clovis, CA
435,730.00
Did not submit addendum
The bid bond you submitted with your bid is herewith returned to you.
The City of Lodi wishes to thank you for your interest in this project, and assures you that we
welcome proposals from you in the future.
Hans Hansen
Manager, Engineering and Operations
Enclosure (1)
c: Electric Utility Director
City Clerk
Purchasing Officer
',IEUDPDC120003\EUD-DATAIUSERIENG1Bid SpecsISTREETLIGHT 21Award Notice2b.doc
CITY COUNCIL
ALAN S. NAKANISHI, Mayor
PHILLIP A. PENNINO
Mayor Pro Tempore
SUSAN HITCHCOCK
EMILY HOWARD
KEITH LAND
CITY OF LODI
ELECTRIC UTILITY DEPARTMENT
ALAN N. VALLOW, DIRECTOR
1331 S HAM LANE
LODI, CALIFORNIA 95242-3995
(209)333-6762
FAX (209) 339-6839
June 7, 2001
Mr. Philip J. Asborno
Collins Electrical Company, Inc.
611 W. Fremont Street
Stockton CA 95203
Re: Streetlight Completion Project -Phase II
H. DIXON FLYNN
City Manager
RANDALL A. HAYS
City Attorney
SUSAN J. BLACKSTON
City Clerk
At the City Council meeting of June 6, 2001, the City Council awarded the bid referenced above
to Tim Paxin's Pacific Excavation, Elk Grove, CA, the lowest responsible bidder. The bids
received for this project are tabulated below:
Bidder
Amount ($)
Tim Paxin's Pacific Excavation, Elk Grove, CA
367,221.00
Arrow Construction, Sacramento, CA
367,370.00
Richard Heaps, Sacramento, CA
388,546.00
Tennyson Electric, Livermore, CA
394,950.00
Cla born Contracting, Auburn, CA
398,134.00
Collins Electrical, Stockton, CA
460,000.00
Steiny and Company, Vallejo, CA
489,110.00
Summit Electrical Construction, Clovis, CA
435,730.00
* Did not submit addendum
The bid bond you submitted with your bid is herewith returned to you.
The City of Lodi wishes to thank you for your interest in this project, and assures you that we
welcome proposals from you in the future.
Hans Hansen
Manager, Engineering and Operations
Enclosure (1)
c: Electric Utility Director
City Clerk
Purchasing Officer
'dEUDPDC1200031EUD-DATAIUSERIENG\Bid Specs\STREETLIGHT 2Wward Notice2c.doc
CITY COUNCIL
ALAN S. NAKANISHI, Mayor
PHILLIP A. PENNINO
Mayor Pro Tempore
SUSAN HITCHCOCK
EMILY HOWARD
KEITH LAND
Ms. Susan Steiny
Steiny and Company, Inc.
27 Sheridan Street
Vallejo, CA 94590
CITY OF LODI
ELECTRIC UTILITY DEPARTMENT
ALAN N. VALLOW, DIRECTOR
1331 S HAM LANE
LODI, CALIFORNIA 95242-3995
(209)333-6762
FAX (209) 339-6839
June 7, 2001
Re: Streetlight Completion Project -Phase II
H. DIXON FLYNN
City Manager
RANDALL A. HAYS
City Attorney
SUSAN J. BLACKSTON
City Clerk
At the City Council meeting of June 6, 2001, the City Council awarded the bid referenced above
to Tim Paxin's Pacific Excavation, Elk Grove, CA, the lowest responsible bidder. The bids
received for this project are tabulated below:
Bidder
Amount ($)
Tim Paxin's Pacific Excavation, Elk Grove, CA
367,221.00
Arrow Construction, Sacramento, CA
367,370.00
Richard Heaps, Sacramento, CA
388,546.00
Tennyson Electric, Livermore, CA
394,950.00
Cla born Contracting, Auburn, CA
398,134.00
Collins Electrical, Stockton, CA
460,000.00
Steiny and Company, Vallejo, CA
489,110.00
Summit Electrical Construction, Clovis, CA
435,730.00
Did not submit addendum
The bid bond you submitted with your bid is herewith returned to you.
The City of Lodi wishes to thank you for your interest in this project, and assures you that we
welcome proposals from you in the future.
Hans Hansen
Manager, Engineering and Operations
Enclosure (1)
c: Electric Utility Director
City Clerk
Purchasing Officer
11EUDPDC1200031EUD-DATAIUSERIENG18id SpecsZTREETLIGHT 2{Award Notice2d.doc
CITY COUNCIL
ALAN S, NAKANISHI, Mayor
PHILLIP A. PENNINO
Mayor Pro Tempore
SUSAN HITCHCOCK
EMILY HOWARD
KEITH LAND
CITY OF LODI
ELECTRIC UTILITY DEPARTMENT
ALAN N. VALLOW, DIRECTOR
1331 S HAM LANE
LODI, CALIFORNIA 95242-3995
(209)333-6762
FAX (209) 339-6839
June 7, 2001
Summit Electrical Construction
P.O.Box1860
Clovis CA 93613
Re: Streetlight Completion Project — Phase II
H. DIXON FLYNN
City Manager
RANDALL A. HAYS
City Attorney
SUSAN J.BLACKSTON
City Clerk
At the City Council meeting of June 6, 2001, the City Council awarded the bid referenced
above to Tim Paxin's Pacific Excavation, Inc., Elk Grove, CA, the lowest bidder. The bids
received for this project are tabulated below:
BIDDER
AMOUNT
Tim Paxin's Pacific Excavation, Inc. Elk Grove CA
$367,221.0
Arrow Construction Sacramento CA
367 370.00
Richard Heaps, Electrical Contractor Inc. Sacramento CA
388 546.00
Tennyson Electric Inc. Livermore CA
394 950.00
Cla born Contracting Group, Inc. Auburn CA
398 134.00
Collins Electrical Company, Inc. Stockton CA
460 000.00
Steiny and Co. Inc. Valle'o CA
489 110.00
Summit Electrical Construction Clovis CA
435 730.00
Since the City did not receive an acknowledgement from you prior to the bid opening
indicating that you had received the addendum that was issued during the bidding
process, your bid was regarded as non-responsive. The addendum was mailed via
FedEx and received in Fresno CA on April 26, 2001, at 09:38 by A. Rubana per FedEx's
records.
The bid bond you submitted with your bid is herewith returned to you.
The City of Lodi wishes to thank you for your interest in this project, and assures you that
we welcome proposals from you in the future.
Hans Hansen I
16nager, Engineering and Operations
Enclosure (1)
c: Electric Utility Director
City Clerk
Purchasing Officer
Award letter.doc