HomeMy WebLinkAboutAgenda Report - June 6, 2001 E-09AGENDA TITLE: Adopt resolution awarding the contract for installation of streetlights on Streetlight Completion Project Phase 2 to Tim Paxin's Pacific Excavation, Inc. ($367,221.00) MEETING DATE: June 6, 2001 SUBMITTED BY: Electric Utility Director RECOMMENDED ACTION: That the City Council award the contract for installation of streetlights on Streetlight Completion Project Phase 2 to the low bidder, Tim Paxin's Pacific Excavation, Inc. in the amount of $367,221.00. BACKGROUND INFORMATION: On May 1, 2001, eight bids were received and opened for this project. The bid results are tabulated below: BIDDER AMOUNT Tim Paxin's Pacific Excavation, Inc., Elk Grove, CA $367,221.00 Arrow Construction, Sacramento, CA 367,370.00 Richard Heaps, Electrical Contractor, Inc., Sacramento, CA 388,546.00 Tennyson Electric, Inc., Livermore, CA 394,950.00 Cla born Contracting Group, Inc., Auburn, CA 398,134.00 Collins Electrical Company, Inc., Stockton, CA 460,000.00 Steiny and Co., Inc., Vallejo, CA 489,110.00 Summit Electrical Construction, Clovis, CA 435,730.00- * Did not submit addendum This project will install streetlights in various locations throughout the City. The involved streets are shown darkened within the circles on the attached map. It is estimated that the Streetlight Completion Project, when completed, will have installed 1,000 - 1,200 lights during the next 3 - 5 years. Plans and Specifications for this project were approved by the City Council at the meeting of March 21, 2001. During the bidding process, one addendum was issued. In order to be considered a qualified bidder a prospective bidder was required to return a signed acknowledgement indicating receipt of the addendum or include such acknowledgement with the bid. One bidder did not submit the acknowledgement. The addenda were mailed via FedEx. Fed Ex's records indicate delivery of the addendum to Summit Electrical Construction. Funding: Business Unit # 161672 Streetlight Completion Project Funding Approval: •A" n .x''71 •+ Vicky M Athie, Finance Director Alan N. Vallow, Electric Utility Director PREPARED BY: Hans Hansen, Manager, Engineering and Operations ANWHH/Ist APPROVED: H. Dixon ynn --city mpr ager DI� I mil W ,I 1 l I' it J�LUL u J I �; Wl 33H02l3H� li � '; 1mrnT',T..T,T,, ±Fil a �0ej`�u RESOLUTION NO. 2001-144 A RESOLUTION OF THELOD1 CITY COUNCIL. AWARDING THE CONTRACT FOR INSTALLATION OF STREETLIGHTS UNDER STREETLIGHT COMPLETION PROJECT PHASE 2 WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council sealed bids were received and publicly opened May 1, 2001 at 11:00 a.m. for Installation of Streetlights under Streetlight Completion Project Phase 2, described in the specifications therefore approved by the City Council on March 21, 2001; and WHEREAS, said bids have been compared, checked, and tabulated and a report thereof filed with the City Manager as shown on as follows: BIDDER/LOCATION AMOUNT Tim Paxin's Pacific Excavation Inc. Elk Grove CA $367,221.00 Arrow Construction Sacramento CA 367 370.00 Richard Heaps, Electrical Contractor Inc. Sacramento CA 388 546.00 Tennyson Electric Inc. Livermore CA 394 950.00 Cla born Contracting Group, Inc. Auburn, CA 398 134.00 Collins Electrical Company, Inc. Stockton CA 460 000.00 Steiny and Co. Inc. Valle'o CA 489 110.00 Summit Electrical Construction Clovis CA 435,730.00* * Did not submit addendum WHEREAS, the City Manager recommends awarding the contract for the Installation of Streetlights under Streetlight Completion Project Phase 2, to Tim Paxin's Pacific Excavation, of Elk Grove, California. NOW, THEREFORE, BE IT RESOLVED, that the Lodi City Council does hereby award the contract for the Installation of Streetlights under Streetlight Completion Project Phase 2, to Tim Paxin's Pacific Excavation, of Elk Grove, California, in the amount of $367,221.00. Dated: June 6, 2001 I hereby certify that Resolution No. 2001-144 was passed and adopted by the City Council of the City of Lodi in a regular meeting held June 6, 2001, by the following vote: AYES: COUNCIL MEMBERS — Hitchcock, Howard, Land, Pennino and Mayor Nakanishi NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None SUSAN J. BLACKSTON City Clerk 2001-144 CITY COUNCIL ALAN NAKANISHI, Mayor PHILLIP A. PENNINO Mayor Pro Tempore SUSAN HITCHCOCK EMILY HOWARD KEITH LAND May 24, 2001 CITY ,OF LODI Nexans Energy USA Inc. c/o Isberg Nott Company Attn Steve Kanty 8 Crow Canyon Court Suite 210 San Ramon CA 94583 CITY HALL, 221 WEST PINE STREET P.O. BOX 3006 LODI, CALIFORNIA 95241-1910 (209) 333-6778 FAX (209) 333-6791 Re: Formal bid: #1/0 and #350 600V XLPE Underground Triplex Dear Mr. Kanty: H. DIXON FLYNN City Manager SUSAN BLACKSTON City Clerk RANDALL A. HAYS =;City Attorney This letter provides formal notification to you of the plan by City of Lodi staff to recommend that the Lodi City Council award the bid for 25,000 feet of #1/0 and 24,000 feet of #350 600V underground triplex to the second -low bidder, Western States Electric, instead of the low bidder, Nexans Energy USA, Inc. The reasons for the recommendation are as follows: 1) The 24 -week leadtime indicated on the proposal would delay installations at several subdivisions which are planned for this summer. Second -low bidder quoted a leadtime of four to six weeks; other bidders quoted two to seven -week leadtimes. The "Information to Bidders" section of the bid instructions, subsection entitled "Delivery", indicates that "delivery time will be part of the bid evaluation." Staff has determined that the cost of delay of the projects would exceed the increase in cost of award to the second -low bidder, and that it is in the City's best interest to obtain timely delivery. 2) The exceptions taken on Item #2, i.e., Full hard conductor instead of % to'/ hard as specified, No sequential footage markings instead of sequential footage markings every two feet, as specked, and No wood lagging instead of wood lagging on the reels, as specified, are not acceptable to the Engineering Division of the Electric Utility Department. If you do not agree with staffs recommendation to award to the second -low bidder, and believe that the City should award to you, points 1) and 2) above notwithstanding, you may file a letter of protest with the City of Lodi. Your letter should indicate why you believe the City should award to you, and it should address the issues of leadtime and exceptions to the specifications. Nexans Energy USA, Inc. May 24, 2001 Page 2 Your letter should be addressed to Mr. Alan Vallow Director, Electric Utility Department City of Lodi 1331 South Ham Lane Lodi CA 95242-3995 and it must be received by 8:00 a.m. Friday, June 1, 2001. The director or his designated representative will respond to you prior to June 6, 2001. If you do not agree with the response, you will have the opportunity to address the Lodi City Council in opposition to staffs recommendation and in support of your proposal. The City Council meets at 7:00 p.m. Wednesday, June 6, 2001. The decision of the Lodi City Council will be final. If you require details regarding the recommendation or procedure, please contact me. Sincerely, J --4 E Harris Purchasing Officer City of Lodi cc: Electric Utility Director City Clerk May 30 01 11:20a P.1 ISBERG NOTT COMPANY 8 CROW CANYON COURT • SWE 210 FAX COVER SHEET SAN RAMON , CA. 84683 DATE: 5/30/01 TO: Lodi Municipal Electric System RECEIVED Joel Hams .153- Phone: 3).Phone: 209-333-6777 Fax: 209-39-6791 JUN - 2001 FROM: lsberg Nott Company City Clerk Bob Sheridan City of Lodi Phone: 925-820-8102 or 925426-4718 Fax: 925-820-0532 or 925426-0323 PAGES TO FOLLOW: C::' REPLY: URGENT _ ASAP 2f -NONE _ FYI SUBJECT: Nexans Energy USA Per your letter of 5/24 please be advised we will not be protesting the bid resufts in any manner and understand the reason for the award going to a supplier with much better lead tinier in ref. to the City of Lodi formal bid for the 110 and #350 600V XLPE Underground Triplex cable. CITY COUNCIL ALAN S. NAKAMISHI, Mayor PHILLIP A. PENNINO Mayor Pro Tempore SUSAN HITCHCOCK EMILY HOWARD KEITH LAND CITY OF LODI ELECTRIC UTILITY DEPARTMENT ALAN N. VALLOW, DIRECTOR 1331 S HAM LANE LODI, CALIFORNIA 95242-3995 (209)333-6762 FAX (209) 339-6839 June 7, 2001 Mr. Tim Paxin, President Tim Paxin's Pacific Excavation Inc 9701 Dino Drive Suite 110 Elk Grove CA 95624 Re: Streetlight Completion Project — Phase II H. DIXON FLYNN City Manager RANDALL A. HAYS City Attorney SUSAN J. BLACKSTON City Clerk At the City Council meeting of June 6, 2001, your firm was awarded the contract for Streetlight Completion Project -Phase II in the amount of $367,221.00. The bids received for the project are tabulated below: Bidder Amount ($) Tim Paxin's Pacific Excavation, Elk Grove, CA 367,221.00 Arrow Construction, Sacramento, CA 367,370.00 Richard Heaps, Sacramento, CA 388,546.00 Tennyson Electric, Livermore, CA 394,950.00 Cla born Contracting, Auburn, CA 398,134.00 Collins Electrical, Stockton, CA 460,000.00 Steiny and Company, Vallejo, CA 489,110.00 Summit Electrical Construction, Clovis, CA 435,730.00 ' Did not submit addendum At this time various documents need to be completed and/or provided by you in order to finalize the Contract for this project. Therefore, enclosed with this letter you will find: Contract, 3 copies. Please execute each copy on page 4.4 under CONTRACTOR and return the three copies to the City for execution. The effective date of this contract will be the date the City executes the Contract. Mr. Tim Paxin, President Tim Paxin's Pacific Excavation Inc 9701 Dino Drive Suite 110 Elk Grove CA 95624 Contract Surety Bonds (Labor and Materials, Faithful Performance) 1 copy of each. Please have these bonds completed and submitted with the Contract. See section 2.900 of "Information to Bidders". The bonds must be executed on the forms enclosed with this letter in addition to any other documents your Surety Company may wish to supply. The "California All -Purpose Acknowledgment" must also be completed for each Bond. Insurance Certificate Please provide and include the insurance certificates with the Contract, as required per section 2.1100 and 2.1200 of "Information to Bidders". The "Certificate Holder's" address should be City of Lodi, 221 West Pine, Lodi, California, 95240. Please return all documents to: Hans Hansen, Manager, Engineering and Operations City of Lodi, Electric Utility Department 1331 South Ham Lane Lodi CA 95242-3995 Upon execution of the contract a pre construction meeting will be scheduled at the Electric Utility Service Center, 1331 S. Ham Lane, Lodi CA. Please indicate the name or names of the individual(s) in your organization we should contact regarding the specific date and time of the pre construction meeting. A copy of the "Specifications" for this project has been enclosed for your reference. Upon execution of the contract by the City your Bid Bond will be returned. Should you have any questions, please do not hesitate to contact me at (209) 333-6769. 4, X& Hans Hansen Manager, Engineering and Operations Enclosures c: Electric Utility Director City Clerk Purchasing Officer Award Notice.doc CITY COUNCIL ALAN S. NAKANISHI, Mayor PHILLIP A. PENNINO Mayor Pro Tempore SUSAN HITCHCOCK EMILY HOWARD KEITH LAND Mr Michael Wegener Arrow Construction 7307 Roseville Road #6 Sacramento CA 95842 CITY OF LODI ELECTRIC UTILITY DEPARTMENT ALAN N. VALLOW, DIRECTOR 1331 S HAM LANE LODI, CALIFORNIA 95242-3995 (209)333-6762 FAX (209) 339-6839 June 7, 2001 Re: Streetlight Completion Project — Phase 11 H. DIXON FLYNN City Manager RANDALL A. HAYS City Attorney SUSAN J. BLACKSTON City Clerk At the City Council meeting of June 6, 2001, the City Council awarded the bid referenced above to Tim Paxin's Pacific Excavation Inc., Elk Grove, CA, the lowest responsible bidder. The bids received for this project are tabulated below: Bidder Amount ($) Tim Paxin's Pacific Excavation, Elk Grove, CA 367,221.00 Arrow Construction, Sacramento, CA 367,370.00 Richard Heaps, Sacramento, CA 388,546.00 Tennyson Electric, Livermore, CA 394,950.00 Cla born Contracting, Auburn, CA 398,134.00 Collins Electrical, Stockton, CA 460,000.00 Steiny and Company, Vallejo, CA 489,110.00 Summit Electrical Construction, Clovis, CA 435,730.00 " Did not submit addendum The bid bond you submitted with your bid proposal will be returned to you once the contract for this project has been executed, expected within 30 days. The City of Lodi wishes to thank you for your interest in this project, and assures you that we welcome proposals from you in the future. .7C11zJ [,�r� Hans Hansen Manager, Engineering and Operations c: Electric Utility Director City Clerk Purchasing Officer Award Notice 1.doc CITY COUNCIL ALAN S. NAKANISHI, Mayor PHILLIP A. PENNINO Mayor Pro Tempore SUSAN HITCHCOCK EMILY HOWARD KEITH LAND Ms Diane Meehan, President Richard A. Heaps 8909 Florin Road Sacramento CA 95829 CITY OF LODI ELECTRIC UTILITY DEPARTMENT ALAN N. VALLOW, DIRECTOR 1331 S HAM LANE LODI, CALIFORNIA 95242-3995 (209)333-6762 FAX (209) 339-6839 June 7, 2001 Re: Streetlight Completion Project -Phase II H. DIXON FLYNN City Manager RANDALL A. HAYS City Attorney SUSAN J. BLACKSTON City Clerk At the City Council meeting of June 6, 2001, the City Council awarded the bid referenced above to Tim Paxin's Pacific Excavation, Elk Grove, CA, the lowest responsible bidder. The bids received for this project are tabulated below: Bidder Amount ($) Tim Paxin's Pacific Excavation, Elk Grove, CA 367,221.00 Arrow Construction, Sacramento, CA 367,370.00 Richard Heaps, Sacramento, CA 388,546.00 Tennyson Electric, Livermore, CA 394,950.00 Cla born Contracting, Auburn, CA 398,134.00 Collins Electrical, Stockton, CA 460,000.00 Steiny and Company, Vallejo, CA 489,110.00 Summit Electrical Construction, Clovis, CA 435,730.00 * Did not submit addendum The bid bond you submitted with your bid is herewith returned to you. The City of Lodi wishes to thank you for your interest in this project, and assures you that we welcome proposals from you in the future. Hans Hansen Manager, Engineering and Operations Enclosure (1) c: Electric Utility Director City Clerk Purchasing Officer %1EUDPDC1200031EUD-DATAIUSER\ENG18id SpeCSWREETLIGHT 21Hward Notice2.doc CITY COUNCIL ALAN S. NAKANISHI, Mayor PHILLIP A. PENNING Mayor Pro Tempore SUSAN HITCHCOCK EMILY HOWARD KEITH LAND CITY OF LODI ELECTRIC UTILITY DEPARTMENT ALAN N. VALLOW, DIRECTOR 1331 S HAM LANE LODI, CALIFORNIA 95242-3995 (209)333-6762 FAX (209) 339-6839 June 7, 2001 Mr. Michael A. Tennyson, President Tennyson Electric Inc. 7275 National Drive Suite A Livermore CA 94550 Re: Streetlight Completion Project -Phase II H. DIXON FLYNN City Manager RANDALL A. HAYS City Attorney SUSAN J. BLACKSTON City Clerk At the City Council meeting of June 6, 2001, the City Council awarded the bid referenced above to Tim Paxin's Pacific Excavation, Elk Grove, CA, the lowest responsible bidder. The bids received for this project are tabulated below: Bidder Amount ($) Tim Paxin's Pacific Excavation, Elk Grove, CA 367,221.00 Arrow Construction, Sacramento, CA 367,370.00 Richard Heaps, Sacramento, CA 388,546.00 Tennyson Electric, Livermore, CA 394,950.00 Cla born Contracting, Auburn, CA 398,134.00 Collins Electrical, Stockton, CA 460,000.00 Steiny and Company, Vallejo, CA 489,110.00 Summit Electrical Construction, Clovis, CA 435,730.00 " Did not submit addendum The bid bond you submitted with your bid is herewith returned to you. The City of Lodi wishes to thank you for your interest in this project, and assures you that we welcome proposals from you in the future. X1 4) oeewe/ Hans Hansen Manager, Engineering and Operations Enclosure (1) c: Electric Utility Director City Clerk Purchasing Officer 11EUDPDC1200031EUD-DATAWSERIENGIBid SpecsISTREETLIGHT 2lAward Notice2a.doc CITY COUNCIL ALAN S. NAKANISHI, Mayor PHILLIP A. PENNINO Mayor Pro Tempore SUSAN HITCHCOCK EMILY HOWARD KEITH LAND CITY OF LODI ELECTRIC UTILITY DEPARTMENT Mr. David G. Gove, President Claybom Contracting Group, Inc. 10556 Combie Road Auburn, CA 95602-8908 ALAN N. VALLOW, DIRECTOR 1331 S HAM LANE LODI, CALIFORNIA 95242-3995 (209)333-6762 FAX (209) 339-6839 June 7, 2001 Re: Streetlight Completion Project -Phase 11 H. DIXON FLYNN City Manager RANDALL A. HAYS City Attorney SUSAN J. BLACKSTON City Clerk At the City Council meeting of June 6, 2001, the City Council awarded the bid referenced above to Tim Paxin's Pacific Excavation, Elk Grove, CA, the lowest responsible bidder. The bids received for this project are tabulated below: Bidder Amount ($) Tim Paxin's Pacific Excavation, Elk Grove, CA 367,221.00 Arrow Construction, Sacramento, CA 367,370.00 Richard Heaps, Sacramento, CA 388,546.00 Tennyson Electric, Livermore, CA 394,950.00 Cla born Contracting, Auburn, CA 398,134.00 Collins Electrical, Stockton, CA 460,000.00 Steiny and Company, Vallejo, CA 489,110.00 Summit Electrical Construction, Clovis, CA 435,730.00 Did not submit addendum The bid bond you submitted with your bid is herewith returned to you. The City of Lodi wishes to thank you for your interest in this project, and assures you that we welcome proposals from you in the future. Hans Hansen Manager, Engineering and Operations Enclosure (1) c: Electric Utility Director City Clerk Purchasing Officer ',IEUDPDC120003\EUD-DATAIUSERIENG1Bid SpecsISTREETLIGHT 21Award Notice2b.doc CITY COUNCIL ALAN S. NAKANISHI, Mayor PHILLIP A. PENNINO Mayor Pro Tempore SUSAN HITCHCOCK EMILY HOWARD KEITH LAND CITY OF LODI ELECTRIC UTILITY DEPARTMENT ALAN N. VALLOW, DIRECTOR 1331 S HAM LANE LODI, CALIFORNIA 95242-3995 (209)333-6762 FAX (209) 339-6839 June 7, 2001 Mr. Philip J. Asborno Collins Electrical Company, Inc. 611 W. Fremont Street Stockton CA 95203 Re: Streetlight Completion Project -Phase II H. DIXON FLYNN City Manager RANDALL A. HAYS City Attorney SUSAN J. BLACKSTON City Clerk At the City Council meeting of June 6, 2001, the City Council awarded the bid referenced above to Tim Paxin's Pacific Excavation, Elk Grove, CA, the lowest responsible bidder. The bids received for this project are tabulated below: Bidder Amount ($) Tim Paxin's Pacific Excavation, Elk Grove, CA 367,221.00 Arrow Construction, Sacramento, CA 367,370.00 Richard Heaps, Sacramento, CA 388,546.00 Tennyson Electric, Livermore, CA 394,950.00 Cla born Contracting, Auburn, CA 398,134.00 Collins Electrical, Stockton, CA 460,000.00 Steiny and Company, Vallejo, CA 489,110.00 Summit Electrical Construction, Clovis, CA 435,730.00 * Did not submit addendum The bid bond you submitted with your bid is herewith returned to you. The City of Lodi wishes to thank you for your interest in this project, and assures you that we welcome proposals from you in the future. Hans Hansen Manager, Engineering and Operations Enclosure (1) c: Electric Utility Director City Clerk Purchasing Officer 'dEUDPDC1200031EUD-DATAIUSERIENG\Bid Specs\STREETLIGHT 2Wward Notice2c.doc CITY COUNCIL ALAN S. NAKANISHI, Mayor PHILLIP A. PENNINO Mayor Pro Tempore SUSAN HITCHCOCK EMILY HOWARD KEITH LAND Ms. Susan Steiny Steiny and Company, Inc. 27 Sheridan Street Vallejo, CA 94590 CITY OF LODI ELECTRIC UTILITY DEPARTMENT ALAN N. VALLOW, DIRECTOR 1331 S HAM LANE LODI, CALIFORNIA 95242-3995 (209)333-6762 FAX (209) 339-6839 June 7, 2001 Re: Streetlight Completion Project -Phase II H. DIXON FLYNN City Manager RANDALL A. HAYS City Attorney SUSAN J. BLACKSTON City Clerk At the City Council meeting of June 6, 2001, the City Council awarded the bid referenced above to Tim Paxin's Pacific Excavation, Elk Grove, CA, the lowest responsible bidder. The bids received for this project are tabulated below: Bidder Amount ($) Tim Paxin's Pacific Excavation, Elk Grove, CA 367,221.00 Arrow Construction, Sacramento, CA 367,370.00 Richard Heaps, Sacramento, CA 388,546.00 Tennyson Electric, Livermore, CA 394,950.00 Cla born Contracting, Auburn, CA 398,134.00 Collins Electrical, Stockton, CA 460,000.00 Steiny and Company, Vallejo, CA 489,110.00 Summit Electrical Construction, Clovis, CA 435,730.00 Did not submit addendum The bid bond you submitted with your bid is herewith returned to you. The City of Lodi wishes to thank you for your interest in this project, and assures you that we welcome proposals from you in the future. Hans Hansen Manager, Engineering and Operations Enclosure (1) c: Electric Utility Director City Clerk Purchasing Officer 11EUDPDC1200031EUD-DATAIUSERIENG18id SpecsZTREETLIGHT 2{Award Notice2d.doc CITY COUNCIL ALAN S, NAKANISHI, Mayor PHILLIP A. PENNINO Mayor Pro Tempore SUSAN HITCHCOCK EMILY HOWARD KEITH LAND CITY OF LODI ELECTRIC UTILITY DEPARTMENT ALAN N. VALLOW, DIRECTOR 1331 S HAM LANE LODI, CALIFORNIA 95242-3995 (209)333-6762 FAX (209) 339-6839 June 7, 2001 Summit Electrical Construction P.O.Box1860 Clovis CA 93613 Re: Streetlight Completion Project — Phase II H. DIXON FLYNN City Manager RANDALL A. HAYS City Attorney SUSAN J.BLACKSTON City Clerk At the City Council meeting of June 6, 2001, the City Council awarded the bid referenced above to Tim Paxin's Pacific Excavation, Inc., Elk Grove, CA, the lowest bidder. The bids received for this project are tabulated below: BIDDER AMOUNT Tim Paxin's Pacific Excavation, Inc. Elk Grove CA $367,221.0 Arrow Construction Sacramento CA 367 370.00 Richard Heaps, Electrical Contractor Inc. Sacramento CA 388 546.00 Tennyson Electric Inc. Livermore CA 394 950.00 Cla born Contracting Group, Inc. Auburn CA 398 134.00 Collins Electrical Company, Inc. Stockton CA 460 000.00 Steiny and Co. Inc. Valle'o CA 489 110.00 Summit Electrical Construction Clovis CA 435 730.00 Since the City did not receive an acknowledgement from you prior to the bid opening indicating that you had received the addendum that was issued during the bidding process, your bid was regarded as non-responsive. The addendum was mailed via FedEx and received in Fresno CA on April 26, 2001, at 09:38 by A. Rubana per FedEx's records. The bid bond you submitted with your bid is herewith returned to you. The City of Lodi wishes to thank you for your interest in this project, and assures you that we welcome proposals from you in the future. Hans Hansen I 16nager, Engineering and Operations Enclosure (1) c: Electric Utility Director City Clerk Purchasing Officer Award letter.doc