Loading...
HomeMy WebLinkAboutAgenda Report - April 18, 2001 E-09Owl CITY OF LODI COUNCIL COMMUNICATION AGENDA TITLE: Adopt Resolution Awarding Emergency Repair of Enze Pool to Applied Fiberglass Systems, Rancho Cordova, CA, in the Amount of $31,961.00 and Appropriate Funds MEETING DATE: April 18, 2001 PREPARED BY: Parks and Recreation Director RECOMMENDED ACTION: That the City Council award emergency repair work of Enze Pool to Applied Fiberglass Systems, Rancho Cordova, CA, and appropriate funds for the project. BACKGROUND INFORMATION: In May/June of 1996, Enze Pool received a new hand laid fiberglass coating. Last year, a water return line broke in the bottom of the pool causing the fiberglass to blister and delaminate from the plaster pool shell. Staff has hand sanded and patched small areas as recommended by the Health Department in order to operate the daily pool use. In order to open Enze Pool for our summer swim season, the blistered and delaminating fiberglass needs to be replaced. When the pool was fiberglassed five years ago, it was awarded through a sole source contract to Aqua Pool and Spa due to the hand laid application process and the lack of vendors specializing in this type of application. Unfortunately, Aqua Pool and Spa is no longer fiberglassing pools. Staff contacted four pool service vendors, however, this company was the only one providing this type of hand laid fiberglass. Staff is recommending awarding this work to Applied Fiberglass Systems due to the scope of work and the necessity of performing the repair work in time for the summer aquatics programs. The current condition of the fiberglass poses a safety hazard to anyone using the pool due to sharp edges of the fiberglass that has blistered. FUNDING: 2000/01 Contingency Fund Project Estimate: $33,000.00 �� Funding Available: Vicky McAthie, Finance Director Roger Baltz Parks and Recreation or Prepared by Steve Virrey, Parks Project Coordinator RB/SV/SVB cc: City Attorney APPROVED: H. Dixon iynn -- Ci Manager 04/12/01 AUG -24-00 06:19 AM APPLIED FIBERGLASS SYS 916 631 4257 P.02 APPLIED FIBERGLASS SYSTEMS ::A A:!C;- NO fiHh0h I j W I IG. NO. 003f;5Ff11 WATERPROOFING b CONCRETE COATINGS August 23, 2000 Mr. Frank Pepper City of Lodi Palk and Recreation Department 12.5 North Stockton Street Lodi, California 95240 Attn, Frank Pepper We apprn:ciate the opportunity to provide you with a price for you pool renovation. The work that needs to be done and the price are outlined below. Pool Resurfacing • Drain pool -- By City of Lodi • Prepare existing surface to accept new application. • Mask entire pool. Fibcrgla:s Application Automatically controlled, spray applied dispersal of components, i.e., resin, glass fiber and initiator by high-pressure equipment. Four layer application includes: 1. Sealer coat 2. Pigment integral laminate -Cobalt Free 3. Barrier tie coat 4. Marine Grade/100% NPG-ISO Cobalt Free high;build topcoat - U.V. stabilized. • Inspect entire fiberglass surface for protrusions and remove. • Apply resinous sealant to niched areas and around light. • Reinstate lanes and targets. Price for pool: $31,961.00 - Cobalt Free Resin (price available for cobaltic resin application) Days to complete:- T days I look forward to working with you on this project. Please confirm that September 15"' is still the targeted start date. If you have any further questions or concerns please call me. Sincerely, (:'AKIAN ) OFFICE 7700 EDGEWATER DRIVE --SUITE 325 OAKLAND, CA -04621 (510) 562-9420 FAX (5101 56i,-9334 SACRAMENTO OFFICE 3229 FITZGEPALD ROAD - SUITE A - RANCHO CORDOVA. CA 95742 (916) 658.2374 FAX (9161631-4:51 1-(80CI-55T-77QtT RESOLUTION NO. 2001-95 A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING EMERGENCY REPAIR OF ENZE POOL, AND FURTHER APPROPRIATING FUNDS FOR THE PROJECT ---------------------------------------------------------------------- WHEREAS, Lodi Municipal Code, Section 3.20.070, authorizes dispensing with bids for purchases of supplies, services or equipment when it is in the best interest of the City to do so; and WHEREAS, in May/June of 1996, Enze Pool received a new hand -laid fiberglass coating; and WHEREAS, in 2000, a water return line broke in the bottom of the pool causing the fiberglass to blister and delaminate from the plaster pool shell; and WHEREAS, staff has sanded and patched small areas as recommended by the Health Department in order to operate the daily pool use; and WHEREAS, in order to open Enze Pool for the Summer 2001 swim season, the fiberglass needs to be replaced; and WHEREAS, staff has contacted four pool service vendors, and only one vendor, Applied Fiberglass Systems, of Rancho Cordova, California, provides this type of hand -laid fiberglass; and WHEREAS, staff therefore recommends authorizing that this work be performed by Applied Fiberglass Systems in the amount of $31,961.00. NOW, THEREFORE, BE IT RESOLVED, that the Lodi City Council hereby authorizes the emergency repair of Enze Pool to Applied Fiberglass Systems, of Rancho Cordova, in the amount of $31,961.00; and BE IT FURTHER RESOLVED, that funds in the amount of $33,000.00 be appropriated for this project. Dated: April 18, 2001 I hereby certify that Resolution No. 2001-95 was passed and adopted by the City Council of the City of Lodi in a regular meeting held April 18, 2001, by the following vote: AYES: COUNCIL MEMBERS — Hitchcock, Howard, Pennino and Mayor Nakanishi NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — Land ABSTAIN: COUNCIL MEMBERS — None SUSAN J.BLACKSTON City Clerk 2001-95