Loading...
HomeMy WebLinkAboutAgenda Report - June 7, 2023 C-11CITY OF a i C A L I FORN IA AGENDA ITEM Cal COUNCIL COMMUNICATION AGENDA TITLE: Adopt Resolution Authorizing City Manager to Execute Amendment No. 1 to 2021-2023 Sidewalk and Miscellaneous Concrete Repair Program to A.M. Stephens Concrete, Inc. of Lodi, CA MEETING DATE: June 7, 2023 PREPARED BY: Public Works Director RECOMMENDED ACTION. Adopt resolution authorizing City Manager to execute Amendment No. 1 to 2021-2023 Sidewalk and Miscellaneous Concrete Repair Program to A.M. Stephens Concrete, Inc. of Lodi, CA BACKGROUND INFORMATION: This project consists of the construction, removal, and/or the replacement of curb, gutter, sidewalk, ramps, or other miscellaneous concrete items at various locations throughout the City on an as -needed basis. On April 21, 2021, Council approved specifications and adopted a resolution authorizing the City Manager to award a contract to the lowest responsive bidder, not -to -exceed $250,000; and execute change orders, not -to - exceed $50,000. On July 7, 2021, the City Manager executed the contract with Popuch Concrete Contracting, Inc., of Lodi, in the amount of $190,480. A.M. Stephens Concrete, Inc. purchased Popuch Concrete Contracting, Inc. in June, 2022 and a Consent to Assignment was executed to continue the contract under A.M. Stephens Concrete, Inc. on November 29, 2022. The current contract with A.M. Stephens Concrete, Inc. is set to expire on June 30, 2023. The contract, consistent with previous contracts, has included the ability to extend the contract if mutually agreeable to the City and the contractor. A.M. Stephens Concrete, Inc. will not agree to extend the contract under the current terms due to increased operating costs. To address the contractor's concern, staff recommends extending the contract for an additional 1 year with the annual Consumer Price Index (CPI) adjustment. The CPI data between January 2021 and January 2023 reflects a 2 -year increase of 14.51 percent (based on the West Region of the "All Urban Consumers -All Items" category). Staff believes that if the contract is bid again this year, the unit prices would increase by more than 14.51 percent as Popuch Concrete Contracting, Inc. was the lowest of five bids received on May 12, 2021. This contract extension will be contingent on the Fiscal Year 2023/24 Budget being adopted by Council. The City Manager will retain his authorization to execute change orders for $50,000 per fiscal year over the life of this contract, including extensions. APPROVED:...... - Stephen Schwabauer, City Manager \\cvcfilv02\pubwks$\WP\PROJECTS\STREETS\2021-23 Sidewalk and Concrete Repair\CExtension2.docx 5/4/2023 Adopt Resolution Authorizing City Manager to Execute Amendment No. 1 to 2021-2023 Sidewalk and Miscellaneous Concrete Repair Program to A.M. Stephens Concrete, Inc. of Lodi, CA June 7, 2023 Page 2 FISCAL IMPACT: This project extends the useful life of City sidewalks and miscellaneous concrete. If this street maintenance activity is not performed on a regular basis, future, more costly repairs may be necessary, and leave the City vulnerable to expensive claims. This project will not impact the City's General Fund. FUNDING AVAILABLE: Budgeted Fiscal Year 2023/24: Measure K (30599000.77020): $70,000 TDA Bike Ped (3199000.77020): $30,000 TOTAL: $100,000 - - (2!4� , Andrew Keys O-A,ay 31, 20r3 09:23 H, Andrew Keys Deputy City Manager/Internal Services Director CCU, Charles E. Swimley, Jr. Public Works Director Prepared by Jimi Billigmeier, Associate Civil Engineer CES/JB/cd Attachments cc: Utility Manager \\cvcfilv02\pubwks$\WP\PROJECTS\STREETS\2021-23 Sidewalk and Concrete Repair\CExtension2.docx 5/4/2023 AMENDMENT NO. 1 A.M. STEPHENS CONCRETE, INC. 2021-2023 SIDEWALK AND MISCELLANEOUS CONCRETE REPAIR PROGRAM CONTRACT THIS AMENDMENT NO. 1 TO CONTRACT, is made and entered this day of , 2023, by and between the CITY OF LODI, a municipal corporation (hereinafter "CITY"), and A.M. STEPHENS CONCRETE, INC., a California corporation (hereinafter "CONTRACTOR"). WITNESSETH: 1. WHEREAS, CONTRACTOR and CITY entered into a Contract on July 7, 2021, and Consent to Assignment on November 29, 2022 (collectively, the "Agreement"), as set forth in Exhibit 1, attached hereto and made part of; and 2. WHEREAS, CONTRACTOR requested to amend said Agreement to increase the unit prices by 14.51 percent (2 -year Consumer Price Index adjustment since 2021), with the new prices set forth in Exhibit 2, attached hereto and made part of; and 3. WHEREAS, City requested to extend the term of the Agreement through June 30, 2024; and 4. WHEREAS, CONTRACTOR and CITY agree to said amendments. NOW, THEREFORE, the parties agree to amend the Agreement as set forth above. All other terms and conditions of the Agreement remain unchanged. IN WITNESS WHEREOF, CITY and CONTRACTOR have executed this Amendment No. 1 on the date and.year first above written. CITY OF LODI, a municipal corporation A.M. STEPHENS CONCRETE, INC., a California corporation hereinabove called "CITY" hereinabove called "CONTRACTOR" STEPHEN SCHWABAUER City Manager Attest: OLIVIA NASHED, City Clerk Approved as to Form: JANICE D. MAGDICH, City Attorney NAME: Title: Exhibit 1 CONSENT TO ASSIGNMENT - CONTRACT # 7439 THIS CONSENT TO CONTRACT ASSIGNMENT OF 2021-2023 SIDEWALK AND MISCELLANEOUS CONCRETE REPAIR PROGRAM CONTRACT, is made and entered this Lq�' day of Ko%tevx.U&v'- , 2022, by and between the CITY OF LODI, a municipal corporation (hereinafter "CITY"), and A.M. STEPHENS CONCRETE, INC, a California corporation (hereinafter CONTRACTOR-). WITNESSETH: 1. WHEREAS, Popuch Concrete Contracting, Inc. entered into a Contract an July 7, 2021 ( the "Contract"), as set forth in Exhibit 1, attached hereto and made a part hereof; and 2. WHEREAS, Popuch Concrete Contracting, Inc. wishes to assign the Contract to A.M. Stephens Concrete, Inc.; and 3. WHEREAS, CITY consents to said assignment. NOW, THEREFORE, the City provides approval to Popuch Concrete Contracting, Inc. to assign the Contract and CONTRACTOR accepts the assignment. IN WITNESS WHEREOF, CITY and CONTRACTOR have executed this Assignment on the date and year first above written. CITY OF LODI, a municipal corporation A.M. STEPHENS CONCRETE, INC., a California hereinabove called "CITY" corporation, hereinabove called "CONTRACTOR" Name: VV2 City Manager Tit17 Attest: OLIVIA NASHED, City Clerk Approved as to Form: J NICE D. MAGDICH, City Attorney POPUCH CONCRETE CONTRACTING, INC- A California corporation NaRA. John Popuch Title: President EXHIBIT 1 2021-2023 SIDEWALK AND MISCELLANEOUS CONCRETE REPAIR PROGRAM CONTRACT CITY OF LODI, CALIFORNIA THIS CONTRACT made by and between the CITY OF LODI, State of California, herein referred to as the "City," and POPUCH CONCRETE CONTRACTING, INC., a California corporation, herein referred to as the "Contractor." WITNESSETH' That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other, as follows: The complete Contract consists of the following documents which are incorporated herein by this reference, to -wit: Notice Inviting Bids Information to Bidders General Provisions Special Provisions Bid Proposal Contract Contract Bonds Plans The July 1992 Edition, Standard Specifications, State of California, Business and Transportation Agency, Department of Transportation All of the above documents, sometimes hereinafter referred to as the "Contract Documents," are intended to cooperate so that any work called for in one and not mentioned in the other is to be executed the same as if mentioned in all said documents. ARTICLE I - That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the City and under the condition expressed in the two bonds bearing even date with these presents and hereunto annexed, the Contractor agrees with the City, at Contractor's cost'and expense, to do all the work and furnish all the materials except such as are mentioned in the specifications to be furnished by the City, necessary to construct and complete in a good workmanlike and substantial manner and to the satisfaction of the City the proposed improvements as shown and described in the Contract Documents which are hereby made a part of the Contract. ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does hereby employ, the Contractor to provide all materials and services not supplied by the City and to do the work according to the terms and conditions for the price herein, and hereby contracts to pay the same as set forth in Section 5.600, "Measurement, Acceptance and Payment," of the General Provisions, in the manner and upon the conditions above set forth; and the said parties for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree to the full performance of the covenants herein contained. ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division 2 of the Labor Code The Contractor and any Subcontractor will pay the general prevailing wage rate and other employer payments for health and welfare, pension, vacation, travel time, and subsistence pay, apprenticeship or other training programs. The responsibility for compliance with these Labor Code requirements is on the prime contractor. ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for doing all the work contemplated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City, and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Plans and Contract Documents and the requirements of the Engineer under them, to -wit: Perform the work necessary to construct, remove, and/or replace curb, gutter, sidewalk, ramps, or other miscellaneous concrete items at various locations throughout the City. This is a 2 -year unit price bid that will be divided into work orders typically ranging in price between $500 and $20,000. All improvements will include other incidental and related work, all as specified in the specifications for the "2021-2023 Sidewalk and Miscellaneous Concrete Work' See Section 6-07 "Description of Bid Items" for additional information. CONTRACT ITEMS Item Description Est Qty I Unit I Unit Price Total_ I 1 Saw Cut Concrete 700 L LF 1$6.50 $ 4,550.00 2 Remove Sidewalk, Asphalt 5,000 $ 32,500.00 Concrete, RampSF $6.50 3 Remove Commercial Sidewalk 500 SF $7.00 $ 3,500.00 4 Remove Curb and Gutter 200 LF $16.50 $ 3,300.00 �j 5 Root Surgery Under Sidewalk 30 $ 12,000.00 or in Planter Area f EA $400.00 6 Root Surgery Under Curb and 10 $ 4,500.00 Gutter EA $450.00 Install Sidewalk or Residential 7 i 500 $ 8,500.00 Driveway 0 - 75 SF) SF $17.00 8 Install Sidewalk or Residential 1,500 $ 18,750.00 Drivewa 76 - 300 SF SF $12.50 9 I Install Sidewalk or Residential 3,000 $ 30,000.00 Driveway>300 SF)SF $10.00 10 Install Curb Ram T 1,000 1 SF I $17.00 $ 17,000.00 11 Install Commercial Driveway 300 SF $14.00 $ 4,200.00 �12Install Curb and Gutter 150 $ 7,500.00 0 - 20 LF LF $50.00 11 1��3 I Install Curb and Gutter 2 21 - 50 LF)_00 LF I $45.00 $ 9,000.00 iInstall 14 _ Curb and Gutter 100 $4,200.00 I (>51 LF) LF $42.00 — Item Description Est Qty Unit Unit Price Total 15 Install Truncated Domes 60 $2,280.00 3' x 4' typical SF $38.00 $ 1,600.00 16 Install Furnished Side Inlet or DropInlet Catch Basin Assembly � 2 EA $800.00 17 Install Catch Basin Barrel 1 EA $1,500.00 $ 1,500.00 v 18 Install Furnished Street Name _ 1$300.00 $ 600.00 Sign Base _ 2 EA 19 Miscellaneous Concrete 1Sub 5,000 $ 10,000.00 rade Compaction SF $2.00 _ 20 1$200 _ Move -In Cost for Jobs Less Than $ 1,000.00 2 EA $500.00 21 Landscape Re air 800 SF Wt $5.00 $ 4,000.00 22 Set Monument Box _ _ 2 _._ 0 EA $ 500.00 $ 10,000.00 , TOTAL $190,480.00 ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should there be any conflict between the terms of this instrument and the Bid Proposal of the Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to establish lines and grades for the work as specified under the Special Provisions. All labor or materials not mentioned specifically as being done by the City will be supplied by the Contractor to accomplish the work as outlined in the specifications. ARTICLE V111 - The length of the contract will be twenty-four (24) months, starting July 1, 2021 and ending June 30, 2023. The contract may be extended if agreed upon by the Contractor and the City. ARTICLE IX - State of California Senate Bill 854 requires the following, No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. ARTICLE X - Counterparts and Electronic Signatures This Agreement and other documents to be delivered pursuant to this Agreement may be executed in one or more counterparts, each of which will be deemed to be an original copy and all of which, when taken together, will be deemed to constitute one and the same agreement or document, and will be effective when counterparts have been signed by each of the parties and delivered to the other parties. Each party agrees that the electronic signatures, whether digital or encrypted, of the parties included in this Agreement are intended to authenticate this writing and to have the same force and effect as manual signatures. Delivery of a copy of this Agreement or any other document contemplated hereby, bearing an original manual or electronic signature by facsimile transmission (including a facsimile delivered via the Internet), by electronic mail in "portable document format" (".pdf') or similar format intended to preserve the original graphic and pictorial appearance of a document, or through the use of electronic signature software will have the same effect as physical delivery of the paper document bearing an original signature. WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6-04.03 OF THE SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT. IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year and date written below. CONTRACTOR: CITY OF LODI, a municipal corporation hUl - j//a D , / I By: Steve Schwabauer STEPHEN SCHWABAUER City Manager Date: _� ijum Attest: Title NN1FE US IR City Cleric (CORPORATE SEAL) Approved As To Form, Janice D. Magdich JANICE D. MAGDICH City Attorney r, :r.rn •.),:uraw :::.J.",1c,:.F_ : , ._ - . i <"2' ?1 ilftwalx 3rd 1anrwe lLaw-(: ir4 •ai:' Ir:: 4.4 05113/21 Exhibit 2 2023-2024 Sidewalk and Misc. Concrete Repair Program Contract Rate Charges Description Unit Unit Price 1 Saw Cut Concrete LF $ 7.44 2 Remove Sidewalk, Asphalt Concrete, Ramp SF $ 7.44 3 Remove Commercial Sidewalk SF $ 8.02 4 lRemove Curb and Gutter LF $ 18.89 5 Root Surgery Under Sidewalk or in Planter Area EA $ 458.04 6 Root Surgery Under Curb and Gutter EA $ 515.30 7 Install Sidewalk or Residential Driveway (0 - 75 SF) SF $ 19.47 8 Install Sidewalk or Residential Driveway (76 - 300 SF) SF $ 14.31 9 Install Sidewalk or Residential Driveway (>300 SF) SF $ 11.45 10 Install Curb Ramp SF $ 19.47 11 Install Commercial Driveway SF $ 16.03 12 Install Curb and Gutter (0 - 20 LF) LF $ 57.26 13 Install Curb and Gutter (21 - 50 LF) LF $ 51.53 14 Install Curb and Gutter (>51 LF) LF $ 48.09 15 Install Truncated Domes (3'x 4' typical) SF $ 43.51 16 Install Furn. Side Inlet/Drop Inlet Catch Basin Assembly EA $ 916.08 17 Install Catch Basin Barrel EA $ 1,717.65 18 Install Furnished Street Name Sign Base EA $ 343.53 19 Miscellaneous Concrete Subgrade Compaction SF $ 2.29 20 Move -In Cost for Jobs Less Than $200 EA $ 572.55 21 Landscape Repair SF $ 5.73 22 ISet Monument Box EA $ 572.55 RESOLUTION NO. 2023-107 A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING THE CITY MANAGER TO EXECUTE AMENDMENT NO. 1 TO THE 2021-2023 SIDEWALK AND MISCELLANEOUS CONCRETE REPAIR PROGRAM WITH A.M. STEPHENS CONCRETE, INC., OF LODI WHEREAS, this project consists of the construction, removal, and/or the replacement of curb, gutter, sidewalk, ramps, or other miscellaneous concrete items at various locations throughout the City on an as -needed basis; and WHEREAS, on April 21, 2021, Council approved specifications and adopted a resolution authorizing the City Manager to award a contract to the lowest responsive bidder in an amount not to exceed $250,000 and to execute change orders in an amount not to exceed $50,000. On July 7, 2021, the City Manager executed the contract with Popuch Concrete Contracting, Inc., of Lodi, in the amount of $190,480; and WHEREAS, A.M. Stephens Concrete, Inc., purchased Popuch Concrete Contracting, Inc., in June 2022 and a Consent to Assignment was executed to continue the contract under A.M. Stephens Concrete, Inc., on November 29, 2022; and WHEREAS, the current contract with A.M. Stephens Concrete, Inc., is set to expire on June 30, 2023. A.M. Stephens Concrete, Inc., has agreed to extend the contract through June 30, 2024 with a Consumer Price Index -based increase of 14.51% to cover the costs of inflation and increasing minimum wage; and WHEREAS, staff recommends authorizing the City Manager to execute Amendment No. 1 to 2021-2023 Sidewalk and Miscellaneous Concrete Repair Program with A.M. Stephens Concrete, Inc. of Lodi. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute Amendment No. 1 to 2021-2023 Sidewalk and Miscellaneous Concrete Repair Program with A.M. Stephens Concrete, Inc., of Lodi, California; and BE IT FURTHER RESOLVED, pursuant to Section 6.3q of the City Council Protocol Manual (adopted 11/6/19, Resolution No. 2019-223), the City Attorney is hereby authorized to make minor revisions to the above -referenced document(s) that do not alter the compensation or term, and to make clerical corrections as necessary. Dated: June 7, 2023 ----------------------------------------------------------------------- ----------------------------------------------------------------------- I hereby certify that Resolution No. 2023-107 was passed and adopted by the City Council of the City of Lodi in a regular meeting held June 7, 2023 by the following votes: AYES: COUNCIL MEMBERS — Bregman, Craig, Nakanishi, Yepez, and Mayor Hothi NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None OLIVIA NASHED City Clerk 2023-107