HomeMy WebLinkAboutAgenda Report - June 7, 2023 C-05CITY OF C� 0 zt� CALIFORNIA COUNCIL COMMUNICATION AGENDA ITEM Cv,5 AGENDA TITLE: Approve Plans and Specifications and Authorize Advertisement for Bids for Wastewater Main Rehabilitation Program (Project No. 10) and Adopt Resolution Authorizing City Manager to Award Contract to Lowest Responsive Bidder ($1,100,000), and Execute Change Orders ($110,000), and Appropriate Funds ($1,210,000) MEETING DATE: PREPARED BY: June 7, 2023 Public Works Director RECOMMENDED ACTION: Approve plans and specifications and authorize advertisement for bids for Wastewater Main Rehabilitation Program (Project No. 10) and adopt resolution authorizing City Manager to award Contract to lowest responsive bidder in an amount not -to -exceed $1,100,000, and to execute change orders in an amount not -to -exceed $110,000, and appropriate funds in the amount of $1,210,000. BACKGROUND INFORMATION: The Wastewater Main Rehabilitation Program is intended to systematically replace and repair existing wastewater infrastructure that has reached its useful life. This is the tenth project scheduled in this program. Project No. 9 was accepted by City Council on May 17, 2023. As part of that project, staff requested a change order to lightly clean and assess additional sections of wastewater line in this location, which have been an ongoing maintenance concern. These sections included approximately 1500 feet of 14" wastewater line north of Vine Street from Sacramento Street to Hutchins Street; approximately 140 feet of 14" wastewater main west of Ham Lane from the south side of Lodi Middle School to Park Street; and approximately 1200 feet of 24" wastewater main west of Ham Lane from the south side of Lodi Middle School to the Municipal Service Center's corp yard. See attached Exhibit A. Video reports confirmed that these pipes have seriously deteriorated, and are in immediate need of repair shown in attached Exhibit B. Repair will include replacement of a portion of wastewater line downstream of the Adventist Health Lodi Memorial Hospital. As with previous phases of the project, staff is again recommending the use of trenchless methods of rehabilitation to minimize both surface disruption and costs. The plans and specifications are on file in the Public Works Department. The planned bid opening date is July 12, 2023. The project estimate is $1,000,000. Staff recommends approving plans and specifications and authorize advertisement for bids for Wastewater Main Rehabilitation Program (Project No. 10) and adopt resolution authorizing City Manager to award Contract to lowest responsive bidder in an amount not -to -exceed $1,100,000, and to execute change orders in an amount not -to -exceed $110,000, and appropriating funds in the amount of $1,210,000. APPROVED: �,,R,,y:5,,0:109 0,1 PDT Stephen Schwabauer, City Manager \\cvcfilv02\pubwks$\WP\PROJECTS\SEWE R\Wastewater Main Rehab 10\CPSA-Award.docx 5/24/2023 Approve Plans and Specifications and Authorize Advertisement for Bids for Wastewater Main Rehabilitation Program (Project No. 10) and Adopt Resolution Authorizing City Manager to Award Contract to Lowest Responsive Bidder ($1,100,000), and Execute Change Orders ($110,000), and Appropriating Funds ($1,210,000). June 7, 2023 Page 2 FISCAL IMPACT: Completing this project will reduce future maintenance costs and increase the performance and reliability of the wastewater system. This project will not impact the General Fund. FUNDING AVAILABLE: Budgeted in Fiscal Year 2022/23. Requested appropriation Wastewater Capital (53199000.77020): $1,210,000 TOTAL $1,210,000 0-,M� ;(� Andrew Keys Deputy City Manager/Internal Services Director I. cy�o Charles E. Swimley, Jr. Public Works Director Prepared by Jimi Billigmeier, Associate Civil Engineer CES/JB/cd Attachments cc: Andrew Richle, Utilities Superintendent \\cvcfilv02\pubwks$\WP\PROJECTS\SEWE R\Wastewater Main Rehab 10\CPSA-Award.docx 5/24/2023 Wastewater Main Rehabilitation Program Project No. 10 Proposed Change Order Work C 0� Vinewood School L Vi ewood Park Ud u Qa a g Lodi Middle E School _ Ko Park 0 TTII Exhibit A -American Legion Park it. i RI ER EtfiU111 * 0 0.05 0.1 Miles Clyde eedha School Legend Note 0.2 i Wastewater Lines to be Rehabilitated c • .:�. i ; IL ti 4p ip de Capital Improvement Plan FY 2022-2023 Project Title: Vastewater Main Replacement #A Munis Project Code: #145 Section I: Description District Nos: Citywide Project Length Priority Inspect and repair wastewater mains within the City. Rehab methods will be mostly trenchless technology and small point repairs with trenching will be made. Justification/factor driving project Repair old leaking wastewater pipe to prevent pipe failure and reduce infiltration and inflow to the wastewater treatment plant. Additional Information Originally in the CIP program for FY 23/24 for $2M, moved to appropriate in FY 22/23 for $1,210,000 Section II: Estimated Project Costs Expenditure Prior Years FY 21122 FY 22123 FY 23124 FY 24125 FY 25126 FY 26127 Future Yrs Total Estimate Budget Contracts $ - $ 1,210,000 $ 1,210,000 �$ - $ - $ - $ - $ - $ - Total Capital Costs $ - $ - $ 1,210,000 $ - $ - $ - $ - $ - $ 1,210,000 Section III: Funding Sources/Methods of Financing Funding Source(s) Prior Years FY 21122 FY 22123 FY 23124 FY 24125 FY 25126 FY 26127 Future Yrs Total Estimate Budget 531 - Wastewater Capital Outlay $ - $ 1,210,000 $ 1,210,000 Total Project Financing $ - $ - ' $ 1,210,000 $ - $ - $ - $ - $ - $ 1,210,000 RESOLUTION NO. 2023-101 A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING THE CITY MANAGER TO AWARD A CONTRACT TO THE LOWEST RESPONSIVE BIDDER FOR WASTEWATER MAIN REHABILITATION PROGRAM (PROJECT NO. 10) AND TO EXECUTE CHANGE ORDERS; AND FURTHER APPROPRIATING FUNDS --------------------------------------------------------------------- --------------------------------------------------------------------- WHEREAS, the Wastewater Main Rehabilitation Program is intended to systematically replace and repair existing wastewater infrastructure that has reached its useful life; and WHEREAS, during Project No. 9, sections of wastewater line were identified as being seriously deteriorated and in need of immediate repair at the following locations: approximately 1,500 feet of 14 -inch wastewater line north of Vine Street from Sacramento Street to Hutchins Street; approximately 140 feet of 14 -inch wastewater main west of Ham Lane from the south side of Lodi Middle School to Park Street; and approximately 1,200 feet of 24 -inch wastewater main west of Ham Lane from the south side of Lodi Middle School to the Municipal Service Center yard. As with previous phases of the project, staff is again recommending the use of trenchless methods of rehabilitation to minimize both surface disruption and costs; and WHEREAS, staff recommends authorizing the City Manager to award a contract for Wastewater Main Rehabilitation Program (Project No. 10) to the lowest responsive bidder in an amount not to exceed $1,100,000; and WHEREAS, staff also recommends authorizing the City Manager to execute change orders in an amount not to exceed $110,000; and WHEREAS, staff further recommends appropriating funds in the amount of $1,210,000 to the Wastewater Capital Fund (53199000.77020). NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby authorize the City Manager to award a contract for Wastewater Main Rehabilitation Program (Project No. 10) to the lowest responsive bidder in an amount not to exceed $1,100,000; and BE IT FURTHER RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute change orders in an amount not to exceed $110,000; and BE IT FURTHER RESOLVED that the Lodi City Council does hereby authorize appropriating funds in the amount of $1,210,000 as set forth above; and BE IT FURTHER RESOLVED, pursuant to Section 6.3q of the City Council Protocol Manual (adopted 11/6/19, Resolution No. 2019-223), the City Attorney is hereby authorized to make minor revisions to the above -referenced document(s) that do not alter the compensation or term, and to make clerical corrections as necessary. Dated: June 7, 2023 I hereby certify that Resolution No. 2023-101 was passed and adopted by the City Council of the City of Lodi in a regular meeting held June 7, 2023 by the following vote: AYES: COUNCIL MEMBERS — Bregman, Craig, Nakanishi, Yepez, and Mayor Hothi NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None OLIVIA NASHED City Clerk 2023-101