AGENDA ITEM
C-3
COUNCIL COMMUNICATION
AGENDA TITLE: Approve Plans and Specifications and Authorize Advertisement for Lower Sacramento
Road Resurfacing Project
MEETING DATE: April 19, 2023
PREPARED BY: Public Works Director
RECOMMENDED ACTION: Approve plans and specifications and authorize advertisement for bids for
Lower Sacramento Road Resurfacing Project.
BACKGROUND INFORMATION: This project includes localized pavement repair, resurfacing of the
pavement, and replacing the traffic striping. The project limits will include
Lower Sacramento Road (from Kettleman Lane to the Turner Road).
Lower Sacramento Road was last reconstructed in 2000 with an open -graded rubberized asphalt mix. In 2020,
92,000 square feet of pavement was repaired to prolong the structural integrity. While most of the road still
has plenty of structural integrity, the road's top layer is chipping off, creating an uneven driving surface. This
project will create a smoother and quieter driving surface while prolonging the life of the road.
The specifications are on file in the Public Works Department. The planned bid opening date is May 10, 2023.
The contract estimate is $2,500,000.
FISCAL IMPACT: By investing in the recommended maintenance project, significant capital dollars
will be saved by extending the useful life of the pavement and foregoing more
costly pavement reconstruction
FUNDING AVAILABLE: Funding will be identified at project award.
CLOU,o
Charles E. Swimley, Jr.
Public Works Director
Prepared by Alice Bernardino, Associate Civil Engineer