Loading...
HomeMy WebLinkAboutAgenda Report - April 19, 2023 C-03CITY OF t2ce �.1.0 o z CALIFORNIA AGENDA ITEM C-3 COUNCIL COMMUNICATION AGENDA TITLE: Approve Plans and Specifications and Authorize Advertisement for Lower Sacramento Road Resurfacing Project MEETING DATE: April 19, 2023 PREPARED BY: Public Works Director RECOMMENDED ACTION: Approve plans and specifications and authorize advertisement for bids for Lower Sacramento Road Resurfacing Project. BACKGROUND INFORMATION: This project includes localized pavement repair, resurfacing of the pavement, and replacing the traffic striping. The project limits will include Lower Sacramento Road (from Kettleman Lane to the Turner Road). Lower Sacramento Road was last reconstructed in 2000 with an open -graded rubberized asphalt mix. In 2020, 92,000 square feet of pavement was repaired to prolong the structural integrity. While most of the road still has plenty of structural integrity, the road's top layer is chipping off, creating an uneven driving surface. This project will create a smoother and quieter driving surface while prolonging the life of the road. The specifications are on file in the Public Works Department. The planned bid opening date is May 10, 2023. The contract estimate is $2,500,000. FISCAL IMPACT: By investing in the recommended maintenance project, significant capital dollars will be saved by extending the useful life of the pavement and foregoing more costly pavement reconstruction FUNDING AVAILABLE: Funding will be identified at project award. CLOU,o Charles E. Swimley, Jr. Public Works Director Prepared by Alice Bernardino, Associate Civil Engineer CES/AB/cd Attachment cc: Utility Manager Stephen Sohwabauer, City Manager \\cvcriIv02\pubwks$\WP\PROJECTS\STREETS\LOWER SACRAMENTO\Lower Sacramento Resurfacing 2023\CSA.doc 4/412023