HomeMy WebLinkAboutAgenda Report - May 17, 2023 C-07CITY OF a o z CALIFORNIA AGENDA ITEM C•7 COUNCIL COMMUNICATION AGENDA TITLE: Accept Improvements Under Contract for Wastewater Main Rehabilitation Program (Project No. 9) MEETING DATE: May 17, 2023 PREPARED BY: Public Works Director RECOMMENDED ACTION: Accept improvements under contract for Wastewater Main Rehabilitation Program (Project No. 9). BACKGROUND INFORMATION: The Wastewater Main Rehabilitation Program is intended to systematically replace and repair existing wastewater infrastructure that has reached its useful life. This is the ninth project scheduled in this program. Project No. 9 rehabilitated approximately 1200 lineal feet of 24 -inch and 30 -inch diameter wastewater trunk lines running south from Ham Lane and Park Street, continuing along the east side of the WID Canal, ending at Century Boulevard. Lining for these pipes has been completed, improving the level of service, increasing reliability and reducing risk of pipeline failures. As with previous phases of the project, trenchless methods of rehabilitation were used to minimize both surface disruption and costs. The project also rehabilitated 16 wastewater manholes, see attached Exhibit A. The original contract amount was $1,656,535. The final cost of the contract was $1,688,072.39 and was completed in substantial conformance with the specifications approved by City Council. There was one change order incorporating two items totaling $31,537.39. Item 1 revised unit item quantities to match work performed amounting to a credit in the amount of $33,849. Item 2 included work requested by staff amounting to $65,386.39. The additional work requested by staff included cleaning and evaluation of additional 1500 lineal feet of wastewater lines ($16,199.81), additional cleaning of heavy debris from vacon decanting at MSC ($16,965.30), additional mobilization due to rain delays ($14,278.75), and other minor items. The original contract was 90 days. Change Order No. 1 added 120 calendar days for excessive rain events when bypass work was not permitted. Pre -construction and post -construction photos of a sample manhole rehabilitation and wastewater line rehabilitation are shown in Exhibit B. Following acceptance by the City Council, as required by law, the City Engineer will file a Notice of Completion with the County Recorder's office. The notice serves to notify vendors and subcontractors that the project is complete and begins their 30 -day period to file a stop notice requiring the City to withhold payments from the prime contractor in the event of a payment dispute. APPROVED-- _._....,....,,, «, t.,y 3 7f1,T11.31 PGT Stephen Schwabauer, City Manager \\cvcfi I v02\pu bwks$\ W P\PROJ ECTS\SE W E R\W astewate rReha bP roject9\CAccept1.docx 5/4/2023 Accept Improvements Under Contract for Wastewater Main Rehabilitation Program (Project No. 9) May 17, 2023 Page 2 FISCAL IMPACT: Completing this project will reduce future maintenance costs and increase the performance and reliability of the wastewater system. This project will not impact the General Fund. FUNDING AVAILABLE: This project was funded by Wastewater Capital (53199000.77020): UM --0 Charles E. Swimley, Jr. Public Works Director Prepared by Jimi Billigmeier, Associate Civil Engineer CES/JB/cd Attachments cc: Andrew Richle, Utilities Superintendent Travis Kahrs, Water Plant Superintendent \\cvcfilvo2\pubwks$\WP\PROJECTS\SEWER\WastewaterRehabProject9\CAcceptl.docx 5/4/2023 Wastewater Main Rehabilitation Program - Project No. 9 Exhibit A Legend Pipelines Rehabilitated LJ F7 N W- E S 500 1,000 2,000 Feet 44 ti USMH: Q1514 DSMH: NEN: MH AMH Access Point Manhole 31,7 USI. H: P1546 DS%4 NEW MH 12.6 r�i L obi scellaneo:ls 6Vate, Level V�T �. _hr F, Sim 1 a ' Nr USMH: Q1514 DSMH: NEN: MH AMH Access Point Manhole 31,7 USI. H: P1546 DS%4 NEW MH 12.6