Loading...
HomeMy WebLinkAboutAgenda Report - April 4, 2001 E-13CITY OF LODI COUNCIL COMMUNICATION AGENDA TITLE: Adopt resolution authorizing the City Manager to sign a professional services agreement for McLane Substation Grounding Analysis and Design with Power Engineers, Inc. (not to exceed $10,000) (EUD). MEETING DATE: April 4, 2001 SUBMITTED BY: Electric Utility Director RECOMMENDED ACTION: That the City Council authorize the City Manager to sign a professional services agreement for McLane Substation Grounding Analysis and Design with Power Engineers, Inc. in an amount not to exceed $10,000. BACKGROUND INFORMATION: A portion of the McLane Substation Site was divided off some years ago for construction of a well. At that time a cyclone fence was installed to provide physical separation between the two City facilities. The ground grid was left in place within the entire site. One function of the ground grid in a substation is to reduce step and touch potentials (voltages) on the perimeter and within the substation to acceptable levels during fault conditions. Solid state control facilities, now commonly used at well sites, could be exposed to damaging potentials with the present ground grid configuration. Therefore, to ensure that a safe environment exists around and adjacent to the substation facility, it is recommended that an analysis of the grounding system be performed and corrective measures, if warranted, be designed and subsequently implemented. FUNDING: Available within the Department's 2000-2001 Financial Plan and Budget Substation Construction, High Voltage, page E-28 Funding Approval: Vick cAthie Finance Director nr ,% , r/ate/V� uQ Ow Alan N. Vallow Electric Utility Director PREPARED BY: Hans Hansen, Manager, Engineering and Operations c: City Attorney Public Works Director APPROVED' -L �1, ,/, H. Dixon Flyn - City Manager RESOLUTION NO. 2001-76 A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING THE CITY MANAGER TO EXECUTE A PROFESSIONAL SERVICES AGREEMENT WITH POWER ENGINEERS, INC., FOR THE MCLANE SUBSTATION GROUNDING ANALYSIS AND DESIGN WHEREAS, a portion of the McLane Substation Site was divided off some years ago for construction of a well, and at that time a cyclone fence was installed to provide physical separation between the two City facilities; and WHEREAS, the ground grid was left in place within the entire site. One function of the ground grid in a substation is to reduce step and touch potentials (voltages) on the perimeter and within the substation to acceptable levels during fault conditions; and WHEREAS, solid station control facilities now commonly used at well sites could be exposed to damaging potentials; and WHEREAS, to ensure that a safe environment exists around and adjacent to the substation facility, it is recommended that an analysis of the grounding system be performed and corrective measures, if warranted, be designed and subsequently implemented. NOW, THEREFORE, BE IT RESOLVED, that the Lodi City Council does hereby authorize the City Manager to execute a professional services agreement with Power Engineers, Inc., for the McLane Substation Grounding Analysis and Design, at a cost not to exceed $10,000.00. Dated: April 4, 2001 ------------------------------------------------------------------ ------------------------------------------------------------------ I hereby certify that Resolution No. 2001-76 was passed and adopted by the Lodi City Council in a regular meeting held April 4, 2001 by the following vote: AYES: COUNCIL MEMBERS — Hitchcock, Land and Mayor Nakanishi NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — Howard and Pennino ABSTAIN: COUNCIL MEMBERS — None SUSAN J. BLACKSTON City Clerk 2001-76