HomeMy WebLinkAboutResolutions - No. 2023-79RESOLUTION NO. 2023-79 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE CONTRACT FOR SALAS PARK PARKING LOT IMPROVEMENTS TO GEORGE REED, INC., OF MODESTO; AND AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDERS WHEREAS, the Salas Park parking lot was originally constructed in 1984 and included 182 parking stalls, seven post -top area lights along the west side of the parking lot, and two double -sided street lights along Stockton Street; and WHEREAS, in 2013, the City modified the parking lot to create six Americans with Disabilities Act (ADA) accessible parking stalls, which reduced the total number of stalls to 179; and WHEREAS, this project will install new curbing, pavement, parking lot lighting, and ADA compliant driveway approaches along Stockton Street and convert the existing post -top lights to brighter and more energy-efficient LED lights. While the existing accessible parking stalls will remain, the striping will be redone with the rest of the parking lot, and in order to install the appropriate parking lot lighting, three trees will need to be removed from the middle of the parking lot; and WHEREAS, plans and specifications for this project were approved on December 7, 2022, and construction is anticipated to start on June 20, 2023 (to accommodate the BOBS sports schedule). The City received the following 11 bids for this project on April 19, 2023: Bidder Location Bid Above/(Below) Estimate George Reed Modesto $ 631,170.00 $ (330,137.00) Consolidated Engineering, Inc. Valley Springs $ 645,513.70 $ (315,793.30) Western Engineering Loomis $ 673,945.50 $ (287,361.50) Sinclair General Engineering Const. Oakdale $ 750,973.31 $ (210,333.69) Dirt Dynasty, Inc. Farmington $ 760,394.00 $ (200,913.00) McFadden Construction, Inc. Stockton $ 768,739.18 $ (192,567.82) B&M Builders Rancho Cordova $ 780,073.00 $ (181,234.00) Robert Burns Construction, Inc. Stockton $ 799,266.54 * $ (162,040.46) Martin General Engineering, Inc. Rancho Cordova $ 874,805.60 $ ( 86,501.40) United Pavement Maintenance Hughson $ 888,220.00 $ ( 73,087.00) The Design Build, Inc.** Sacramento $ 936,674.00 * $ ( 24,633.00) " Corrected Figure *" Non -Responsive (Did not include receipt of Addendum No. 1) WHEREAS, staff recommends awarding the contract for Salas Park Parking Lot Improvements to George Reed, Inc., of Modesto, in the amount of $631,170; and WHEREAS, staff further recommends authorizing the City Manager to execute change orders in an amount not to exceed $100,000. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award the contract for Salas Park Parking Lot Improvements to George Reed, Inc., of Modesto, California, in the amount of $631,170; and BE IT FURTHER RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute the contract and change orders in an amount not to exceed $100,000; and BE IT FURTHER RESOLVED, pursuant to Section 6.3q of the City Council Protocol Manual (adopted 11/6/19, Resolution No. 2019-223), the City Attorney is hereby authorized to make minor revisions to the above -referenced document(s) that do not alter the compensation or term, and to make clerical corrections as necessary. Dated: May 3, 2023 I hereby certify that Resolution No. 2023-79 was passed and adopted by the City Council of the City of Lodi in a regular meeting held May 3, 2023 by the following votes: AYES: COUNCIL MEMBERS — Bregman, Craig, Nakanishi, Yepez, and Mayor Hothi NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None OLIVIA NASHED City Clerk 2023-79