HomeMy WebLinkAboutResolutions - No. 2023-41RESOLUTION NO. 2023-41
A RESOLUTION OF THE LODI CITY COUNCIL RESCINDING
RESOLUTION NO. 2022-60; AND ADOPTING AMENDED PROVISIONS TO
IMPLEMENT THE CITY OF LODI GROWTH MANAGEMENT PLAN
WHEREAS, the Lodi City Council adopted Ordinance No. 1521 on September 20, 1991,
thereby establishing the City's Growth Management Plan; and
WHEREAS, Ordinance No. 1521 establishes that the City Council will adopt guidance
for the implementation of the Growth Management Plan, including procedures and requirements
for the approval of Growth Allocations; and
WHEREAS, the City Council then adopted Resolutions No. 91-170 and No. 91-171,
establishing submittal requirements and procedures for the review of applications for Growth
Allocations; and
WHEREAS, the City Council on January 20, 2021, made changes to the Growth
Allocation process, rescinding Resolutions No. 91-170 and No. 91-171 and adopting Resolution
No. 2021-21 in their place; and
WHEREAS, the City Council on March 2, 2022, made further changes to the Growth
Allocation process, rescinding Resolution No. 2021-21 and adopting Resolution 2022-60 in its
place; and
WHEREAS, the City staff has prepared additional clarifications to the Growth Allocation
process to expressly state how Growth Allocations for annexations can be approved and how to
track the allocations and still provide the Council with the ability to comment on proposed
developments at an early stage; and
WHEREAS, the City Council has now reviewed Resolution No. 2023-41 and has
determined it would be beneficial to amend procedures and requirements to achieve these
improvements; and
WHEREAS, the goals and intent of Ordinance No. 1521 would remain in effect as
adopted, without any amendments to the Ordinance or to the rate at which development within
the City of Lodi may occur; and
WHEREAS, the City's Growth Management Plan was established through Ordinance
No. 1521 and no changes to Ordinance No. 1521 are proposed in this action. The proposed
amendments would be limited to the procedures for the review of Growth Allocation requests,
which would not alter the rate, location, form or intensity of development in the City. As such, it
can be seen with certainty that the proposed amendments would not cause a significant effect
on the environment and adoption of the proposed amendments is exempt from review under
CEQA subject to Section 15061(b)(3) of the CEQA Guidelines.
NOW, THEREFORE, BE IT RESOLVED by the Lodi City Council as follows:
A. The Recitals as stated above are true and incorporated herein by this reference.
B. Earlier Resolution Rescinded
The City Council hereby repeals and replaces Resolution No. 2022-60 in its entirety.
C. Growth Allocations Required
1. Consistent with the provisions of Ordinance No. 1521, the following actions require
approval of Growth Allocations prior to residential projects or the residential
component(s) of a mixed-use project receiving approval:
a. Approval of an Annexation, General Plan Amendment, Rezone, Specific Plan,
Planned Unit Development, Master Plan, tentative subdivision map, or similar
land use entitlement.
b. Approval of a multifamily residential project on a parcel that has not received a
Growth Allocation.
c. Issuance of building permits.
2. The following are exempt from requirements for Growth Allocations:
a. Commercial and industrial projects.
b. Senior citizen housing.
c. Construction of a new or replacement of a single-family home.
d. Reconstruction of any residential unit that was originally constructed with a
Growth Allocation.
e. Residential project of four (4) units or less, including attached and detached
units.
f. Accessory Dwelling Units.
g. Emergency Housing.
D. Development Plan.
Applications for Growth Allocations shall include a Development Plan that includes the
following, as appropriate for the project, at sufficient detail to provide the City Council with
the developer's intent in terms of the type and quality of development:
1. A map showing the following:
a. Proposed street system and/or lotting design proposed within the development.
b. Areas proposed to be dedicated or reserved for parks, open -space conservation,
playgrounds, school sites, public buildings, churches, and other such uses.
c. Compliance with this requirement shall not be construed to relieve the applicant
from compliance with City and State Subdivision regulations or any other
applicable local or State laws.
2. A map showing the location of all trees over nine (9) inches in diameter with an
indication of whether they will be removed or retained as part of the project.
3. A land -use plan for the proposed development indicating the proposed land uses, as
well as a description of and development standards for each land use designation
(including, if desired, reference(s) to the Lodi Zoning Code for development standards,
permitted land uses, etc.).
4. A map showing existing uses (including agriculture) inside and within 500 feet of the
proposed development.
5. Typical plot plan(s) for residential dwellings for each typical proposed residential lot type.
The plot plan(s) shall identify development standards, including setbacks from lot lines
7
for front, side and rear yards.
6. A circulation diagram and standards defining the proposed system of public and private
streets within the development, and all other features (on- and off-street bikeways,
pedestrian sidewalks, and trails, etc.) related to the movement of vehicles, goods,
pedestrians, and bicyclists within the development and to and from adjacent public
thoroughfares. The circulation diagram shall also document proposed off-street parking.
7. Elevations and perspective drawings of the front elevations of all proposed structures,
including single-family residences and their accessory buildings. Elevations of all sides
of proposed non-residential and/or neighborhood serving structures shall be provided.
Such drawings need not be the result of final architectural decisions, but shall be
reviewed for consistency in the formal design review process. The purpose of such
drawings is to indicate height of proposed buildings, the proposed character and level of
finish, and the general appearance of the proposed structures to ensure that the entire
development will meet the City's expectations for quality design and construction, will
have architectural unity, and will be in harmony with the surrounding developments.
8. Engineering data as described in the City of Lodi Public Improvement Design Standards.
E. Development Schedule -
1 .
chedule.
1. An application shall be accompanied by a development schedule indicating to the best
of the applicant's knowledge the approximate date when construction of the project can
be expected to begin, the anticipated rate of development and the completion date.
2. If a Tentative Subdivision Map is not filed one year after Growth Allocations are
approved, the City Council may rescind the approved Growth Allocations following a
public hearing at which the applicant shall be provided with notice and an opportunity to
be heard. This would allow the applicant to explain why the project has been delayed
and request an extension of the deadline to file a tentative map.
3. If the City Council determines that a proposed residential development will require
multiple years to complete, allocations may be approved for a stated number and type of
residential unit for each year of the development schedule.
4. For projects seeking a multi-year allocation, the City may require initial submittal of
individual tentative maps for each year's phasing of multi-year allocations
F. Processing of Application for Growth Allocations.
1. Application for growth allocations must be accompanied by a Development Plan and an
initial submittal of any application(s) which will be required for the proposed development
of housing, including: Annexation, General Plan Amendments, Change of Zone, or
Tentative Subdivision Map. An application for any required approval shall not be
submitted prior to approval of a Growth Allocation.
For annexation applications that require the issuance of Growth Allocations, the
applicant shall submit all materials described above for review prior to consideration of
prezoning of the subject parcel. When the City Council considers such Growth Allocation
for a future annexation, any approval shall be conditioned upon completion of the
annexation of the project to City within such period of time as shall be specified by the
City, and such Growth Allocation approval shall not be effective until annexation of such
property to the City has been completed. If annexation is not completed within the time
specified or any approved extension thereof, then the approval of such Growth
Allocations by the City Council shall be null and void. The total balance of available
3
Growth Allocations will not be affected by the Growth Allocation approval until such time
as the subject property is annexed to the city.
3. The City Council shall conduct a public hearing to consider the application for Growth
Allocation and shall either approve or deny the request for Growth Allocation. The
Council may also provide initial feedback on the Development Plan.
4. A Growth Allocation of units equal to or greater than the number of units proposed in the
Final Map must be approved and in place prior to recording of a Final Map.
5. Should the City Council approve a Growth Allocation for fewer units than the number of
units requested by the applicant, the applicant shall amend any subsequent applications
to conform with the number of units approved by the City Council.
6. All subsequent required approvals, including General Plan amendments, changes of
zone, Planned Developments, tentative subdivision maps, and development review,
shall be reviewed and approved as provided in the Lodi Zoning Code after the approval
of Growth Allocations.
G. Carry Over of Growth Allocations.
1. Annual Accrual of New Growth Allocations. On January 1 of each year new Growth
Allocations will be created in an amount that will accommodate a 2% increase over the
City's previous year population. The number of new Growth Allocations shall be the
number of dwellings required to accommodate the increased population based on the
average number of persons per household as determined by the State Department of
Finance.
2. Unused Growth Allocations. Growth Allocation available in any given year that are not
assigned to a development project shall be deemed to be Unused Growth Allocations
and shall be available to assign in subsequent years.
3. Allocations Associated with an Annexation. For purposes of calculating Unused Growth
Allocations, any Allocations assigned to a property seeking annexation shall be deemed
as Unused until such time as the associated annexation is complete and the subject
property joins the City, then the Growth Allocation issuance becomes effective.
4. Carry Over Allocations. An Unused Allocation becomes a Carry Over Allocation on
January 1 of the year following its original creation.
5. Available Growth Allocations. Available Growth Allocations shall be calculated on
January 1 of each year as the sum of newly -created Growth Allocations plus any Carry
Over Growth Allocations from previous years.
6. Oldest Allocations Assigned First. In each year, the first allocations assigned to
development projects shall be the oldest Carry Over Growth Allocations. Once all Carry
Over Growth Allocations have been assigned, the Growth Allocations created in the
current year shall be assigned.
7. Automatic Retirement of Carry Over Growth Allocations. Growth Allocations may only be
carried over for two subsequent years. If a Carry Over Growth Allocation has not been
assigned to a development project within three years of its original creation, then such
Growth Allocation shall be automatically retired.
8. Annual Accounting of Growth Allocations. By January 15 of each year, the Community
Development Department shall document newly -created Growth Allocations for the
4
current year and Carry Over Growth Allocations from previous years. Any Carry Over
Growth Allocations that are determined to be more than three years old are
automatically retired.
H. Points System/Evaluation Criteria.
Consistent with the provisions of Ordinance No. 1521, the following point system/evaluation
criteria shall be applied to the review of projects when requested Growth Allocations exceed
the number of available Growth Allocations.
1. Agricultural Land Conflicts Score
a. Project does not require conversion of vacant agricultural land 10
b. Project is adjacent to agricultural land on one side 7
c. Project is adjacent to agricultural land on two sides 5
d. Project is adjacent to agricultural land on three sides 3
e. Project is surrounded by agricultural land 0
2. On -Site Agricultural Land Buffer
a. Project needs no agricultural land mitigation 10
b. Adequate on-site buffer has been provided as a part of site
layout for all adjacent agricultural land 7
c. On-site buffer provided as a part of site layout for only part of
the project 5
d. No buffer between project and adjacent agricultural land 0
3. General Location
A map showing such priority shall be adopted or updated from time
to time by the Council, and shall be available for inspection in the
office of the City Clerk.
a. Project located within Priority Area 1 200
b. Project located within Priority Area 2 100
c. Project located within Priority Area 3 0
4. Relationship to Public Services
a. General Location
i. Project abuts existing or approved development that
has not yet been built on four sides 10
ii. Project abuts existing or approved development that
has not yet been built on three sides 7
5
iii. Project abuts existing or approved development that
has not yet been built on two sides
5
iv. Project abuts existing or approved development that
has not yet been built on one side
3
V. Project is surrounded by undeveloped land
0
b. Wastewater
i. Project is located adjacent to existing Master Plan
4
sanitary sewers or mains designed to serve the project
10
ii. Project will extend a Master Plan line within its
boundaries
8
iii. Project will extend a Master Plan line outside of its
boundaries but within existing right -of way (0 if right-
of-way is necessary)
4
iv. Project requires construction of a new lift station for
which funds are available in the Sewer Impact Fee
Fund
0
T Project requires construction of a new lift station for
which funds are not available in the Sewer Impact Fee
Fund
* Project cannot proceed without provision of funding
for construction of the lift station.
c. Water
i. Project is located adjacent to existing Master Plan
water mains or mains designed to serve the project
10
ii, Project will extend Master Plan lines within its
boundaries
8
iii. Project will extend Master Plan lines outside its
boundaries but within existing right-of-way (0 if outside
right-of-way)
4
iv. Project requires construction of a new water well for
which funds are available in the Water Impact Fee
Fund
0
V_ Project requires construction of new water well for
which funds are not available in the Water Impact Fee
Fund
vi. Project improves the existing system (i.e., eliminates
dead -ends, loops master plan lines, provides a well
site)
+1 to 3
0
* Project cannot proceed without provision of
funding for construction of the required well.
d. Drainage
i. Project is served by an existing drainage basin and
Master Plan line or mains designed to serve the
project 10
J. Project will extend a Master Plan line or expand an
existing basin within its boundaries 8
iii Project will extend a Master Plan line or expand an
existing basin outside of its boundaries but within
existing rights-of-way (0 points if right-of-way is
necessary) 4
iv. Project requires construction of a new basin for which
funds are available in the Master Drainage Impact Fee
Fund 0
V. Project requires construction of a new basin for which
funds are not available in the Master Drainage Impact
Fee Fund
* Project cannot proceed without provision of
funding for construction of the required basin.
5. Promotion of Open Space
Points shall be awarded on the basis of the percentage of
coverage of the total loss of project area by roof area and
paved areas on-site (exclusive of streets and single-family
homes).
20% or less
30% or less
40% or less
50%
60%
70% or greater
Project owner shall submit an analysis of the percentage of
the coverage of surface area.
6. Traffic
10
8
6
4
2
0
a. Project widens or improves an existing facility 10
b. Project will extend Master Plan streets within its boundaries 8
c. Project will extend Master Plan streets outside its boundaries
but within existing right-of-way (0 if outside right-of-way) 4
7
d. Project requires roadway improvements for which funds are
available in the Street Impact Fee Program 0
e. Project requires roadway improvements for which funds are
not available in the Street Impact Fee Program
f. Project improves circulation by providing additional access to
adjacent development (including non -vehicular access) +1 to 5
* Project cannot proceed without provision of funding for
construction of the required road improvement.
7. Housing
Low- and Moderate -Income Housing. A point credit will be awarded with the
following schedule:
25% or more of units low and moderate 10
20%-24% 8
15%-19% 6
10%-14% 4
5%-9% 2
Less than 5% low and moderate or low and moderate
housing proposed 0
8. Site Plan and Project Design --Bonus Points for Multi -Family
Projects These criteria shall only apply to multi -family projects.
a. Landscaping. (Planning Commission shall evaluate and
provide between 10 and 0 points) 0-10
b. Architectural Design. (SPARC Committee shall evaluate and
provide between 10 and 0 points) 0-10
9. Schools
a. Project is within 1/4 mile of an existing (or proposed)
elementary school 10
b. Project is within 1/2 mile of an existing (or proposed)
elementary school 5
c. Project is more than 1/2 mile from an existing or proposed
elementary school 0
d. Project is within 1/2 mile of an existing (or proposed)
middle school. 10
e. Project is within 1 mile of an existing or proposed middle
school 5
f. Project is more than 1 mile from an existing or proposed
middle school 0
g. Project is within 1 mile of an existing or proposed high school 10
8
h. Project is within 2 miles of an existing or proposed high school 5
10. Fire Protection. (Proximity to fire protection services)
a. Within 3 -minute emergency vehicle driving time from the
nearest fire station 10
b. Within 4 -minute emergency vehicle driving time from the
nearest fire station 5
c. Beyond 4 -minute emergency vehicle driving time from the
nearest fire station 0
Dated: February 15, 2023
I hereby certify that Resolution No. 2023-41 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held February 15, 2023 by the following votes:
AYES: COUNCIL MEMBERS — Bregman, Craig, Khan, Nakanishi, and
Mayor Hothi
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — None
ABSTAIN: COUNCIL MEMBERS — None
OLIVIA NASHED
City Clerk
2023-41
�