Loading...
HomeMy WebLinkAboutAgenda Report - December 21, 2022 C-054�A CITY OF AGENDA ITEM C4w 5 . .a 4 dz / o i CALIFORNIA COUNCIL COMMUNICATION AGENDA TITLE: Adopt Resolution Authorizing City Manager to Execute Change Orders for an Additional $35,000 for Stormwater Trash Collection Project — Phase 2 MEETING DATE: December 21, 2022 PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt Resolution Authorizing City Manager to execute change orders for an additional $35,000 for Stormwater Trash Collection Project — Phase 2 BACKGROUND INFORMATION: The project consists of installing a trash capture device in the storm drain line upstream from Outfall No. 4 located on the City owned Awani Drive Property, North of Turner Road. The device is designed to filter trash from the storm drain system before being discharged into the Mokelumne River. This project is in response to the statewide mandate requiring trash in the City's storm drain system be collected prior to discharging to rivers or streams. On August 18, 2021, Council awarded the contract to Soracco, Inc. for $294,874, and authorized the City Manager to execute change orders in the amount of $60,000. On September 21, 2022, Council increased the City Manager's change order authority by an additional $72,000. The additional change order authority was necessary to compensate the contractor to haul and dispose of the hazardous soil to the nearest hazardous waste landfill as required by the County Health Department. The additional funds also addressed an increase in the trash collection device procurement costs associated with the substantial delays brought forth by the County's requirements. The work associated with the original project is now completed, however an issue has arisen at the Outfall No. 9 pump station, also located on the Mokelumne River. The pump station's discharge manhole includes a 60 -year old flap gate that is cracked, causing water to continuously backflow into the storm drain system from the Mokelumne River. The original system was not designed to accommodate this additional water from the river, and if the crack worsens, it may adversely impact the storm drain system's ability to adequately serve the City. Staff received a proposal from the contractor to perform the flap gate repair and manhole reconstruction for $75,850. This does not Include costs for additional asphalt pavement repair (approximately $10,000), or any addition unknown conditions that are likely to be encountered at this location. Staff recommends maintaining approximately a 20% change order contingency for the remaining construction. This would require increasing the City Manager's not -to -exceed change order authority by APPROVED: Andrew Keys Stephen Schwabauer, City Manager \\CVCFILV02\PubWks$\WP\PROJECTS\STORMDRN\Stormwater Trash Collectlon Project - Phase 2 (2021) (21-07)\CC_CO Auth2.doc 12/8/2022 Adopt Resolution Authorizing City Manager to Execute Change Orders for an Additional $35,000 for Stormwater Trash Collection Project — Phase 2 December 21, 2022 Page 2 $35,000 to a total not -to -exceed amount of $167,000. The recommended increase will accommodate the flap gate repair and provide project funding to respond to unknown conditions during construction. FISCAL IMPACT: Expanding the scope of this project will facilitate a needed repair to a portion of the City storm drain system and reduce storm drain impacts associated with Mokelumne River water inundating the City's system. This project does not impact the General Fund. FUNDING AVAILABLE: Budgeted Fiscal Year 2021/22- Wastewater Capital PWWW-21003 (53199000.77020): $461,874 Andrew Keys Andrew Keys Deputy City Manager/Internal Services Director �� Charles E. Swimley, Jr. Public Works Director Prepared by Alice Bernardino, Associate Civil Engineer CES1ABlcd Attachments cc: Utility Superintendent Signature: Oydrw X&�b Email: akeys@lodi,gov Signature: QJVUJ,tv wIp Email: akeys@lodi.gov \\CVCFILV02\PubWks$1WPIPROJECTS\STORMDRN\Slormwater Trash Collection Project - Phase 2 (2021) (21-07)\CC—CO Auth2.doc 12/6/2022 RESOLUTION NO. 2022-312 A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING THE CITY MANAGER TO EXECUTE ADDITIONAL CHANGE ORDERS FOR STORMWATER TRASH COLLECTION PROJECT — PHASE 2 ------------------------------------------------------------------------- WHEREAS, the project consists of installing a trash capture device in the storm drain line upstream from Outfall No. 4 located on the City -owned Awani Drive property, north of Turner Road; and WHEREAS, on August 18, 2021, Council authorized the City Manager to award the contract to Soracco, Inc., for $294,874, with the authority to execute change orders in an amount not to exceed $60,000; and WHEREAS, on September 21, 2022, Council increased the City Manager's change order authority by an additional $72,000, which was necessary to compensate the contractor to haul and dispose of the hazardous soil to the nearest hazardous waste landfill as required by the County Health Department, and also addressed an increase in the trash collection device procurement costs associated with the substantial delays brought forth by the County's requirements; and WHEREAS, the discharge manhole at the Outfall No. 9 pump station includes a 60 -year-old flap gate that is cracked, causing water to continuously backflow into the storm drain system from the Mokelumne River; and WHEREAS, staff recommends authorizing the City Manager to execute change orders for an additional $35,000 for Stormwater Trash Collection Project — Phase 2. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute change orders for an additional $35,000 for Stormwater Trash Collection Project — Phase 2; and BE IT FURTHER RESOLVED, pursuant to Section 6.3q of the City Council Protocol Manual (adopted 11/6/19, Resolution No. 2019-223), the City Attorney is hereby authorized to make minor revisions to the above -referenced document(s) that do not alter the compensation or term, and to make clerical corrections as necessary. Dated: December 21, 2022 I hereby certify that Resolution No. 2022-312 was passed and adopted by the City Council of the City of Lodi in a regular meeting held December 21, 2022 by the following votes: AYES: COUNCIL MEMBERS — Hothi, Khan, Kuehne, and Nakanishi NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — Chandler ABSTAIN: COUNCIL MEMBERS — None OLIVIA NASHED City Clerk 2022-312