AGENDA ITEM C#b
COUNCIL COMMUNICATION
AGENDA TITLE: Approve Plans and Specifications and Authorize Advertisement for Bids for Turner and
Century Resurfacing Project
MEETING DATE: December 7, 2022
PREPARED BY: Public Works Director
RECOMMENDED ACTION Approve plans and specifications and authorize advertisement for bids for
Turner and Century Resurfacing Project.
BACKGROUND INFORMATION: This project includes localized pavement repair, the application of
approximately 16,000 square yards of rubberized asphalt cape seal and
fiberized slurry seal. The project limits will include Turner Road (from
Stockton Street to the Highway 99) and Century Boulevard (from Ham Lane to WID Canal), as shown on
Exhibit A.
The rubberized asphalt cape seal is a combination of a rubberized chip seal comprising the bottom layer
followed with an upper layer of fiberized slurry seal (slurry seal with strands of glass fiber added). The
rubberized cape seal with fiberized slurry will be applied to all streets within the project limits.
While the asphalt overlay is superior in ride quality, these pavement rehabilitation alternatives are expected to
extend the life of deteriorated roads by around one-half of that of an overlay, at approximately one-third of the
cost.
The specifications are on file in the Public Works Department. The planned bid opening date is January 18,
2023. The contract estimate is $895,000.
FISCAL IMPACT: By investing in the recommended maintenance project, significant capital dollars
will be saved by extending the useful life of the pavement and foregoing more
costly pavement reconstruction
FUNDING AVAILABLE: Funding will be identified at project award. A portion of the project funding will
come from the Federal Transportation Improvement Program.
&&=2
Charles E. Swim ey, Jr.
Public Works Director
Prepared by Alice Bernardino, Associate Civil Engineer
CES/AB/cd
Attachment
cc: Utility Manager
APPROVED:am
r I
Stephen Schwabauer, City Manager