Loading...
HomeMy WebLinkAboutAgenda Report - December 7, 2022 C-06CITY OF Z?10 Z CALIFORNIA AGENDA ITEM C#b COUNCIL COMMUNICATION AGENDA TITLE: Approve Plans and Specifications and Authorize Advertisement for Bids for Turner and Century Resurfacing Project MEETING DATE: December 7, 2022 PREPARED BY: Public Works Director RECOMMENDED ACTION Approve plans and specifications and authorize advertisement for bids for Turner and Century Resurfacing Project. BACKGROUND INFORMATION: This project includes localized pavement repair, the application of approximately 16,000 square yards of rubberized asphalt cape seal and fiberized slurry seal. The project limits will include Turner Road (from Stockton Street to the Highway 99) and Century Boulevard (from Ham Lane to WID Canal), as shown on Exhibit A. The rubberized asphalt cape seal is a combination of a rubberized chip seal comprising the bottom layer followed with an upper layer of fiberized slurry seal (slurry seal with strands of glass fiber added). The rubberized cape seal with fiberized slurry will be applied to all streets within the project limits. While the asphalt overlay is superior in ride quality, these pavement rehabilitation alternatives are expected to extend the life of deteriorated roads by around one-half of that of an overlay, at approximately one-third of the cost. The specifications are on file in the Public Works Department. The planned bid opening date is January 18, 2023. The contract estimate is $895,000. FISCAL IMPACT: By investing in the recommended maintenance project, significant capital dollars will be saved by extending the useful life of the pavement and foregoing more costly pavement reconstruction FUNDING AVAILABLE: Funding will be identified at project award. A portion of the project funding will come from the Federal Transportation Improvement Program. &&=2 Charles E. Swim ey, Jr. Public Works Director Prepared by Alice Bernardino, Associate Civil Engineer CES/AB/cd Attachment cc: Utility Manager APPROVED:am r I Stephen Schwabauer, City Manager \\CVCFILV02\PubWks$\WP\PROJECTS\STREETS\2021 Turner and Century Resurfacing Project\CSA doc 11/17/2022 r '4�44 04 - 4 W441601 04 � �P �IFORa�