AGENDA ITEM
H-3
COUNCIL COMMUNICATION
AGENDA TITLE: Adopt Resolution Approving Final Budget Adjustments for Fiscal Year 2022 and
Appropriating Funds ($1,180,816.55)
MEETING DATE: November 2, 2022
PREPARED BY: Budget Manager
RECOMMENDED ACTION: Adopt Resolution Approving Final Budget Adjustments for Fiscal Year 2022
and Appropriating Funds ($1,180,816.55).
BACKGROUND INFORMATION The year-end closing process for each fiscal year takes many months to
finalize all expenditures and journal postings. During the closing process
for FY 22, additional budget was needed in Fleet Services, PRCS Grant
Fund, Electric Utility Capital and the Asset Seizure Fund.
Fleet Services was in need of an additional $190,818.39 in appropriations to cover increases in fuel and repair
supplies due to inflation and supply demands. These costs are charged back to departments for the services
used. No additional budgetary adjustments were needed in operating department budgets.
PRCS Grants was in need of an additional $1,097.16 in appropriations for the Stocker grant. This grant is
funded on an annual basis and is used to provide aquatic programming sponsorships for youth in need. In FY
22, a total of 127 program sponsorships were awarded which included 107 swim lessons participants, 18
summer swim participants and 2 lifeguard course participants.
The Electric Utility capital program includes several maintenance projects that are needs -based driven. Annual
budgets are created with expected expenditure needs. For FY 22, three projects were over spent due to an
increase in service level demands and increased system maintenance efforts associated with safety and
reliability. These costs totaled $641,461. These projects are:
• Work for Others — need for $266,158 in appropriations for subdivision development.
• Overhead Maintenance — need for $112,376 in appropriations for conductor projects.
• Underground Maintenance —need for $262,927 in appropriations for inspections and cable.
On October 6, 2021, City Council adopted resolution 2021-272 which authorized the use of $347,440 in Asset
Seizure funds for the design work on the Police Training Facility. The resolution did not include facilitating the
transfer of funds to the General Fund Capital Improvement Fund where the project is being expensed. The
action requested is to provide the authorization to transfer the funds.
APPROVED: - j. ligim rn'ct 14. 2022 16149 PDT)
Stephen Schwabauer, City Manager
FISCAL IMPACT: Fleet: The costs were recovered through charges to departments. All departments
were able to accommodate the increased costs within their FY 22 budgets.
PRCS Stocker Grant: Funding was received to cover 100% of the program costs.
Electric Utility: Work for Others is reimbursed by developers; maintenance projects
to come from fund balance.
Asset Seizure Funds: No impact. Use of the funds were previously authorized.
FUNDING AVAILABLE: Fund balance is available to cover the above budgetary adjustments. Adjustments
are as follows:
Fleet: 65055000.72551 $ 115,341.25
65055000.72533 $ 71,750.23
65055000.72355 $ 3,726.91
Stocker Grant: 20673400.72388 $ 1,097.16
Electric Utility: 50199000.77020 $ 641,461.00
Asset Seizure: 21099000.76220 $ 347,440.00
TOTAL: $1,180,816.55
Q X,p
Andrew Keys
Deputy City Manager/Internal Services Director
Capital Improvement Program - Maintenance
FY 2021-2022
Maintenance Project Title:
12 kV Overhead Maintenance
I Munis Project Code:
EUCP-21002
#43
Section I:Description
District Nos: Citywide Project Length
Ongoing
Priority
High
Maintenance and improvements associated with the 12 kV overhead distribution system.
Justification/factor driving project
These ongoing efforts include replacement of annealed copper conductors with aluminum conductor steel reinforced (ACSR). Whereas copper is notoriously brittle and prone to breakage
with age, ACSR offers optimal strength for ovehead line design. Additional activities include replacement of poles, transformers and/or switches as needed as well as inspection of
overhead infrastrucutre, and pole test, treat and stubbing efforts.
Additional Information
Section II
Estimated Project Costs
Expenditure
Internal Staff
Miscellaneous
Prior Years FY 20121
Estimate
$ - $ 360,000
$ - $ 241,000
FY 21122
Budget
$ 1,343,000
$ 1,129,376
FY 22123 FY 23124 FY 24125
$ 1,343,000 $ 846,200 $ 846,200
$ 1,017,000 $ 685,800 $ 685,800
$
$
FY 25126
846,200
685,800
Future Yrs
N/A
N/A
$
$
Total
5,584,600
4,444,776
Contracts
$ -
$ 424,579
$ 50,000
$ 50,000
$ 50,000
$ 35,000
$
35,000
N/A
$
644,579
Total Capital Costs
$ -
$ 1,025,579
$ 2,522,376
$ 2,410,000
$ 1,582,000
$ 1,567,000
$
1,567,000
NIA
$
10,673,955
Section III
Funding Sources/Methods of Financing
Funding Source(s)
501 - EU Outlay Capital Reserve Fund
Total Project Financing
Prior Years FY 20121
Estimate
$ - $ 1,351,000
$ - $ 1,351,000
FY 21122
Budget
$ 2,410,000
$ 2,522,376
FY 22123 FY 23124 FY 24125
$ 2,410,000 $ 1,582,000 $ 1,567,000
$ 2,410,000 $ 1,582,000 $ 1,567,000
$
FY 25126
1,567,000
Future Yrs
N/A
$
Total
10,887,000
$ 1,567,000 NIA $
10,887,000
Section IV
Operating Budget Impact
Operating Cost or (savings)
Personnel
Other Operating Costs
Total Operating Impact
Prior Years FY 20121
Estimate
$ -
$ -
$ - $ -
FY 21122
Budget
FY 22123
FY 23124
FY 24125
$ -
$
FY 25126
-
Future Yrs
$ -
$
$
$
Total
-
-
-
$ -
$ -
$ -
Capital Improvement Program - Maintenance
FY 2021-2022
Maintenance Project Title:
12 W Underground Maintenance
I Munis Project Code:
EUCP-21006
#44
Section (:Description
District Nos: Citywide Project Length
Ongoing
Priority
High
Inspection and replacement of 12 kV underground infrastructure and other underground electric infrastructure maintenance as needed.
Justification/factor driving project
These ongoing maintenance efforts include, but are not limited to, replacement of failed/end-of-life cable; replacement of cable due to engineering study of predictive failure;
installation/replacement of subsurface equipment with pad -mounted equipment to increase operability and reliability and other underground electric infrastructure maintenance as needed.
Additional Information
Section II
Estimated Project Costs
Expenditure
Internal Staff
Miscellaneous
Contracts
Total Capital Costs
Prior Years FY 20121
Estimate
$ - $ 115,000
$ - $ 185,000
$ - $ 750,000
$ j $ 1,050,000
FY 21122
Budget
$ 115,000
$ 447,927
$ 500,000
$ 1,062,927
FY 22123 FY 23124 FY 24125
$ 25,000 $ 25,000 $ 25,000
$ 40,000 $ 40,000 $ 40,000
$ 100,000 $ 100,000 $ 100,000
$ 165,000 $ 165,000 $ 165,000
FY 25126
Future Yrs
Total
$ 25,000
N/A
$
330,000
$ 40,000
N/A
N/A
$
$
$
792,927
1,650,000
2,772,927
$ 100,000
$ 165,000
jNIA
Section III
Funding Sources/Methods of Financing
Funding Source(s)
501 - EU Outlay Capital Reserve Fund
Total Project Financing
Prior Years FY 20121
Estimate
$ - $ 1,050,000
$ - $ 1,050,000
FY 21122
Budget
$ 1,062,927
$ 1,062,927
FY 22123 FY 23124 FY 24125
$ 165,000 $ 165,000 $ 165,000
$ 165,000 $ 165,000 $ 165,000
$
$
FY 25126
165,000N/A
165,000
Future Yrs
NIA
$
$
Total
2,772,927
2,772,927
Section IV
Operating Budget Impact
Operating Cost or (savings)
Personnel
Other Operating Costs
Total Operating Impact
Prior Years
$ -
$ -
$ -
FY 20121
Estimate
$ -
FY 21122
Budget
$ -
FY 22123 FY 23124 FY 24125
$ - $ - $ -
$
FY 25126
-
Future Yrs
$ -
$
$
$
Total
-
-
-
Capital Improvement Program - Maintenance
FY 2021-2022
Maintenance Project Title: Work for Others - Reimbursed
I Munis Project Code: EUCP-15004 #46
Section LDescription District Nos: Citywide Project Length Ongoing Priority Normal
Installation and/or expansion of electrical service infrastructure for new development and/or existing customers.
Justification/factor driving project
This work is invoiced and paid for by the requesting party with revenues returned to the Electric Utility operating fund.
Additional Information
Section II Estimated Project Costs
Expenditure Prior Years
Internal Staff $ -
FY 20/21
Estimate
FY 21/22
Budget
FY 22123 FY 23124 FY 24/25 FY 25/26
$ 275,000 $ 275,000 $ 275,000 $ 275,000
Future Yrs
Total
$ 500,000
$ 275,000
N/A
$ 1,875,000
Miscellaneous
$ -
$ 500,000
$ 541,158
$ 275,000
$ 275,000
$ 275,000
$ 275,000
N/A
$ 2,141,158
Total Capital Costs
$ -
$ 1,000,000
$ 816,158
$ 550,000
1 $ 550,000 $ 550,000
$ 550,000
N/A
1 $ 4,016,158
Section III
Funding Sources/Methods of Financing
Funding Source(s) Prior Years FY 20121 FY 21122 FY 22123 FY 23124 FY 24125 FY 25/26 Future Yrs Total
Estimate Budget
501 - EU Outlay Capital Reserve Fund $ - $ 1,000,000 $ 816,158 $ 550,000 $ 550,000 $ 550,000 $ 550,000 N/A $ 4,016,158
Total Project Financing $ - $ 1,000,000 $ 816,158 $ 550,000 $ 550,000 $ 550,000 $ 550,000 N/A $ 4,016,158
Section IV MOperating Budget Impact
Operating Cost or (savings) Prior Years
Personnel $ -
Other Operating Costs $ -
Total Operating Impact $ -
FY 20121
Estimate
FY 21122
Budget
FY 22/23
FY 23124 FY 24/25
FY 25/26
Future Yrs
Total
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
RESOLUTION NO. 2022-270
A RESOLUTION OF THE LODI CITY COUNCIL
APPROVING FINAL BUDGET ADJUSTMENTS FOR FISCAL
YEAR 2022; AND FURTHER APPROPRIATING FUNDS
WHEREAS, the Lodi City Council adopted the Fiscal Year 2021/22 Financial Plan and
Budget on June 2, 2021; and
WHEREAS, the year-end reporting period for Fiscal Year 2C21/22 has been completed;
and
WHEREAS, additional budgets for Fleet Services, PRCS Grants, Electric Utility and Asset
Seizure funds are necessary to address unbudgeted expenditure needs for Fiscal Year 2021/22;
and
follows:
WHEREAS, staff recommends the additional Fiscal Year 2021/22 appropriations as
Fleet: 65055000.72551
$115,341.25
65055000.72533
$ 71,750.23
65055000.72355
$ 3,726.91
Stocker Grant: 20673400.72388
$ 1,097.16
Electric Utility: 50199000.77020
$641,461.00
Asset Seizure: 21099000.76220
$347,440.00
NOW, THEREFORE BE IT RESOLVED that the Lodi City Ccuncil does hereby authorize
the additional Fiscal Year 2021/22 appropriations and adjustments totaling $1,180,816.55, as set
forth above.
Dated: November 2, 2022
I hereby certify that Resolution No. 2022-270 was passed and adopted by the City Council
of the City of Lodi in a regular meeting held November 2, 2022, by tl-e following vote:
AYES: COUNCIL MEMBERS — Hothi, Khan, Kuehne, Nakanishi, and
Mayor Chandler
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — None
ABSTAIN: COUNCIL MEMBERS — None