HomeMy WebLinkAboutAgenda Report - November 2, 2022 C-06CITY OF AGENDA ITEM-(0 Age oe p Z C A L I FO RN IA COUNCIL COMMUNICATION AGENDA TITLE: Adopt Resolution Authorizing City Manager to Execute Professional Services Agreement with ICF Consulting, LLC, of Sacramento, to complete City of Lodi Zero-Emissions Bus Study & Rollout Plan (Not-to-Exceed $99,914) MEETING DATE: November 2, 2022 PREPARED BY: Public Works Director RECOMMENDED ACTION Adopt resolution authorizing City Manager to Execute Professional Services Agreement with ICF Consulting, LLC, of Sacramento, to complete the City of Lodi Zero -Emissions Bus Study & Rollout Plan in an amount not - to -exceed $99,914. BACKGROUND INFORMATION: On August 30, 2022, Public Works (PW) issued a Request for Proposals (RFP) to develop a comprehensive system wide study of Zero -Emission Bus (ZEB) transition needs. The study is being completed in support of the City of Lodi's compliance with the California Air Resource Board's (CARB) Innovative Clean Transit (ICT) regulation, which requires 100% of new transit bus purchases to be zero -emission by 2029, and 100% of transit bus fleets to be zero -emission by 2040. The study will identify a recommended ZEB type (i.e. battery electric vs. hydrogen fuel cell), infrastructure requirements, and a phasing plan for capital improvements and vehicle procurement. The analysis will comprehensively factor in key operational parameters such as transit service requirements including route, range and staffing needs, fleet management including operation logistics and maintenance, and charging or fueling needs. Financial viability and cost-effectiveness with regard to initial purchase prices, lifetime costs, operational costs, and financing strategies will also be examined. These findings will be summarized in a Zero Emission Bus Rollout Plan, to be approved and adopted by City Council and submitted to CARB by July 2023, as mandated by the ICT regulations. The RFP was developed by PW and Lodi Electric Utility (LEU) staff, and advertised widely to transit and zero - emission industry working groups. Two proposals were received and evaluated by PW and LEU staff, and the panel recommended selection of ICF Consulting, LLC based on their qualifications, approach to the scope of work, and understanding of CARB's ICT regulation. Their specific experience completing ZEB plans for other California transit agencies, as well as cost, were two important factors. This ZEB study will be completed concurrently with the citywide Fleet Electrification Master Plan. Transit buses were intentionally excluded from the Citywide Fleet Electrification Master Plan because the CARB ICT Regulation mandating zero -emission buses is separate from the CARB Advanced Clean Fleet (ACF) Regulation, which mandates the zero -emission transition for non -bus vehicle types. Staff is however anticipating significant overlap and coordination between these two efforts in terms of needed electric distribution system capacity, infrastructure requirements, implementation strategies, and general resource sharing. APPROVED: Stephen Schwabauer, City Manager \\cvcfilv02\pubwks$\Transit\12) Procurements & RFPs\ZEB Rollout Plan Study= ZEB Rollout Plan docx 10/19/2022 Adopt Resolution Authorizing City Manager to Execute Professional Services Agreement with ICF Consulting, LLC, of Sacramento, to complete City of Lodi Zero -Emissions Bus Study & Rollout Plan (NTE $99,914) November 2, 2022 Page 2 It is anticipated ICF Consulting, LLC will begin work on the Zero -Emissions Bus Study and Rollout Plan in November, with all work scheduled to be completed by June 2023. A draft ZEB Rollout Plan will be presented and discussed with the City Council at a date to be determined, with Plan adoption and submission to CARB occurring shortly thereafter. The Zero -Emissions Bus Study & Rollout Plan will be funded up to fifty percent by Lodi Electric Utility's Low Carbon Fuel Standard (LCFS) fund. The balance will be paid for using Transportation Development Act (TDA) funds. FISCAL IMPACT: The Zero -Emissions Bus Study & Rollout Plan is required for compliance with CARB's ICT regulation, and failure to complete the plan by July 2023 could subject the City to penalties and potentially negatively impact future funding. The project does not impact the General Fund. FUNDING AVAILABLE: Transportation Division TDA funds: (60199000.77040) Lodi Electric Utility LCSF funds: (50362500.72990) Andrew Keys Andrew Keys Deputy City Manager/Internal Services Director Charles E. Swimley, Jr. Public Works Director Prepared by: Frank Huang, Junior Transportation Planner & Julia Tyack, Transportation Manager CES/FH/JT/cd Attachment cc Fleet Services Supervisor Lodi Electric Utility Director Signature: Q/rr %(� Email: akeys@iodi,gov C-6 AGREEMENT FOR PROFESSIONAL SERVICES ARTICLE 1 PARTIES AND PURPOSE Section 1.1 Parties THIS AGREEMENT is entered into on 20 by and between the CITY OF LODI, a municipal corporation (hereinafter "CITY"), and ICF Consulting, LLC, a Delaware Limited Liability Company authorized to do business in California (hereinafter "CONTRACTOR"). Section 1.2 Purpose CITY selected the CONTRACTOR to provide the services required in accordance with attached- Scope of Services, Exhibit A, attached and incorporated by this reference. CITY wishes to enter into an agreement with CONTRACTOR for Zero Emission Bus Study and Rollout Plan (hereinafter "Project") as set forth in the Scope of Services attached here as Exhibit A. CONTRACTOR acknowledges that it is qualified to provide such services to CITY. ARTICLE 2 SCOPE OF SERVICES Section 2.1 Scope of Services CONTRACTOR, for the benefit and at the direction of CITY, shall perform the Scope of Services as set forth in Exhibit A. Section 2.2 Time For Commencement and Completion of Work CONTRACTOR shall commence work pursuant to this Agreement, upon receipt of a written notice to proceed from CITY or on the date set forth in Section 2.6, whichever occurs first, and shall perform all services diligently and complete work under this Agreement based on a mutually agreed upon timeline or as otherwise designated in the Scope of Services. CONTRACTOR shall submit to CITY such reports, diagrams, drawings and other work products as may be designated in the Scope of Services. CONTRACTOR shall not be responsible for delays caused by the failure of CITY staff to provide required data or review documents within the appropriate time frames. The review time by CITY and any other agencies involved in the project shall not be counted against CONTRACTOR's contract performance period. Also, any delays due to weather, vandalism, acts of God, etc., shall not be counted. CONTRACTOR shall 1 remain in contact with reviewing agencies and make all efforts to review and return all comments. Section 2.3 Meetings CONTRACTOR shall attend meetings as may be set forth in the Scope of Services. Section 2.4 Staffing CONTRACTOR acknowledges that CITY has relied on CONTRACTOR's capabilities and on the qualifications of CONTRACTOR's principals and staff as identified in its proposal to CITY. The Scope of Services shall be performed by CONTRACTOR, unless agreed to otherwise by CITY in writing. CITY shall be notified by CONTRACTOR of any change of Project Manager and CITY is granted the right of approval of all original, additional and replacement personnel at CITY's sole discretion and shall be notified by CONTRACTOR of any changes of CONTRACTOR's project staff prior to any change. CONTRACTOR represents it is prepared to and can perform all services within the Scope of Services (Exhibit A) and is prepared to and can perform all services specified therein. CONTRACTOR represents that it has, or will have at the time this Agreement is executed, all licenses, permits, qualifications, insurance and approvals of whatsoever nature are legally required for CONTRACTOR to practice its profession, and that CONTRACTOR shall, at its own cost and expense, keep in effect during the life of this Agreement all such licenses, permits, qualifications, insurance and approvals, and shall indemnify, defend and hold harmless CITY against any costs associated with such licenses, permits, qualifications, insurance and approvals which may be imposed against CITY under this Agreement. Section 2.5 Subcontracts Unless prior written approval of CITY is obtained, CONTRACTOR shall not enter into any subcontract with any other party for purposes of providing any work or services covered by this Agreement. Section 2.6 Term The term of this Agreement commences on November 22, 2022 and terminates upon the completion of the Scope of Services or on June 30, 2023, whichever occurs first. 2 ARTICLE 3 COMPENSATION Section 3.1 Compensation CONTRACTOR's compensation for all work under this Agreement shall conform to the provisions of the Fee Proposal, attached hereto as Exhibit B and incorporated by this reference. CONTRACTOR shall not undertake any work beyond the scope of this Agreement unless such additional work is approved in advance and in writing by CITY. Section 3.2 Method of Payrnent CONTRACTOR shall submit invoices for completed work on a monthly basis, or as otherwise agreed, providing, without limitation, details as to amount of hours, individual performing said work, hourly rate, and indicating to what aspect of the Scope of Services said work is attributable. CONTRACTOR's compensation for all work under this Agreement shall not exceed the amount of the Fee Proposal. CITY shall pay CONTRACTOR Net 30 from the date it receives an accurate invoice. Section 3.3 Costs The Fee Proposal shall include all reimbursable costs required for the performance of the Scope of Services. Payment of additional reimbursable costs considered to be over and above those inherent in the original Scope of Services shall be approved in advanced and in writing, by CITY. Section 3.4 Auditing CITY reserves the right to periodically audit all charges made by CONTRACTOR to CITY for services under this Agreement. Upon request, CONTRACTOR agrees to furnish CITY, or a designated representative, with necessary information and assistance needed to conduct such an audit. CONTRACTOR agrees that CITY or its delegate will have the right to review, obtain and copy all records pertaining to performance of this Agreement. CONTRACTOR agrees to provide CITY or its delegate with any relevant information requested and shall permit CITY or its delegate access to its premises, upon reasonable notice, during normal business hours for the purpose of interviewing employees and inspecting and copying such books, records, accounts, and other material that may be relevant to a matter under investigation for the purpose of determining compliance with this requirement. CONTRACTOR further agrees to maintain such records for a period of three (3) years after final payment under this Agreement. 3 ARTICLE 4 MISCELLANEOUS PROVISIONS Section 4.1 Nondiscrimination In performing services under this Agreement, CONTRACTOR shall not discriminate in the employment of its employees or in the engagement of any sub CONTRACTOR on the basis of race, color, religion, sex, sexual orientation, marital status, national origin, ancestry, age, or any other criteria prohibited by law. Section 4.2 ADA Compliance In performing services under this Agreement, CONTRACTOR shall comply with the Americans with Disabilities Act (ADA) of 1990, and all amendments thereto, as well as all applicable regulations and guidelines issued pursuant to the ADA. Section 4.3 Indemnification and Responsibility for Damage CONTRACTOR to the fullest extent permitted by law, shall indemnify and hold harmless CITY, its elected and appointed officials, directors, officers, employees and volunteers from and against any claims, damages, losses, and expenses (including reasonable attorney's fees and costs), arising out of performance of the services to be performed under this Agreement, provided that any such claim, damage, loss, or expense is caused by the negligent acts, errors or omissions of CONTRACTOR, any subcontractor employed directly by CONTRACTOR, anyone directly or indirectly employed by any of them, or anyone for whose acts they may be liable, except those injuries or damages arising out of the active negligence, sole negligence, or sole willful misconduct of the City of Lodi, its elected and appointed officials, directors, officers, employees and volunteers. CITY may, at its election, conduct the defense or participate in the defense of any claim related in any way to this indemnification. If CONTRACTOR is actively defending an action under the indemnification obligations hereunder and CITY chooses at its own election to conduct its own defense, participate in its own defense, or obtain independent legal counsel in defense of any claim related to this indemnification, CITY shall be allowed to participate in such defense at its own cost and expense. Section 4.4 No Personal Liability Neither the City Council, nor any other officer or authorized assistant or agent or City employee shall be personally responsible for any liability arising under this Agreement. 4 Section 4.5 Responsibility of CITY CITY shall not be held responsible for the care or protection of any material or parts of the work described in the Scope of Services prior to final acceptance by CITY, except as expressly provided herein. Section 4.6 Insurance Requirements for CONTRACTOR CONTRACTOR shall take out and maintain during the life of this Agreement, insurance coverage as set forth in Exhibit C attached hereto and incorporated by this reference. Section 4.7 Successors and Assigns CITY and CONTRACTOR each bind themselves, their partners, successors, assigns, and legal representatives to this Agreement without the written consent of the others. CONTRACTOR shall not assign or transfer any interest in this Agreement without the prior written consent of CITY. Consent to any such transfer shall be at the sole discretion of CITY. Section 4.8 Notices Any notice required to be given by the terms of this Agreement shall be in writing signed by an authorized representative of the sender and shall be deemed to have been given when the same is personally served or upon receipt by express or overnight delivery, postage prepaid, or three (3) days from the time of mailing if sent by first class or certified mail, postage prepaid, addressed to the respective parties as follows: To CITY: City of Lodi 221 West Pine Street P.O. Box 3006 Lodi, CA 95241-1910 Attn: Julia Tyack, Transportation Manager To CONTRACTOR: ICF Consulting, LLC. 9300 Lee Hwy Fairfax, VA 22031 Joseph C. Moran, Senior Contracts Manager Section 4.9 Cooperation of CITY CITY shall cooperate fully and in a timely manner in providing relevant information it has at its disposal relevant to the Scope of Services. Section 4.10 CONTRACTOR is Not an Employee of CITY CONTRACTOR agrees that in undertaking the duties to be performed under this Agreement, it shall act as an independent contractor for and on behalf of CITY and not an employee of CITY. CITY shall not direct the work and means for accomplishment of the services and work to be performed hereunder. CITY, however, retains the right to 5 require that work performed by CONTRACTOR meet specific standards without regard to the manner and means of accomplishment thereof. Section 4.11 Termination CITY may terminate this Agreement, with or without cause, by giving CONTRACTOR at least ten (10) days written notice. Where phases are anticipated within the Scope of Services, at which an intermediate decision is required concerning whether to proceed further, CITY may terminate at the conclusion of any such phase. Upon termination, CONTRACTOR shall be entitled to payment as set forth in the attached Exhibit B to the extent that the work has been performed. Upon termination, CONTRACTOR shall immediately suspend all work on the Project and deliver any documents or work in progress to CITY. However, CITY shall assume no liability for costs, expenses or lost profits resulting from services not completed or for contracts entered into by CONTRACTOR with third parties in reliance upon this Agreement. Section 4.12 Confidentiality CONTRACTOR agrees to maintain confidentiality of all work and work products produced under this Agreement, except to the extent otherwise required by law or permitted in writing by CITY. CITY agrees to maintain confidentiality of any documents owned by CONTRACTOR and clearly marked by CONTRACTOR as "Confidential" or "Proprietary", except to the extent otherwise required by law or permitted in writing by CONTRACTOR. CONTRACTOR acknowledges that CITY is subject to the California Public Records Act. Section 4.13 Applicable Law Jurisdiction Severability, and Attorney's Fees This Agreement shall be governed by the laws of the State of California. Jurisdiction of litigation arising from this Agreement shall be venued with the San Joaquin County Superior Court. If any part of this Agreement is found to conflict with applicable laws, such part shall be inoperative, null, and void insofar as it is in conflict with said laws, but the remainder of this Agreement shall be in force and effect. In the event any dispute between the parties arises under or regarding this Agreement, the prevailing party in any litigation of the dispute shall be entitled to reasonable attorney's fees from the party who does not prevail as determined by the San Joaquin County Superior Court. Section 4.14 Cid Business License Requirement CONTRACTOR acknowledges that Lodi Municipal Code Section 3.01.020 requires CONTRACTOR to have a city business license and CONTRACTOR agrees to secure such license and pay the appropriate fees prior to performing any work hereunder. 6 Section 4.15 Captions The captions of the sections and subsections of this Agreement are for convenience only and shall not be deemed to be relevant in resolving any question or interpretation or intent hereunder. Section 4.16 Integration and Modification This Agreement represents the entire understanding of CITY and CONTRACTOR as to those matters contained herein. No prior oral or written understanding shall be of any force or effect with respect to those matters covered hereunder. This Agreement may not be modified or altered except in writing, signed by both parties. Section 4.17 Contract Terms Prevail All exhibits and this Agreement are intended to be construed as a single document. Should any inconsistency occur between the specific terms of this Agreement and the attached exhibits, the terms of this Agreement shall prevail. Section 4.18 Severability The invalidity in whole or in part of any provision of this Agreement shall not void or affect the validity of any other provision of this Agreement. Section 4.19 Ownership of Documents All documents, photographs, reports, analyses, audits, computer media, or other material documents or data, and working papers, whether or not in final form, which have been obtained or prepared under this Agreement, shall be deemed the property of CITY. Upon CITY's request, CONTRACTOR shall allow CITY to inspect all such documents during CONTRACTOR's regular business hours. Upon termination or completion of services under this Agreement, all information collected, work product and documents shall be delivered by CONTRACTOR to CITY within ten (10) calendar days. CITY agrees to indemnify, defend and hold CONTRACTOR harmless from any liability resulting from CITY's use of such documents for any purpose other than the purpose for which they were intended. Section 4.20 Authority The undersigned hereby represent and warrant that they are authorized by the parties to execute this Agreement. Section 4.21 Federal Transit Funding Conditions ❑ If the box at left is checked, the Federal Transit Funding conditions attached as Exhibit D apply to this Agreement. In the event of a conflict between the terms of this Agreement or any of its other exhibits, and the Federal Transit Funding Conditions, the Federal Transit Funding Conditions will control. VA Section 4.22 Counterparts and Electronic Signatures This Agreement and other documents to be delivered pursuant to this Agreement may be executed in one or more counterparts, each of which will be deemed to be an original copy and all of which, when taken together, will be deemed to constitute one and the same agreement or document, and will be effective when counterparts have been signed by each of the parties and delivered to the other parties. Each party agrees that the electronic signatures, whether digital or encrypted, of the parties included in this Agreement are intended to authenticate this writing and to have the same force and effect as manual signatures. Delivery of a copy of this Agreement or any other document contemplated hereby, bearing an original manual or electronic signature by facsimile transmission (including a facsimile delivered via the Internet), by electronic mail in "portable document format" (".pdf') or similar format intended to preserve the original graphic and pictorial appearance of a document, or through the use of electronic signature software will have the same effect as physical delivery of the paper document bearing an original signature. IN WITNESS WHEREOF, CITY and CONTRACTOR have executed this Agreement as of the date first above written. ATTEST: OLIVIA NASHED City Clerk CITY OF LODI, a municipal corporation STEPHEN SCHWABAUER City Manager APPROVED AS TO FORM: ICF Consulting, LLC JANICE D. MAGDICH, City Attorney a Delaware Limited Liability Company By: By: Name: JOSEPH C. MORAN Title: Senior Contracts Manager Attachments: Exhibit A — Scope of Services Exhibit B — Fee Proposal Exhibit C — Insurance Requirements Exhibit D — Federal Transit Funding Conditions (if applicable) Funding Source: 503625000.72990 8, 60199000.77020 (Business Unit & Account No.) Doc ID: CA: Rev.11.01.202 2.LT 8 Exhibit A — Scope of Work SCOPE OF WORK TABLE OF CONTENTS Contents TASK 1: PROJECT MANAGEMENT & INITATION.................................................................... 2 TASK 2: FINANCIAL ANALYSIS .................................................. ......,....,............ ....... 3 A. Initial Purchase Prices.................................................................................:.................. 3 B. Lifetime Costs............................................................................................................. 3 C. Operational Costs............................................................................................................. 4 TASK 3: IMPLEMENTATION ANALYSIS..................................................................................... 4 TASK 4: ZERO EMISSION BUS ROLLOUT PLAN.................................................................... 5 A. Transit Agency Information.....................................................,................................... 5 B. Rollout Plan Generation Information ........................................ ,..................... ............. 5 C. Technology Portfolio............................................................................................. 6 D. Current Bus Fleet Composition and Future Bus Purchases........................... ............. 6 E. Facilities and Infrastructure Modifications................................................................... 7 F. Providing Service in Disadvantaged Communities..................................................... 7 G. Workforce Training................................................................................................... 7 H. Potential Funding Sources............................................................................................. 8 I. Start-up and Scale -up Challenges................................................................................. 8 ATTACHMENTS Exhibit A Attachment 1: California Air Resource Board: Innovative Clean Transit Regulation — Final Regulation Order Exhibit A Attachment 2: Transit Vehicle List Exhibit A Attachment 3: Service Schedules & Maps Exhibit A Attachment 4: Dial-A-RideNineLine Service Area Exhibit A Attachment 5: Service Mileage Information GrapeLine Zero -Emission Bus Study & Rollout Plan Exhibit A — Scope of Work 1 SCOPE OF WORK CITY OF LODI GRAPELINE: ZERO -EMISSION BUS STUDY & ROLLOUT PLAN The City of Lodi GrapeLine ("CITY," or "transit agency," hereinafter) is soliciting proposals from qualified firms to develop a comprehensive system wide analysis of Zero -Emission Bus (ZEB) transitional needs. The analysis should include an assessment of zero -emission technology options (i.e. battery electric vs. hydrogen fuel cell), corresponding infrastructural requirements, cost estimations, and timeline planning. The analysis will factor in important transit -specific considerations such as bus route scheduling needs, range limitations, city site assessments, workforce training requirements, and any other operational barriers to implementation. Financial impacts of the transition will be examined, specifically the differences in capital & operating cost of ZEB technologies versus current fleet technology, the capital & operating cost of corresponding ZEB infrastructure, vehicle lifetime costs, and any other operating cost impacts. The consultant shall coordinate with ICF Consulting, LLC (ICF) and Lodi Electric Utility (LEU) on opportunities to integrate the Zero -Emission Bus Study's findings with the ongoing Citywide Fleet Electrification Master Plan; the CITY's non -transit electrification plan being created to satisfy California Air Resource Board's Advanced Clean Fleet (ACF) regulation, to be completed Q1 2023. The findings of these analyses will be summarized in a California Air Resource Board Innovative Clean Transit (ICT) compliant Zero Emissions Bus Rollout Plan. The consultant may rovide alternative popfoaches to the following scope of work based on expertise and experience, In the proposal Work Plan detail any variations to the approached tasks, and explain how it will better achieve a desired outcome. TASK 1: PROJECT MANAGEMENT & INITATION The consultant's proposal Work Plan should include a task for project management. The task will include a kick-off meeting with consultant personnel and City project staff which includes Public Works (Transit Division, Engineering, & Fleet Services), Lodi Electric Utility (LEU), and Transdev (transit operations contractor). During this meeting, consultant will work with project staff to refine goals & objectives, timelines & deliverables, and study components. The project management task will also include frequent and regularly scheduled meetings to be held throughout the project either virtually, or in-person, as determined by the consultant and project staff. As part of the project initiation, consultant will also identify existing CITY conditions such as: • Existing transit fleet, including already -scheduled purchases • Existing infrastructure, city sites, and staff resources Current fleet operations, including maintenance costs, fuel costs, operations practices GrapeLine Zero -Emission Bus Study & Rollout Plan Exhibit A — Scope of Work • Existing plans, such as the Short Range Transit Plan • Existing progress on ICF's/LEU's/CITY's CARB ACF Fleet Electrification Master Plan and opportunities to expand or integrate with it. This assessment of existing CITY conditions will serve as the foundation for study comparisons and analyses. Task 1 Deliverables: • Meeting agenda, minutes, and other meeting materials; timelines • Existing conditions analysis TASK 2: FINANCIAL ANALYSIS A financial cost analysis will be completed comparing current operating costs and projected operating costs for zero -emission buses (ZEBs). The comparison will assume equal or similar service offerings, but will also consider such factors as operating staff differences and impacts to route schedules & fleet management due to ZEB use. Consultant will use current and historic price trends as a baseline for all cost factors such as electricity, fuel, and zero -emission bus & infrastructure costs, but should vary projected cost assumptions, factoring for inflation. Primary cost categories may include, but are not limited to, initial purchase prices, lifetime costs, and operational costs. A. Initial Purchase Prices For initial purchase prices, consultant shall examine costs of conventional buses versus zero -emission buses, inclusive of typical transit bus specification options (e.g. CAD/AVL/ITS hardware, fare collection equipment, signage, etc.). Initial cost for zero -emission buses shall also be inclusive of all infrastructural costs, such as battery electric charging station(s), including potential charging solution types (e.g. depot plug-in on -route, overhead, etc.), or hydrogen fueling station(s), including potential delivery & dispensing methods (e.g. gaseous, liquid, on-site production). Consultant shall analyze potential right of way acquisition and land cost impacts for infrastructural requirements, as well as electric capacity upgrades, if applicable. Consultant shall consult with LEU and ICF to identify overlap and coordination between distribution system capacity and infrastructure requirements, as it relates to both the CITY transit fleet, and the CITY's light, medium & heavy-duty fleet, based on ICF's citywide Fleet Electrification Master Plan. Consultant shall identify opportunities for cost savings and resource sharing. B. Lifetime Costs Lifetime costs for vehicles shall include vehicle replacement parts and major overhauls, inclusive of battery of fuel cell lifecycle replacements, if applicable. Grapel-ine Zero -Emission Bus Study & Rollout Plan Exhibit A — Scope of Work Lifetime costs for infrastructure shall include major required overhauls, maintenance, and required upgrades. C. Operational Costs Operational costs shall include fuel costs (CNG, electricity, or hydrogen fuel). CNG fuel costs ($/gallon) shall be based on existing and/or projected costs, using historical prices as a baseline. Electricity costs shall be based on existing and/or projected rate structures, such as time -of -use, if applicable. The analysis will consider costs associated with projected charging during high -demand, on -peak hours or charging during off-peak hours. Consultant will provide scheduling strategies to help reduce CITY electricity demand costs. Lodi Electric Utility (LEU) will be consulted as part of this analysis_ Hydrogen fuel costs shall be based on existing and/or projected costs, using historical prices as a baseline, and respective to potential delivery and dispensing methods. Operational costs shall also include maintenance costs. Maintenance costs may include standard vehicle servicing (e.g. fluid changes, tire changes, brake pads, etc.) and other typical repair costs. Consultant shall determine typical maintenance costs of zero - emission buses, as well as costs that may be associated with staffing expertise gaps (e.g. outsourcing repairs due to lack of technical knowledge). D. Financing Strategies Consultant shall identify funding sources and methods to adequately finance the transition. This may include grants or other cost -offsetting mechanisms such as: fuel/electricity generation (i.e. solar technology, photovoltaic reformation of hydrogen), battery storage, peak shaving, LCFS program participation, or sale of fuel. Task 2 Deliverables: • Meeting agendas, minutes, and meeting materials • Financial analysis comparing ZEB fleet options versus current fleet technology TASK 3: IMPLEMENTATION ANALYSIS Consultant will complete an implementation analysis for ZEB deployment, per CARB ICT regulations. This will include identification of ZEB type, infrastructure requirements, development of a phasing plan for infrastructure improvements & vehicle procurement, and purchasing plan to meet CARB deadlines. The analysis will comprehensively factor in key operational parameters such as: service requirements including route, range, & staffing needs, fleet management including operation logistics & maintenance, charging/fueling needs, and any other operational barriers. Financial viability and cost-effectiveness shall be a key factor in consultant's analysis. Grapel-ine Zero -Emission Bus Study & Rollout Plan Exhibit A — Scope of Work Consultant must document all assumptions, methodologies, modeling techniques, designs, cost assumptions, and findings. It is critical that the consultant demonstrates clear rationale for all implementation recommendations. Task 3 Deliverables: • Meeting agendas, minutes, and meeting materials. • Implementation analysis TASK 4: ZERO EMISSION BUS ROLLOUT PLAN Building off of previously performed implementation and financial analyses, consultant will summarize findings in a Zero Emission Bus (ZEB) Rollout Plan. The plan will contain the required elements defined in the California Air Resource Board (CARB) Innovative Clean Transit (ICT) regulation — attached as Exhibit 1 Attachment 4: California Air Resource Board: Innovative Clean Transit regulation — Final Regulation Order. The following outline is a summary of the regulation's required information (labeled "(required)"); in addition to CARB-determined supplementary information that may further enhance the quality of the report, labeled either "(recommended)" or "(optional)". Consultant will work with CITY to determine if the optional or recommended supplementary information is relevant and/or to be included in the Rollout Plan. Note that this outline is meant as general guidance for the format and content of the Rollout Plan. It does not replace the final regulation order, which takes precedence in all instances; it does not require the Rollout Plan follow this exact format; it does not specify the levels of analysis or research the consultant may need to perform to create the content of the plan. A. Transit Agency Information 1. Transit agency's name (required) 2 Transit agency's mailing address (number, street: city; county_ Zip code) (recommended) 3 Transit agency's air district(s) (recommended) 4 Transit agency s air basin(s) i,recommended) 5. Total number of buses in ICT -defined Annual Maximum Service (recommended) 6 Population of urbanized area (recommended) 7 Contact information of Transportation Manager (including name; title, phone number, email) (recommended) 8. Statement that the transit agency is not part of a Joint Zero -Emission Bus Group (13 CCR § 2023.1(d)(3)) (required). B. Rollout Plan Generation Information 1. Identify if transit agency's Rollout Plan has a goal of full transition to zero -emission technologies by 2040 that avoids early retirement of conventional transit buses (13 CCR § 2023.1(d)(1)(A)) (required). Grapel-ine Zero -Emission Bus Study & Rollout Plan Exhibit A — Scope of Work 2 Explain how transit agency plans to avoid potential early retirement of conventional buses in order to meet the 2040 goal; considering the ICT regulation requires 100°/, ZEB purchases in 2029, and that conventional transit buses purchased in 2028 could be delivered in or after 2029 (optional). 3 Identify City of Lodi Council approval date of plan (recommended) i Rollout Plans approval date (MM/DD/YYYY) (recommended) il. Resolution number (recommended) iii. Statement that a copy of the Council approved resolution is attached to the Rollout Plan, and to be submitted to CARIB (13 CCR § 2023.1(d)(2)) (required). 4 Provide CITY contact information for CARB to follow up on details of the Rollout Plan, if needed (recommended): i Contact: name (first and last name) it. Title ifr Phone number iv. Email 5 Identify that consultant created plan (recommended) i Identify the consulting companYs name (recommended) G Identify cost for the creation of the Rollout Plan (recommended) 7 Statement of person -hours it took to create the Rollout Plan (recoirunended) C. Technology Portfolio 1. Identify type(s) of ZEB technologies (e.g. battery electric and fuel cell electric buses) transit agency is to deploy through 2040 (13 CCR § 2023.1(d)(1)(B)) (required) D. Current Bus Fleet Composition and Future Bus Purchases 1 Create a table containing current fleet information (recommended) Include: i Fuel types of each bus ii Bus type (e g standard or cutaway) iii Engine Model Year iv Bus Model Year v Projected retirement year vi Any already planned or scheduled purchases. with the above a) through e) 2. Create a table containing expected future bus purchases (13 CCR § 2023.1(d)(1)(D)) (required). Include: i. Total Number of bus purchases ii. Timeline (year) of bus purchases iii. Number of ZEB purchase, percentage of annual ZEB purchases, ZEB bus type(s), ZEB fuel type(s) iv. Number of conventional bus purchases, percentage of annual conventional bus purchases, conventional bus type(s), conventional fuel type(s). GrapeLine Zero -Emission Bus Study & Rollout Plan Exhibit A — Scope of Work 6 v. If applicable, percentage of annual conversion bus purchases, type(s) of conversion buses, fuel type(s) of conversion buses vi. Bus types to purchase (e.g. full length, cutaways) 3. Identify if transit agency should consider converting conventional buses in-service to zero -emission buses (13 CCR § 2023.1(d)(1)(E)) (required). i. If conventional buses are to be converted, identify (required): 1. Number of ZEB conversions, timeline (year), bus type(s), removed propulsion system, and new propulsion system. E. Facilities and Infrastructure Modifications 1. Create a table identifying the names, locations, and main functions of CITY divisions or facilities (e.g. bus yards, maintenance bays, fueling yards, etc.) that would be involved in deploying and maintaining ZEBs. (13 CCR § 2023.1(d)(1)(C)) (required). i. Identify which facilities would require infrastructural upgrades or modifications to support ZEB deployment. (13 CCR § 2023.1(d)(1)(C)). (required) ii. Specify the type(s) of infrastructure planned at each division or facility, and provide their service capacities (13 CCR § 2023.1(d)(1)(C)). (required). iii For the table, explain the following (recornmended): a. Types of necessary upgrades or infrastructure modifications each facility or division needs b The specification of each infrastructure in the related facility or division before and after upgrades or modifications 2. Identify if modifications must be made to bus parking arrangements. Explain the necessary modifications, and why they are needed (recommended) i Identify if additional parking spaces are needed, explain why. 3 Identify the propulsion system (i e CNG, BEB, hydrogen fuel cell) of all buses that will be dispatched from facilities identified in the above table and information (#1- 3) Identify if any facilities are located in NOx-exempt areas (recommended). 4 Identify the electric utility in transit agency s service area, and adjacent service areas (recommended) F. Providing Service in Disadvantaged Communities i. Identify the disadvantaged and low-income communities, per CalEnviroScreen, located in transit agency's service area (13 CCR § 2023.1 (d)(1)(17)) (required). i. Describe how the transit agency is planning to deploy zero -emission buses in disadvantaged communities (13 CCR § 2023.1(d)(1)(F)) (required). G. Workforce Training 1. Describe the transit agency's plan and schedule for the training of bus operators and maintenance/repair staff on ZEB technologies (13 CCR § 2023.1(d)(1)(G)). (required). 2. Complete a Workforce Training schedule with the following information (optional): L Tirneline (year) GrapeLine Zero -Emission Bus Study & Rollout Plan Exhibit A — Scope of Work ii, Training Program /Class iii. Purpose of training iv. Name of Provider v. Number of Trainees vi. Trainees positions vii. Training Hours viii. Training Frequency ix. Estimated Costs per Class H. Potential Funding Sources 1. Identify all potential funding sources the transit agency expects to use to acquire zero emission technologies (both vehicles and infrastructure) (13 CCR § 2023.1(d)(1)(H)). (required). 2, Complete a Workforce Training schedule with the following information (optional): i Tirneline (year) ii. Training Program / Class iii. PUrpose of training iv Name of Provider v Number of Trainees vi Trainees positions vii. Training Hours viii Training Frequency ix Estimated Costs per Class Start-up and Scale -up Challenges 1 Describe any major challenges transit agency is currently facing in small scale zero -emission bus deployment (optional) i. Describe how CARB may assist in overcoming these challenges, share any recommendations (optional) 2 Describe any major challenges transit agency is facing in scaling up ZEB deployment (optional) i, Describe hove CARB may assist in overcoming these challenges; share any recommendations (optional) Prior to Lodi City Council approval of the ZEB Rollout Plan and submission to CARB, consultant will assist CITY staff in presenting the study findings to the Lodi City Council. Task 3 Deliverables: ■ Meeting agendas, minutes, and other materials • Draft ZEB Rollout Plan/Report • Final ZEB Rollout Plan • Presentation of findings to Lodi City Council Grapel-ine Zero -Emission Bus Study & Rollout Plan Exhibit A — Scope of Work 8 Zero Emission Bus Study & ICF Rollout Plan Submitted to: Submitted by: Julia Tyack ICF Incorporated, U.C. Transportation Manager 980 9th St Suite 1200 City of Lodi Public Works Department Sacramento, CA 95814 221 W. Pine Street Lodi, CA 95240 Contact: Fang Yan Lead Consultant Phone: 916-210-5906 Fang. Yan(a icf.com September 27, 2022 This proposal includes data that shall not be disclosed outside the City of Lodi and shall not be duplicated, used, or disclosed—in whole or in part—for any purpose other than to evaluate this proposal. If, however, a contract is awarded to this offeror as a result of—or in conjunction with—the submission of these data, City of Lodi shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the City of Lodi's right to use information contained in these data if It Is obtained from another source without restriction, The data subject to this restriction are contained in this volume and its appendices and attachments, Zero Emission Bus Study & Rollout Plan September 27, 2022 Julia Tyack, Transportation Manager City of Lodi Public Works Department 221 W. Pine Street Lodi, CA 95240 September 27, 2022 Subject: ICF Proposal in Response to Request for Proposal (RFP) titled "Zero Emission Bus Study and Rollout Plan" Dear Ms. Tyack, ICF Incorporated, U.C. (ICF) along with our partner Hydrogen Technology and Energy Corporation (HTEC), collectively "ICF", is pleased to submit our proposal in response to City of Lodi's (CITY) RFP titled "Zero Emission Bus Study and Rollout Plan." Our team is very well positioned to accomplish the full scope of this project for the following reasons: We are a leader in zero -emission technology and charging Infrastructure assessment. In California, our team has recently completed zero -emission bus (ZEB) rollout plans for three transit agencies: SunLlne Transit, Golden Empire Transit (GET), and Fresno Area Express (FAX). These plans outline a path for each agency to transition their bus fleets to zero -emission in accordance with the Innovative Clean Transit (ICT) Regulatlon, The transition plans were developed collaboratively with the transit agencies to ensure buy -in across departments and to align with the team moving forward. We have also been leading evaluations of opportunities to deploy zero -emission medium and heavy-duty (MD/HD) vehicles and infrastructure for various public agencies. Our Team has extensive knowledge and expertise in MD/HD zero -emission technology and infrastructure, and the ongoing work includes the San Diego Association of Government (SANDAG) Medium and Heavy-duty Zero Emission Vehicle Blueprint (2022), and LA Metro Comparative Truck Technology Report (2022). We have strong experience in design and development of fleet transition and zero -emission infrastructure development plans. Our team has been closely involved in fleet electrification and infrastructure planning projects for nearly a decade. To share some examples, ICF is currently supporting the City of Lodi to complete a citywide Fleet Electrification Master Plan and to meet CARB's Advanced Clean Fleet Regulation, ICF also supported the City and County of Honolulu with a fleet transition plan (including their transit vehicles) to meet their goal of achieving 100% renewable fuel use in ground transportation for all City fleets by 2035. We have deep knowledge of California's transportation landscape, its regulatory and incentive programs, and have a track record of offering innovative fleet electrification solutions to local government throughout the state. We have Northern California-based program implementation and technical staff ready to work closely with CITY staff, collect necessary data, present the plan, and assist with charging and fueling infrastructure deployment efforts. Our proposed Project Manager, Fang Yan, is available to meet CITY staff and officials as well as fleet and facility managers in person at CITY offices. ICF plans to perform the work in this proposal on a Time and Materials basis with a not -to -exceed budget of $99,913.29. ICF proposes an 8 -month period of performance, from November 15, 2022 to July 1, 2023. We also acknowledge the receipt of all RFP addenda. We look forward to hearing from you regarding the status of our proposal and welcome the opportunity for further discussion. Please direct all communications regarding this proposal to both Joe Moran, Senior Contracts Manager, at (703) 218-2713 or Joe. Moran(rr}ict.com, and Fang Yan, Project Manager, at (916) 210-5906 or Fang.Yan(dicf.com, Sincerely, Joseph C. Moran, Senior Contracts Manager CONFIDENTIAL Zero Emission Bus Study & Rollout Plan September 27, 2022 Table of Contents Tableof Contents............................................................................................................................................................................ 3 SectionI: Executive Summary .......................................................................................................................................................4 Section II: Qualifications and Experience of the Firm.................................................................................................................5 OfferorBackground...................................................................................................................................................................... 5 ExperienceSummary ...................................................................................................................................................................6 SectionIII: Project Approach, Work Plan, and Schedule..........................................................................................................12 Project Understanding.............. ..... ..... ........................ 12 WorkPlan.............................................,.........................................,...,,.,,...,......,......,...............,...........,...............................13 ProjectSchedule........................................................................................................................................................................24 SectionIV: Organization and Staffing........................................................................................................................................25 Team Organization and Staffing Plan...........................................,..............................., ...,............. ....._.............. ......... ... 25 Summaryof Key Staff Qualifications................................................................................................... .............. ... ...... .... 26 SectionV: Fee Proposal...............................................................................................................................................................28 PriceAssumptions ........... ................................................... ................ .... ................................ ... .... 28 High -Level Budget per Task....................................................................................................................................................... 28 Hoursper Labor Category .......................................................................................................................:............................... 29 SectionVI: Staff Resumes...........................................................................................................................................................30 FangYan, PhD, PE....................................................................................................................................................................30 SamPoumazed, PhD, PE............................................................................................................:...........................................32 JeffreyAng-Olson..................................................................................................................................................................... 34 CarrieGiles................................................................................................................................................................................36 RamonMolina Garcia................................................,......,.........,..............,......,,..,.......................;........................................... 38 MaxKaffel..... ......... .........,.,....................................... ........,.................................. ............................... 39 DrewTurro, MPP.......................................................................................................................................................................41 JeffGrant...................................................................................................................................................................................43 CleoneRobinson........................................................................................................................................................................47 TylerDickens............................................................................................................................................................................49 SectionVII: Certificates of Insurance.........................................................................................................................................51 Section VIII: Exceptions and Proposed Changes to the City's Standard Form Agreement..................................................56 SectionIX: References (Form 1) .................................................................................................................................................58 Section IX: Acknowledgement of Addenda (Form 2)................................................................................................................ 61 CONFIDENTIAL Zero Emission Bus Study & Rollout Plan Section I: Executive Summary September 27, 2022 In 2018, the California Air Resources Board (CARB) ZEB Purchase Schedule adopted the Innovative Clean Transit (ICT) regulation Total which requires all public transit agencies to gradually Year Large Transit Small Transit transition to a 100 -percent zero -emission bus fleet and 2023 25% - encourages them to provide innovative first and last -mile 2024 25% - connectivity and improved mobility for transit riders. 2025 25% Specifically, beginning in 2029, the regulation requires 100% of new purchases by transit agencies to be Zero 2026 50% 25% Emission Buses (ZEBs), with a goal for full transition by 2027 50% 25% 2040. The regulation applies to all transit agencies that 2028 50% 25% own, operate, or lease buses with a gross vehicle weight 2029+ 100% 100% rating (GVWR) greater than 14,000 lbs, It includes standard, articulated, over -the -road, double-decker, and cutaway buses. In addition to the purchase requirements, the ICT also requires each transit agency to submit a complete Zero -Emission Bus Rollout Plan (Rollout Plan), approved by its governing body, showing how it plans to achieve a full transition to ZEBs. The intent of the Rollout Plans is for the transit agencies to undergo a careful planning before the purchase requirements of ICT begin, This is to ensure that the vehicle procurement, infrastructure build out, and fuel cost management are all coordinated within the agency and the most effective and technologically feasible solutions are selected. While large transit agencies should have submitted their governing body approved Rollout Plan by July 1, 2020; small transit agencies have until July 1, 2023 to submit these plans. The City of Lodi (CITY) currently provides transit services, known as GrapeLine, within its boundaries and limited adjacent areas in northern San Joaquin County. Under the iCT's definition of large and small transit agencies, the CITY's transit service is considered as "small transit agency" and therefore, it is obligated to submit a Rollout Plan by July 1, 2023. This project is intended to develop a comprehensive system wide analysis of ZEB transitional needs that include an assessment of zero -emission technology options (i.e,, battery electric vs. hydrogen fuel cell), relevant infrastructure requirements (e.g., charging or fueling), cost estimates, and timeline planning. As part of this project, a robust financial impacts analysis will be conducted to examine the differences in capital & operating expenses (CAPEX/OPEX) of ZEB technologies versus current fleet technology as well as their associated infrastructure. These analyses will assist in development of the most cost-effective and operationally viable approach to a ZEB fleet, and will inform the capital improvements, infrastructural needs, and purchasing strategies that the City shall consider when transitioning its GrapeLine service to zero -emission technologies, The findings from this study will be summarized in a Zero -Emission Bus Rollout Plan that fully meets CARB's ICT regulatory requirements and will be ready for submission to CARB by July 1, 2023. ICF Incorporated, L.L.C, (ICF) along with our partner Hydrogen Technology and Energy Corporation (HTEC), formerly ZEN, has proposed a team with the requisite knowledge and experience to complete the full scope of this project. Our team offers a track record of successful completion of ZEB Rollout Plans for various transit agencies, as well as fleet transition projects for local governments, air districts, metropolitan planning organizations (MPOs), and states. Throughout these projects, our team provided end-to-end technical assistance and worked hand-in- hand with public agencies to achieve their transportation decarbonization goals, We have a deep understanding of fleet electrification challenges, local teams ready to engage with fleets, and proprietary tools that enable us to efficiently design a tailored transition plan. In California, we have been closely involved in fleet electrification and infrastructure planning projects for nearly a decade. For example, HTEC has recently completed ZEB rollout plans for three transit agencies in California: SunLine Transit, Golden Empire Transit (GET), and Fresno Area Express (FAX). While SunLine's plan calls for a complete transition to ZEBs by 2035, GET and FAX's plans are designed for completion in 2040. Each plan incorporates a mix of battery electric and fuel cell electric buses that ensure the CONFIDENTIAL Zero Emission Bus Study & Rollout Plan September 27, 2022 agencies will be able to maintain their current level of service while minimizing the transition cost. ICF has also helped Los Angeles Metro develop a strategy to guide the deployment of more than 3,500 Level 2 charging stations by 2028 to support Metro employees that drive to work, its non -revenue fleet, and Metro transit riders. ICF is currently supporting the San Diego Association of Government (SANDAG) to develop a medium- and heavy-duty zero -emission vehicle blueprint that guides the transition of freight and transit vehicles to zero- emission technology and highlights the challenges related to technology readiness, infrastructure availability, and cost. Aside from our experience, our project manager, Fang Yan was one of the lead staff that developed the ICT regulation back in 2018. She led the technology and cost assessment of the regulation along with writing up a significant part of the regulatory language, She has deep knowledge of transit operation, market readiness of ZEB technology, and regulatory requirements of ICT specific to Rollout Plan, We believe that to successfully complete the project scope, our team will need to "hit the ground running" with staff who bring best practice approaches, methods, and tools, together with a detailed understanding of CITY's transit operation, technology readiness, infrastructure planning, make-ready, and funding opportunities. The expertise and past performance of our team provide assurance that ICF can develop a Zero Emission Bus Study and Rollout Plan that fully supports the CITY'S objectives and meet California's ICT regulatory requirements. Section II: Qualifications and Experience of the Firm This section provides an overview of ICF, describes our past project experience that is most relevant to this project, and presents multiple references for projects similar to this one conducted over the past five years, Offeror Background ICF is a global consulting firm internationally recognized for tackling some of the biggest challenges facing our society, with strong expertise in the fields of transportation and climate change. Since 1969, ICF has been serving government at all levels, major IIIIIIIIIIIIIIIIIIII� corporations, and multilateral institutions. With more than 75 offices and approximately 8,000 employees worldwide, ICF brings deep domain expertise, problem- solving ' CF capabilities, and a result -driven approach to deliver strategic value across the lifecycle of client programs, ICF is recognized for creative solutions to the transportation policy, planning, programming challenges faced by public agency decision -makers. Our strategic partner on this project is Hydrogen Technology and Energy Corporation (HTEC). In March 2022, HTEC acquired Zen and the Art of Clean Energy Solutions (Zen), a consulting firm specializing in hydrogen and fuel cells and WHTEC zero -emission transportation. HTEC has four main business platforms: Clean Fuels, FUELING THE DRIVE TO HYDROGEN Stations & Distribution, Transportation Solutions, and Technology Solutions. The Modelling and Analysis department, within Transportation Solutions, specializes in zero -emission transportation, and has extensive knowledge and experience in developing comprehensive fleet transition plans for clients across North America. The team has developed a proprietary kinetic model which accurately predicts the performance of battery electric and fuel cell electric buses on existing bus routes based on terrain and operational data, HTEC's modelling capabilities and deep understanding of zero -emission technologies help guide clients in deploying zero emission buses, fueling infrastructure, and supporting facilities. CONFIDENTIAL Zero Emission Bus Study & Rollout Plan September 27, 2022 The combination of expertise within ICF and HTEC creates an ideal team for this project. The team that we are proposing for this project includes technology, markets, and policy experts in alternative fuels and advanced vehicle technologies, including electric and hydrogen Exhibit f. ICFs Fleet Electrification Client Portfolio powered vehicles and associated infrastructure, and (Number ofReetsPorwhich 1CFhesconducted flestelechllkatlonstudies have strong expertise in building fleet transition Commercial, e solutions that are tailored around the client specific needs. Both ICF and HTEC have supported many s„►ii s' .. local agencies in California and nationwide with their Utility,3 fleet transition plans including transit buses, medium and heavy-duty vehicles, as well as their light duty r - State, s fleet. This includes fleet transition planning for the r NJ Federal, t Fresno Area Express, Golden Empire Transit, and Tribal Organization, I SunLine Transit in California, Mass Transportation Authority in Flint, Michigan, as well as Brockton Area Transit and Merrimack Valley Regional Transit Authority in Massachusetts. Additionally, ICF is currently supporting the CITY to complete a citywide Fleet Electrification Master Plan and to assist the CITY with meeting CARB's upcoming Advanced Clean Fleet Regulation. Some of these project experiences are described in further detail in this section. The chart in Exhibit 1 illustrates our diverse and extensive portfolio related to fleet electrification efforts across the nation, Experience Summary The Scope of Work in the CITY's RFP is ambitious and will require strong capabilities in a variety of different elements of fleet transition strategies, infrastructure planning, and funding and financing solution. Our team is unique in that we provide deep and proven expertise in understanding zero -emission technology status (both battery electric as well as fuel cell electric), market readiness, collection and analysis of fleet operational characteristics and duty cycles (including route analysis), assessment of charging and fueling infrastructure needs, and capital improvements needed by transit agencies on their path to meet the regulatory obligations of the ICT. Our team capabilities in fleet electrification results from our work for numerous clients including cities, counties, MPOs, and transit agencies (e.g., Santa Clara County, Solano County, Los Angeles Metro, Los Angeles County, Sonoma County, Tahoe Regional Planning Agency, FAX, GET, Sunline Transit) for more than a decade, We also have extensive experience working with electric utilities to support community -wide transportation electrification. For example, through National Grid's Fleet Advisory Services Program, our team has been engaging with 100 public fleets, including various transit agencies, in Massachusetts. The objectives of these fleet assessment programs are to collect vehicle inventory data and provide fleet reports with specific recommendations for vehicle replacements, as well as associated environmental and financial impacts, The programs also seek to educate these fleets on the financial and environmental benefits of fleet electrification, focusing on the unique challenges and opportunities that face fleet managers and decision makers. Through this extensive experience, we have learned that each fleet assessment is unique, and an automated process will not be able to thoroughly address the challenges for full transition of the CITY's transit fleet. At the same time, our experience has also taught us which best practices exist and how they can be transferable. The CITY will need a dynamic team that understands the local fleet landscape, regulatory requirements, and is ready to meet with fleet managers to fully understand their operations, facility layouts, and unique challenges during fleet transition and infrastructure deployment, ICF's team is well prepared to support the CITY with these efforts, and we will leverage our experience to: ■ Determine the most cost-effective and operationally viable approach to transition to a ZEB fleet ■ Determine the corresponding capital improvements, and Infrastructural needs • Determine a sustainable ZEB implementation & purchasing strategy, which can be summarized into a CARB ICT -compliant Zero Emissions Rollout Plan, CONFIDENTIAL Zero Emission Bus Study & Rollout Plan September 27, 2022 Project Examples The following are examples of work performed by ICF and HTEC in the last five years that best characterizes the work quality and expertise the CITY can expect our team to apply to the tasks in the RFP. Fresno Area Express ICT ZEB Study and Rollout Plan Start: 0312020 End: 11/2020 Name of Client: Fresno Area Express (FAX) Client's PM: Brian Barr, Assistant Director Email: B.barr fresno,gov Telephone Number: 559.621.1418 Work Performed: HTEC (formerly Zen) was a subcontractor to the Leflore Group (project coordinators) and acted as technical lead to develop a zero -emission bus plan for Fresno Area Express (FAX), a central California public transit agency. HTEC conducted all technical analysis and wrote the final transition plan while the Leflore Group coordinated 16-A with FAX and provided insight into procurement policies. The plan provided a ut Ptan comprehensive roadmap to meet the Innovative Clean Transit (ICT) requirement of fully transitioning to a zero -emission bus fleet by 2040. The project scope included identifying route and operational constraints, siting electrical charging and hydrogen fueling infrastructure, projecting transition costs, and identifying and applying for government grants to support purchasing and upgrade costs. Project deliverables included filing a board approved ICT Plan to California Air Resources Board and delivering a more comprehensive transition plan to FAX identifying near term steps on the transition pathway. Total Amount Invoiced: $158,000. Golden Empire Transit ICT ZEB Study and Rollout Plan supHs Start: 0412020 End: 11/2020 Name of Client: Golden Empire Transit (GET) Client's PM: Deidre Brown, C00 Email: dbrown metbus.oro Telephone Number: 661,324,7874 Work Performed: HTEC (formerly Zen) was a subcontractor to the Leflore Group (project coordinators) and acted as technical lead to develop a zero -emission bus plan for Golden Empire Transit (GET), located in Kern County. HTEC conducted all technical analysis and PA wrote the final transition plan while the Leflore Group coordinated with FAX and provided insight into procurement policies The plan provided a comprehensive roadmap to meet the ICT requirement of fully transitioning to a zero -emission bus fleet by 2040. To achieve this, HTEC completed a comprehensive analysis of the agency's fixed route and paratransit fleet composition, daily operational schedule, and site layouts. Key constraints such as Infrastructure siting, bus operational range requirements, and available funding were considered in developing an ideal zero -emission transition plan. HTEC leveraged its industry contacts from electric charging and hydrogen infrastructure suppliers to cost and size the support equipment and performed a techno-economic analysis to determine projected annual capital and operational expenditures to guide the agency's long-range transit planning and budget allocations. Project deliverables included filing a board -approved ICT Plan to CARB and delivering more comprehensive transition plans to the agencies identifying near-term steps on the transition pathway, Total Amount Invoiced: $158,000. CONFIDENTIAL Zero Emission Bus Study & Rollout Plan SunLine Transit ZEB & H2 Infrastructure Deployment and Rollout Plan September 27, 2022 Start: 06/2017 End: 03/2021 Name of Client: SunLine Transit Agency (SunLine) Client's PM: Lauren Skiver, CEO Email: lskiverC7a sunline.org Telephone Number: 760.343.3456 Work Performed: HTEC (formerly Zen) acted as owner's representative, project manager, and technical lead to develop a zero -emission bus plan and manage and deploy a $17 million project for SunLine Transit Agency (SunLine), funded by CARB, involving the deployment of a 900 kg-H2/day PEM electrolyzer H2 Station and 5 New Flyer FCEBs. The project included a 1 -year demonstration of the fleet and hydrogen infrastructure, where HTEC collected and analyzed performance data and monthly tailored key performance indicators, HTEC used lessons learned from the project and key performance indicators to develop a zero -emission transition plan for SunLine to fully transition their fleet in accordance with CARB's ICT regulation requirements. The long-range transition plan included route energy modelling, infrastructure constraints analysis, evaluation of zero -emission buses and supporting infrastructure technologies, techno-economic modelling to develop an optimized path for SunLine, and a synthesized roadmap and transition plan. HTEC also developed a near-term funding priority list and has helped SunLine apply for various voucher programs and competitive grant solicitations. Total Amount Invoiced: $670,493 National Grid Massachusetts Fleet Advisory Services Program Start: 09/2020 End: 09/2024 Name of Client: National Grid Massachusetts Client's PM: Sejal Shah, Senior Manager Email: seial.shah(anationalorid.com Telephone Number: 781.250.9084 Work Performed: ICF is supporting National Grid to Seethe Difference ® Get Started With Your engage 100 public fleets including four transit agencies EVs Can Make Custom Analysis in Massachusetts to evaluate the real opportunities for. vehicle electrification; educate these fleets on the financial and environmental benefits of fleet electrification, focusing on the unique challenges and p opportunities that face municipal and bus fleet managers and decision makers; and maintain relationships with the -- fleet customers to provide information, refine their fleet electrification analysis, and assist in overcoming Benefits of Using EVs technical and logistical barriers to EV deployment, " " Throughout the life of the program, participating fleets receive annual report refreshes, which will include newY7 F EV models and new additional funding sources as they become available. The program also serves as a channel to distribute National Grid incentives through its EV Charging Station Program. More information available at: https:f/fleetadviscrvma,nationalgdd.coml, Budget: $2,000,000 (Not -to -Exceed) CONFIDENTIAL Zero Emission Bus Study & Rollout Plan September 27, 2022 Electric Vehicle Charging Infrastructure Implementation Plan, Los Angeles County Metropolitan Transportation Authority (Metro) Start: 03/2018 End: 03/2019 40 Plush indcc Mon% Name of Client: Los Angeles Metro Client's PM: Andrew Quinn Email: quinna(ad)metro.net Telephone Number: 213.418.320 Work Performed: Los Angeles Metro turned to ICF to lead the development of its Electric Vehicle Charging Infrastructure Implementation Plan. ICF helped Metro develop a clear and robust strategy to guide the deployment of more than 3,500 Level 2 charging stations by ° 2028 to support Metro employees that drive to work, Its non -revenue fleet, and Metro transit m riders. ICF developed Metro's vision statement and guiding principles for the Initiative - emphasizing a positive consumer experience, aligning with Metro's sustainability objectives, allocating resources efficiently, and integrating with other stakeholder initiatives. The Plan addresses program design, timelines, potential costs and cost offsets, staffing and competency requirements, program impacts and implementation strategies. To ensure effective and efficient execution of the plan, ICF identified and aligned roles and responsibilities across Metro departments including Environmental Compliance and Sustainability, Procurement, Non -Revenue Fleet, Facility Maintenance, Parking Management, Grants, Marketing, and Countywide Planning. ICF developed a plan to engage strategic partners like utilities, third party service providers, and other public agencies. ICF also developed a detailed outreach plan for transit riders and Metro employees, to communicate the benefits of EVs and EV charging. Finally, ICF developed a novel tool for EV charging infrastructure siting analysis to help deploy EV charging as cost-effectively as possible by considering areas of likely high demand for charging.' Total Amount Invoiced: $155,000 Driving to Net Zero, Santa Clara County Start: 07/2020 End: 08/2021 Municipal Clean Fleel Plannlnp Name of Client: County of Santa Clara Client's PM: Kevin Armstrong Gu Wano Email: kevin.armstronq(c)ceo.sccgov.orq Telephone Number: 408.993,4761 Work Performed: ICF supported the County of Santa Clara, California in developing a :. plan to increase Zero Emission Vehicle (ZEV) market penetration throughout the county. The plan includes a focus on siting charging infrastructure, training materials for local government officials, a clean fleets tool for municipal fleets in the county, and a targeted outreach campaign. ICF conducted a charging infrastructure siting analysis to assess the areas in Santa Clara County that are most likely to experience increased demand for EV ® NP charging (see figure below), Our team analyzed key EV ownership indicators and regional travel patterns to identify areas where the deployment of chargers will likely be the most cost effective. To provide guidance to local government staff, we developed a compendium of best practices for EV readiness that outlines key recommendations for building and zoning codes, permitting, regional planning, and fleet deployments. ICF also conducted a consumer survey of County residents that will help to inform our outreach and education strategy. We created tailored training materials for local governments on fleet implementation and permitting. Throughout the project, our team led the stakeholder coordination process to engage regional cities in the plan development and better understand and address the local barriers and opportunities to ZEV adoption. Total Amount Invoiced: $450,000 ' Available online at: htlps:llecosystems.azurewebsites.neULA_Metro/ev_charging/default,aspx CONFIDENTIAL Zero Emission Bus Study & Rollout Plan September 27, 2022 Clean Truck Technology Comparative Report Start: 05/2022 End:10/2022 Name of Client: LA Metro Client's PM: Akiko Yamagami Email: vamagamiaftmelro.nel Telephone Number: 213.547.4305 Work Performed: ICF is supporting the LA Metro in developing a Clean Truck X11 Technology Comparative Report which compares four types of vehicle technologies (i.e., diesel, hydrogen, battery electric, and natural gas), over immediate, short-, medium-, and long -terms, on market maturity, infrastructure and energy supply readiness and needs, cost of ownership, emissions and public health impacts, and barriers to adoption. As part of this report, ICF will also provide insights on the level of 0 Metro naF technology transformation needed for LA Metro to meet its public health and climate goals, as well as the scale of fueling and charging infrastructure build out to support this transition. ICF will develop the report so it can serve as technology and Infrastructure guidance to inform decision- making among policymakers and Metro staff. Both the Port of LA and Long Beach are serving as key peer reviewers of this study. Total Amount Invoiced: $178,000 SANDAG Medium and Heavy Duty Zero Emission Vehicle Blueprint Start: 05/2022 End: 3/2024 Name of Client: San Diego Association of Governments (SANDAG) Client's PM: Jeff Hoyos Email: "eff.hoyos@sandag.org Telephone Number: 619.699.1932 Work Performed: ICF is supporting SANDAG to develop a medium- and heavy-duty zero emission vehicle blueprint that guides the transition of freight and transit vehicles to zero emission technology and highlights the challenges related to technology readiness, infrastructure availability, and cost. In development of this blueprint, ICF is conducting a thorough research and analysis effort on the policy landscape surrounding zero emission MD/HD vehicles, market readiness, infrastructure needs, technology and infrastructure gaps, and criteria for infrastructure siting. As part of this work, ICF will also conduct a comprehensive outreach and stakeholder engagement to solicit inputs from various stakeholders including communities, state and local agencies, industry, and environmental groups to inform the development of the plan. In developing the Blueprint, ICF will also outline the MD/HD ZEV goals that the region needs to meet over the next two decades and will include a comprehensive list of near- and long-term strategies, including funding opportunities, to overcome the barriers in deployment of MD/HD ZEVs and help the region to achieve its goals. Budget (Not -to -Exceed): $163,000. Determining Vehicle Attributes and Infrastructure Cost for Medium- and Heavy -Duty Vehicle Technologies Start: 2021 End: 3/2022 Name of Client: California Energy Commission Client's PM: Quentin Gee Email: Quentin.Geeftenergy.ca.gov Telephone Number: 916.654.3837 Medium- &Heavy-DutyVehlale Work Performed: ICF assisted the California Energy Commissions (CEC) to Attribute Analysis determine the vehicle attributes including fuel efficiency, range, vehicle cost, waaanwa,baixua6 maintenance cost, and infrastructure cost for various medium- and heavy-duty (MD/HD) technologies such as diesel, low NOx natural gas, electric, and hydrogen. M ^-• °~m Aside from analysis of historical data, ICF also provided CEC with projected vehicle and infrastructure attributes for hydrogen and battery electric MD/HD vehicles. As SCF part of this project, ICF also analyzed cost data from 244 projects funded through the California Electric Vehicle Infrastructure Project (CALeVIP) to deploy more than 500 Level 2 chargers with charging capacities ranging from 7 to 10 kW and approximately 300 DC fast chargers with CONFIDENTIAL Zero Emission Bus Study & Rollout Plan September 27, 2022 charging capacities ranging from 50 to 63 kW. The outcome of this project was a comprehensive list of attributes that CEC can use in their energy demand forecasting models for updating the Integrated Energy Policy Report (IEPR), More details on charging infrastructure assessment can be found at this link. Total Amount Invoiced: $125,000 City of Honolulu Capital Fleet Transition Plan CPTY OF KGROLULH CAPITAL FLEET TRANSITION PLAN final repoh ILIIVE20 Start: 0712020 End: 08/2021 Name of Client: City of Honolulu Client's PM: Nicola Hedge Email: nicola.hedpe(@hcnoluiu.nov Telephone Number: 808.768.2273 Work Performed: ICF supported the City and County of Honolulu in developing a fleet transition plan to meet their goal of achieving 100% renewable fuel use in ground transportation for all City fleets by 2035. To do this, ICF collected data on and assessed all of Honolulu's existing fleet vehicles, identified which vehicles are suitable for replacement with EVs, identified appropriate and cost-effective EV equivalent makes and models, conducted driver interviews to understand the nuance of vehicle operations, estimated the costs of Citywide fleet transition by department, developed a recommended phased vehicle replacement timeline, and estimated the emissions benefits under replacement scenarios. ICF assessed the site -level and distribution grid -level impacts of installing the charging infrastructure needed to support the client's EV rollout. ICF obtained data on existing power capacity at EV dwell sites. ICF also estimated the number, type, and power level of charging infrastructure needed under different scenarios to support EV implementation and estimated the cost implications of this infrastructure development. Total Amount Invoiced: $150,000. CONFIDENTIAL Zero Emission Bus Study & Rollout Plan Section III: Project Approach, Work Plan, and Schedule Project Understanding September 27, 2022 The City of Lodi (CITY) operates the Lodi GrapeLine local transit services within its boundaries and limited adjacent areas. The GrapeLine, a fixed route transit service, consists of five weekday regular routes, three weekday express routes, and four weekend regular routes, operating within approximately 19 square miles, According to the RFP, in FY21122, the GrapeLine (fixed route, demand response, and ADA paratransit services) provided ridership to almost 160,000 passengers and with an annual Vehicle Revenue Miles (VRM) of 275,220 miles. According to National Transit Database (NTD), in 2020 GrapeLine expended a total operating funds of more than $3.5 million along with capital fund of more than $1.4 million. According to Attachment 2 of the Exhibit A of the RFP, currently the GrapeLine operates a total of 26 CNG powered vehicles (seven Class 8 transit buses, and 19 cutaways) of model years 2012 through 2019. The city currently plans to replace six (6) of the 2012 Class 8 transit buses and thirteen (13) of the 2014 cutaways with brand new CNG models. In 2018, CARB adopted the ICT regulation which requires the public transit agencies to gradually transition to a 100 -percent zero -emission bus fleet and encourages them to provide innovative first and last -mile connectivity and improved mobility for transit riders. Specifically, beginning in 2029, the regulation requires 100% of new purchases by transit agencies to be ZEB with a goal for full transition by 2040. The regulation applies to all transit agencies that own, operate, or lease buses with a gross vehicle weight rating (GVWR) greater than 14,000 lbs. It includes standard, articulated, over -the -road, double-decker, and cutaway buses. In addition to the purchase requirements, the ICT also requires each transit agency to submit a complete Zero -Emission Bus (ZEB) Rollout Plan, approved by its governing body, showing how it plans to achieve a full transition to ZEBs. The intent of the Rollout Plans is for the transit agencies to undergo a careful planning before the purchase requirements of ICT begin, This is to ensure that the vehicle procurement, infrastructure build out, and fuel cost management are all coordinated within the agency and the most effective and technologically feasible solutions are selected. While large transit agencies should have submitted their governing body approved Rollout Plan by July 1, 2020; small transit agencies have until July 1, 2023 to submit these plans. In response to the regulatory requirements of the ICT regulation, the CITY plans to conduct a comprehensive system wide analysis of Zero -Emission Bus (ZEB) transitional needs to determine the most cost-effective and operationally viable approach to a ZEB fleet; and decide on the capital improvement and infrastructure buildout that the CITY shall consider as it plans for this transition. ICF has proposed a team with the requisite knowledge and experience to complete the full scope of this project. As part of this project, our team will first conduct an implementation analysis for ZEB deployment, per CARB ICT regulations. Such assessment will include a comprehensive market assessment of available ZEB technologies and infrastructure including their capital costs and operational characteristics, and development of a phasing plan for infrastructure improvements and vehicle procurement and purchasing plan to meet CARB deadlines. In conducting the implementation analysis, ICF will collect both fleet and operational data (beyond those provided through RFP package) and will utilize those to determine the most cost effective zero -emission technology and infrastructure options that the CITY could consider as it transitions its fleet to zero -emission technology over the next 18 years. Aside from the cost effectiveness, the implementation analysis will also factor in transit -specific considerations such as bus route scheduling needs, range limitations, CITY's electrical capacity, space constraints, workforce training requirements, and other potential operational barriers. Next, we will conduct a comprehensive financial analysis that compares capital, operation, and lifetime costs (both current and projected costs) of ZEBs versus their counterpart internal combustion engine (ICE) buses. As part of this financial assessment, ICF will provide financing and funding solutions that could be leveraged to reduce the cost of transition to ZEBs including the cost of the vehicles, infrastructure, and facility modifications (e.g., site and grid level upgrades, right-of-way and land acquisitions). Workforce development is also a key factor to successful implementation of zero -emission fleet transition plans. As CONFIDENTIAL Zero Emission Bus Study & Rollout Plan September 27, 2022 part of this study, we will describe the existing trainings and the requirements for its operators, and maintenance team. We will also describe the steps that the CITY can take to prepare its workforce for transition to ZEBs, Following the completion of these analyses, our team will summarize its finding into a ZEB Rollout Plan to meet the regulatory requirements established under CARB's ICT regulation. More details on our approach to tackle each of these tasks are provided in the following section. Work Plan This section presents our proposed work plan, covering the key elements described in the RFP Scope of Work. We have proposed a sequence of activities that differs slightly from the RFP in some regards in order to complete the scope in what we feel is the most logical and efficient manner. The estimated cost for each task is featured in Section V: Fee Proposal, Task 1: Project Management & Initiation Task 1 covers the project management activities that will span the entire contract. Our team will begin the project by holding a kick-off meeting with key members of the ICF/HTEC team (including representatives from the ICF team who are working on the ongoing Citywide Fleet Electrification Master Plan) and CITY staff which includes Public Works (Transit Division, Engineering, & Fleet Services), Lodi Electric Utility (LEU), and Transdev (transit operations contractor). Working with CITY staff, ICF will prepare the meeting agenda, facilitate the meeting, and distribute notes after the meeting, ICF will also work with CITY staff to refine goals & objectives, timelines & deliverables, and study components. As part of the project initiation, ICF will identify a list of data which reflects CITY's existing conditions (details provided in Task 2.1) which will serve as the foundation for study comparisons and analyses. ICF will capture notes from the kickoff meeting, and coordinate with CITY to schedule regular check-in meetings either virtually, or in-person, which will include the presentation of progress on project tasks and key findings. ICF will also submit written progress reports with monthly invoices. Throughout the contract, Fang Yan, ICF's Project Manager, will be available to conduct site visits and assessments at CITY facilities. Our project manager will also ensure that ICF's deliverables including the comprehensive implementation planning for the transit fleet, financial analysis, and the zero -emission bus rollout plan (for submission to CARB) to meet the CITY's needs and requirements. Fang Yan and Sam Pournazeri (our deputy project manager) are based in ICF's Sacramento office. Both will be also available to CITY staff, officials, and fleet managers on-site for key presentations, meetings, and briefings. Task 1 Deliverables: • Project kickoff meeting agenda and notes • Project management plan • Regular check-in meetings with CITY • Check-in meeting minutes Task 2: Transition Planning and Implementation Analysis Task 2.1: Data and Information Collection of Existing Conditions Vehicle Fleet & Operation In Task 2.1, ICF will work with Public Works and TransDev to collect data on the existing conditions of CITY transit vehicle fleet and its operation. As a first step to develop a bus rollout plan, ICF will establish a baseline of the existing fleet and scheduled bus procurement, operation and maintenance, as well routes and schedule, We will provide a data request form outlining specific information to be collected. To establish the baseline, the data collection at vehicle -by -vehicle level includes the followings: Fleet Characteristics CONFIDENTIAL Zero Emission Bus Study & Rollout Plan ■ Vehicle type (e.g., standard bus or cutaway) • Vehicle fuel type and engine ■ Make, model, GVWR, length, seating capacity • Model year, in-service year • Average daily mileage • Fuel refueling log September 27 2022 • Time & frequency of use • Modes of service (e.g,, fixed route or demand response) • Current odometer reading • Expected lifetime and planned replacement year • Funding sources In addition to fleet vehicle inventory, ICF will also collect data about operation and maintenance: Operation and Maintenance • Fuel economy Maintenance log (e.g., repair schedule and cost by labor and parts) • Fuel contract and cost Midlife/major overhauls and timeline To make technology assessment and identify ZEB types to transition to, ICF will establish a database of the transit agency's existing service and operations: Bus Routes and Schedule • Latest General Transit Feed Specification (GTFS) • Trips that are not in-service (e.g,, deadheads) • Typical trip starting and ending points (e.g., parking facility, transition locations between in-service trips to complete a block operation) • Bus dispatch log • Annual maximum service • Route type (e.g., local, rapid, or express) In addition to the above data request, ICF will interview fleet managers and a sample of drivers to obtain insights into the typical range of operating conditions for the vehicles, which may not be available or obvious within the data provided, as well as to better understand future fleet needs. The scheduled fleet replacement and procurement, vehicle delivery time, as well as grant awarded status and schedule will be covered during the interview with fleet managers. ICF will interview a fleet manager and up to two drivers for a maximum of three interviews. Facilily and Infrastructure In addition to establishing a baseline of vehicle data, ICF will also collect data to establish a baseline of CITY's existing facility and infrastructure conditions, including maintenance facility, transit center, depot yard, fuel and charging stations, To do this, we will rely on information provided by the CITY, ICF will then make site visits of CITY facilities to check landscapes, and work with CITY to confirm key information of owned or leased facilities such as: Depot Yard • Location(s) • Service capacity of vehicles • Size of the depot • Layout of the depot • Fueling and charging stations Asset ownership (owned, leased) • Electrical capacity • Utility tariff Maintenance Facility • Location(s) • Number of maintenance bays ■ Service capacity of vehicles • Bus wash lanes Transit Center • Location(s) • Size and layout • Electrical capacity To complete the charging infrastructure baseline, we propose to also collect data on site -level and grid -level electrical equipment to understand the current capacity of the equipment for power delivery. To obtain data on site - level electrical equipment, ICF will coordinate with CITY and identify the proper points of contact, such as facility managers, building managers, and/or engineers that can provide us with capacity data on the electrical equipment at each site. To obtain data on grid -level equipment, ICF will coordinate with Lodi Electric Utility (LEU) to obtain data on key distribution equipment that services each site that currently houses charging equipment, such as CONFIDENTIAL Zero Emission Bus Study & Rollout Plan September 27, 2022 transformers, feeders, and conductors. While ICF will work with LEU to determine the best approach to efficiently and cost-effectively obtaining this data, ICF expects that such data may be available by cross-referencing site -level meter numbers with equipment which serves each meter. Considering that ICF will be conducting a site -level and grid -level capacity analysis as part of the CITY's Fleet Electrification Master Plan, we will make sure that both of these assessments are well -coordinated, Existing and Upcoming Plans To better integrate the bus rollout plan with other existing and upcoming plans from the CITY, ICF will coordinate with CITY and other departments to understand the development and guidance of the transit program in Short - Range Transit Plan (SRTP), and also collaborate within ICF staff internally on the citywide Fleet Electrification Master Plan Lastly, ICF will work with CITY to obtain information about staff resources to have a better understanding of the organization structure, as well as staffs existing experience and knowledge of ZEB operation and maintenance, This will serve as a baseline for preparing the workforce training guidance which is a required element of the ICT's Rollout Plan, Task 2.1 Deliverables • Data request forms provided to CITY, Public Works, TransDev and LEU staff to solicit relevant data Task 2.2: Analyze Bus Fleet, Assess Technology, and Develop ZEB Replacement Schedule ICF will use data collected in Task 2.1 and will leverage its proprietary Fleet Assessment Model to analyze CITY's bus fleet vehicles, characterize their operations, and develop tailored recommendations for the transition to ZEBs, ICF's Fleet Assessment Model is a robust tool that has been developed and refined over time through use with multiple government, utility, and fleet clients. It leverages a comprehensive and regularly updated database ZEV model availability, specifications, operating capabilities, and costs to deliver highly tailored fleet transition recommendations, Originally developed for our partnership with National Grid's Fleet Advisory Program in Massachusetts, ICF has continued to improve the fleet model and its supporting data to support over 50 other clients, such as the Mass Transportation Authority in Flint, Michigan, as well as Brockton Area Transit and Merrimack Valley Regional Transit Authority in Massachusetts. Section II provides more details on ICF's experience with fleet transition and charging/fueling infrastructure planning. Factoring in important transit -specific considerations such as bus route scheduling needs, range limitations, city site assessments, and other operational barriers, ICF will also identify the lowest -cost replacement options that fit these criteria. ICF will use its model to deliver key recommendations on a vehicle -by -vehicle level and at a fleet level. Outputs of the model will include the following: • Identification of ZEB technology type, e.g, battery electric or fuel cell electric buses • Recommended ZEB replacement makes and models • Upfront and operational cost differentials from the existing ICE vehicles • Total cost of ownership across the lifetime of vehicles (upfront, operational, and lifetime costs including both vehicles and infrastructure) ■ Estimated emissions reductions from ZEB replacements (i,e,, benefits) • Estimated total cost of fleet transition • A recommended phased bus replacement and procurement schedule When developing the bus replacement schedule, ICF will consider the site -level and grid -level capacity constraints for supporting battery electric buses. For example, in our experience with developing the ZEB Rollout Plan for Fresno Area Express (FAX), we realized that expanding past the existing distribution line capacity may require FAX to purchase and construct a substation, which is estimated to cost in the order of $5 - $10 million. This was deemed cost prohibitive and therefore, we recommended a final fleet composition that was mixture of battery electric buses CONFIDENTIAL Zero Emission Bus Study & Rollout Plan September 27, 2022 and fuel cell electric buses. The exact mix was determined to ensure the current level of service will be maintained while minimizing cost. In development of the transition plan, ICF will factor in CARB's Innovative Clean Transit (ICT) regulation, which requires small transit agencies to have at least 25% of buses purchased during 2026-2028 and 100% in 2029 and later to be ZEBs, ICF will ensure that the replacement schedule for buses will comply with these requirements while at the same time provide a seamless and cost-effective transition that enables the fleet to accomplish its required day-to-day duties. Exhibit 2 below provides a flow chart laying out the process for developing ZEB replacement recommendations and a fleet transition plan, Exhibit 2. !CF's Process for F/eet Assessment Your fleet vehicle and usage data Our assumptions to help fill in data gaps • Vehicle Capital Costs • Annual Fuel Costs • Annual Maintenance Coats • Infrastructure Hardware Costs • Infrastructure Installation Costs • Potential Grants ZEV Model Library I Summary Presentation Detailed Report Excel Supplement Task 2.2 Deliverables ■ Draft and final ZEB replacement and procurement plan to comply with Rollout Plan under ICT in Task 4 Task 2.3 Charging and Fueling Infrastructure Recommendation Establish the Baseline Infrastructure Scenario Using the ZEB replacement recommendations generated in Task 2.2 as a basis, ICF will identify the energy and fueling needs of ZEBs. Several outputs from Tasks 2.1 and 2,2 will be key inputs for developing charging and fueling infrastructure implementation strategies as part of this task, including the following: How much energy/fuel each ZEB will need: o Average daily energy consumption (in kilowatt-hours or kilograms of hydrogen) o Bus battery or hydrogen tank capacity o Duration time of charging to full capacity (specific to battery electric buses) o The maximum power acceptance rate for each bus (specific to battery electric buses) Where ZEB will park and maintained What times of day each ZEB will be available to charge Using this information, ICF will develop a baseline charging and fueling infrastructure Implementation scenario that projects the following information: • The projected number of chargers needed to support the ZEB replacements overtime • The recommended charging type (e.g., depot or on -route) and power level (in kilowatts, kW) of fast chargers • The number and projected capacity of hydrogen refueling stations (if any) CONFIDENTIAL Zero Emission Bus Study & Rollout Plan Develop and Evaluate an Allernatiye EV Chaming Infrastructure Scenario September 27, 2022 Once the baseline infrastructure scenario is established, with the same data from Tasks 2.1 and 2.2, ICF will then develop an alternative to identify the maximum achievable vehicle -to -charger ratios, based on bus operation schedules, availability for charging, and charging duration. Maximizing the number of vehicles using a single charger reduces the number of chargers that are installed, therefore reducing upfront capital cost, To do this, ICF will analyze the fleet, its operational characteristics, and its vehicles' energy and power needs to estimate the highest achievable vehicle -to -charger ratio. While not explicitly identified in the RFP, our team will also explore how managed (or'smart) charging may impact power demand. ICF will analyze how the introduction of smart charging may reduce overall power demand by optimizing the number of vehicles that charge at the same time, thereby reducing charger power output needs. Review the Electrical Capacity of Transit Facilities and Ident[N Potential Grid and Site -Level Upgrade Needs Upon determining the optimal number, types, output power levels of chargers, ICF will turn our focus to the electrical needs for facilities expected to host charging infrastructure. ICF will review the electrical capacity of CITY's transit facilities to support the projected additional load from ZEB charging and identify potential site -level and distribution grid impacts of that additional load. ICF will also integrate this additional need to the ongoing Fleet Electrification Master Plan. This task will be done together in the Fleet Electrification Master Plan, following similar data collection and methodology, Task 2.3 Deliverables • A memo illustrating charging and fueling infrastructure needs under baseline and alternative scenarios • A memo describing electrical capacity and upgrade needs at transit facilities Task 2.4 Facility and Infrastructure Improvement Plan Based on the phase-in of ZEBs and their charging/fueling infrastructure needs, ICF will coordinate with CITY to make facilities and infrastructure modifications needed to support this transition. The modification plan will rely on the implementation analyses results from Tasks 2.2 and 2.3. For electrical charging infrastructure modification overtime, ICF will identify construction or modification dates, with major equipment to be installed, including transformer size (MW), electrical distribution infrastructure, number of chargers. ICF will also help to identify potential challenges and constraints in parking and charging limits and assist in updates to parking arrangements. With respect to hydrogen infrastructure, if needed, we will work with the CITY to determine whether to site the hydrogen infrastructure at its existing facility or purchase a new parcel of land and install it at the new location. We will also provide the CITY with the major hydrogen fueling infrastructure equipment list that needs to be installed over time to meet the hydrogen demand from the fleet. These will include the number of hydrogen liquid storage containers, compressors, hydrogen pumps, high pressure gas storage cylinders, vaporizers, fueling system, fuel pre -cooling system, dispensers, etc. For maintenance infrastructure, based on the existing facility and its equipment, ICF will identify modifications needed to assist with special needs for ZEB maintenance, Task 2.4 Deliverables: • A memo to show facility and infrastructure modifications overtime. Task 3: Financial Analysis & Funding Strategies Task 3.1: Financial Analysis As part of Task 3, ICF will conduct a life cycle cost -benefit and financial analysis of recommended zero -emission bus replacement as compared to their existing ICE (i.e., CNG) counterparts in the form of a Total Cost of CONFIDENTIAL Zero Emission Bus Study & Rollout Plan September 27, 2022 Ownership (TCO) analysis which is one of the primary factors in determining the business case for zero- emission vehicles. In development of this analysis ICF will account for: • Vehicle capital cost • Vehicle operations and maintenance costs • Infrastructure capital cost including equipment, installation, and potential site/grid level upgrades needed • Infrastructure operations and maintenance costs • Vehicle lifetime costs (e,g., battery overhaul) • Infrastructure lifetime costs Utilizing the recommended bus replacement discussed in Task 2.2, ICF will estimate the total cost of owning and operating each ZEB replacement. This TCO analysis will be comparative to assess the difference in TCO between ZEB replacements and business -as -usual, ICE vehicle replacements over the service life of each vehicle. ICF will estimate TCO on a vehicle -by - vehicle basis and will also roll -up vehicle -level estimates into fleet -level transition cost estimates, Within its Fleet Assessment Model, ICF has a comprehensive database of commercially available (or soon to be available) ZEBs, that is being regularly updated to capture the latest makes and models available and changes to vehicle attributes and pricing. ICF will use cost data from this library, augmented by available cost data from manufacturers and the data collected from the fleets to estimate TCO for both cases: recommended ZEB replacement and business -as -usual. This analysis will account for the capital cost of the vehicle, as well as vehicle operating costs including charging, fueling, and maintenance. ICF will also estimate equipment, installation, energy management system, and maintenance costs associated with charging and fueling infrastructure as discussed earlier in Task 23, More details on data sources are provided below: Vehicle capital, operation, and maintenance cost. ICF will leverage its comprehensive database of ZEBs and attributes to determine both the initial purchase price of ZEBs (both battery electric and hydrogen) inclusive of typical transit bus specification options (e.g,, CADIAVLIITS hardware, fare collection equipment, signage, eta) as well as to calculate the cost of operation (e.g., hydrogen, electricity, natural gas) and maintenance. With respect to electricity and fuel prices, ICF will rely on historical prices and the CITY's contracted fuel price as a baseline as well as the projected energy prices from the most recent Annual Energy Outlook (AEO) projections provided by the U.S. Energy Information Administration (EIA). In determining the cost of electricity, ICF will consider the demand charges as well as projected rate structures, such as time -of -use (TOU) specifically designed for Transportation Electrification (TE) and will consider pricing and costs associated with charging projected to be done during high - demand, on -peak periods and charging done during off-peak periods. In addition, ICF will also consider the potential impact of Incentive (e.g., both state and federal program) as well as subsidies (e.g., LCFS credits) along with savings from distributed energy resources (e.g., solar technology, photovoltaic reformation of hydrogen, battery storage, peak shaving). With respect to maintenance cost, ICF will consider the maintenance cost of ICE including propulsion related maintenance cost, which consists of exhaust, fuel, power plant system (engine, traction battery system, and fuel cell stack), preventative maintenance inspections (PMI), oil and filter changes, changing tires and brake pads, and other wear and tear items plus the occasional large repairs. We will work with the CITY to collect maintenance cost CONFIDENTIAL Fleet TCO Comparison NPV Costs Over Vehicle Llfespans $9,000,000 $8,000,000 $7,000,000 $6,000,000 $5,000,000 $4,000,000 r $3,000,000 5 $2,000,000 r� $1,000,000 ICE Replacements Recommended ZEB Replacements Charging Infrastructure Installation • Charging Infrastructure Hardware NPV Maintenance Costs a NPV Fuel Costs Incentive/ Grant . Capital Cost Vehicle capital, operation, and maintenance cost. ICF will leverage its comprehensive database of ZEBs and attributes to determine both the initial purchase price of ZEBs (both battery electric and hydrogen) inclusive of typical transit bus specification options (e.g,, CADIAVLIITS hardware, fare collection equipment, signage, eta) as well as to calculate the cost of operation (e.g., hydrogen, electricity, natural gas) and maintenance. With respect to electricity and fuel prices, ICF will rely on historical prices and the CITY's contracted fuel price as a baseline as well as the projected energy prices from the most recent Annual Energy Outlook (AEO) projections provided by the U.S. Energy Information Administration (EIA). In determining the cost of electricity, ICF will consider the demand charges as well as projected rate structures, such as time -of -use (TOU) specifically designed for Transportation Electrification (TE) and will consider pricing and costs associated with charging projected to be done during high - demand, on -peak periods and charging done during off-peak periods. In addition, ICF will also consider the potential impact of Incentive (e.g., both state and federal program) as well as subsidies (e.g., LCFS credits) along with savings from distributed energy resources (e.g., solar technology, photovoltaic reformation of hydrogen, battery storage, peak shaving). With respect to maintenance cost, ICF will consider the maintenance cost of ICE including propulsion related maintenance cost, which consists of exhaust, fuel, power plant system (engine, traction battery system, and fuel cell stack), preventative maintenance inspections (PMI), oil and filter changes, changing tires and brake pads, and other wear and tear items plus the occasional large repairs. We will work with the CITY to collect maintenance cost CONFIDENTIAL Zero Emission Bus Study & Rollout Plan September 27, 2022 information (if available) for their existing fleet, For battery and hydrogen buses, ICF will conduct a literature review similar to the one conducted by CARB on Transit Bus Maintenance Cost to determine the maintenance cost of battery electric and hydrogen powered buses. This literature review will also include recent analysis conducted by National Renewable Energy Laboratory (NREL) for the Foothill Transit Agency (NREL Foothills Re ort), SunLlne Transit Agency (NREL Suni-ine Re ori), and Orange County Transportation Authority (NREL OCTA Report). ICF will also account for the cost of maintenance staffing and potential workforce development costs (or cost of outsourcing repairs due to lack of technical knowledge). Infrastructure capital, operation, and maintenance cost; ICF will review the available cost data on equipment, installation and maintenance of charging and hydrogen fueling infrastructure. For example, over the past three years, there have been multiple studies conducted by various non-profit organizations such as International Council on Clean Transportation2 (ICCT), NREL3, Rocky Mountain Institute^ (RMI), Environmental Defense Funds (EDF) to estimate the cost of EV charging infrastructure deployment including the cost of equipment, and installation. A list of estimates provided by these studies are shown in Table 1 below. Additionally, ICF recently acquired EV charging infrastructure cost data associated with projects funded by the California Energy Commission through the California Electric Vehicle Infrastructure Project (CALeVIP). Between December 2017 and October 2021, the program has funded 244 projects to deploy more than 500 Level 2 chargers and approximately 300 DC fast chargers which provides a wealth of information of both the equipment and installation cost of EV chargers. ICF will expand this analysis by including more recent data on charging infrastructure cost (equipment and installation). Table 1; Equipnient and Installation Cost Data Reported in the Literature ICCT (2019) Equipment Cost NREL (2020) RMI(2020) EDF & GNA (2021) ICCT (2019) Installation Cost NREL (2020) RMI(2020) EDF & GNA (2021) $3k $28k $75k $140k $3.5k $38k $90k $2.5k - $4.9k $20k - $36k $76k -$100k $128k -$150k $137k $481k $3k - $4k $18k - $46k $19k - $48k $26k - $66k $2.5k $20k $60k $7k $63k $76k $138k $35k $175k In addition to the cost of equipment and installation, ICF will also account for the potential costs related to site -level make-ready costs (e.g., site preparation work: electrical work and wiring, special work such as boring and trenching, special site and structural considerations, etc.) determined under Task 2.3 as well as fleet management software and hardware (if applicable) and permitting costs. In its assessment, ICF will also include operational and maintenance costs such as EVSE maintenance costs, data contract costs, and network contract costs (if applicable). With respect to infrastructure maintenance cost, general maintenance for charging infrastructure includes storing charging cables securely, checking parts periodically, and keeping the equipment clean. Chargers may need intermittent repairs as well, Warranty pricing also varies by manufacturer; plans can be fixed -term, renewable, and included with equipment costs. ICF team will explore all of these cost elements and will incorporate them as part of this financial analysis. Similar to EV chargers, we will also leverage the comprehensive literature review and data analysis we have conducted recently to determine the capital, operational, and maintenance cost of hydrogen stations. Our team has h JRheiccl.or itasldelaullrfl iia TEV Chgrqina__Ca9t 201 813.adl � hJtpsJlunvw��en�ed�ec;,comrsstien�elarp�leloii�52542435120342312 hItftVUmi. -con len u 0020101IRMl• V•C s i •I fraslru ure• r s hk:Itiggs.edt.oraianerovexchanaelfilW2D210-y DF, GNA-Final-Pdarch•2021.pd 1 CONFIDENTIAL Zero Emission Bus Study & Rollout Plan September 27, 2022 designed and built hydrogen fueling stations currently in operation. We will complete high-level hydrogen station design concepts to determine the estimated cost of fueling stations of the appropriate size for the CITY. We will also estimate the delivered price of hydrogen based on literature sources and knowledge of the California market combined with bottoms up modelling of the cost of hydrogen production, delivery, and storage. Our team will also include in its assessment the cost of potential right of way acquisition and land cost impacts (if applicable). Vehicle and Infrastructure Lifetime Cost. In its financial assessment, ICF will also account for vehicle lifetime costs such as cost of engine and transmission overhauls, battery replacement, and fuel cell stack replacement, We will also include any lifetime costs associated with charging and fueling infrastructure to the extent they are not included in the maintenance costs (e.g„ replacement of broken chargers, hydrogen fueling station equipment failures, etc.). Task 3.2: Funding & Financing Strategies Following the completion of the financial and cost analysis, ICF will develop a detailed funding and financing plan that recommends specific grants, rebates, or various utility programs for the buses and/or :. charging/fueling infrastructure in the project, as necessary, to minimize cost for the CITY as it transitions its fleet to ZEB. ICF will leverage our experts' knowledge and work from similar past projects to develop a II comprehensive list of applicable funding opportunities for ZEB charging infrastructure development. The plan will also include details on eligibility criteria, opportunities to stack funding, and public-private partnerships that can help minimize the cost of the CITY's transition to a zero -emission fleet. In doing so, ICF will rely on the comprehensive Laws & Incentives database we maintain as part of the Department of Energy's Alternative Fuel Data Center (AFDC), which includes nearly 1,000 records of laws, incentives, and programs related to EVs and EVSE, including those in California. Additionally, ICF will also closely coordinate with relevant federal (e.g., EPA, DOE), state (CARB, CEC), and local agencies (e.g., San Joaquin Valley APCD) to formulate detailed funding strategies that can be utilized by the CITY to maximize the efficacy of these grant and rebate programs. Examples of these grants and rebates Include upcoming federal tax rebates introduced as part of the Inflation Reduction Act, federal Low or No Emission Vehicle Program, FTA Section 5339 Bus and Bus Facilities, federal EV infrastructure grants provided through Infrastructure Investment and Jobs Act, the Low Carbon Transportation Investments and Air Quality Improvement Program administered by CARB, and the Clean Transportation Program managed by the CEC, As owners and operators of EVSE, the CITY can participate in the CARB's Low Carbon Fuel Standard (LCFS) market and generate LCFS credits for providing EV charging services. These credits can contribute meaningfully to the return on investment of installing EVSE at CITY facilities. Recognizing the current need to accelerate EV charging infrastructure, in some cases, CARB allows LCFS credits to be generated not just for EV charging activity but also for installing EVSE capacity at the location. This allows LCFS to provide incentive to install EVSE regardless of utilization while EV adoption increases. Meanwhile, as the fleet owner of EVs, the City could generate LCFS credits with the reported electricity used by City fleet vehicles. For example, Antelope Valley Transit Agency (AVTA) earned over $800,000 LCFS credits from using electric buses during one fiscal year. ICF will provide general guidance on LCFS registration and reporting. Of course, incentive funding is only one form of coverage to aid in fleet transition and infrastructure investments. To potentially achieve cost saving through economies of scale and synergies with existing ZEB initiatives, our team will CONFIDENTIAL Zero Emission Bus Study & Rollout Plan September 27, 2022 also discuss other financing opportunities including state cooperative procurement schedules, joint procurement, cooperative contract procurement, and performance-based procurement options, For example, under joint procurement option two or more transit agencies, can enter a procurement contract with the vendor. All transit agencies involved will agree to the same terms and are required to specify quantities of the transit vehicle or other product. Such model could significantly reduce administrative burden and increase purchasing power. Another procurement option is performance-based procurement, where a transit agency can conduct a testing phase with each vendor's product, This provides the transit agency with more detailed performance information as a measure of bid quality. This term also applies more generally to procurements that set performance-based standards rather than technical specifications, allowing vendors to propose a wider range of potentially innovative approaches. FTA has also recently enacted new legislation within the Fixing America's Surface Transportation (FAST) Act authorization to further encourage the use of these innovative methods. Our team will also provide recommendations on the use of "piggybacking," which entails leveraging the successful competitive bidding processes conducted by another government entity or by a mutual benefit organization to simplify adoption of green buying practices. We will also explore the feasibility of using cooperative procurement contracts through various channels such as Sourcewell, Drive EV Fleets, National Purchasing Partners, and the National Association of State Procurement Officials of which the California Department of General Services is participating member. ICF will also explore financing mechanisms, especially for development of EV charging stations, the non-traditional as -a -service Public -Private Partnerships (P3s) options (e.g,, infrastructure -as -a -service models where the service provider take ownership of the charging infrastructure in return for significantly reduced or eliminated capital costs at a monthly fee), P3s involve a private partner who will finance initial capital costs of EV charging infrastructure, with private debt and equity, and receive returns on initial investment overtime once charging stations are available for use, Our team will assist the City in understanding potential P3 financing mechanisms including their risks and benefits. Task 3 Deliverables: • Financial analysis comparing ZEB fleet options versus current fleet technology • A memo summarizing available and eligible fundings and financing plans for ZEB and charging/fueling infrastructure for the CITY Task 4: Zero Emission Bus Rollout Plan Following the completion of Tasks 2 and 3, ICF will compile the results from the implementation and financial analyses and will summarize findings in a ZEB Rollout Plan consistent with the requirements established by CARB under the ICT regulations. To develop the report, we will first create a detailed outline of the CITY's ZEB Rollout Plan utilizing CARB's Zero - Emission Bus Rollout Plan Guidance for Transit Agencies guideline considering both the "required" information that shall be included in the plan as well as those that are considered by CARB as "(recommended)" or "(optional)". ICF will work closely with the CITY to determine if the optional or recommended supplementary information is relevant and/or to be included in the Rollout Plan. Upon approval of the outline, we will draft all major content sections of the plan including an executive summary section that highlight key findings of the study. At minimum the CITY's ZEB Rollout Plan will include the following information; • Transit AQancy �nformariorr; We will include general Information regarding the transit agency, such as name, mailing address, contact information, etc. • Rollout Plan General Information: We will describe whether the Rollout Plan have a goal of full transition to zero -emission technologies by 2040 that avoids early retirement of conventional transit buses, and how the CITY is planning to avoid those early retirements in order to meet the 2040 goal. We will also include information on the City Council's approval of the plan. CONFIDENTIAL • Technology Portfolio: Following the transition planning and implementation analysis conducted under Task 2, we will describe the portfolio of ZEB technologies that the CITY is considering as part of this roll out plan and we will include discussions and finding regarding the operational constraints (using the route analysis), infrastructure constraints, as well as cost and financial implications of different technology choices. • Current Bus Fleet Composition and Future Bus Purchases: Utilizing data collected under Task 2.1, we will describe the current composition of the CITY's GrapeLine fleet, including the fleet characteristics, operation and maintenance, bus routes and schedule, as well as depots and existing infrastructure. As part of this section, we will also describe the phased fleet transition planning developed under Task 2.2, and will provide future bus purchase schedule (i.e., schedule of converting conventional buses to ZEB). As part of this section, we could also include a discussion on the capital, operation and maintenance cost related to ZEB purchase. • Facilities and Infrastructure Modifications: This section will be focusing on the charging and fueling infrastructure deployment as well as facility modification needed. Utilizing the analysis conducted under Tasks 23 and 24, we will describe the needed charging and fueling infrastructure, the site and grid level upgrades needed, potential right of way and land acquisition, and the estimated cost and needed investments to facilitate the transition. • Providing Service in Disadvantaged Communities: According to the CalEnviroScreen 4.0 as well as 2022 updates to SB 535 Disadvantaged Communities, CITY's GrapeLine provides services to disadvantaged communities (especially on the east side of the City). As part of this section we will describe, how the CITY plans to deploy ZEBs in disadvantaged communities, and how such deployment could lead to air quality and public health improvements within those communities. • Workforce Training: Utilizing the staff resources information collected under Task 21, we will describe the existing trainings offered by the CITY and the requirements for its operators, and maintenance team. We will also describe the steps that the CITY will take to prepare its workforce for transition to ZEBs. This could include taking advantage of trainings from the bus manufacturers and station suppliers, including maintenance and operations training, station operations and fueling safety, first responder training and other trainings that may be offered by the technology providers as well as those offered by other transit agencies such as the West Coast Center of Excellence in Zero Emission Technology (CoEZET) offered by SunLine Transit Agency, and ZEB University program offered by the AC Transit. • Potential Funding Sources: We use the information collected and analyzed under Task 3,2 to describe the potential federal, state, and local funding sources for both the ZEB purchase as well as its charging/fueling infrastructure. In this section we will provide an overview of these funding programs, provide an estimated amount funding that could be available to the CITY, and will describe how the CITY could leverage those. • Start-up and Scaleup Challenges (Optional): Here in this section, we will describe the major challenges including financial, technology availability, performance uncertainty, and infrastructure constraint with full transition to ZEB. We will describe those challenges both from the perspective of small scale as well as mass deployment of ZEBs. We may also describe how CARB through its incentive program could assist the CITY to overcome those challenge. Aside from the ZEB Rollout Plan, ICF will also develop PowerPoint slides for presenting the plan to City Council at one Shirtsleeve Meeting on May 16, 2023 for information and discussion, and one City Council Meeting on June 7, 2023 for final adoption. During the Shirtsleeve meeting ICF will conduct a question & answer session with the City Council and solicit comments and suggestions from the City Council on the draft plan. This presentation will summarize the analysis and the Rollout Plan and provide simple, easy-to-understand, and visually engaging infographics that describe the report and promote ways for the City Council to learn about the topic and provide comments. ICF will provide multiple opportunities for the CITY to provide comments on the draft and final presentations. Zero Emission Bus Study & Rollout Plan September 27, 2022 We will submit the first working draft of the report and the presentation slides to the CITY staff for review and feedback by April 7, 2023. Upon receiving comments from CITY staff, ICF will revise the report and develop a draft for formal public review by May 1, 2023. We understand that CITY will conduct the public review process of the ZEB Rollout Plan which includes public outreach and collection of comments. Upon receiving public comments, ICF will create the final version of the report and the presentation slides, addressing all relevant comments by CITY staff, stakeholders, and the public, ICF's copyeditors and graphics experts will finalize the plan and the presentations slide for submission to CITY by May 24, 2023. Upon approval of the plan, we will work closely with the CITY staff to submit the final ZEB Rollout Plan to CARB by June 29, 2023. Task 4 Deliverables: • Working draft of ZEB Rollout Plan and PowerPoint slides to CITY by April 7, 2023 • Draft ZEB Rollout Plan formal public review by May 1, 2023 • Draft PowerPoint slides for City Council Shirtsleeve Meeting by May 1, 2023 • Presentation of ZEB Rollout plan to City Council during Shirtsleeve meeting by May 16, 2023 ■ Final ZEB Rollout Plan and PowerPoint slides by May 24, 2023 • Presentation of Final ZEB Rollout Plan to City Council for approval by June 7, 2023 • Submissions of the Final ZEB Rollout Plan to CARB by June 29, 2023 CONFIDENTIAL q k \ \ viLU � (D _C Gi _ C%i C6 § 2 �92a 2 £ o C c c C4 cc~�� 2 %2 5 § =3Ca _0 7 $ E 2 0 M 0 cn 1-1 o= 2 k �k 2 S f 2 b-G3r7 LL E o m % f 2 a) —K0(D §tom 27 zA, U) e �»2 kfkk �obmk � kcm — 0 2 ca §kms/ � b �2 �wwca. 2�2a >f�§ 2«/R U- 0 L - 9GGGk §a c° § 2 �Ca (D £%f\7 0 4 �J2 o � E 2 ■ B E ca c 2 a § b k —�—�� k § f ® b LL W e -0 'e g@3CCU � . Q u a uj 2 § u 299 0 ■ _ k §%o u .2 2A u % j uU.(A � ' k ■ § � 232 o2k . Q u a uj 2 § u Zero Emission Bus Study & Rollout Plan September 27, 2022 Section IV: Organization and Staffing Team Organization and Staffing Plan ICF will have ultimate responsibility for all project deliverables, schedule adherence, cost control, and quality assurance. ICF's track record of successfully completing transportation and fleet electrification projects for various local governments and transit agencies, provides assurance of our ability to lead this challenging project. We have carefully structured the staffing for our proposed team with the requirements of the City's Scope of Work in mind. We believe that successful execution of this project will require: 1. A seasoned leadership team that that brings broad knowledge of fleet transition and infrastructure planning, the ability to manage and direct concurrent tasks involving complex analyses, and skills and extensive experience in utility coordination. 2. Teams of subject matter experts and analysts that span the spectrum of zero emission bus technology and infrastructure assessment topics and have the ability work independently, while also understanding how each project task relates to the full scope of work and final Plan. 3. A team that closely works with the CITY's Fleet Electrification Master Plan project and ensures that the two plan (i.e., Fleet Electrification Master Plan and ZEB Rollout Plan) are well coordinated The exhibit below illustrates our proposed team organization and areas of subject matter expertise for key staff and other senior staff. Exhibit 4. Staffing Plan Project.•ement Task 2. Transition Planning Implementation JAML Task 1. Fang Yan, ICF Carrie Giles, ICF Sam Poumazed, ICF Drew Turro, ICF Max Kaffel, ICF StrategiesTask 3. Financial Analysis & Funding Tim Murray, HTEC Jeff Grant,HTEC Cleone Robinson, HTEC Task 4. • Emission Bus Rollout Fang Yan, ICF Ramon Molina Garcia, ICF Tyler Dickens, HTEC CONFIDENTIAL Zero Emission Bus Study & Rollout Plan September 27, 2022 The table below summarizes the roles and responsibilities of our proposed key and supporting staff, Ke y Staff Roles and Responsibilities Jeff Ang-Olson, ICF Project Director, Executive Oversight Fang Yan, ICF Project Manager, Lead on Task 1 and 4 Sam Pournazeri, ICF Deputy Project Manager, Support Task 1 Came Giles, ICF Lead on Task 2 Tim Murray, HTEC Lead on Task 3 Jeff Grant, HTEC Support Task 3 Max Kaffel, ICF Support Task 2 Drew Turro, ICF Support Task 2 Ramon Molina Garcia, ICF Support Task 4 Cleone Robinson, HTEC Support Task 3 Tyler Dickens, HTEC Support Task 4 Summary of Key Staff Qualifications This section presents brief summaries of the qualifications of our proposed key staff. Resumes for key staff are included in Section VII. Our proposed project manager, Dr. Fang Yan brings in over 15 years of experience in emission modeling, public polices, and clean fuel and vehicle technologies to support clients in navigating the technical, economic, and regulatory challenges in decarbonization. She led the Californla Alr Resources Board (CARB)'s Innovative Clean Transit (ICT) Regulation development and brought rich experiences in battery electric and fuel cell electric vehicle technologies, charging and hydrogen infrastructure, as well as total cost ownership of zero -emission vehicles, She was part of the team that developed the California's 2020 Mobile Source Strategy as well as Draft 2022 Statewide SIP Strategy. During the development of these plans, she worked closely and collaborated with California Energy Commission (CEC) and California Public Utilities Commission (CPUC) to forecast zero emission infrastructure needed to power the anticipated zero emission MD/HD vehicles resulting from CARB's policies. Jeffrey Ang-Olson (Principal in Charge) is a transportation planner and engineer with 22 years of experience in demand forecasting, alternative fuels, GHG and criteria pollutant emissions analysis, and economics. Based in Sacramento, he has worked extensively in California on emission reduction strategy identification and evaluation. Jeff led the recent Pathways to Clean Vehicles and Fuels in San Bernardino County study. He also led the Alternative Fuels Infrastructure Plan for the Solano Transportation Authority. Previously Jeff led the environmental analysis and mitigation strategy development as part of SCAG's Comprehensive Regional Goods Movement Plan team. He also led the emissions mitigation tasks for the Gateway Cities Air Quality Action Plan, and served as technical lead for RCTC's Goods Movement Environmental Justice Guidebook. He has worked extensively on freight transportation and emission reduction strategies for the EPA. As a certified Project Management Professional (PMP), Jeff is a member of TRB's Urban Freight Transportation Committee and a former member of TRB's Air Quality Committee. Dr. Sam Pournazerl (Deputy Project Manager) is the Director of Clean Transportation and Energy at ICF and is a nationally recognized expert with over 10 years of experience In advanced transportation technologies, data analytics, emissions, energy, and cost modeling, and development of sustainable vv" freight strategies. As the previous head of the California Air Resource Board's (CARE) Mobile Source Analysis Branch, Dr, Pournazeri played a critical role in design and development of the California's J�mobile source emissions modeling tools (EMFAC), as well as development of the California 2020 Mobile Source Strategy—a blueprint for the next generation of freight and passenger transportation policies that California needs to tackle over the next three decades. Dr. Pournazeri has an extensive knowledge on California's zero emission MD/HD vehicle policies have provided technical support on numerous regulations including the CARB's Advanced Clean Trucks, Advanced Clean Fleet, Heavy-duty Engine Standards, etc. Sam has a PhD in Mechanical Engineering and is a certified Professional Engineer with the State of California, CONFIDENTIAL Zero Emission Bus Study & Rollout Plan September 27, 2022 Jeff Grant is the Vice President of Transportation Solutions at HTEC, leading the group in its goal of delivering Zero -Emission Transportation Solutions across the US and Canada. Jeff excels in providing assistance and expertise with non -dilutive funding, technology selection, partner matchmaking, integration, operations and maintenance, and project management, His understanding of the needs of government and private sector partners enables him to deliver contracts and successful projects that are "win-win" for all stakeholders Carrie Giles is an experienced project manager, leading transportation electrification and alternative fuel vehicle work. She has worked with a wide range of clients to address energy, environmental, and transportation policy issues and create clean energy projects. Carrie has experience in energy market analysis, policy analysis, technology commercialization, readiness planning, implementation work, and business development. Carrie works extensively on alternative fuel vehicle programs in conjunction with programs from the U.S. Department of Energy (DOE), the National Renewable Energy Laboratory (NREL), utilities, and numerous state and local governments. She has worked on projects that include vehicles fuels such as electricity, natural gas, propane, biodiesel, and fuel cell technologies. Drew Turro is a senior transportation specialist with more than five years of experience working on issues related to the reduction of greenhouse gas emissions in the energy and transportation systems. His current work supports alternative fuel vehicle programs in conjunction with programs from the U.S. Department of Energy (DOE), the National Renewable Energy Laboratory (NREL), and state and local governments. Prior to joining ICF, Mr. Turro supported transit agencies and school districts with zero -emission vehicle deployments and long-term planning studies to assess pathways i to transition their fleets to zero -emission vehicles. He has a Master of Public Policy from the University of Minnesota and Bachelor of Arts in Psychology from Valparaiso University. Tim Murray specializes in technical analysis, project management, and market assessment. He creates analytical models to answer complex questions and conducts literature reviews that help clients strategize for the future. Tim employs a data driven approach to long-range planning for emissions reduction and the shift to zero -emission battery and fuel cell electric technologies and infrastructure. Tim leads HTEC's modelling and analysis to quantify expected vehicle performance and emissions reduction potential from the adoption of zero -emission technologies. CONFIDENTIAL Zero Emission Bus Study & Rollout Plan Section V: Fee Proposal September 27, 2022 ICF has prepared this submission on a Time & Materials Not -to -Exceed basis. ICF's estimate is based on experience in performing similar work for other clients and reflects the results of the detailed analysis of the different activities to be performed under each task and the total estimated number of deliverables (including drafts and final versions) that will be required. This price is what we believe is appropriate to achieve CITY'S objectives for this study and deliver all the necessary work products. Additionally, ICF's distribution of hours by labor categories reflects the staffing mix that ICF believes will be most cost effective in completing this work. ICF reserves the right to reallocate hours between labor categories as we see fit to complete the work in the most efficient manner within the overall ceiling. Our proposed period of performance for the resulting award is approximately 8 months, ending July 1, 2023. The final project schedule will be developed jointly between ICF and the City of Lodi after the project Is awarded. As described In the RFP, ICF understands that expenses for travel, in-house reproduction, other reproduction used in the administration of the contract, or any other reasonably anticipated expenses, will be considered as non - reimbursable overhead expenses. Therefore, none of those expenses are included in our Pricing Sheet, Price Assumptions • ICF assumes that all payments will be due within (30) days after receipt of an acceptable invoice. High -Level Budget per Task Task 1: Project Management 55 $11,812.47 Task 2: Transition Planning Implementation Analysis 198 $32,108.72 Task 3: Financial Analysis 180 $32,003.87 Task 4: Zero Emission Bus Rollout Plan 129 $23,988.23 Total (Not -to -Exceed) 562 $99,913,29 CONFIDENTIAL Zero Emission Bus Study & Rollout Plan Hours per Labor Category September 27, 2022 Project Director $275.44 2 0 0 4 6 $1,652.64 Project Manager $199.52 32 8 0 24 64 $12,769.28 Deputy Project Manager $219.59 10 0 0 24 34 $7,466.06 Senior Consultant $186.03 0 24 40 0 64 $11,905.92 Consultant $135.25 0 40 40 40 120 $16,230.00 Analyst $99.49 0 40 0 0 40 $3,979.60 Principal Engineer $284.24 1 2 2 4 9 $2,558.17 Senior Technical Specialist $258.40 8 T- 24 26 9 67 $17,312.85 Technical Specialist $164.80 2 60 72 24 158 $26,038.76 Total , 55 198 180 129 562 $99,913.28 CONFIDENTIAL Zero Emission Bus Study & Rollout Plan Section VI: Staff Resumes Fang Yan, PhD, PE Senior Energy Consultant Fang is a Carbon Intensity Lead in the Energy Advisory Services group. She performs Lifecycle Assessment (LCA) for low carbon fuels transactions including Carbon Intensity (CI) analyses under various low carbon fuel programs. She focuses on California's Low Carbon Fuel Standard Program (LCFS), with a broad expertise in regulatory and strategy assessment, transportation modeling, and electrification. Fang brings in over 15 years of experience in emission modeling, public polices, and clean fuel and vehicle technologies to support clients in navigating the technical, economic, and regulatory challenges in decarbonization. She led California Air Resources Board (CARB)'s Innovative Clean Transit Regulation development and brought rich experiences in battery electric and fuel cell electric vehicle technologies, charging and hydrogen infrastructure, as well as total cost ownership of zero -emission vehicles. She managed Mobile Source Strategy and layout of the land of California's future transportation system to zero -emission technologies. She also worked closely and collaborated with California Energy Commission and Public Utilities Commission to forecast infrastructure needs to accommodate California's fleet transition to meet air quality and climate goals, Fang has extensive tool development and data analytics experience using Python and MySQL. Prior to joining ICF, she was a manager of CARB's mobile source emission modeling, led scenario analyses and technical assessment of various regulations and policies, and oversaw the on -road emission inventory, also known as EMFAC, which has been used worldwide by over thousands of modelers from government, industry, and academia. September 27, 2022 Years of Experience Professional start date: 2006 ICF start date: 02/2022 Education PhD, Environmental Engineering, University of Illinois at Urbana and Champaign, 2012 MS, Environmental Engineering, University of Illinois at Urbana and Champaign, 2008 BA, Environmental Engineering, Tsinghua University, China, 2006 Certifications Professional Engineer in Chemical Engineering In California Relevant Project Experience Market and Incentive Review of Hydrogen and RNG — Various Clients, 02/2022 — Present Technical Expert. Fang explores short-term and long-term anticipated evolution of the US EPA's Renewable Fuel Standard (RFS) program and California's LCFS programs and forecasts the interactions and merging of future energy markets with upcoming low carbon fuel programs and zero -emission vehicle standards in California state, U,S and internationally. The clients include but not limited to Global Common Energy, H Cycle, and Leyline Renewable Capital. Lifecycle Assessment of Sustainable Aviation Fuel (SAF), RNG, Renewable Diesel (RD), Ethanol, and Hydrogen — Various Clients 02/2022 — Present Technical Expert and Project Manager. Fang provides project management and technical consulting to low carbon fuel projects either in development or in operation. She performs lifecycle and market assessment due diligence for various clients to access lifecycle emissions of SAF, RNG, RD, ethanol, and hydrogen and to evaluate the economic impacts with growing markets. She conducts scenario analysis to discuss the various federal and state level incentives in place to support Carbon Capture and Sequestration (CCS) and to address the opportunities and technologies to reduce carbon intensities. Example clients are Growth Energy, Gron Fuel, California Bioenergy, and Allotrope, CONFIDENTIAL Zero Emission Bus Study & Rollout Plan September 27, 2022 Carbon Intensity Analyses and LCFS Pathway Applications- Various Clients, 0212022 — Present Technic Expert and Project Manager. Fang assists clients evaluating the preliminary Cl scores of clean fuels and making applications of CARB's fuel pathways to receive LCFS credits. Fang manages the delivery of Cl and LCA reports, performs Cl modeling and research, and develops tools to optimize production of reports and modeling. Example clients are BlueLine, CR&R Environment, Applied LNG, and DTE. Energy Demand and LCFS Credits Forecasting Modeling — Various Clients, 0212022 — Present Technical Expert. Fang integrates the lasted version of EMFAC with low fuel production scales and potential carbon intensities to explore the impacts of various state and federal policies on future energy demand and credits generation. She provides regulatory insights as well as technical supports and programming to refine parameters of the model. Mobile Source Emission Modeling - CARB, California, 2019 — 2022 Team Manager. Fang led and managed a technical and data driven team of 10+ scientists and engineers with PhD degrees to develop the next version of EMFAC, CARB's official on -road mobile source emission inventory, promoted innovate approaches to improve emission inventories, such as big data of transportation analytics. In addition, with hands-on experience in programming, particularly in Python, R, and MySQL, she led several data analysis projects based on granular vehicle activity and emission data. She worked with multiple stakeholders including U,S, EPA, CEC, Caltrans, air districts and MPOs to meet their requests and data needs. ' Infrastructure Demand and Needs to Support ZEV Deployment — CARB, California, 2021— 2022 Project Manager and Technical Expert. Fang collaborated with CEC and CPUC to address the Infrastructure demand and needs due to California's current and upcoming ZEV policies which are used to meet stringent air quality goals. She led and organized multi -agency discussions and identified issues, challenges, and opportunities for state agencies to plan charging and refueling infrastructure to support ZEV deployment. She provided fleet turnover scenarios and made independent reviews of infrastructure modeling. The outcomes were incorporated as a chapter of California's 2022 State Strategy for the State Implementation Plan, Technology Assessment and Cost and Benefit Analysis of Transit Fleet Turnover — CARB, California, 2016-2018 Technical Expert. Fang Led the development of Innovative Clean Transit regulation, the first zero -emission technology focused regulation for the heavy-duty sector. She collected data and integrated various Information into cost and benefits modeling. She also proposed rule concepts, developed basic principles, designed compliance milestones, and wrote regulation orders. She designed measures to incorporate mobility options into the regulation, Employment History ICF, Carbon Intensity Lead. Sacramento, CA. 2022 — present California Air Resources Board, Manager. Sacramento, CA. 2016 —2022, Argonne National Laboratory, Environmental Engineer, Argonne, IL. 2011 —2015 International Institute for Applied System Analysis, Research Fellow. Laxenburg, Austria, 2011 Summer University of Illinois at Urban and Champaign. Research Assistant. Urbana, IL. 2006 — 2011 CONFIDENTIAL Zero Emission Bus Study & Rollout Plan Sam Pournazeri, PhD, PE Director, Transportation & Energy Dr. Pournazeri is a Director of Clean Transportation and Energy at ICF team and is a nationally recognized expert with over 10 years of experience in advanced transportation technologies, data analytics, emissions and energy modeling, and development of sustainable transportation strategies. During his tenure at California Air Resources Board (CARB), Dr. Pournazeri played a critical role in design and development of the California's mobile source emissions modeling tools (EMFAC and OFFROAD), as well as development of the California 2020 Mobile Source Strategy -a blueprint for the next generation of freight and passenger transportation policies that California needs to tackle over the next three decades. Dr. Pournazeri is by far one of the most knowledgeable individuals on the technical analysis behind most of the California transportation policies and incentive programs. He has a deep understanding of planning and policy development processes as well as the ability to communicate across a wide range of multi -disciplinary teams. Project Experience California's Mobile Source Emissions Inventory—California Air Resources Board, Sacramento, 0112012-1012021 September 27, 2022 Years of Experience Professional start date: 0912008 ICF start date: 11/2021 Education ■ PhD, Mechanical Engineering, University of California Riverside, 2012 ■ BSc, Mechanical Engineering, Sharif University of Technology, 2006 Program Lead. Development of sophisticated modeling platforms to assess Certifications and Registrations the environmental impact of transportation policies in California. As part this * Professional Mechanical Engineer effort, Sam led a team of 35 scientists and engineer focused on developing (PE) Lic#: M36830 and implementing data analytics and emissions modeling platforms to inform design and structure of various transportation policies implemented by the California Air Resources Board. 2020 Mobile Source Strategy—California Air Resources Board, Sacramento, 01/2020-1012021 Program Lead. The mobile source strategy serves as the blueprint for the next generation of transportation policies that California needs to tackle over the next three decades. It defines the technology mixes needed in the transportation sector for California to achieve it clean air goals including near term air quality and longer-term climate targets. Within these efforts, Dr. Poumazeri had the opportunity to work directly with almost all the mobile source and fuel programs within the California Air Resources Board and provide an integrated planning perspective and common vision for transforming the transportation sector. He utilized his extensive knowledge and experience in transportation and freight system technologies to navigate the team through challenging and politically sensitive policy issues during the development of the plan. Medium and Heavy -Duty Vehicle ZEV Blueprint - SANDAG, 0612022 - Present Project Manager - Sam is leading an effort with San Diego Association of Government (SANDAG) to develop a medium- and heavy-duty (MD/HD) zero emission vehicle blueprint that guides the transition of freight and transit vehicles to zero emission technology and highlight the challenges related to technology readiness, infrastructure availability, and cost. As part of this work, Sam will be forecasting the MD/HD ZEV adoption in the region along with charging and fueling infrastructure needed to support them. The blueprint will also Identify key implementation strategies that the region can take to accelerate the adoption of zero emissions MD/HD vehicles, Clean Truck Technology Comparative Report - LA Metro, 0512022 - Present Deputy Project Manager- Sam is co -managing a project with LA Metro to provide an objective assessment of four types of vehicle technologies (i.e., diesel, hydrogen, battery electric, and natural gas), over immediate, short-, medium-, and long -terms, on market maturity, infrastructure and energy supply readiness and needs, cost of ownership, emissions and public health impacts, and barriers to adoption. As part of this report, Sam provided insights on the level of technology transformation needed for LA Metro to meet its public health and climate goals, as well as the scale of fueling and charging infrastructure build out to support this transition. The report will serve as technology and infrastructure roadmap to inform decision-making among policymakers and Metro staff. CONFIDENTIAL Zero Emission Bus Study & Rollout Plan September 27, 2022 2022 Climate Study – Confidential Client, 0312022 – 0612022 Transportation Lead - Sam was the transportation lead to support a utility in developing their 2022 Climate Report, As part of this project, Sam developed various transportation decarbonization scenarios consistent with IEA Net Zero Emission (NZE) and IEA Announced Pledges Scenario (APS). He conducted an integrated modeling analysis illustrating the mix of technology and fuels needed at the national and sub -national level to keep the global warming below 2.1 and 1.5 degree C by the end of century. Evaluation of the National Health Benefits from the Transition to Zero -Emission Transportation Technologies – American Lung Association, 1212021– 312022 Senior Consultant - As part of this project, ICF conducted a comprehensive analysis for the American Lung Association (ALA) of the potential health and climate benefits of a scenario for increasing on -road vehicle electrification across the United States, ICF's analysis was the basis for ALA's Road to Clean Air report. As part of this updated assessment, Sam conducted a thorough assessment of EV markets in the U.S, for light, medium, and heavy-duty vehicles, and developed EV adoption rates considering federal and state policies, technology and infrastructure readiness, and industry announcement. Quantifying the Environmental Justice Impacts of Zero -Emission Vehicles – International Council on Clean Transportation, April 2022 -Present Project Lead. Sam is leading team of technical and policy analyst across three different firms (ICF, Forth. and Cenex) to assess the disparity in ZEV ownership and usage across various markets, evaluate current metrics and approaches adopted by different jurisdictions to quantify ZEV equity impacts and examine existing governments' strategies to enhance equity and promote EJ within their ZEV policies. The outcome of this research to provide International ZEV Alliance with recommendations on additional strategies and mechanisms that can be employed to strengthen the equity aspects of ZEV policies. Transportation Modeling Options – California Energy Commission, 1112021– 0312022 Project lead. Sam led a team at ICF to evaluate the existing travel demand models utilized by CEC within the Dynasim – the software system that CEC use to project and estimate transportation energy demand under various scenarios and identify the limitation of the existing models, Sam also reviewed a dozen of various travel demand models and VMT forecasting frameworks and provided CEC with recommendations on the VMT forecasting tools that the agency can use. NCHRP 25-55: Assessment of Regulatory Air Pollution Dispersion Models to Quantify the Impacts of Transportation Sector Emissions, 2021 -present. Sam was the lead for the traffic emission modeling and dispersion modeling using ADMS for this project with Transportation Research Board of the National Academy of Science. The work Is focused on comprehensively evaluating the dispersion models that support hotspot assessments of vehicle air pollution in regulatory applications, assessing the best performing models, and improving confidence in modeling assessments of roadway pollution. Development of Baseline Emissions Inventory for Transportation Network Companies (TNC) —California Air Resources Board, Sacramento, 0112019-1212019 Program Lead. Senate Bill 1014 (SB 10141), enacted in 2018, directed the California Air Resources Board (CARB) and the California Public Utilities Commission (CPUC) to develop and Implement measures to reduce GHG emissions from transportation network companies (TNC). As the first step through this process, Dr. Poumazeri led a technical team within CARB to analyze over approximately 1.4 billion trip records provided by the TNC companies such as Uber and Lyft to determine the Greenhouse Gas (GHG) emissions associated with TNC operation in California. This metric was used to determine the regulatory stringencies as part of the California's Clean Mile Standard (CMS) regulation. Freight and Passenger Transportation Policy Assessment—California Air Resources Board, Sacramento, 0112012-1012021 Program Lead. During his tenure at CARB, Dr. Pournazed conducted technical assessment and advised CARB's executive team on several key transportation policies in California including, but not limited to, the Truck and Bus Rule, Advanced Clean Truck (ACT) regulation, Phase 1 and 2 GHG emissions standards for medium and heavy duty trucks, Zero emissions Transport Refrigeration Units (TRU) regulation, Ocean -Going Vessels At Berth regulation, amendments to Commercial Harbor Craft (CHC) regulation, and the California's Advanced Clean Cars (ACC) program. 3") CONFIDENTIAL Zero Emission Bus Study & Rollout Plan Jeffrey Ang-Olson Vice President, Transportation Jeffrey Ang-Olson is a transportation planner and engineer with expertise in vehicle activity analysis, alternative fuels, GHG and criteria pollutant emissions analysis, land use, freight transportation, and transportation economics, He has worked extensively in Southern California on emission reduction strategy identification and evaluation projects. For SCAG and SBCTA, Jeff recently led the Pathways to Clean Vehicles and Fuels in San Bernardino County study. He is currently supporting the Port of San Diego's Clean Air Strategy. Previously Jeff led the environmental analysis and mitigation strategy development as part of SCAG's Comprehensive Regional Goods Movement Plan team, He also led the emissions mitigation tasks for the Gateway Cities Air Quality Action Plan, and served as technical lead for RCTC's Goods Movement Environmental Justice Guidebook. He has worked extensively on freight transportation and emission reduction strategies for the U.S. EPA. Jeff is a member of TRB's Urban Freight Transportation Committee and a former member of TRB's Air Quality Committee. Relevant Project Experience Paths to Clean Vehicle Technology and Alternative Fuels Implementation in San Bernardino County, SCAG, 2018-20. September 27, 2022 Years of Experience 22 Education ■ Master of City Planning, University of California, Berkeley ■ Master of Science, Transportation Engineering, University of California, Berkeley ■ Bachelor of Science, Electrical Engineering, Rice University Certifications and Memberships ■ Certified Project Management Professional ■ Certified National Highway Institute Instructor Led a study to explore ways that local and regional agencies and the private Member, Urban Freighl Committee, sector can accelerate the penetration of clean vehicle and fuel technologies, with Transportation Research Board a focus on San Bernardino County, California, The study considered improved vehicle fuel efficiency, electric and fuel cell vehicles, natural gas vehicles, and several types of biofuels. Jeff directed the creation of a sophisticated modeling framework to enable analysis of various clean vehicle and fuel scenarios, calculating criteria and GHG emissions impacts and costs. Costs included vehicle purchase price, fueling costs, vehicle maintenance costs, and fueling infrastructure costs. The study also identified and assessed strategies to support implementation of the most promising scenarios, culminating in an Action Plan for local governments. NCHRP 25.46: Deploying Clean Truck Freight Strategies, TRB, 2015.17. Supported the development of a Guide and analytical Tool to help public agencies determine the viability and feasibility of deploying clean truck freight strategies. The Tool enables users to quickly view the potential emission reductions, fuel savings, and cost impacts of strategies including advanced vehicle technologies, alternative fuels, operational strategies, and supporting infrastructure, National Assessment for Reducing Air Pollution and Greenhouse Gases at U.S. Ports, EPA, 2014.16. Task lead for a major study of port -related emissions and control strategies. The study estimated current and future emissions at 19 U.S. ports, considering drayage trucks, railroads, cargo handling equipment, harbor craft and ocean going vessels, Jeff led the evaluation of emission reduction strategies. This involved a screening assessment to identify the most promising control strategies for 2020, 2030, and 2050, He then led calculations of emission reduction effectiveness for approximately 20 strategies, and assessed the combined impacts of two strategy packages. Gateway Cities Air Quality Action Plan, Los Angeles County Metropolitan Transportation Authority, 2011-13. Task lead in this major study of air quality and health risk in the Gateway Cities sub -region, which includes 23 cities in southeastern Los Angeles County. Jeff led a screening analysis to select 17 new emission control measures for detailed evaluation. These included measures targeting area sources, on -road vehicles, and off-road equipment CONFIDENTIAL Zero Emission Bus Study & Rollout Plan September 27, 2022 and marine vessels. Jeff analyzed each of these measures to estimate the potential emission reduction, cost, and cost-effectiveness, For each measure, Jeff also assessed implementation steps and timing. Solano County Alternative Fuels and Infrastructure Plan, Solano Transportation Authority, 2012-13 Led development of an Alternative Fuels and Infrastructure Plan for Solano County, California. As part of this project, he worked with a variety of fleet managers representing diverse interests and needs (with more than 120 service buses and another 4,000 government fleet vehicles), reviewed the regulatory framework that affects their, respective fleets, provided an overview of alternative fuels (e.g., vehicle and fuel costs and availability), developed an inventory of buses and infrastructure for Solano County, and developed recommendations for strategies to pursue as part of the County's efforts to increase use of alternative transportation fuels, Southern California Regional Goods Movement Plan, SCAG, 2010-12 Led a team that developed and analyzed emission reduction strategies as part of SCAG's Comprehensive Regional Goods Movement Plan, The analysis focused on reducing trucking and railroad emissions in 2023 and 2035. For trucking, several types of advanced technologies were considered, including advanced natural gas engines, hybrid electric trucks, plug-in hybrid electric trucks, and battery electric trucks. For rail, the analysis considered strategies such as accelerated penetration of Tier 4 locomotives, rail system electrification, and various options for low emission switcher engines. The study also considered operational strategies such as idle reduction, expansion of on -dock and near -dock rail, grade separation of rail intersections, and a truck inspection and maintenance program. Opportunities to Reduce Greenhouse Gas Emissions from Trucking, Environmental Defense Fund, 2009 Led an examination of the potential for trucking sector GHG emission reductions from strategies that are not currently a central focus of the US, EPA's SmartWay program, particularly operational strategies and strategies focused on short -haul trucks engaged primarily in urban operation. Impacts of Public Policy on the Freight Transportation System, Transportation Research Board, 2008- 10 Served as Principal Investigator for National Cooperative Freight Research Program (NCFRP) Project 02. The primary objective of this project was to identify the impacts of public policy on the freight transportation system. The project considered a wide range of policy types, including environmental, safety, public health, security, energy, land use, trade, infrastructure investment and finance, and infrastructure operations and maintenance policies. Goods Movement Environmental Justice Guidebook, Riverside County Transportation Commission, 2007-09. As part of a consultant team, led the development of a guidebook for local governments on mitigating the environmental impacts of goods movement in Southern California, Jeff identified low-income and minority communities in the region and assisted with the creation of maps showing the proximity of these communities to major goods movement facilities (highways, rail lines, rail yards, ports, warehousing centers, etc.). He assessed the air quality, public health, congestion, and economic impacts of goods movement, focusing on five facility types: truck highways, rail lines, rail yards, ports, and ware houseldistrlbution centers. The guidebook describes effective strategies for local governments and community groups to mitigate these impacts, CONFIDENTIAL Zero Emission Bus Study & Rollout Plan Carrie Giles Director, Transportation Carrie Giles is an experienced project manager, leading transportation electrification and alternative fuel vehicle work. She has worked with a wide range of clients to address energy, environmental, and transportation policy issues and create clean energy projects. Carrie has experience in energy market analysis, policy analysis, technology commercialization, readiness planning, implementation work, and business development. Carrie works extensively on alternative fuel vehicle programs in conjunction with programs from the U.S. Department of Energy (DOE), the National Renewable Energy Laboratory (NREL), utilities, and numerous state and local governments. She has worked on projects that include vehicles fuels such as electricity, natural gas, propane, biodiesel, and fuel cell technologies. Select Project Experience Project Manager - State and Federal Alternative Fuels Laws and Incentives Database Update, NREL, 2014 -Present Leads and supports a team of clean transportation experts to provide monthly updates for NREL's existing online database of state and federal alternative fuel laws and incentives and identifies new laws and incentives. This project requires extensive research that spans government legislative, state energy office, and private utility websites. Tracks state and federal legislation to create policy and case study bulletins on legislative trends and issues. September 27, 2022 Years of Experience 15+Years of Experience Education MST, Environmental Science, University of Utah BA, History, University of Maryland, Baltimore Educatlon Project Management Professional (PMP) certification, Project Management Institute Project Manager - Maryland Zero Emission Electric Vehicle Infrastructure Council (ZEEVIC), Maryland Department of Transportation (MDOT), 2016 -Present Managing a team providing technical and policy support for MDOT, and particularly EVIC, to help coordinate the electric vehicle (EV) and electric vehicle supply equipment (EVSE) efforts Statewide. Helping prepare State reports related to EV and EVSE, provide support at EV meetings across the State, and continue work on the MarylandEV.org communications campaign, Previously developed an electric vehicle outreach program to drivers, business owners, property managers, and vehicle dealerships to raise awareness of electric vehicle options and incentives in the State of Maryland. Analyzed Maryland vehicle registrations for electrification options while surveying Marylanders to identify electric vehicle deployment opportunities. Hosted two workplace charging workshops to engage Maryland businesses and remove barriers for station deployment. Project Manager - EVsmart Program Implementation and Outreach, Baltimore Gas & Electric (BGE), 2019 - Present Providing guidance and coordination on Maryland EV efforts, to implement the EVsmart Program as efficiently as possible. Managing event support efforts to promote the EVsmart program within BGE service territory and educate customers on the benefits of transportation electrification. Creating a dealership outreach program for dealerships to more successfully sell EVs, Project Manager - Transportation Electrification Blueprint (Blueprint), County of Los Angeles, 2019 Provided an overview of the state of transportation electrification for various local municipalities within Los Angeles. Compiled research from County partners to create a cohesive Blueprint for the Los Angeles region, as a deliverable to the California Energy Commission (CEC). Provided editing, graphics, and formatting design for the Blueprint. Project Manager - Electric Vehicle Charging Siting Analysis, County of Los Angeles, 2017-2019 Led a team researching the County's EVSE needs, for both fleets and employees, Provided siting analysis via GIS outlay, to determine the current charging capacity, the potential for charging expansion, and the needs for charging as they relate to the surrounding community, Ms, Giles led grant writing opportunities for the County in conjunction with local utilities and EV market partners. Project Manager - Alternative Fuel School Bus Study, Maryland Energy Administration, 2019. Led a team evaluating the feasibility of replacing diesel school buses with natural gas, propane, and electric school buses in the state of Maryland, Provided a technology and market update for each alternative fuel, and Intervlewed fleet managers state-wide to gauge interest in alternative fuels. CONFIDENTIAL Zero Emission Bus Study & Rollout Plan September 27, 2022 Project Manager - Massachusetts State Fleet Electrification Study, Massachusetts Department of Energy Resources, 2017 Led a team to identify electrification opportunities for vehicles owned and operated by Massachusetts. Project Manager - EV Everywhere Workplace Charging Challenge, NREL, 2014.2017 Managed a team with NREL and DOE to expand EVSE availability nationwide through companies pledging their commitment to providing EVSE for employee use. The ICF team created and enacted a methodology to recruit partners nationwide to the become Challenge partners and raise awareness of workplace charging as a critical piece of EV deployment. Actively recruited partners, provided account management for partners, supervised employees completing outreach, developed documents to convey technical information to employers, and spoke on workplace charging at conferences and workshops. Deputy Project Manager - Electric Vehicle Feasibility Study, Yukon Energy Corporation, 2015.2016 Investigated the feasibility of operating EVs and EVSE in the Yukon Territory. Research Involved a literature review, manufacturer interviews, and Yukon EV driver interviews on the feasibility of operating EVs and EVSE in freezing temperatures. Analysis was conducted to determine what infrastructure and grid load changes are required for wide- scale EV deployment in the Yukon. Northern Director, Utah Clean Cities Coalition, 2009.2011 While employed at Utah Clean Cities Coalition, served as northern director. Represented the DOE's Clean Cities program, working extensively with alternative fuels for vehicles as well as with electric powered vehicles such as fuel cells, hybrid technologies, and EVs for fueling station creation, public education, implementation, and more. Managed and created all marketing, communications, fundraising, and public relations. Administered every aspect of a $14.9 million American Recovery and Reinvestment Act grant from DOE to the Coalition and over 20 sub -recipients, to displace 1.1 -million -gallons of petroleum annually by funding the purchases of alternative fuel and hybrid vehicles, as well as creating natural gas fueling stations for vehicles, EVSE, and the state's first LNG station. CONFIDENTIAL Zero Emission Bus Study & Rollout Plan Ramon Molina Garcia Transportation Specialist Ramon is a Transportation Specialist in the Climate, Energy and Transportation group at ICF. He focuses on evaluating zero -emission vehicle penetration and their impacts on emissions reductions and energy use, His recent research experiences involve transitioning diesel heavy-duty vehicles to battery -electric and hydrogen fuel cell vehicles to meet California environmental goals. Prior to joining ICF, he earned his MS degree in Mechanical and Aerospace Engineering at the University of California, Irvine, with a research emphasis on zero - emission buses for public transportation. Ramon looks forward to becoming more involved in advising government agencies on electrification of transportation as he develops expertise in cleaner vehicle technologies. Project Experience Clean Truck Comparative Report—LA Metro, Los Angeles, 0412022 -Present. Technical Report Support. Co-author of a series of technical reports for LA Metro's Clean Truck Initiative. Roadmap Planning for Zero -Emission Transit—University of California, Irvine, 06/2019- 1212021 Graduate Student Researcher. Investigated technoeconomic Implications of CARB's Innovative Clean Transit Regulation. An assessment of available battery- and fuel cell electric buses was performed to create a bus fleet management optimization tool. Drafting OCTA's zero -emission bus plan showed that a homogenous fuel cell electric bus fleet saves millions compared to mixed fleet. Comparative Study on Environmental -Economic Impacts of Fuel Cell and Battery - Electric Buses within a Microgrid—SCAQMD, Irvine, 0612019 -1212019 Vehicle Study Lead and Technical Report Support. Conducted vehicle metrics study on UCl's BY battery -electric bus fleet to determine significant impacts on fuel economy. Co-authored technical report delivered to SCAQMD. September 27, 2022 Education MS, Mechanical and Aerospace Engineering, University of California, Irvine, 2021 Bachelor of Arts, Physics, Macalesler College, 2019 Experience in vehicle market research and performance analysis for battery and hydrogen fuel cell electric vehicles for impact statements and technology COVID-19 Impacts on Air Quality, Climate, Health, and Energy—University of California, Irvine, 0312021- 0612021 recommendations. Lead Technical Writer and Mentor. Graduate course in which mechanical engineering and chemistry students took on the unique challenge of identifying the impacts of COVID-19 on air quality, climate, public health, and energy. Employment History ICF, Transportation Specialist, 0412022 - Present University of California, Irvine. Graduate Student Researcher. Irvine, CA. 0612019 - 0912021. CONFIDENTIAL 1 rte. Years of Experience Professional start date: 2022 ICF start date: 04/2022 Education MS, Mechanical and Aerospace Engineering, University of California, Irvine, 2021 Bachelor of Arts, Physics, Macalesler College, 2019 Experience in vehicle market research and performance analysis for battery and hydrogen fuel cell electric vehicles for impact statements and technology COVID-19 Impacts on Air Quality, Climate, Health, and Energy—University of California, Irvine, 0312021- 0612021 recommendations. Lead Technical Writer and Mentor. Graduate course in which mechanical engineering and chemistry students took on the unique challenge of identifying the impacts of COVID-19 on air quality, climate, public health, and energy. Employment History ICF, Transportation Specialist, 0412022 - Present University of California, Irvine. Graduate Student Researcher. Irvine, CA. 0612019 - 0912021. CONFIDENTIAL Zero Emission Bus Study & Rollout Plan Max Kaffel Transportation Specialist Max Kaffel has three years of research experience in sustainable transportation and renewable energy systems. He specializes in transportation planning and policy with expertise in economic analyses and greenhouse gas accounting. Relevant Project Experience Joint Office Technical Assistance (TA)—National Renewable Energy Laboratory, February 2022 -Present The TA responds to technical inquiries from state agencies and related entities that are generated as a result of the work of the DOT/DOE Joint Office, whose work expands state EV charging deployment. These inquiries require in-depth research and understanding of EV and EV charging programs under the Bipartisan Infrastructure Law. Mr. Kaffel supports the daily operations of the TA team by responding to inquiries. September 27, 2022 Years or Experience ■ Professional start date: 09/2017 ■ 1CF starl date, 03/2019 Education Development of U.S, Greenhouse Gas Emissions Inventory for the Bachelor of Science, University Transportation Sector and Transportation GHG Report—United States of California, Berkeley Environmental Protection Agency, March 2020 -Present Currently producing the mobile sources section of the official U.S. GHG Inventory. This work includes collection of activity data, research into improved on -road and off-road emissions factors, the use of the MOVES Model and the NONROAD Model, and the development of outreach materials and reports. This work is conducted annually and includes a QA/QC process and an annual consideration of improvements in the methods and data used – for the U.S. Environmental Protection Agency. Freight Logistics Transportation Research and Analysis—United States Environmental Protection Agency, October 2020 -February 2021 Served as the analyst for a study of the third -party logistics industry for the EPA SmartWay program. The SmartWay Transport Partnership is an EPA voluntary program that helps industry reduce Greenhouse Gas (GHG) emissions by enabling the environmental and energy benchmarking of carrier, shipper, 3PL and multimodal freight transportation operations. Conducted market research to characterize all of the different 3PL industry segments, including dedicated contract carriage, domestic transportation management, international transportation management and value-added warehousing and distribution. The purpose of the research was to estimate the environmental impact of different 3PL sectors – for the Environmental Protection Agency. Renewable Sources of Natural Gas; Supply & Emissions Reduction Assessment Study, American Gas Foundation (AGF), March 2019 -February 2020 Max helped support the resource assessment research as well as assisted on the drafting of multiple report sections. Offering assistance throughout the project, Max utilized his research experience to develop biomass feedstock potential estimates, which informed the scenario -based analysis that the report employs. Climate Action Report, California Department of Transportation (Caltrans), March 2019 -April 2020 ICF is providing support with the development of a Climate Action Plan (CAP) for the California Department of Transportation. Max is assisting with the analysis of VMT and GHG transportation mitigation measures. His duties include assessing the technological and cost feasibility of transportation planning improvements that can be applied statewide. Infrastructure Carbon Estimator (ICE) Tool, Minnesota Department of Transportation (MnDOT), March 2019 -March 2021 ICF is updating and enhancing the scope of the ICE tool, which is an excel -based model that estimates the lifecycle energy and greenhouse gas (GHG) emissions from the construction and maintenance of transportation facilities. Max is supporting with quality assurance duties for the revised tool as well as preparing an ICE tool instructional webinar and will provide ongoing technical assistance as needed, CONFIDENTIAL Zero Emission Bus Study & Rollout Plan September 27, 2022 CMAQ Input Data Dictionary, Federal Highway Administration (FHWA), May 2019 -June 2019 Max develop the data dictionary for the transportation demand management (TDM) Inputs. With the purpose of giving users a higher level of detail and clarity, the data dictionary provided CMAQ users recommendations on methodology, common errors, resources, and for inputs that were less self-explanatory, clear definitions of what the input should represent. Mobility Management Strategy Guidebook, San Diego Association of Governments (SANDAG), May 2019 Max supported the writing and editing duties of the Mobility Management Strategy Guidebook; the guidebook detailed transportation strategies including employer commute programs, land use strategies, parking management, neighborhood enhancements, transit strategies, and transportation system management, With an emphasis on reducing vehicle miles traveled (VMT), the guidebook offers strategies to reduce traffic congestion, greenhouse gas and local air pollutant emissions, and related public health and environmental impacts. Renewable Energy: Trends, Options, and Potentials for Agriculture, Forestry, and Rural America including Puerto Rice, United States Department of Agriculture (USDA), April -May 2019 As part of an exhaustive report detailing the immense growth of renewable energy in the United States, which offers economic, energy security, and environmental improvement opportunities for the agricultural and forestry sectors and rural communities, Max supported the writing of two chapters entailing the technological characterization, barriers, and public policies of corn ethanol. Understanding the existing RNG marketplace PowerPoint, Sumitomo Corporation of Americas, April 2019 Max developed a PowerPoint presentation that identified the key renewable natural gas (RNG) market participants, including landfill -to -gas facility owners and operators, dairy and agricultural residue facility owners and operators, biogas clean-up technology developers, anaerobic digester developers, renewable hydrogen (steam methane reformation), feedstock suppliers, and gasification technology developers. LCFS Technical Support, Los Angeles County Metropolitan Transportation Authority, March 2019 As part of ongoing technical support for LA Metro, Max delivered a memorandum highlighting relevant amendments to the low carbon fuel standard (LCFS) in 2019, including book -and -claim accounting for low -carbon intensity (CI) electricity and new validation and verification requirements. Employment History ICF, Transportation Analyst, March 2019 - Present City of Oakland & Climate Corps AmeriCorps, Energy and Sustainability Fellow, September 2018 - February 2019 The Natural Resources Defense Council, Energy and Transportation Intern, September 2017 - September 2018 CONFIDENTIAL Zero Emission Bus Study & Rollout Plan Drew Turro, MPP Senior Transportation Spec ia Mr. Turro has more than five years of experience working on issues related to the reduction of greenhouse gas emissions in the energy and transportation systems. His current work supports alternative fuel vehicle programs in conjunction with programs from the U.S. Department of Energy (DOE), the National Renewable Energy Laboratory (NREL), and state and local governments. Prior to joining ICF, Mr. Turro supported transit agencies and school districts with zero -emission vehicle deployments and long-term planning studies to assess pathways to transition their fleets to zero -emission vehicles. He has a Master of Public Policy from the University of Minnesota and Bachelor of Arts in Psychology from Valparaiso University. Project Experience Transportation Prince George's County EV Charger Siting Analysis—Metropolitan Washington Council of Governments (MWCOG), 2022 - Present Program/Project Role. Drew assists with research and analysis work to identify potential sites for EV chargers in Prince George's County. He coordinates with staff from Prince George's County, MWCOG, and other project partners to coordinate data needs, solicit analysis feedback, and draft project meeting minutes. September 27, 2022 Years of Experience Professional start date: 09/2012 ICF start date: 05/2022 Education Master of Public Policy, University of Minnesota, 2019 Bachelor of Arts, Psychology, Valparaiso University, 2012 Clean School Bus Technical Response Service—NREL, 2022 - Present Program/Project Role. Drew supports the daily operation of the TRS by responding to inquiries related to the EPA's Clean School Bus Program. He performs research on topics related to technical aspects of program implementation and provides it to program applicants, industry contacts, fleet managers, original equipment manufacturers, and government agencies. Long -Range Zero -Emission Fleet Planning—Transfort (Fort Collins), 2021- 2022 Analyst. While at CTE, Drew conducted data analysis to inform Transfort's long-range fleet transition planning efforts. Drew analyzed vehicle operational data, financial data, and fleet procurement schedules to assess the feasibility and costs associate with transitioning to different zero -emission vehicle and fueling technologies. Guide to Green Energy Adoption for Transit Agencies—National Center for Applied Transit Technology (N- CATT), 2020 - 2021 Project Manager/Author. While at CTE, Drew led the development of a guidebook that provides an overview of green energy technologies and their application in zero-emisslon transit fleet deployments. Drew served as the project manager and developed content for three chapters included in the guidebook covering green energy infrastructure, microgrids, and charge management. Drew presented a summary of the guidebook for an N-CATT webinar, which included interviewing an agency included as a case study in the guidebook. Zero -Emission Transit Bus Deployment—Central Florida Regional Transportation Authority (LYNX), 2020 - 2022 Lead Assoc!ate/Analyst. While at CTE, Drew provided project management and analysis support to LYNX for their zero -emission bus deployment of eight Proterra battery -electric buses. Drew led project meetings, drafted meeting minutes, and developed key performance indicator (KPI) reports for LYNX. KPI reports tracked operational and financial metrics including vehicle efficiency, cost per mile, and utilization. Getting Stockton Schools to Zero Emissions—Stockton Unified School District (SUSD), 2020 -2022 Lead Associate/Analyst. While at CTE, Drew provided support for SUSD both on their deployment of 11 Blue Bird electric school buses (ESB) and long-range zero -emission fleet planning activities. Drew developed key performance indicator (KPI) reports for SUSD's ESB fleet, drafted quarterly reports for the California Air Resources Board (CARB), and supported all project management tasks. Drew also analyzed vehicle operational data, financial data, and fleet procurement schedules to assess the feasibility and costs associate with transitioning to a 100% zero -emission school bus fleet. CONFIDENTIAL Zero Emission Bus Study 6 Rollout Plan September 27, 2022 Zero -Emission Transit Bus Deployment—Lane Transit District (LTD), 2019 – 2022 Lead Associate/Analyst. While at CTE, Drew provided project management and analysis support to LTD for their zero-emisslon bus deployment of two BYD battery -electric buses (BEB) and 11 New Flyer BEBs. Drew supported project management tasks including drafting meeting minutes, monthly reports, and project schedules. Drew also supported analysis tasks, including key performance indicator (KPI) reports, on -route charging analyses, utility rate modeling, total cost of ownership assessments of different vehicle technologies, and the development of data processes and definitions to inform the transition of KPI reporting to LTD. Employment History ICF, Senior Transportation Specialist. Minneapolis. 05/2022 – Present. Center for Transportation and the Environment (CTE). Lead Associate. St. Paul, MN. 07/2019 – 05/2022, Minnesota Department of Commerce. Intern – Conversation Improvement Program. St, Paul, MN. 06/2018 – 0712019. Valparaiso University. Assistant Director of Alumni Relations. Valparaiso, IN. 12/2013 – 06/2017. Lewis University. Freshman Admission Counselor. Romeoville, IL. 09/2012 –12/2013 CONFIDENTIAL Zero Emission Bus Study & Rollout Plan Jeff Grant September 27, 2022 „.,C IHTEC FUELING THE DRIVE TO HPDR! PROFILE SUMMARY Jeff Grant has over 22 years' experience in business and project development, and government relations In the hydrogen sector, With a passion for electrification of the transportation industry, Jeff has been instrumental in developing hydrogen and fuel cell equipment deployments In early markets. As Principal and co-founder of Zen Clean Energy Solutions (acquired by HTEC in March 2022), Jeff led Zen's project development and fleet transition verticals with a focus on creating and refining ideas, finding and securing non -dilutive funding, identifying partnerships, and delivering contracts. He led multiple project development files for Zen, including key partnerships for HTEC's early-stage light-duty fueling network in BC. At HTEC, Jeff is responsible for the Transportation Solutions department, involving fleet transition planning, transportation project development and execution, and vehicle leasing for heavy-duty fleet partners. Jeff recently served as the vice -chair of Hydrogen BC. Priorto starting Zen, Jeffwas with Ballard Power Systems for over 15 years In several key business development roles, Including the commercial lead for the North American bus market, and account manager for Ballard's largest customer at the time, Plug Power. Jeff also led several key external relations activities at Ballard, Key roles include: ■ Chair, Canadian Transportation Fuel Cell Alliance Working Group Chair, Canadian Sub -Committee to IEC TC/105 • Chair, California Fuel Cell Partnership Bus Team Jeff studied Business Administration at Carleton University and Algonquin College and has certificates from BCIT, Caltech, and the Sauder School of Business. SELECTED PROFESSIONAL EXPERIENCE • British Columbia Hydrogen Study, Canada, 2019 - (Government Relations & Policy Lead) Zen led a consortium to analyse the potential for hydrogen to help BC achieve its decarbonization goals. The study considered both how demand for hydrogen will develop between 2020 and 2050 as well as how the Province could build up its low -carbon production capacity to serve both domestic supply and the export market. As part of this project, Jeff led the development of policy CONFIDENTIAL Zero Emission Bits Sludy & Rollout Plan September 27, 2022 recommendations, program support and funding priorities for the Government of BC. AZETEC - Alberta Zero Emission Truck Electrification Collaboration, Alberta, 2018 -present - (Principal Oversight) In collaboration with key stakeholders in Alberta, Jeff helped initiate and implement the first heavy-duty fuel cell electric truck project in Alberta. AZETEC is an industry -led initiative to reduce emissions from Alberta's heavy-duty transportation sector by harnessing the benefits of low HTEC Commercial Business Development, North America, 2015-present—(Embedded Role, Director of Corporate Development) HTEC is a private company developing fueling solutions to support the supply of hydrogen to new retail fuel markets, as well as existing wholesale markets, through hydrogen infrastructure and technology solutions. HTEC is the Canadian leader in owning and operating hydrogen fueling stations in the country, developing 4 of the first 5 commercial fueling stations nationally. Jeff oversees the project development activities in California, Quebec, British Columbia and Alberta. His areas of focus include securing funding from multiple levels of government; managing partnerships with key suppliers; and developing site license agreements with the host sites including Shell and 7 -Eleven (Esso). ■ Ballard Power Systems Commercial Business Development, North America, 2015-2019— (Project Development) Ballard Power Systems is a leading global provider of innovative clean energy and fuel cell solutions.Jeff provides project development services for targeted heavy-duty applications like goods movement equipment at the ports, transit buses, and class s trucks. Jeffs areas of focus include: securing government contracts that result in large scale commercial agreements with vehicle OEM's; rolling stock; and supporting fuelling infrastructure. ■ BAE Systems Commercial Business Development, North America, 2016-present—(Project Development) BAE Systems is a leading global provider of green power and propulsion solutions for trucks, buses and other heavy-duty applications. Jeff provides government relations and project development services for seaport applications in California incorporating BAE Systems hybrid electric drivetrain solutions. Canadian National Hydrogen Strategy, NRCan, 2020 - (Project Lead, Policy and Funding Priorities) Zen has been down selected to develop the national hydrogen strategy for Canada under contract to Natural Resources Canada (NRCan). The hydrogen strategy will leverage materials and key learnings from other studies and stakeholder engagement undertaken by NRCan and its previous consultants. Zen's primary scope will be to synthesize the existing material into a cohesive strategy and roadmap that sets short-term, mid-term, and long-term recommendations and defines clear roles and responsibilities needed to achieve the roadmap targets. Jeffwill lead the policy recommendations and funding priorities for the study. CONFIDENTIAL Zero Emission Bus Study & Rollout Plan Tim Murray September 27, 2022 WHTEC HTEC FUELING THE DRIVE TO HYDROGEN PROFILE SUMMARY Tim manages HTEC's Transportation Solutions - Modelling and Analysis activities, which includes modelling and analysis of heavy-duty fleet vehicles and infrastructure to develop long-range plans to deploy zero - emission technologies. The data -driven approach provides fleet operators with key insights into the benefits and challenges of transitioning to zero - emission operation and identifies key pitfalls that operators can avoid by building a solid roadmap for success. Tim brings seven years of experience in clean energy and sustainability to his role where he specializes in technical analysis, project management, and market assessment. He creates analytical models to answer complex questions using literature sources and real-world operating data. Prior tojoining HTEC, Tim led Zen Clean Energy'stransit planning activities and worked as a consultant in the clean energy sector. At Zen, he developed long-range plans for five public transit agencies to transition their fleets to 100% zero -emission vehicles over the next 15 to 25 years. These plans ensure optimal and customized transition pathways that meet transit agency operational needs while aligning with strategic initiatives. The plans call for a combination of hydrogen fuel cell and batteryelectric buses and paratransitvehlcles and considerall coststothe agencies including bus purchases, hydrogen fueling or battery charging infrastructure, facility upgrades, vehicle maintenance, and fuel. Mr. Murray is a registered Engineer -in -Training with Engineers and Geoscientists of British Columbia (EGBC). SELECTED PROFESSIONAL EXPERIENCE HTEC / Zen January 2019 - Present Manager, Fleet Transition Planning Fresno Area Express Zero -Emission Vehicle Transit Plan, United States of America, 2020 — (Project Manager) Fresno Area Express (FAX) is a public transit agency operating in Fresno, California. Zen wrote a plan for FAX to transition its fleet of 112 fixed route buses and 48 paratransit vehicles to zero emission by 2040. Mr. Murray was the primary technical contact and managed the project's schedule and budget. Mr. Murray also led the modelling and technical analysis of FAX's operations to identify key constraints such as infrastructure siting, cash-flow, and operating schedule. Mr. Murray also connected FAX with electric charging and hydrogen fuelling infrastructure suppllers, and zero emission bus OEMsto develop operator training plans and estimate overall capital expenditures. CONFIDENTIAL Zero Emission Bus Study & P,ollout Plan September 27, 2022 Golden Empire Transit Zero -Emission Vehicle Transit Plan, United States of America, 2020 — (Project Manager) Golden Empire Transit (GET) is a public transit agency operating in Bakersfield, California. Zen wrote a plan for GET to transition its fleet of 85 fixed route buses and 22 paratransit vehicles to zero emission by 2040. Mr. Murray was the primary technical contact and manages the project's schedule and budget. He led the technical modelling of GET's existing bus routes to determine the most cost-effective and efficient blend of battery electric and fuel cell electric replacement buses. Mr. Murray conducted a techno-economic analysis over the transition plan's lifetime to guide GET's long-range transit planning and budget allocation, SunLine Key Performance Indicator Report Project, United States of America, 2019-2022— (Project Manager) Mr. Murray led the development of monthly report showing key performance indicatorsfor SunLine Transit's bus fleet and hydrogen electrolyzer station. The reports are generated using several data sources including SunLine's fuel management system, utility billing data, and the electrolyzer station's PLC system. The reports track parameters including station availability, bus fleet fuel economy, number and success of fuelling events, bus operating expense, and hydrogen fill rate. SunLine Transit Zero -Emission Vehicle Transition Plan, United States of America, 2019- ongoing—(Project Manager) SunLine Transit is a public transit agency operating in the Coachella Valley in Southern California. Zen wrote a plan for SunLine transit to transition their fleet of 81 buses and 39 paratransit vehicles to zero -emission by 2040. Mr. Murray conducted extensive modelling to optimize the mix of battery electric and hydrogen vehicles in the fleet based on cost, technical capabilities, and operational constraints. He forecasted hydrogen, natural gas, and electricity demand and estimated costs related to vehicle and infrastructure purchases, fuel, and maintenance. Detroit Department of Transportation Zero Emission Bus Fleet Transition Plan, United States of America, 2022 - (Project Manager) Detroit Department of Transportation (DDOT) is the public transportation operator in Detroit, Michigan, operating a fleet of 292 fixed -route transit buses. Zen was responsible for creating a rollout plan to transition DDOTs fleet to 100% zero -emission by 2050. Mr. Murray acted as project manager and oversaw key elements of the plan including hydrogen, diesel, and electricity demand over time, fleet purchasing schedules, projected capital and operating costs from bus and fuelling infrastructure procurement and bus fuel and maintenance, projected GHG emissions, and analyses to determine the optimal mix of battery electric and fuel cell electric buses for the fleet. Alberta Zero Emission Hydrogen Transit Fleet Transition Plans, Canada, 2021 - ongoing - (Project Manager) The Alberta Zero Emission Hydrogen Transit (AZEHT) project will demonstrate two hydrogen fuel cell electric buses to be used inroad trials shared by four transit agencies within the municipalities of Edmonton, Strathcona County, Calgary, and Banff/Bow Valley, located in Alberta Canada. As part of AZEHT, HTEC is providing zero -emission fleet transition plans to the four public transit agencies to provide comprehensive guidelines to how they can transition their fleets to 100°/% zero -emission. Tim is acting as project manager and technical oversight forthe transition plans, including hydrogen, diesel, and electricity demand over time, fleet purchasing schedules, projected capital and operating costs from bus and fuelling infrastructure procurement and bus fuel and maintenance, projected GHG emissions, and analyses to determine the optimal mix of battery electric and fuel cell electric buses for the fleet. The status and size of the agencies being analyzed are as follows: o Edmonton Transit Service (ETS), complete, 1048 planned fixed -route buses, 4 garage facilities, 100% ZEB by 2040 o Strathcona County Transit (SCT), complete, 52 single-decker buses, 20 double-decker buses, 100% ZEB by 2048 o Roam Transit (Banff/Bow Valley), in progress o Calgary Transit, in progress CONFIDENTIAL Zero Emission Bus Study & Rollout Plan Cleone Robinson HTEC PROFILE SUMMARY September 21, 2022 Of HTEC FUELING THE DRIVE TO HYDROGEN Cleone Robinson is an EIT at HTEC on the Transportation Solutions - Modelling and Analysis team. Cleone specializes in data analysis, transportation energy and performance modelling, techno-economic analysis, and advanced visual representation of combined qualitative and quantitative data. Cleone led the KPI modelling for SunLine Transit Agency - a public transit agency in California - to provide insight on electrolyzers, hydrogen filling stations, and clean energy transit fleets to SunLine and the California Air Resources Board (GARB). Cleone has been the modelling and analysis lead on several zero -emission bus fleet transition plans, including 3 Innovative Clean Transit (ICT) Regulation plans in California. The ICT plans required transit agencies to fully transition their fleets to 100% zero -emissions by 2040 and included a combination of battery electric buses and fuel cell electric buses to replace current CNG and paratransit buses being operated; while considering the capital expenditures of buses, infrastructure restrictions, fuel and maintenance costs, and the energy requirements for routes operated by the agency. Cleone has developed numerous site infographics and site schematics to support clean energy models, requests for information, and reports. Prior to joining HTEC, Cleone studied at Queen's University in Kingston, Ontario, where she obtained a Bachelor of Applied Science, with a Major in Mechanical Engineering. While at Queen's, Cleone's studies focused on clean energy including designing an energy -interface module for a district energy line powered by CHP and biofuel in a remote community as part of the Northern Communities Project, designing and prototyping a micro - wind turbine, Pelton wheel water turbine, and a mini passive and active solar building. SELECTED PROFESSIONAL EXPERIENCE HTEC / Zen EIT, Modelling and Analysis November 2019 - Present SunLine Transit Zero -Emission Vehicle Transit Plan, United States of America, 2020—(Analyst) Ms. Robinson is led the route analysis for the Zero -Emission Vehicle Transit Plan at SunLine Transit which Is a public transit agency located in the Coachella Valley in Southern California. Zen wrote a plan to transition SunLine's current fleet consisting of 81 buses and 39 paratransit vehicles to zero -emission by 2040. Cleone was responsible for determining the number of battery electric and fuel cell buses needed to replace SunLine's current fleet based on the routes CONFIDENTIAL Zcro Emission Bus Study & Rollout Plan September 27. 2022 offered by the agency and the power restrictions of each innovative technology. She developed a complex model to analyse the energy required to complete unique duty cycles and if a specific fuel cell or battery electric bus model would be able to complete each route. Fresno Area Express Innovative Clean Transit Plan, United States of America, 2020 —(Analyst) Fresno Area Express is a public transit agency operating in San Joaquin Valley in California. Zen was responsible for transitioning Fresno's fleet of 114 buses and 56 paratransit vehiclesto zero -emissions by 2040 in accordance with the Innovative Clean Transit Regulation in California. Ms. Robinson was responsible for determining the combination of fuel cell and battery electric vehicles and the timeline for future bus purchases based on cost, technical capabilities (route analysis), and operational constraints. In her model, Cleone also forecasted hydrogen, electricity, and natural gas demand from 2020 to 2040, as well as estimating costs related to vehicle and infrastructure purchases, fuel, and maintenance. Golden Empire Transit Innovative Clean Transit Plan, United States of America, 2020 - (Analyst) Golden Empire Transit is a public agency operating in Bakersfield California. Zen was responsible for transitioning GETS fleet of 85 buses and 22 paratransit vehicles to zero -emission by 2040 in accordance with the Innovative Clean Transit Regulation in California. Ms. Robinson was responsible for determining the combination of fuel cell electric and battery electric vehicles and the timeline for future bus purchases based on cost, technical capabilities (route analysis), and operational constraints. In her model, Cleone also forecasted hydrogen, electricity, and natural gas demand from 2020 to 2040, as well as estimating total cost of ownership for different transition scenarios. Detroit Department of Transportation Zero Emission Bus Fleet Transition Plan, United States of America, 2022 - (Analyst) Detroit Department of Transportation (DDOT) is the public transportation operator in Detroit, Michigan, operating a fleet of 292 fixed -route transit buses. Zen was responsible for creating a rollout plan to transition DDOT's fleet to 100% zero -emission by 2050. Cleone was responsible for the purchasing schedule, financial analysis, GHG reduction calculations, and fuelling infrastructure sizing requirements based on industry trends, technical capabilities, and operational constraints. Alberta Zero Emission Hydrogen Transit Fleet Transition Plans, Canada, 2021 - ongoing - (Analyst) The Alberta Zero Emission Hydrogen Transit (AZEHT) project will demonstrate two hydrogen fuel cell electric buses to be used in road trials shared by four transit agencies within the municipalities of Edmonton, Strathcona County, Calgary, and Banff/Bow Valley, located in Alberta Canada. As part of AZEHT, HTEC is providing zero -emission fleet transition plans to the four agencies to provide comprehensive guidelines to how they can transition their fleets to 100% zero -emission. Cleone is responsible for the purchasing schedule, financial analysis, GHG reduction calculations, and fuelling infrastructure sizing requirements based on industrytrends, technical capabilities, and operational constraints. The status and size of the agencies being analyzed are as follows: o Edmonton Transit Service (ETS), complete, 1048 planned fixed -route buses, 4 garage facilities, 100% ZEB by 2040 o Strathcona County Transit (SCT), complete, 52 single-decker buses, 20 double-decker buses, 100% ZEB by 2048 o Roam Transit (Banff/Bow Valley), in progress o Calgary Transit, in progress CONFIDENTIAL Zero Emission Bus Study & Rollout Plan Tyler Dickens HTEC PROFILE SUMMARY September 27, 2022 4PHTEC FUELING THE DRIVE TO HYDROGEN Mr. Tyler Dickens works in the Transportation Solutions - Modelling and Analysis team at HTEC. Tyler's works on projects which have a focus on zero -emission transportation, electrification, hydrogen and fuel cells. Tyler specializes in data science, transportation energy and performance modelling, technoeconomic demand modelling, and advanced visual representation of combined qualitative and quantitative data. Tyler studied at the University of British Columbia in Vancouver, BC, where he obtained a Bachelor of Applied Science in Civil Engineering, with a Minor in Commerce and a Focus in Environmental Engineering. Prior to joining Zen, Tyler worked directly with a variety of public, private and first nation clients. Tyler has worked in a variety of integral roles on major infrastructure projects including the Transmountain Pipeline Project, the Pattullo Bridge Replacement Project, the YVR jet Fuel Pipeline Project, and more. SELECTED PROFESSIONAL EXPERIENCE HTEC / Zen Engineering Associate January 2022 - Present Edmonton Transit Service Zero (ETS) Emission Bus Transition Plan, Canada, 2022 (Analyst) Tyler supported the Fleet Transition Plan for ETS, creating a roadmap for ETS to move towards a fleet of fully Zero Emission Buses (ZEBs). Tyler performed backend modeling forthe analysis. • Detroit Department of Transportation (DDOT) Zero Emission Bus Transition Plan, Canada, 2022 (Analyst) Tyler supported the Fleet Transition Plan for DDOT, creating a roadmap for DDOT to transition to a fully ZEB fleet. Tyler performed backend modeling for the analysis, including an exploratory analysis of energy consumption of bus heaters in cold weather conditions. ■ BC Hydrogen Station Permitting Guidebook, Canada, 2022 (Technical Writer) - To support the Hydrogen Fueling Program, the Ministry of Energy, Mines, and Low Carbon Innovation (EMLI) are developing a B.C.-specific hydrogen station permitting guidebook. The intention of the guidebook will be to provide a resource for EMLI's Hydrogen Fueling Program and provide support for hydrogen fueling station developers and local governments as they work through the permitting process, and encourage hydrogen station development in the province. CONFIDENTIAL Zeio Emission Bus Study & RnIIOut Plan September 27, 2022 Zero -Emission Vehicle Route Energy Analysis Modelling Tool, Canada, 2022 (Lead Software Developer) Zen has created a proprietary model that predicts the performance of battery electric and fuel cell electric buses on existing bus routes. The tool supports Zen in optimizing plans for clientsto deploy zero -emission buses and fueling/charging infrastructure. Alberta Zero Emission Hydrogen Transit Fleet Transition Plans, Canada, 2021 - ongoing - (Analyst) The Alberta Zero Emission Hydrogen Transit (AZEHT) project will demonstrate two hydrogen fuel cell electric buses to be used in road trials shared by four transit agencies within the municipalities of Edmonton, Strathcona County, Calgary, and Banff/Bow Valley, located in Alberta Canada. As part of AZEHT, HTEC is providing zero -emission fleet transition plans to the four agencies to provide comprehensive guidelines to howthey can transition their fleets to 100% zero - emission. Tyler performs backend modeling for the analysis, including an exploratory analysis of energy consumption of bus heaters in cold weather conditions and hydrogen infrastructure sizing and cost estimations. The status and size of the agencies being analyzed are as follows: o Edmonton Transit Service (ETS), complete, 1048 planned fixed -route buses, 4 garage facilities, 100%ZEB by 2040 o Strathcona County Transit (SCT), complete, 52 single-decker buses, 20 double-decker buses, 100% ZEB by 2048 o Roam Transit (Banff/Bow Valley), in progress o Calgary Transit, in progress Core6 Environmental September 2018 - December 2021 Environmental Engineer • Provided on-site expertise to the Pattullo Bridge Replacement Project Team for the strategic implementation and management of environmental programs project -wide. • Provided construction oversite on complex projects to ensure project compliance with applicable regulations, guidelines and contractual obligations. • Worked directly with clients and contractors to coordinate and implement environmental field investigations. Clients included public, private, and first nations groups across BC, Yukon and Northwest Territories. • Wrote proposals and environmental reports to meet individual client needs. • Provided clients with interpretation of applicable regulations, standards, guidelines and permits. G H D Ltd. September 2017 -July 2018 Junior Engineer • Coordinated the procurement of equipment valued over $2,000,000 for over ten first nation solid waste projects across BC. * Designed and implemented recycling, solid waste and composting programs in remote first nation communities, coordinating directly with senior band members and band managers. Managed the operation of the landfill gas flare at the Bailey Landfill in Chilliwack, BC, monitoring live gas composition levels and adjusting the landfill gas extraction wells to optimize performance. Modeled landfill leacheate and greenhouse gas emissions, and worked with a team designing landfill systems. CONFIDENTIAL Zero Emission Bus Study & Rollout Plan Section V: Fee Proposal September 27, 2022 ICF has prepared this submission on a Time & Materials Not -to -Exceed basis. ICF's estimate Is based on experience in performing similar work for other clients and reflects the results of the detailed analysis of the different activities to be performed under each task and the total estimated number of deliverables (Including drafts and final versions) that will be required. This price is what we believe Is appropriate to achieve CITY's objectives for this study and deliver all the necessary work products, Additionally, ICF's distribution of hours by labor categories reflects the staffing mix that ICF believes will be most cost effective in completing this work, ICF reserves the right to reallocate hours between labor categories as we see fit to complete the work in the most efficient manner within the overall ceiling. Our proposed period of performance for the resulting award is approximately 8 months, ending July 1, 2023, The final project schedule will be developed jointly between ICF and the City of Lodi after the project Is awarded, As described in the RFP, ICF understands that expenses for travel, in-house reproduction, other reproduction used in the administration of the contract, or any other reasonably anticipated expenses, will be considered as non - reimbursable overhead expenses. Therefore, none of those expenses are included in our Pricing Sheet. Price Assumptions • ICF assumes that all payments will be due within (30) days after receipt of an acceptable invoice. High -Level Budget per Task Task 1: Project Management 55 $11,812,47 Task 2: Transition Planning Implementation Analysis 198 i $32,108.72 Task 3: Financial Analysis 180 $32,003.87 Task 4: Zero Emission Bus Rollout Plan 129 $23,988.23 Total (Not -to -Exceed) 562 $99,913.29 CONFIDENTIAL Zero Emission Bus Study & Rollout Plan Hours per Labor Category September 21, 2022 Project Director $275,44 2 0 0 4 6 $1,652.64 Project Manager $199.52 32 8 0 24 64 $12,769.28 Deputy Project Manager $219.59 10 0 0 24 34 $7,466.06 Senior Consultant $186.03 0 24 40 0 64 $11,905.92 Consultant $135.25 0 40 40 40 120 $16,230.00 Analyst $99.49 0 40 0 0 40 $3,979.60 Principal Engineer $284.24 1 2 2 4 9 $2,558.17 Senior Technical Specialist $258.40 8 24 26 9 67 $17,312.85 Technical Specialist $164.80 2 60 72 24 158 $26,038.76 Total 55 198 180 129 562 $99,913.28 CONFIDENTIAL EXHIBIT C NOTE., The City of Lodi Is now using the online insurance program PINS Advantage. Once you have been awarded a contract you will receive an email from the City's online Insurance program requesting you to forward the small to your Insurance provider(s) to submit the required insurance documentation electronically Insurance Reguirements for Professional Services- ICF Contractor shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder and the results of that work by the Contractor, his agents, representatives, employees or subcontractors. MINIMUM SCOPE AND LIMIT OF INSURANCE Coverage shall be at least as broad as: 1. Commercial General Liability (CGL): Insurance Services Office Form CG 00 01 or equivalent covering CGL on an "occurrence" basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $1,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general a ate limit shall be twice the reciulred occurrence limit, 2. Automobile Liability: ISO Form Number CA 00 01 covering any auto or if Contractor has no owned autos, then hired, and non - owned autos with limit no less than $1,000,000 per accident for bodily injury and property damage. 3. Workers' Compensation: as required by the State of California, with Statutory Limits, and Employer's Liability Insurance with limit of no less than $1,000,000 per accident for bodily injury or disease. 4. Professional Liability (Errors and Omissions) Insurance appropriates to the Consultant's profession, with limits not less than $1,000,000 per occurrence or claim. Other Insurance Provisions: (a) Additional Named Insured Status The City of Lodi, its elected and appointed boards, commissions, officers, agents, employees are to be included as additional insureds on the CGL and auto policy with respect to liability arising out of work or operations performed by or on behalf of the Contractor including materials, parts, or equipment furnished in connection with such work or operations. General liability coverage can be provided in the form of an endorsement to the Contractor's insurance (at least as broad as ISO Form CG 20 10 11 85 or if not available, through the addition of both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 if a later edition is used or equivalent endorsement forms. (b) Primary and Non -Contributory Insurance Endorsement The limits of insurance coverage required may be satisfied by a combination of primary and umbrella or excess insurance. For any claims related to this contract, the Contractor's insurance coverage shall be primary coverage at least as broad as ISO CG 20 01 04 13 as respects the Entity, its officers, officials, employees, and volunteers. Any insurance or self-insurance maintained by the Entity, its officers, officials, employees, or volunteers shall be excess of the Contractor's insurance and shall not contribute with it. (c) Waiver of Subrogation Contractor hereby grants to City of Lodi a waiver of any right to subrogation which any insurer of said Contractor may acquire against the City of Lodi by virtue of the payment of any loss under such insurance. Contractor agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not the City of Lodi has received a waiver of subrogation endorsement from the insurer NOTE: (1) The street address of the CITY OF LODI must be shown along with (a) and (b) and (c) above: 221 West Pine Street, Lodi, California, 95240; (2) The insurance industry standard ACORD form must state, on Its face or as an endorsement, a description of therp oiect that it is insuring. (d) Severability of Interest Clause The term "Insured" is used severally and not collectively, but the inclusion herein of more than one insured shall not operate to increase the limit of the company's liability under the Contractors commercial general liability and business automobile liability policies. (e) Notice of_CanceVation or Change in Coverage Endorsement This policy may not be canceled nor the coverage reduced by the company without 30 days' prior written notice of such cancellation or reduction in coverage to the Risk Manager, City of Lodi, 221 West Pine St., Lodi, CA 95240, Page 1 I oft pages I Risk: rev. 11/1/22 (f) Continuity of Coverage All policies shall be in effect on or before the first day of the Term of this Agreement. At least thirty (30) days prior to the expiration of each insurance policy, Contractor shall furnish a certificate(s) showing that a new or extended policy has been obtained which meets the minimum requirements of this Agreement. Contractor shall provide proof of continuing insurance on at least an annual basis during the Term. If Contractor's insurance lapses or is discontinued for any reason, Contractor shall immediately notify the City and immediately obtain replacement insurance. Contractor agrees and stipulates that any insurance coverage provided to the City of Lodi shall provide for a claims period following termination of coverage which is at least consistent with the claims period or statutes of limitations found in the California Tort Claims Act (California Government Code Section 810 et seq.). (g) Failure to Comply If Contractor fails or refuses to obtain and maintain the required insurance, or fails to provide proof of coverage, the City may obtain the insurance. Contractor shall reimburse the City for premiums paid, with interest on the premium paid by the City at the maximum allowable legal rate then in effect in California. The City shall notify Contractor of such payment of premiums within thirty (30) days of payment stating the amount paid, the name(s) of the insurer(s), and rate of interest. Contractor shall pay such reimbursement and interest on the first (1st) day of the month following the City's notice. Notwithstanding any other provision of this Agreement, if Contractor fails or refuses to obtain or maintain insurance as required by this agreement, or fails to provide proof of insurance, the City may terminate this Agreement upon such breach. Upon such termination, Contractor shall immediately cease use of the Site or facilities and commence and diligently pursue the removal of any and all of its personal property from the site or facilities. (h) Verification of Coverage Consultant shall furnish the City with a copy of the policy declaration and endorsement page(s), insurance industry ACORD form and amendatory endorsements or copies of the applicable policy language effecting coverage required by this clause. All certificates and endorsements are to be received and approved by the City before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the Consultant's obligation to provide them. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time. Failure to exercise this right shall not constitute a waiver of the City's right to exercise after the effective date. If required or requested, copies of insurance polices and/or endorsements will be provided, marked as "Privileged and Confidential" and also under the condition that said policies that are provided and marked "Privileged and Confidential" will not become part of any public record. (i) Self -Insured Retentions Self-insured retentions must be declared to and approved by the City. The City may require the Consultant to provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention. The policy language shall provide, or be endorsed to provide, that the self-insured retention may be satisfied by either the named insured or City. (j) Insurance Limits The limits of insurance described herein shall not limit the liability of the Contractor and Contractor's officers, employees, agents, representatives or subcontractors. Contractor's obligation to defend, indemnify and hold the City and its officers, officials, employees, agents and volunteers harmless under the provisions of this paragraph is not limited to or restricted by any requirement in the Agreement for Contractor to procure and maintain a policy of insurance. (k) subcontractors Consultant shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and Consultant shall ensure that City is an additional insured on insurance required from subcontractors (1) Claims Made Policies If any of the required policies provide coverage on a claims -made basis: 1. The Retroactive Date must be shown and must be before the date of the contract or the beginning of contract work. 2. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of the contract of work, 3. If coverage is canceled or non -renewed, and not replaced with another claims -made policy form with a Retroactive Date prior to the contract effective date, the Consultant must purchase "extended reporting" coverage for a minimum of five (5) years after completion of contract work. (m) Qualified_ Insurer(s) All insurance required by the terms of this Agreement must be provided by insurers licensed to do business in the State of California which are rated at least "A-, VI" by the AM Best Ratings Guide, and which are acceptable to the City. Non -admitted surplus lines carriers may be accepted provided they are included on the most recent list of California eligible surplus lines insurers (LESLI list) and otherwise meet City requirements. Page 2 1 of 2 pages Risk: rev. 11/1/22 RESOLUTION NO. 2022-263 A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING THE CITY MANAGER TO EXECUTE A PROFESSIONAL SERVICES AGREEMENT WITH ICF CONSULTING, LLC, OF SACRAMENTO, TO COMPLETE CITY OF LODI ZERO -EMISSIONS BUS STUDY AND ROLLOUT PLAN WHEREAS, on August 30, 2022, the Public Works Department issued a Request for Proposals (RFP) to develop a comprehensive system -wide study of Zero -Emission Bus (ZEB) transition needs; and WHEREAS, the study will identify a recommended ZEB type (i.e., battery electric vs. hydrogen fuel cell), infrastructure requirements, and a phasing plan for capital improvements and vehicle procurement; and WHEREAS, two proposals were received and evaluated by Public Works and Lodi Electric Utility staff, and the panel recommended selection of ICF Consulting, LLC, based on their qualifications, approach to the scope of work, and understanding of California Air Resources Board's Innovative Clean Transit regulation; and WHEREAS, staff recommends authorizing the City Manager to execute a Professional Services Agreement with ICF Consulting, LLC, of Sacramento, to complete the City of Lodi Zero -Emissions Bus Study and Rollout Plan in an amount not to exceed $99,914. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute a Professional Services Agreement with ICF Consulting, LLC, of Sacramento, California, to complete the City of Lodi Zero -Emissions Bus Study and Rollout Plan in an amount not to exceed $99,914; and BE IT FURTHER RESOLVED, pursuant to Section 6.3q of the City Council Protocol Manual (adopted 11/6/19, Resolution No. 2019-223), the City Attorney is hereby authorized to make minor revisions to the above -referenced document(s) that do not alter the compensation or term, and to make clerical corrections as necessary. Dated: November 2, 2022 ------------------------------------------------------------------------ ------------------------------------------------------------------------ I hereby certify that Resolution No. 2022-263 was passed and adopted by the City Council of the City of Lodi in a regular meeting held November 2, 2022 by the following votes: AYES- COUNCIL MEMBERS — Hothi, Khan, Kuehne, Nakanishi, and Mayor Chandler NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None OLIVIA NASHED City Clerk 2022-263