Loading...
HomeMy WebLinkAboutAgenda Report - November 2, 2022 C-04CITY OF AGENDA ITEMC4n4 :%evo a t w CALIFORNIA COUNCIL COMMUNICATION AGENDA TITLE: Adopt Resolution Rejecting All Bids, Approve Revised Specifications, Authorize Re- Advertisement for Bids, Authorize City Manager to Award Contract to Lowest, Responsive Bidder for Peterson Park Tennis Court Resurfacing ($60,000), and Authorize City Manager to Execute Change Orders ($5,000) MEETING DATE: November 2, 2022 PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt resolution rejecting all bids, approve revised specifications, authorize re -advertisement for bids, authorize City Manager to award Contract to lowest, responsive bidder for Peterson Park Tennis Court Resurfacing, in an amount not -to -exceed $60,000, and authorize City Manager to execute change orders in an amount not -to -exceed $5,000. BACKGROUND INFORMATION: Council approved the Peterson Park Tennis Court Resurfacing specifications and authorized advertisement for bids on September 21, 2022. This contract was originally intended to fill minor joints and cracks, repair low spots and apply a textured, color surfacing system consisting of new acrylic coatings and new textured game lines. The City received the following three bids on October 13, 2022: The bid package from Vintage Contractors, Inc. was a responsive bid received prior to the bid opening. However, the bid package was inadvertently misplaced and then opened after the public bid opening. As the City Clerk was not present, nor was the bid opened in a public setting, staff recommends rejecting all bids and re -advertising to fully ensure compliance to Public Contract Code. The scope of the project has been revised to include a crack repair system to address the more significant cracks in the court surface. The system is estimated to cost an additional $12,000. Cracks will be filled and taped with a two -layer taping system which will significantly prolong court life. The revised specifications which include the crack repair system, are on file in the Public Works Department. The planned re -bid opening date is November 29, 2022. The estimate remains at $53,000. APPROVED: • Y�, Stephen Schwabauer, City Manager \\cvcfilv02\pubwks$\WP\PROJECTS\PARKS\Peterson Park\Tennis Court Resurfacing\CSA - Reject-Rebid.doc 10/19/2022 Above/(Below) Bidder Location Bid Engineer's Estimate Engineers Estimate $53,000.00 *Vintage Contractors, Inc. San Francisco *$38,750.00 ($14,250.00) First Serve Production, Inc. Meadow Vista $44,900.00 (8,100.00) Courts and Greens, Inc. Bakersfield **$55,100.00 (2,100.00) "Not opened at the public bid opening "'Bid proposal was deemed nonresponsive as it was not labeled per Specifications and no Receipt of Addendum was included. It was not opened at the public bid opening. The bid package from Vintage Contractors, Inc. was a responsive bid received prior to the bid opening. However, the bid package was inadvertently misplaced and then opened after the public bid opening. As the City Clerk was not present, nor was the bid opened in a public setting, staff recommends rejecting all bids and re -advertising to fully ensure compliance to Public Contract Code. The scope of the project has been revised to include a crack repair system to address the more significant cracks in the court surface. The system is estimated to cost an additional $12,000. Cracks will be filled and taped with a two -layer taping system which will significantly prolong court life. The revised specifications which include the crack repair system, are on file in the Public Works Department. The planned re -bid opening date is November 29, 2022. The estimate remains at $53,000. APPROVED: • Y�, Stephen Schwabauer, City Manager \\cvcfilv02\pubwks$\WP\PROJECTS\PARKS\Peterson Park\Tennis Court Resurfacing\CSA - Reject-Rebid.doc 10/19/2022 Adopt Resolution Rejecting All Bids, Approving Revised Specifications, Authorize Re -Advertisement for Bids, Authorize City Manager to Award Contract to Lowest, Responsive Bidder for Peterson Park Tennis Court Resurfacing ($60,000), and Authorize City Manager to Execute Change Orders ($5,000) November 2, 2022 Page 2 FISCAL IMPACT: This project will have a minimal long-term fiscal impact and will not impact the General Fund. FUNDING AVAILABLE: Parks Capital (43299000.77020) - $60,000 Andrew Keys Andrew Keys Deputy City Manager/Internal Services Director a_Lw Charles E. Swimley, Jr. Public Works Director Prepared by Jimi Billigmeier, Associate Civil Engineer CES/JB/cd cc: PRCS Director Signature: Ojrvj� Email: akeys@lodi.gov \\cvcfilv02\pubwks$\WP\PROJECTS\PARKS\Peterson Park\Tennis Court Resurfacing\CSA - Reject-Rebid.doc 10/19/2022 RESOLUTION NO. 2022-261 A RESOLUTION OF THE LODI CITY COUNCIL REJECTING ALL BIDS; APPROVING REVISED SPECIFICATIONS; AUTHORIZING RE -ADVERTISEMENT FOR BIDS; AUTHORIZING THE CITY MANAGER TO AWARD A CONTRACT TO THE LOWEST RESPONSIVE BIDDER FOR PETERSON PARK TENNIS COURT RESURFACING; AND AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDERS WHEREAS, Council approved the Peterson Park Tennis Court Resurfacing specifications and authorized advertisement for bids on September 21, 2022; and WHEREAS, the City received the following three bids on October 13, 2022: WHEREAS, the bid package from Vintage Contractors, Inc., was a responsive bid received prior to the bid opening which was inadvertently misplaced and then opened after the public bid opening. As the City Clerk was not present, nor was the bid opened in a public setting, staff recommends rejecting all bids and re -advertising to fully ensure compliance to Public Contract Code; and WHEREAS, staff recommends rejecting all bids, approving revised specifications, authorizing re -advertisement for bids, authorizing the City Manager to award a contract to the lowest responsive bidder for Peterson Park Tennis Court Resurfacing, in an amount not to exceed $60,000, and authorizing the City Manager to execute change orders in an amount not to exceed $5,000. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby reject all bids for Peterson Park Tennis Court Resurfacing; and BE IT FURTHER RESOLVED that the Lodi City Council does hereby approve the revised specifications and authorize re -advertisement for bids; and BE IT FURTHER RESOLVED that the Lodi City Council does hereby authorize the City Manager to award a contract to the lowest responsive bidder for Peterson Park Tennis Court Resurfacing in an amount not to exceed $60,000; and BE IT FURTHER RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute the contract and change orders in an amount not to exceed $5,000; and BE IT FURTHER RESOLVED, pursuant to Section 6.3q of the City Council Protocol Manual (adopted 1116/19, Resolution No. 2019-223), the City Attorney is hereby authorized to make minor revisions to the above -referenced document(s) that da not alter the compensation or term, and to make clerical corrections as necessary. Above/(Below) Bidder Location Bid Engineer's Estimate Vintage Contractors, Inc. San Francisco $38,750 ($14,250) First Serve Production, Inc. Meadow Vista $44,900 ($8,100) Courts and Greens, Inc. Bakersfield **$55,100 ($2,100) *Not opened at the public bid opening **Bid proposal was deemed nonresponsive as it was not labeled per Specifications and no Receipt of Addendum was included. I was not opened at the public bid opening. WHEREAS, the bid package from Vintage Contractors, Inc., was a responsive bid received prior to the bid opening which was inadvertently misplaced and then opened after the public bid opening. As the City Clerk was not present, nor was the bid opened in a public setting, staff recommends rejecting all bids and re -advertising to fully ensure compliance to Public Contract Code; and WHEREAS, staff recommends rejecting all bids, approving revised specifications, authorizing re -advertisement for bids, authorizing the City Manager to award a contract to the lowest responsive bidder for Peterson Park Tennis Court Resurfacing, in an amount not to exceed $60,000, and authorizing the City Manager to execute change orders in an amount not to exceed $5,000. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby reject all bids for Peterson Park Tennis Court Resurfacing; and BE IT FURTHER RESOLVED that the Lodi City Council does hereby approve the revised specifications and authorize re -advertisement for bids; and BE IT FURTHER RESOLVED that the Lodi City Council does hereby authorize the City Manager to award a contract to the lowest responsive bidder for Peterson Park Tennis Court Resurfacing in an amount not to exceed $60,000; and BE IT FURTHER RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute the contract and change orders in an amount not to exceed $5,000; and BE IT FURTHER RESOLVED, pursuant to Section 6.3q of the City Council Protocol Manual (adopted 1116/19, Resolution No. 2019-223), the City Attorney is hereby authorized to make minor revisions to the above -referenced document(s) that da not alter the compensation or term, and to make clerical corrections as necessary. Dated: November 2, 2022 I hereby certify that Resolution No. 2022-261 was passed and adopted by the City Council of the City of Lodi in a regular meeting held November 2, 2022 by the following votes: AYES: COUNCIL MEMBERS — Hothi, Khan, Kuehne, Nakanishi, and Mayor Chandler NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None OLIVIA NASHED City Clerk 2022-261