Loading...
HomeMy WebLinkAboutAgenda Report - November 16, 2022 C-10CITY OF o i * CALIFORNIA AGENDA ITEM CM10 COUNCIL COMMUNICATION AGENDA TITLE: Adopt Resolution Authorizing City Manager to Execute Additional Change Orders to Fire Station 3 and Fire Station 4 Security Gates and Generator Project ($61,000), and Appropriating Funds ($61,000) MEETING DATE: November 16, 2022 PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt resolution authorizing City Manager to execute additional change orders to Fire Station 3 and Fire Station 4 Security Gates and Generator Project in the amount of $61,000, and appropriating funds in the amount of $61,000. BACKGROUND INFORMATION: This project provides Fire Station 3, located at 2141 South Ham Lane and Fire Station 4 located at 180 North Lower Sacramento Road with an automated vehicular gate to provide site security to meet today's standards; and replaces a driveway and a 46 -year old generator at Fire Station 3. On December 1, 2021, the Council approved plans and specifications for this project and authorized the City Manager to award contract to the lowest bidder not -to -exceed $240,000 and execute change orders not -to - exceed $15,000. The bid opening was held January 19, 2022 and the City received four bids, all significantly above the City Manager's limit to award. On March 2, 2022, the Council awarded the project to Sauren Construction, of Newcastle in the amount of $374, 972 and authorized the City Manager to execute change orders up to $37,000. As it is beneficial to the City, staff is requesting to use this contract for related work to install an automated transfer switch and permanent backup generator at the water tower site. This will provide backup power to the public safety radio during an electrical outage. See attached Proposed Change Order No. 3. As the generator project is ongoing with the possibility that other unforeseen contract costs may arise, the requested $61,000 increase in the City Manager's change order authority will be in addition to the originally approved amount of $37,000, for a total not -to -exceed change order authority amount of $98,000. FISCAL IMPACT: The new gates will provide security and reduce the likelihood of equipment being stolen. Replacing the 46 -year-old generator will reduce maintenance and repair costs and improve reliability. This project will impact the General Fund. om APPROVED: ., Stephen Schwabauer, City Manager \\cvcfilv02\pubwks$\WP\PROJECTS\MISC\FireSta3\FS 3 & FS 4 Generator and Gate Improvements\C FireStation CO -Appropriation doc 10/31/2022 Adopt Resolution Authorizing City Manager to Execute Additional Change Orders to Fire Station 3 and Fire Station 4 Security Gates and Generator Project ($61,000), and Appropriating Funds ($61,000) November 16, 2022 Page 2 FUNDING AVAILABLE: GFCP-22002. Contracts: $75,000 GFCP-21005. Contracts: $180,000 General Fund Capital (43199000.77020) $157,000 Requested appropriation IT (Operating Acct) (10020400.72450) $61,000 TOTAL: $473,000 Andrew Keys Andrew Keys Deputy City Manager/Internal Services Director C"U-(� Charles E. Swimley, Jr, Public Works Director Prepared by Jimi Billigmeier, Associate Civil Engineer CES/JB/cd Attachment cc: Fire Marshal Brad Doell Management Analyst Michelle Munoz Signature: Q r xv�bj Email: akeys@lodi.gov \\cvcfilv02\pubwks$\WP\PROJECTS\MISC\FireSla3\FS 3 & FS 4 Generator and Gate Improvements\C FireStation CO-Appropriation.doc 10131/2022 CITY OF LODI PROPOSED CHANGE ORDER PROJECT: Fire Station 3 and Fire Station 4 Security Gates CO No.: 3 & Generator Project CONTRACTOR: Sauren Construction PCO No.: 2A RFI No.: N/A ARCHITECT/ENGINEER: Jimi Billigmeier FI No.: N/A City of Lodi, Public Works ISubmit Proposal Within 15 Days Upon Receipt of This Request Brief Description Of Work Per Resolution No. 2022-64, the City Manager is authorized to process change orders (up to $37,000) to account for unforeseen contract costs. This proposed change order is to install an automated transfer switch and back-up generator with sub base diesel fuel tank, concrete pad and accessories at the Water Tower Site located at 122 N. Main Street , all as shown on the attached exhibits. Accounts: Amount IT (Operating Acct) (10020400.72450) $60,299.50 Request, Proposal, Recommendation And Approval Requesting Official: J.Billigmeier Request Date: 6/29/2022 Schedule Impact: 0 Days Contractor Proposal Date: N/A Add Amount: Deduct Amount Reason For Change: Provide back up generator at Water Tower and Police Radio Account: See Above CONTRACTOR AGREES TO FURNISH ALL LABOR AND MATERIALS AND PERFORM ALL WORK REQUIRED TO COMPLETE THE ABOVE DESCRIBED WORK CHANGE IN ACCORDANCE WITH THE REQUIREMENTS FOR SIMILAR WORK COVERED BY THE CONTRACT EXCEPT AS OTHERWISE STIPULATED HEREIN FOR THE STATED CONSIDERATION. TO PERFORM THE CHANGES FOR THE AMOUNT INDICATED WHICH INCLUDES ANY EXTENDED OR JOBSITE OVERHEAD, DISRUPTION, RIPPLE EFFECT AND OTHER IMPACT COSTS. NO WORK WILL BE STARTED UNTIL THIS PROPOSAL IS ACCEPTED. IF THE CONTRACTOR DOES NOT SIGN ACCEPTANCE OF THIS ORDER, THE CONTRACTOR SHOULD REFER TO SECTION 4-1.03A OF THE STANDARD SPECIFICATIONS REGARDING FILING A WRITTEN PROTEST WITHIN THE SPECIFIED TIME. ORIGINAL CONTRACT: $ 374,971.70 PREVIOUS ADDS: $ 19,860.00 Contractor Date PREVIOUS DEDUCTS: $ 8,733.00 THIS CHANGE ORDER: $60,299.50 Deputy Public Works Director Date TOTAL CONTRACT AMOUNT $ 446,398.20 INCLUDING ALL CHANGE ORDERS: Public Works Director Date CONTRACT TIME ADJUSTMENT DAYS 'ORIGINAL COMPLETION DATE:90 days after FS3 Generator Delivery City Manager Date ADJUSTED CONTRACT COMPLETION DATE:90 days after FS3 Generator Delivery " 90 days after the Fire Station 3 Generator Delivery CO3.xls 10/25/2022 J 5AUREN C.O. # 2A,2B CONTACT: Date: 9/7/2022 OWNER: Work Period: PROJECT: Contractor: PROJECT # ORIGINAL CONTRACT AMOUNT $374,971.70 NET CHANGE BY CHANGE ORDERS $11,127.00 CURRENT CONTRACTAMOUNT $386,098.78 NET CHANGE THIS CHANGE ORDER $97,837.00 NEW CONTRACT AMOUNT $483,935.70 Requested by: Anni Billigmeier, Architect/Engineer ITEM DESCRIPTION QUANTITY TOTAL GENERATOR TAP -BOX 824 EAST TURNER RD. 1. Power Distribution and Installations including the following: a. Demolition; Electrical associated with Existing Generator -Remove link for (e) motor control b. Provide and install 600a "ATS" and associated wiring c. Provide and install ASCO 600a Camlock Terminal Cabinet d. Provide and install 6"x6"x8' Gutter e. Provide and install Unistrut Mounting Posts Total labor and materials $37,537.50 WATERTOWER 122 NORTH MAIN ST. LODI Power Distribution and Installations including the following: a. Furnish labor and materials to process subgrade, and install reinforced concrete pad to accommodate new generator $5,387.73 b. Modify Fencing to accommodate new generator. Labor/materials $1,549.47 c. Excavation and backfill $2,962.30 GENERATORINSTALL d. Installation of Underground Conduit Associated with Genset e. Provision and Installation of 1 5K Generac SDO15 Generator f. Provision and installlation of of (1) 100a "ATS" and associated wiring g. Disconnection from Transformer It. Add (2) 20a Circuit Breakers to Existing Panel I. Provide and Install Ground Connector and Ground Rod i. (1) Relocate Pullbox flush with grade Total Labor and Materials $50,400.00 TOTAL CHANGE IX] Increase [ ] Decrease: $60,299.50 Sauren Construction Inc. P.O. Box 582734 Elk Grove CA 95758 Ph. 916-414-0444 1 www.saureninc.com LOCUST ST IPROPERTY LINE-/ CONTRACTOR SHALL II INSTALL NEW COMBINATION III I ATS & GENERATOR, III SEE SHT E1 50' II CONTRACTOR SHALL (� CONNECT ATS TO BACK OF III EX. 480V PANEL II L 66 14 I WATER TOWER (PIP) SITE ADDRESS WATER TOWER 122 N MAIN ST REMOVE PORTION OF FENCE READ. TO COMPLY W/3' CLR. SPACE 95' EX AT&T GEN 13 U 1 LR SPACE (TYP) CONTRACTOR SHALL RELOCATE EX PULLBOX FLUSH WITH GRADE I --EX RADIO (PIP) ABANDONED WELL HEAD PROPERTY LINE -\\I I 1 "=20' path://john/17/4 C:IUserslresmilBox120221CityOfLodi WaterTowehWaterTowerGenerator Electric rev 2.rvt RESOLUTION NO. 2022-275 A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING THE CITY MANAGER TO EXECUTE ADDITIONAL CHANGE ORDERS TO THE FIRE STATION NO. 3 AND FIRE STATION NO. 4 SECURITY GATES AND GENERATOR PROJECT; AND FURTHER APPROPRIATING FUNDS WHEREAS, this project provides Fire Station No. 3, located at 2141 South Ham Lane, and Fire Station No. 4, located at 180 North Lower Sacramento Road, with an automated vehicular gate to provide site security to meet today's standards; and replaces a driveway and a 46 -year old generator at Fire Station No. 3; and WHEREAS, on March 2, 2022, the Council awarded the project to Sauren Construction, of Newcastle, in the amount of $374, 972 and authorized the City Manager to execute change orders up to $37,000; and WHEREAS, as it is beneficial to the City, staff is requesting to use this contract for related work to install an automated transfer switch and permanent backup generator at the water tower site to provide backup power to the public safety radio during an electrical outage; and WHEREAS, staff recommends authorizing the City Manager to execute additional change orders to the Fire Station No. 3 and Fire Station No. 4 Security Gates and Generator Project in an amount not to exceed $61,000, and WHEREAS, staff further recommends appropriating funds in the amount of $61,000 to IT (Operating Acct) 10020400.72450. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute additional change orders to the Fire Station No. 3 and Fire Station No. 4 Security Gates and Generator Project in an amount not to exceed $61,000, and BE IT FURTHER RESOLVED that funds in the amount of $61,000 be appropriated as set forth above; and BE IT FURTHER RESOLVED, pursuant to Section 6.3q of the City Council Protocol Manual (adopted 11/6/19, Resolution No. 2019-223), the City Attorney is hereby authorized to make minor revisions to the above -referenced document(s) that do not alter the compensation or term, and to make clerical corrections as necessary. Dated: November 16, 2022 I hereby certify that Resolution No. 2022-275 was passed and adopted by the City Council of the City of Lodi in a regular meeting held November 16, 2022 by the following votes: AYES: COUNCIL MEMBERS — Hothi, Khan, Kuehne, Nakanishi, and Mayor Chandler NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None OLIVIA NASHED City Clerk 2022-275