Loading...
HomeMy WebLinkAboutAgenda Report - October 19, 2022 C-08CITY OF Aat, lid+� zt� 1 CALIFORNIA AGENDA ITEM C-8 COUNCIL COMMUNICATION AGENDA TITLE: Adopt Resolution Awarding Contract for Grape Stake Replacement Project — Phase 1, to Superior Industry Builders, of Merced ($218,221); Authorizing City Manager to Execute Change Orders ($20,000); and Appropriating Funds ($38,221) MEETING DATE: October 19, 2022 PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt resolution awarding contract for Grape Stake Replacement Project — Phase 1, to Superior Industry Builders, of Merced, in the amount of $218,221; authorizing City Manager to execute Change Orders in an amount not -to -exceed $20,000; and appropriating funds in the amount of $38,221. BACKGROUND INFORMATION: From the 1970's through the 1990's there were various subdivisions that constructed approximately 3 miles of grape stake fences along major roadways. These fences were typically constructed to comply with Specific Plans that had been previously adopted by Council and are the City's long-term maintenance responsibility. This project, consisting of approximately one mile of fencing, will be the first phase in replacing the older stakes (that are broken, stained and/or faded) with new ones. On August 17, 2022 Council approved the specifications and authorized the advertisement for bids for this project (see attached Exhibit A for locations). The bid opening date was Wednesday, September 7, 2022. No bids were received for the project. Staff spoke with a few of the perspective bidders after the due date to determine why they did not bid. They believed that there would be a high number of bidders and did not feel that their bid was likely to be the lowest. Section 20166 of the California Public Contract Code states that, "If no bids are received, the legislative body may have the project done without further complying with this chapter." After being notified that no bids were received, staff informed perspective bidders that the City would still be receiving bids (by email) for anyone interested in the contract. Staff received one bid as follows: Bidder Location Bid Above/(Below) Estimate Engineer's Estimate $ 260,000.00 Superior Industry Builders Merced $ 218,221.00 $ (31,779.00) Superior Industry Builders has held five different contracts with the City of Lodi in the past three years. All contracts were successfully completed without incident. Additionally, their bid was 16% below the project estimate. APPROVED: Andrew Keys Stephen Schwabauer, City Manager \\cvcfilv02Npubwks$\WP\PROJECTS\STREETS\Grape Stake Replacement\CAward doc 9/29/2022 Adopt Resolution Awarding Contract for Grape Stake Replacement Project — Phase 1, to Superior Industry Builders, of Lodi ($218,221); Authorizing City Manager to Execute Change Orders ($20,000); and Appropriating Funds ($38,221) October 19, 2022 Page 2 Staff recommends adopting a resolution awarding contract for Grape Stake Replacement Project — Phase 1, to Superior Industry Builders, of Merced, in the amount of $218,221; authorizing City Manager to execute Change Orders in an amount not -to -exceed $20,000; and appropriating funds in the amount of $38,221. FISCAL IMPACT: The project will reduce staff time and ongoing maintenance costs associated with these failing fence sections. Based on the lifespan of the original fence installations, the new grape stake fences will last between 20 and 30 years. FUNDING AVAILABLE: Fiscal Year 2022/23 Budget: Street Fund (30099000.77020): $ 50,000 General Fund Capital (43199000.77020). $ 150,000 Requested Appropriation Street Fund 30099000.77020 38,221 Total: $ 238,221 Andrew Keys Andrew Keys Deputy City Manager/Internal Services Director Charles E. Swimley, Jr. Public Works Director Prepared by Sean Nathan, Senior Civil Engineer CES/SN/cd Attachments Exhibit A Grape Stake Replacement Phase 1 Legend Phase 1 Location 0 500 1,000 Feet LT I ffi±ffifif� Ell n f�fl I 1=1= K -ttlem e an Ln. 100 ntury_Blvd: ,N MI I 11 ntury_Blvd: ,N GRAPE STAKE REPLACEMENT PROJECT PHASE1 CONTRACT CITY OF LODI, CALIFORNIA THIS CONTRACT made by and between the CITY OF LODI, State of California, herein referred to as the "City," SUPERIOR INDUSTRY BUILDERS, INC., a California corporation, herein referred to as the "Contractor." WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other, as follows: The complete Contract consists of the following documents which are incorporated herein by this reference, to -wit: Notice Inviting Bids Information to Bidders Certifications and Forms General Provisions Federal Requirements Special Provisions Bid Proposal Contract Contract Bonds Federal Minimum Wage Rates Plans Addenda The 2018 Edition, Standard Specifications, State of California, Business and Transportation Agency, Department of Transportation City of Lodi Construction Specifications All of the above documents, sometimes hereinafter referred to as the "Contract Documents," are intended to cooperate so that any work called for in one and not mentioned in the other is to be executed the same as if mentioned in all said documents. ARTICLE I - That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the City and under the condition expressed in the two bonds bearing even date with these presents and hereunto annexed, the Contractor agrees with the City, at Contractor's cost and expense, to do all the work and furnish all the materials except such as are mentioned in the specifications to be furnished by the City, necessary to construct and complete in a good workmanlike and substantial manner and to the satisfaction of the City the proposed improvements as shown and described in the Contract Documents which are hereby made a part of the Contract. ARTICLE 11 - The City hereby promises and agrees with the Contractor to employ, and does hereby employ, the Contractor to provide all materials and services not supplied by the City and to do the work according to the terms and conditions for the price herein, and hereby contracts to pay the same as set forth in Section 5.600, "Measurement, Acceptance and Payment," of the General Provisions, in the manner and upon the conditions above set forth; and the said parties for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree to the full performance of the covenants herein contained. contract 4.1 09/30/22 ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division 2 of the Labor Code. The Contractor and any Subcontractor will pay the general prevailing wage rate and other employer payments for health and welfare, pension, vacation, travel time, and subsistence pay, apprenticeship or other training programs. The responsibility for compliance with these Labor Code requirements is on the prime contractor. ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for doing all the work contemplated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City, and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Plans and Contract Documents and the requirements of the Engineer under them, to -wit: The work consists of replacing 5,200 feet of grape stake fencing and other incidental and related work, all as described in the specifications for the project. For additional bid item descriptions refer to Section 6-07 "Description of Bid Items". CONTRACT ITEMS Item Description Qty Unit Unit Price Total 1 Grape Stake Fence Replacement 5,200 LF $ 41.96557 $218,221.00 TOTAL $ 218,221.00 ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should there be any conflict between the terms of this instrument and the Bid Proposal of the Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to establish lines and grades for the work as specified under the Special Provisions. All labor or materials not mentioned specifically as being done by the City will be supplied by the Contractor to accomplish the work as outlined in the specifications. ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract within 15 calendar days after the City Manager has executed the contract and to diligently prosecute to completion within 120 CALENDAR DAYS. ARTICLE IX - State of California Senate Bill 854 requires the following: • No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code contract 4.2 09/30122 section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. • No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. • This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6-04.03 OF THE SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT. IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year and date written below. CONTRACTOR: M Title (CORPORATE SEAL) CITY OF LODI, a municipal corporation 0 STEPHEN SCHWABAUER City Manager Date: Attest: OLIVIA NASHED City Clerk Approved As To Form: JANICE D. MAGDICH City Attorney contract 4.3 09/30/22 Capital Improvement Program - Maintenance FY 2022-2023 Maintenance Project Title: Grapestake Fense Repair Munis Project Code: PWST-20004 #41 Section I:Description District Nos: Citywide Project Length 7/20-6/23 Priority Normal This project is to repair damaged grapestake reverse frontage fence throughout Lodi. Justification/factor driving project This is a public fence maintenance project. Additional Information Public Works staff will be purchasing materials and will perform the repairs. Section II Estimated Project Costs Expenditure Prior Years FY 21122 FY 22123 FY 23124 FY 24125 FY 25126 FY 26127 FY 27128 FY 28129 FY 29130 Future Yrs Total Estimate Budget Contracts $ 50,000 $ 150,000 $ 37,221 _ N/A $ 237,221 Internal Staff $ - $ 1,000 N/A $ 1,000 $ N/A $ $ N/A $ Total Capital Costs $ 50,000 $ 150,000 $ 38,221 $ $ _ _ $ NIA $ 238,221 Section III Funding Sources/Methods of Financing Funding Source(s) Prior Years FY 21122 I FY 22123 FY 23124 FY 24125 FY 25126 FY 26127 FY 27128 FY 28129 FY 29130 Future Yrs Total Estimate Budget 300 - Street Fund $ 50,000 $ 38,221 N/A $ 88,221 431 - Capital Outlay/General Fund $ - $ 150,000 N/A $ 150,000 $ N/A $ $ N/A $ Total Project Financing $ 50,000 $ 150,000 1 $ 38,221 $ $ $ NIA $ 238,221 RESOLUTION NO. 2022-247 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE CONTRACT FOR GRAPE STAKE REPLACEMENT PROJECT — PHASE 1 TO SUPERIOR INDUSTRY BUILDERS, OF MERCED; AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDERS; AND FURTHER APPROPRIATING FUNDS WHEREAS, from the 1970's through the 1990's, there were various subdivisions that constructed approximately three miles of grape stake fences along major roadways, that were typically constructed to comply with Specific Plans that had been previously adopted by Council and are the City's long-term maintenance responsibility; and WHEREAS, on August 17, 2022, Council approved the specifications and authorized the advertisement for bids for this project; and WHEREAS, the bid opening date was Wednesday, September 7, 2022, and no bids were received for the project; and WHEREAS, Section 20166 of the California Public Contract Code states that, "If no bids are received, the legislative body may have the project done without further complying with this chapter"; and WHEREAS, after being notified that no bids were received, staff informed prospective bidders that the City would still be receiving bids (by email) for anyone interested in the contract. Staff received one bid as follows: Bidder Location Bid Above/(Below) Estimate Superior Industry Builders Merced $ 218,221 $ (31,779) WHEREAS, staff recommends awarding the contract for Grape Stake Replacement Project — Phase 1 to Superior Industry Builders, of Merced, in the amount of $218,221 and authorizing City Manager to execute Change Orders in an amount not to exceed $20,000; and WHEREAS, staff further recommends appropriating funds in the amount of $38,221 to the Street Fund (30099000.77020). NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award the contract for Grape Stake Replacement Project — Phase 1 to Superior Industry Builders, of Merced, California, in the amount of $218,221; and BE IT FURTHER RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute the contract and Change Orders in an amount not to exceed $20,000; and BE IT FURTHER RESOLVED that the Lodi City Council does hereby appropriate funds in the amount of $38,221 as set forth above; and BE IT FURTHER RESOLVED, pursuant to Section 6.3q of the City Council Protocol Manual (adopted 11/6/19, Resolution No. 2019-223), the City Attorney is hereby authorized to make minor revisions to the above -referenced document(s) that do not alter the compensation or term, and to make clerical corrections as necessary. Dated: October 19, 2022 I hereby certify that Resolution No. 2022-247 was passed and adopted by the City Council of the City of Lodi in a regular meeting held October 19, 2022 by the following votes: AYES: COUNCIL MEMBERS — Hothi, Khan, Kuehne, Nakanishi, and Mayor Chandler NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None OLIVIA NASHED City Clerk 2022-247