AGENDA TITLE: Approve Plans and Specifications and Authorize Advertisement for Bids for Blakely
Park - Enze Pool Shallow End Adjustment
MEETING DATE: October 19, 2022
PREPARED BY: Public Works Director
RECOMMENDED ACTION: Approve plans and specifications and authorize advertisement for bids
for Blakely Park - Enze Pool Shallow End Adjustment.
BACKGROUND INFORMATION: After Council discussion and direction on September 17, 1989, the
northern pool at Blakely Park (the Enze Pool) was originally constructed
with a shallow end depth of four (4) feet, consistent for use as a Special
Use Pool. Allowable uses for Special Purpose Pools include instruction, diving, competition or medical
treatment.
Recreational use is not currently allowed at Enze Pool as the shallow end depth exceeds the three foot -six
inch (3'6") maximum depth as stipulated by the California Building Code. This project proposes to raise one-
third of the existing 75- foot long swimming pool floor by six (6) inches to facilitate public recreational swim
activities at Enze Pool.
This project includes raising the shallow end pool depth to meet the public swimming pool code requirements
for recreational use and other required incidental work; raising two (2) main drain covers, replacing the pool
plaster finish, replacing the pool depth markers, and replacing the lane line tiles.
The plans and specifications are on file in the Public Works Department. The planned bid opening date is
November 16, 2022. The total project estimate is $219,000.
FISCAL IMPACT: This project will improve the facility programming for public use with minimal
long-term fiscal impact. This project will not impact the General Fund.
FUNDING AVAILABLE: Per Capita Grant Funds - $219,679
Q XQ'P,
Andrew Keys
Deputy City Manager/InteernalServices Director
0___�ZE
Charles E. Swimley, Jr
Public Works Director
Prepared by Jimi Billigmeier, Associate Civil Engineer
CES/JB/cd
cc: PRCS Director
Iw
.... i�i
Stephen Schwabauer, City Manager
\\cvcfilv02\pubwks$\WP\PROJECTS\PARKS\Blakely Park\Enze Pool\CPSA doc
9/3012022