HomeMy WebLinkAboutAgenda Report - October 19, 2022 C-03CITY OF
fl IL 00,
a a i
r
CALIFORNIA
AGENDA ITEM IC 40 3
COUNCIL COMMUNICATION
AGENDA TITLE: Fourth Quarter Fiscal Year 2021/22 Water, Wastewater and Electric Utility Department Financial
Reports
MEETING DATE: October 19, 2022
PREPARED BY: Deputy City Manager
RECOMMENDED ACTION: Receive utility financial reports for the fourth quarter of Fiscal Year 2021/22,
BACKGROUND INFORMATION. In accordance with the Lodi Municipal Code, quarterly financial reports are to be
prepared for the Water, Wastewater, and Electric Utilities.
Quarterly update presentations have been included in this report and a highlight of activities and progress is outlined
below for each utility.
Electric Utility Financial Hi hli hts
• REVENUE is stable and ended the fiscal year at 101 percent of budget.
✓ Sales revenue was 101 percent of budget as energy sales exceeded estimates across all sectors.
Overall, energy sales were 1.3 percent higher than expected. In addition, the utility received
approximately $1 million in California Arrearage Payment Program (CAPP) funds from the State to pay
down past due energy bills accumulated during the COVID pandemic.
✓ Other revenue ended the year at 106 percent of budget due to payments received from others as a result
of work performed by the utility in support of new development and expansions, reimbursement of funds
from the American Rescue Plan Act to the utility for energy bill credits issued to customers during the
COVID pandemic, and increased auction proceeds from the consignment of freely allocated Greenhouse
Gas allowances.
• EXPENSES ended the year at 93 percent of budget.
✓ Non -power operating expenses ended the year at 90 percent of budget.
✓ Power supply costs ended the year at close to 100 percent of budget.
✓ Capital outlay expenses ended the year at 65 percent of budget. Unspent funds which will roll to Fiscal
Year 2023 are primarily associated with system upgrade projects started later in the year and delays
associated with long lead times on materials and vehicles/equipment.
• RESERVES as of June 30, 2022 totaled approximately $37.7 million. These reserves are used to fund pay-as-
you-go capital improvement and system maintenance projects.
• CAPITAL IMPROVEMENT PROJECTS includes approximately $25 million over 5 years for capital improvement
efforts. The projects listed are included in the City's current Capital Improvement Program included in the
adopted budget. The majority of capital improvement work in Fiscal Year 2022 focused on overhead system
maintenance, system capacity upgrades, work to install infrastructure associated with new development and
completion of the LEU facility renovation.
• 5 -YEAR FINANCIAL FORECAST indicates sufficient reserves through Fiscal Year 2024. However, based on a
variety of assumptions, a CPI level rate adjustment of approximately 3 percent is projected in Fiscal Year 2025,
followed by 2 percent in Fiscal Year 2026 in order to maintain Council approved reserve targets.
APPROVED: (Oct s, 202210:47 PDT)
Stephen Schwabauer, City Manager
Wastewater Utility Highlights
REVENUE is stable and ended the fiscal year at 107 percent of budget.
✓ Wastewater sales for the fiscal year ended above target at 104 percent of budget.
EXPENSES as a total ended the fiscal year well below the budget at 61 percent.
✓ Operating expenses for the fiscal year ended slightly above budget at 104 percent.
✓ Capital expenses for the fiscal year were below budget at 13 percent. Included in the capital budget is $2
million for the Main Replacement project 9 which was bid in fiscal year 2022 and awarded in fiscal year
2023. Also included in the budget is $1.2 million for the design of the White Slough electrical building,
$1.1 million for the White Slough fan press, $1.2 million for storm drain trash handling, $996,000 for the
White Slough aeration diffuser and $500,000 for White Slough Digester #3 all of which had minimal
expense in the fiscal year.
RESERVES as of June 30, 2022 totaled $20.71 million which is 309 percent of the 180 days cash target. These
reserves are used to fund pay-as-you-go capital improvement projects planned over the next several fiscal years.
CAPITAL IMPROVEMENT PROJECTS include $36 million in planned projects over the next 5 years. The major
projects include main replacement projects, construction of the electrical building, fan press replacement, aeration
diffuser replacement, UV design and replacement and the storm drain trash handling systems to comply with
state regulations. The projects listed are all in the fiscal year 20-25 Capital Improvement Program that was
included in the adopted budget.
5 -YEAR FINANCIAL FORECAST indicates a decline in reserves through fiscal year 2027.
Water Utility Highlights
• REVENUE is stable and ended the fiscal year at 102 percent of budget.
✓ Water sales are ended the fiscal year at 102 percent of budget.
• EXPENSES are as a total ended the fiscal year well below the budget at 72 percent.
✓ Operating expenses are ended the fiscal year on budget at 101 percent.
✓ Capital expenses ended the fiscal year well below budget at 26 percent. Included in the capital budget is
$1.1 million for the Water Meter Project multi -family phase and over $2.3 million in well rehab projects
which have not been awarded.
• RESERVES as of June 30, 2022 totaled $9.6 million which is 180 percent of the 180 days cash target. These
reserves are used to fund pay-as-you-go capital improvement projects.
• CAPITAL IMPROVEMENT PROJECTS include $17 million in planned projects over the next five years. The
major projects include water plant transmission line, membrane replacement and generator. The projects listed
are all in the fiscal year 20-25 Capital Improvement Program that was included in the adopted budget
• 5 -YEAR FINANCIAL FORECAST indicates a slight decline in reserves through fiscal year 2025.
FISCAL IMPACT: There is no fiscal impact from the preparation of this report.
FUNDING AVAILABLE Adequate funding is available in the Fiscal Year 2021/22 budget, as amended by Council
action from time to time, for the items in this report. All data is presented as current as of
the date(s) obtained from the City's financial reporting system. Final year-end audited
data will be provided in the City's ACFR.
[.fir
Andrew Keys
Deputy City Manager/Internal Services Director
CITY OF
A
,91
l el0
O Z
CALIFORNIA
ELECTRIC 'UTILITY
Electric Utility Department
FY 22 Quarterly Update
(Ending June 30, 2022)
City Council Meeting
October 19, 2022
C IT Y O F
O Z
CALI F O R N I A
ELECTRIC ;UTILITY
Electric Utility Fund
Cash Flow Summary
(June 30, 2022)
Revenue
Budget
Actual
% of Budget
Sales Revenues
77,697,910
78,437,313
101%
Development Impact Fees
596,910
426,580
71%
Other Revenues (interest, misc)
6,727,100
7,133,299
106%
Total Revenues
85,021,920
87,036,947
101%
Power
r
48,505,000
48,380,956
100%
r
16,755,760
15,013,839
90%
Capital Projects
12,639,952
8,213,466
65%
Debt Service
4,428,640
4,383,698
99%
Cost of Service
2,542,630
2,542,630
100%
In -lieu Transfer to General Fund
7,432,690
7,432,690
100%
Total Expenses
92,304,672
85,967,279
93%
Beginning Cash Balance (7/1/21)
42,164,766
Ending Cash Balance (6/30/22)
37,741,126
Reserve Policy Target
% of Target
24,906,890
152%
2
CITY OF
A r
Z
CALIFORNIA
ELECTRIC UTILITY
Electric Utility Funds
Cash Balances
(June 30, 2022)
Operating Funds
$
2117791359
Utility Outlay Reserve Fund
$
1,000,000
Low Carbon Fuel Standard Fund
$
839
Public Benefits Fund
$
5,3731265
Impact Fee Fund
$
1,131,149
Solar Surcharge Fund
$
331,164
Greenhouse Gas Fund
$
8,125,350
Total
$
3797419126
CITY OF
A r
Z
CALIFORNIA
ELECTRIC UTILITY
Electric Utility Reserve Policy
(June 30, 2022)
*Includes cash held locally and at NCPA
$45,000
$40,000
$35,000
$30,000
c $25,000
O
$20,000
$15,000
$10,000
$5,000
Actual Reserves vs. Target
w --of
FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22
■Actual
Marget
Cash balances
support City Council
approved reserve
requirements and
provide funds for pay
as you go Capital
Improvement
Projects.
El
G I'YY of
r o t
CALIFORNIA
ELECTRIC UTILITY
Capital Improvement Project
5 -Year Spending Plan
*Includes approved FY 23 budget and estimated prior year rollover.
**Includes planning and design costs only - construction costs estimated at -$30M and will be debt financed
Note: FY 23/24 and beyond currently under review by Engineering staff
5
Budget*•
$260,000
•Forecast
$0
$0
Project
Actual
$557,064
Distribution Capacity Program
$542,936
Underground / Overhead Maint
$1,891,427
$1,332,000
$1,042,000
$542,000
$442,000
Streetlight Maintenance/ Repair
$42,483
$50,000
$50,000
$50,000
$50,000
LED Streetlight Improvements
$33,564
$466,435
$250,000
$250,000
$0
230 kV Interconnection Project**
$29,798
$153,612
$20,000
$25,000
$25,000
Substation Maint/ Improvements
$171,277
$1,525,296
$870,000
$870,000
$670,000
Building/Security Improvements
$3,767,657
$353,984
$0
$0
$0
Work for Others
$936,528
$550,000
$750,000
$750,000
$750,000
Vehicles & Equipment
$783,668
$2,405,400
$1,010,000
$1,063,000
$170,000
Total Projects
$8,213,466
$7,379,663
$4,252,000
$3,550,000
$2,107,000
*Includes approved FY 23 budget and estimated prior year rollover.
**Includes planning and design costs only - construction costs estimated at -$30M and will be debt financed
Note: FY 23/24 and beyond currently under review by Engineering staff
5
C Ir Y Q F
is •� a �r
CALIFORNIA
ELECTRIC UTILITY
5 -Year Financial Forecast
Looking Ahead
Forecast assumes funding of all budgeted full-time positions in future years
FY 25 and FY 26 include CPI level rate adjustments of 3% and 2% respectively to meet Council
approved reserve target
Co
FY 21-22
Actual
FY 22-23
Budget
FY i
•recast
FY 24-25
Forecast
Forecast
Available Cash
$37,741,126
$31,897,708
$30,502,218
$31,211,871
$33,978,911
Days Cash
177
129
123
123
132
Reserve Target
$24,906,890
$26,850,330
$27,288,114
$27,769,822
$28,167,647
of Target
152%
119%
112%
112%
121
Forecast assumes funding of all budgeted full-time positions in future years
FY 25 and FY 26 include CPI level rate adjustments of 3% and 2% respectively to meet Council
approved reserve target
Co
C Ir Y Q F
is •� a �r
CALIFORNIA
ELECTRIC UTILITY
Power Sales
(June 30, 2022)
Power
Customer•
Residential
•
162,893,827
164,488,219
Small Commercial
165,982,036
166,553,759
Large Commercial/Small Industrial
48,220,129
45,189,477
Industrial
67,396,337
74,307,869
Total
444,492,329
450,539,324
Class
Residential
$
BudgetCustomer
31,900,710
$
32,234,880
..- Rate
$ 0.1960
Small Commercial
$
29,079,090
$
29,876,198
$ 0.1794
Large Commercial/Small Industrial
$
8,073,310
$
7,344,012
$ 0.1625
Industrial
$
8,644,800
$
8,982,223
$ 0.1209
Total
$
77,697,910
$
78,437,313
$ 0.1741
CITY OF
A r
Z
CALIFORNIA
ELECTRIC UTILITY
ECA Revenue
(June 30, 2022)
Customer•
Residential
$
3,407,236
Small Commercial
$
3,375,715
Large Commercial / Small Industrial
$
898,642
Industrial
$
1,512,652
Total Revenue
$
9,194,245
CITY OF
A r
Z
CALIFORNIA
ELECTRIC UTILITY
Electric Utility Fund
Operating Results
(June 30, 2022)
Personnel
$
Budget
9,362,490
$
Actual
10,054,564
% of Budget
107%
Supplies, Materials, Services
$
5,168,710
$
3,820,942
74%
Other Payments
$
2,137,360
$
1,077,811
50%
Utilities
$
87,200
$
60,522
69%
Total Operating Expenses
$
16,755,760
$
15,013,839
90%
�01
CITY OF
A r
Z
CALIFORNIA
ELECTRIC UTILITY
Power Supply Costs
(June 30, 2022)
10
$
Budget
34,291,580
$
Actual
32,894,137
% of Budget
95.9%
Generation
Transmission
$
12,836,020
$
13,844,055
107.9%
Management Services
$
1,377,400
$
1,642,764
119.3%
Total Power Supply Costs
$
48,505,000
$
48,380,956
99.7%
10
CITY OF
A r
Z
CALIFORNIA
ELECTRIC UTILITY
Q4 - 2022
01-2023
02-2023
Q3 - 2023
160,000
140,000
120,000
100,000
'8O,00o
60,000
40,000
20,006
Load Coverage
MWh Load
ROC Matrix
Target
Load Coverage
(Including Purchases)
105,424
60.0%
84.2%
101,234
70.0%
78.4%
116,226
60,0%
71.3%
141,969
60,0%
67.8%
Q4 - 2022 Ql - 2023 Q,2 - 2023 Q3 - 2023
M cove rage
IF Target
--*—Load
LEU continues to meet or exceed Risk Management targets
11
VeI ry OF
a Risk Oversight Committee (ROC)
CALIFORNIA
ELECTRIC UTILITY Report Highlights
• 3 ROC meetings held April —June 2022
— Forward energy purchases approved for 2022 and 2023
— Approved Vintage 2021/2022 Renewable Energy Credit purchases
— Discussed confidential Cap and Trade strategy and activities
— Discussed confidential renewable energy procurement activities
— Provided hydrological conditions update
— Provided update on FY 23 power supply costs
— Approved sale of Low Carbon Fuel Standard Credits
— Approved 2021 Power Source Disclosure Report
— Approved Application for Unsecured Credit to CAISO
— Approved 2021 Renewables Portfolio Standard (RPS) Report
— Discussed RPS Compliance Period 3 Final Results
— Approved 2021 GHG Use of Allowance Proceeds Report
— Completed annual review of RPS Plan
12
C Ir Y Q F
is •� a �r
CALIFORNIA
Strategic Areas of Focus
ELECTRIC UTILITY Project Highlights
• Customer
— Approved rebates for purchase of new and used EVs
— Approved energy efficiency loan for equipment upgrade
— Approved contract with ESG to continue administration of customer rebate
and assistance programs
— Approved additional funding for Keep Your Cool Commercial Refrigeration
Program
— Approved contract to automate and streamline application process for Low
Income Rate Assistance Programs
• Technology
— Approved contract with PowerClerk to automate and streamline solar
application process
— Facilitated presentation by NCPA to Council RE: Hydrogen Hub Project
— Reviewed proposals and conducted interviews for Fleet Electrification Master
Plan Project
13
C Ir Y Q F
is •� a �r
CALIFORNIA
Strategic Areas of Focus
ELECTRIC UTILITY Project Highlights (cont'd)
• Financial
— Received approval to submit Application for Unsecured Credit to CAISO to address
required security associated with increased power supply costs
— Submitted all required information as part of periodic rating review by S&P Global
Ratings
• Reliability
— Participated in summer readiness training and workshops
— Continued substation modernization initiative planning
— Continued system protection coordination update project
— Continued #6 copper replacement work on overhead system
• Workforce Planning
— New Hire - Senior Administrative Clerk
— New Hire - Lineman
— Promotion of P/T Meter Reader to F/T Field Services Representative
— Promotion of Lineman to Troubleshooter
— Promotion of Electric Distribution Operator I to Operator II
14
Public Works Department
Water/Wastewater
IFY 22 Quarterly Update
(Ending June 30, 2022)
Wastewater Fund
Cash Flow Summary
(Ending June 30, 2022)
Budget
Actuals
% of Budget
Revenue
Sales
16,399,030
17,024,462
104%
Development Impact Mitigation Fees
1,618,970
1,996,719
123%
Other (interest, septic, misc.)
427,630
717,135
168%
Total Revenues
18,445,630
19,738,316
107%
Expenses
Operating
8,826,870
9,143,562
104%
Capital
11,456,708
1,497,036
13%
Debt Service
3,346,260
3,338,608
100%
Cost of Services Payment To General Fund
1,130,720
1,130,720
100%
Total Expenses
24,760,558
15,109,926
61%
Beginning Cash (Operations Only)
17,488,631
Ending Cash (Operations Only)
20,711,932
Days Cash (Excluding Capital)
555
% of Target — 180 Days Cash on Hand
309%
Wastewater
Operating Results
(Ending June 30, 2022)
3
Budget
Actuals
% of Budget
Personnel
$
4,438,920
$
4,844,368
109%
Supplies, Materials, Services
$
2,793,660
$
2,480,705
89%
Equipment, Land, Structures
$
300,000
$
135,082
45%
Other Payments
$
435,000
$
724,605
167%
Utilities
$
830,900
$
931,303
112%
Work for Others
$
28,390
$
27,500
97%
Total Operating Expenses
I $
8,826,870
1 $
9,143,562
1 104%
3
Wastewater Funds
Cash Balances
(Ending June 30, 2022)
Amounts above
reserve target are
held for scheduled
■Targe[ capital maintenance
Actual
El
Actual Reserves vs. Target
Operating (530)
20,7111932
Utility Capital / Infrastructure Replacement (531)
41985,295
Capital Reserve (532) (Fund used to pay White Slough COP Debt Service)
(3,190,320)
Wastewater IMF (533)
4,923,319
Rate Stabilization Reserve (534)
500,000
Storm Drain IMF (535)
2,463,937
Total
30,394,163
Amounts above
reserve target are
held for scheduled
■Targe[ capital maintenance
Actual
El
Actual Reserves vs. Target
22,000,000
309%
20,000,000
18,000,000
267% 273% 279% 258%
16,000,000
14,000,000
12,000,000
10,000,000
8,000, 000
6,000, 000
4,000, 000
7
2,000,000
0
-
17/18 18/19 19/20 20121 21122
Amounts above
reserve target are
held for scheduled
■Targe[ capital maintenance
Actual
El
5 -Year Financial Forecast
FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 FY 26-27
Actual Forecast Forecast Forecast Forecast Forecast
Available Cash $20,711,932 $12,017,701 $4,699,000 $5,248,500 $5,779,100 $1,427,300 1
Days Cash
(180 day target)
Minimum
Reserve Target
(25%)
Reserve Target
(50%)
% of Days Cash
Target
540
319 122 150 137
33
$3,499,681
$3,441,000
$3,518,500
$3,198,500
$3,809,500
$3,895,500
$6,999,362
$6,882,000
$7,037,000
$6,397,000
7,619,000
7,791,000
300% 177% 68% 83% 76% 19%
5
Storm Drain Trash Handling
MUS PW Admin Building Remodel
MUS PW Admin Building Roof
Misc. System Relocations
Misc. Wastewater Taps
Main Replacement Project
Sewer Lift Station Wet Well Rehab
Kofu Storm Water Pump Rehab
Salas Storm Water Pump Rehab
Henry Glaves Storm Water Pump Rehab
Peterson Storm Water Pump Rehab
Laurel Storm Relocation
Cluff Storm Water Pump Rehab
Beckman Storm Water Pump Rehab
Project Planning/Misc. Projects
Vehicles/Equipment
Irrigation Improvements
Digester#3 Mixing Imprv.
Digester #4 Lib Rehab
White Slough Office Roof
Plant Maintenance Improvements
Compliance Studies and Reports
Dredge Pond 1 and EQ Pond 1
Fan Press Replacement
Aeration Difusser Replacement
Primary Treatment Rehab
NCPA Maintenance Generator
Pump & Equipment Upgrades
Lower Sacramento Road Public Improvements
Electrical Upgrades/SCADA Construction
UV Design/Replacement
Wastewater
Planned Capital Projects
FY 21-22
FY 22-23
FY 23-24
FY 24-25 FY 25-26
FY 26-27
750,000
281,766
350,000
350,000 350,000
107,252
80,000
35,000
35,000
35,000 35,000
35,000
40,000
40,000
40,000 40,000
40,000
4,395
1,995,605
1,000,000
250,000
200,000
200,000
200,000
200,000
95,343
200,000
200,000
44,073
125,000
125,000
25,000 25.000
25,000
41,786
650,000
75,000
75,000 75,000
75,000
750,000
1,000,000
500,000
1,000,000
100,000
416,084
110,000
100,000
75,000 100,000
60,000
200,000
200,000
200,000 200,000
200,000
200,000
178,208
3,321,792
7,860
2,992,140
500,000
150,000
150,000
150,000 150,000
150,000
203,743
10, 879
105,647
3,000,000
8,000,000
2,500,000
450,000
2,000,000
Totals $1,497,036 $14,069,537$10,355,000 $4,900,000 $1,625,000 $5,535,000 6
Water Fund
Cash Flow Summary
(Ending June 30, 2022)
Budget
Actuals
% of Budget
Revenue
Sales
13,338,910
13,618,433
102%
Development Impact Mitigation Fees
1,113,050
1,198,960
108%
Other (interest, tap fees, water meters, misc.)
605,600
604,463
100%
Total Revenues
15,057,560
15,421,856
102%
Expenses
Operating
7,918,990
7.977,599
101%
Capital
6,670,473
1,709,811
26%
Debt Service
1,927,250
1,910,050
99%
Cost of Services Payment To General Fund
959,910
959,910
100%
Total Expenses
17,476,623
12,557,370
72%
Beginning Cash (Operations Only)
12,441,032
Ending Cash (Operations Only)
9,614,372
Days Cash (Excluding Capital)
324
% of Target — 180 Days Cash on Hand
180%
Water
Operating Results
(Ending June 30, 2022)
Budget
Actuals M
% of Budget
Personnel
$
3,295,870
$
3,121,407
95%
Su lies, Materials, Services
$
1,700,760
$
1,553,917
91
Equipment, Land, Structures
$
105,000
$
13,448
13%
Other Payments
$
1,718,710
$
2,036,404
118%
Utilities
$
989,800
$
1,252,424
127%
Work for Others
$
108,850
$
-
0%
Total Operating Expenses
$
71918,990
$
7,977,599
101
Water Funds
Cash Balances
(Ending June 30, 2022)
12,000,000
10,000,000
8,000, 000
6,000, 000
4,000, 000
2,000,000
0
Actual Reserves vs. Target
180%
165%
0
17/18 18/19 19/20 20/21 2122
- = Amounts above
reserve target are
held for scheduled
capital maintenance
W
Operating (560)
9,614,372
Utility Capital / Infrastructure Replacement (561)
1,650,128
IMF (562)
5,432,236
PCE/TCE Settlements
8,015,484
PCE/TCE Rates (565)
3,765,892
Total
28,441,916
12,000,000
10,000,000
8,000, 000
6,000, 000
4,000, 000
2,000,000
0
Actual Reserves vs. Target
180%
165%
0
17/18 18/19 19/20 20/21 2122
- = Amounts above
reserve target are
held for scheduled
capital maintenance
W
5 -Year Financial Forecast
FY 21-22
Budget
Available Cash $9,614,372
Days Cash 324
(180 day target)
Minimum $2,626,500
Reserve Target
(25%)
Reserve Target $5,253,000
(50%)
% of Days Cash 180%
Target
FY 22-23 FY 23-24 FY 24-25 FY 25-26 FY 26-27
Forecast Forecast Forecast Forecast Forecast
$11,080,899
$11,628,650
$10,135,450
$9,048,350
$10,541,750
377
386
328
286
325
$2,681,000 $3,067,325 $2,816,500 $2,887,500 $2,961,500 1
$5,362,000 $6,134,650 $5,633,000 $5,775,000 $5,923,000 1
210% 215% 182% 159% 180%
10
Water Meter Program
MUS PW Admin Building Remodel
MUS PW Admin Building Roof
Water Taps
Misc. Water Mains
Water Meter Replacement Program
GAC Replacement
Meter Shop Design/Construction
Water Plant Generator
Surface Water Treatment Plant Membrane Repl.
Surface Water Treatment Plant Transmission Line
2020 Well Rehab
Water Well Rehab
Well 5 Pump Rehab
Well 6R GAC
Well 7 Pump Rehab
Well 9 Pump Rehab
Well 14 Pump Rehab
Well 16 Pump Rehab
Well 16 GAC
Well 17 Pump Rehab
Well 18 Pump Rehab
Well 21 Pump Rehab
Well 22 Pump Rehab
Well 23 Pump Rehab
Well 25 Pump Rehab
Well 3R Pump Rehab
Well 15 Pump Rehab
Well 28 GAC Treatment
Project Planning
Vehicles/Equipment
Water
Planned Capital Projects
FY 21-22
FY 22-23
FY 23-24
FY 24-25
FY 25-26
FY 26-27
128,138
1,500,000
1,500,000
107,252
80,000
75,000
75,000
75,000
75,000
75,000
50,000
50,000
250,000
250,000
500,000
75,000
75,000
75,000
75,000
150,000
300,000
300,000
300,000
300,000
300,000
(6,915)
275,865
1,000,000
2,500,000
500,000
1,500,000
530,897
400,000
400,000
400,000
400,000
400,000
200,000
94,432
96,781
200,000
170,000
165,000
250,000
200,000
200,000
250,000
250,000
250,000
250,000
689,405
29,172
25,000
25,000
25,000
25,000
25,000
40,649
50,000
50,000
100,000
100,000
100,000
Totals $1,709,811 $4,285,865 $2,805,000 $4,425,000 $3,925,000 $1,750,000
11