HomeMy WebLinkAboutAgenda Report - September 21, 2022 C-10e CITY OF zlo CALIFORNIA AGENDA ITEM CO/0 COUNCIL COMMUNICATION AGENDA TITLE: Accept Improvements Under Contract for Stormwater Trash Collection Project - Phase 3 (2022) MEETING DATE: September 21, 2022 PREPARED BY: Public Works Director RECOMMENDED ACTION. Accept improvements under contract for Stormwater Trash Collection Project - Phase 3 (2022). BACKGROUND INFORMATION: This project includes installing a trash capture device in the storm drain line in Rivergate Drive, see attached Exhibit A. The device will filter trash as small as a cigarette butt from the storm drain system before it is discharged into Mokelumne River. This is the third of several similar installations needed to comply with a State mandate requiring the collection of all trash in storm drain systems that discharge into rivers or streams. On March 2, 2022, the Council approved plans and specifications for this project, and authorized the City Manager to award contract to the lowest bidder not -to -exceed $400,000 and execute change orders not -to - exceed $40,000. The bid opening was held on March 30, 2022 and the City received the following three bids: Above/(Below) Bidder Location Bid Engineer's Estimate Engineer's Estimate $388,000.00 Soracco, Inc. Lodi $249,870.000 ($138,130) R.D. Morgan Construction, Inc. Ione $348,700.00 ($39,300) Pro Builders Orangeville $380,000.00 ($8,000) The project contract was executed on April 20, 2022 to Soracco, Inc., of Lodi, in the amount of $249,870.00. The City Manager executed one change order in the amount of $9,132.00 to address unexpected compaction related issues due to existing over -saturated subgrade. All work was completed in substantial conformance with the plans and specifications approved by City Council. The final contract price was $259,002.00 and the project was completed prior to the contract completion date. Following acceptance by the City Council, as required by law, the City Engineer will file a Notice of Completion with the County Recorder's office. The notice serves to notify vendors and subcontractors that the project is complete and begins their 30 -day period to file a stop notice requiring the City to withhold payments from the prime contractor in the event of a payment dispute. FISCAL IMPACT. This project will slightly increase annual storm drainage maintenance costs for the trash capture device. APPROVED: Steve Schwabauer Stephen Schwabauer, City Manager \\cvcfilv02\pubwks$\WP\PROJECTS\STORMDRN\Stormwater Trash Collection - Phase 3 (2022)\CAccept doe 8/3112022 Accept Improvements Under Contract for Stormwater Trash Collection Project - Phase 3 (2022) September 21, 2022 Page 2 FUNDING AVAILABLE: This project was funded by Wastewater Capital fund. CCCC2 Charles E. Swimley, Jr. Public Works Director Prepared by Jimi Billigmeier, Associate Civil Engineer CES/JB/cd Attachment Cc: Richard Soracco Soracco, Inc. K:\WP\PROJECTS\STREETS\Downtown Concrete Cleaning Project\2019 Project\CSA.doc 8/31/2022 EXHIBIT A STORMWATER TRASH COLLECTION PROJECT - PHASE 3 (2022) SITE MAP N Legend Phase 3 Boundary Trash Capture Device Location ■ River Oaks Dr.1 0 500 1,000 Feet e,Av. - Forrest Vj SAv. 0 L Daisy Ave?