HomeMy WebLinkAboutAgenda Report - August 3, 2022 C-08*4 CITY OF �i 4g ��J+lio zt� o CALIFORNIA AGENDA ITEM C M 2 COUNCIL COMMUNICATION AGENDA TITLE: Adopt Resolution Accepting Project Under Contract for Grape Bowl Turf Replacement Project MEETING DATE: August 3, 2022 PREPARED BY: Parks, Recreation and Cultural Services Director RECOMMENDED ACTION Adopt resolution accepting project under contract for Grape Bowl Turf Replacement project. BACKGROUND INFORMATION: The previous turf at the Grape Bowl was installed in April of 2010. Routine analysis of the existing field playability and safety requirements of the surface showed the turf had met its life span of 10-12 years. Field Turf USA, Inc. of Montreal, Quebec was selected through a CMAS contract in the amount of $759,686.38. The final amount of the contract is $764,024.78 as a time and material change order was added to address raising existing utility concreate aprons on the south side -line areas. The project included removal and replacement of over 90,000 square feet of synthetic turf and included inlaid soccer and football game line markings, silica sand and true blend coated cork infill mixture. Work also included drain rock and quarry replacement and grading, along with new field grooming equipment, painting of the existing football goals and replacement of Brock drainage panels. Six (6) G -Max tests of the field shall take place on future alternating years and reports will be provided to the Parks, Recreation and Cultural Services Department (PRCS). Work started on May 9, 2022 and was completed on July 12, 2022, 11 days ahead of schedule. Overall the project was successful in replacing the all-weather synthetic turf and addressing the depressed field locations. Following acceptance by the City Council, as required by law, the PRCS Director will file a Notice of Completion with the County Recorder's Office. The notice serves to notify Field Turf USA, Inc. that the project is complete and if applicable, begins their 30 -day period to file a stop notice requiring the City to withhold payment. APPROVED Steve Schwabauer Stephen Schwabauer, City Manager Adopt Resolution Accepting Project Under Contract for the Grape Bowl Replacement Project August 3, 2022 Page 2 FISCAL IMPACT: Improvement shall provide for increased rental opportunities and safer conditions. FUNDING AVAILABLE: Parks Capital (43299000.77020); PKCP-22003. Contracts; $764,024.78. Andrew Keys Andrew Keys Deputy City Manager/Internal Services Director Christina Jarolfiay Pajks, Recreation and Cultural Services Director SV/CJ/tl Cc: City Attorney Field Turf USA, Inc. PRCS Budget Analyst Attachment Signature: Q/r Signature: s;,,c,+,oiys.�o�a in �vnerj Email: akeys@lodi.gov Email: sschwabauer@lodi.gov Exhibit A Contract - Order Date: July 20, 2022 COP#: 1 From: FieldTurf USA, Inc. To: City of Lodi Parks & Rec 7445 C6te-de-Liesse Road, Suite 200 111 N. Stockton St. Montreal, Quebec H4T 1G2 Lodi, CA 95242 Project: Lodi Grape Bowl Contact: Steve Virrey 221 E Lawrence Ave Phone: 209-269-4879 Lodi, CA 95240 Fax: Ref: Email: svirrev@lodi.av Scope Description: T&M Work to raise existing utility boxes and finish grade approved by Steve Virrey via email to FieldTurf on 7/1/22 Mobiliztaion- $690 Materials - $86 Labor- $1,748 Equipment - $1,420 DESCRIPTION QTY UNIT UP PRICE T&M Work 1 LS S 3,944.00 $3,944.00 FT OH&P 1 LS $ 394.40 $394.40 TOTAL CHANGE ORDER: $4,338.40 ORIGINAL CONTRACT: $759,6B6.38 PREVIOUS CHANGE ORDERS: $0.04 REVISED CONTRACT TOTAL: $764,024.78 Notes/Exclusions: • Quote is valid for thirty (30) calendar days The Contract Time will be increased by 1 days. It is mutually agreed that for the above -referenced changes to take place, the original contract price will be adjusted by the above - referenced amount, which will become payable in accordance with the same terms and conditions as in the original contract or purchase order. If all the terms of this change order are acceptable please have an authorized representative sign the bottom of this document and return it to FieldTurf's Montreal office, or as otherwise provided in the contract documents. FieldTurf will, in turn, provide a fully executed copy for your records. Once this document is fully executed, it will be considered a revision/modification to the original FieldTurf USA, Inc. City of Lodi Authorized Representative Au horized,Repr a tati e yq� Date ❑It'Ae 14 175 N. Industrial Blvd, Calhoun, GA 30701 • Toll Free: 1-800-724-2969 • Website: http://www.fieldturf.com RESOLUTION NO. 2022-192 A RESOLUTION OF THE LODI CITY COUNCIL ACCEPTING PROJECT UNDER CONTRACT FOR THE GRAPE BOWL TURF REPLACEMENT PROJECT WHEREAS, the previous turf at the Grape Bowl was installed in April 2010 and routine analysis of the existing field playability and safety requirements of the surface showed the turf had met its life span of 10 to 12 years; and WHEREAS, Field Turf USA, Inc., of Montreal, Quebec, was selected through a California Multiple Award Schedule Contract No. 4-06-78-0031A in the amount of $759,686.38, with a final contract amount of $764,024.78, which included a time -and -material change order to address raising existing utility concrete aprons on the south sideline areas; and WHEREAS, the scope of work included the removal and replacement of 93,714 square feet of synthetic turf, inlaid soccer and football game line markings, silica sand and true blend coated cork infill mixture, drain rock and quarry placement and grading, along with new field grooming equipment, painting of the existing football goals and replacement of brock drainage panels; and WHEREAS, the scope of work also included six G -Max tests of the field, taking place on alternating years with reporting to be provided to the Parks, Recreation and Cultural Services Department. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby accept the improvements under the contract for the Grape Bowl Turf Replacement Project; and BE IT FURTHER RESOLVED, pursuant to Section 6.3q of the City Council Protocol Manual (Res. No. 2019-223), the City Attorney is hereby authorized to make minor revisions to the above -referenced document(s) that do not alter the compensation or term, and to make clerical corrections as necessary. Dated: August 3, 2022 I hereby certify that Resolution No. 2022-192 was passed and adopted by the City Council of the City of Lodi in a regular meeting held August 3, 2022, by the following vote: AYES: COUNCIL MEMBERS — Hothi, Khan, Kuehne, Nakanishi, and Mayor Chandler NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None OLIVIA NASHED City Clerk 2022-192