AGENDA TITLE: Adopt Resolution Accepting Project Under Contract for Grape Bowl Turf
Replacement Project
MEETING DATE: August 3, 2022
PREPARED BY: Parks, Recreation and Cultural Services Director
RECOMMENDED ACTION Adopt resolution accepting project under contract for Grape Bowl Turf
Replacement project.
BACKGROUND INFORMATION: The previous turf at the Grape Bowl was installed in April of 2010.
Routine analysis of the existing field playability and safety requirements of
the surface showed the turf had met its life span of 10-12 years.
Field Turf USA, Inc. of Montreal, Quebec was selected through a CMAS contract in the amount of
$759,686.38. The final amount of the contract is $764,024.78 as a time and material change order was added
to address raising existing utility concreate aprons on the south side -line areas.
The project included removal and replacement of over 90,000 square feet of synthetic turf and included inlaid
soccer and football game line markings, silica sand and true blend coated cork infill mixture. Work also
included drain rock and quarry replacement and grading, along with new field grooming equipment, painting of
the existing football goals and replacement of Brock drainage panels. Six (6) G -Max tests of the field shall take
place on future alternating years and reports will be provided to the Parks, Recreation and Cultural Services
Department (PRCS).
Work started on May 9, 2022 and was completed on July 12, 2022, 11 days ahead of schedule. Overall the
project was successful in replacing the all-weather synthetic turf and addressing the depressed field locations.
Following acceptance by the City Council, as required by law, the PRCS Director will file a Notice of
Completion with the County Recorder's Office. The notice serves to notify Field Turf USA, Inc. that the project
is complete and if applicable, begins their 30 -day period to file a stop notice requiring the City to withhold
payment.
APPROVED Steve Schwabauer
Stephen Schwabauer, City Manager
Adopt Resolution Accepting Project Under Contract for the Grape Bowl Replacement Project
August 3, 2022
Page 2
FISCAL IMPACT: Improvement shall provide for increased rental opportunities and safer conditions.
FUNDING AVAILABLE: Parks Capital (43299000.77020); PKCP-22003. Contracts; $764,024.78.
Andrew Keys
Andrew Keys
Deputy City Manager/Internal Services Director
Christina Jarolfiay
Pajks, Recreation and Cultural Services Director
SV/CJ/tl
Cc: City Attorney
Field Turf USA, Inc.
PRCS Budget Analyst
Attachment
Signature: Q/r Signature: s;,,c,+,oiys.�o�a in �vnerj
Email: akeys@lodi.gov Email: sschwabauer@lodi.gov
Exhibit A
Contract - Order
Date: July 20, 2022
COP#: 1
From: FieldTurf USA, Inc.
To: City of Lodi Parks & Rec
7445 C6te-de-Liesse Road, Suite 200
111 N. Stockton St.
Montreal, Quebec H4T 1G2
Lodi, CA 95242
Project: Lodi Grape Bowl
Contact: Steve Virrey
221 E Lawrence Ave
Phone: 209-269-4879
Lodi, CA 95240
Fax:
Ref:
Email: svirrev@lodi.av
Scope Description: T&M Work to raise existing utility boxes and finish grade approved by Steve Virrey via email to
FieldTurf on 7/1/22
Mobiliztaion- $690
Materials - $86
Labor- $1,748
Equipment - $1,420
DESCRIPTION
QTY UNIT UP PRICE
T&M Work
1 LS S 3,944.00 $3,944.00
FT OH&P
1 LS $ 394.40 $394.40
TOTAL CHANGE ORDER: $4,338.40
ORIGINAL CONTRACT: $759,6B6.38
PREVIOUS CHANGE ORDERS: $0.04
REVISED CONTRACT TOTAL: $764,024.78
Notes/Exclusions:
• Quote is valid for thirty (30) calendar days
The Contract Time will be increased by 1 days.
It is mutually agreed that for the above -referenced changes to take place, the original contract price will be adjusted by the above -
referenced amount, which will become payable in accordance with the same terms and conditions as in the original contract or
purchase order.
If all the terms of this change order are acceptable please have
an authorized representative sign the bottom of this document and
return it to FieldTurf's Montreal office, or as otherwise provided in the contract documents. FieldTurf will, in turn, provide a fully
executed copy for your records. Once this document is fully executed, it will be considered a revision/modification to the original
FieldTurf USA, Inc.
City of Lodi
Authorized Representative
Au horized,Repr a tati e
yq�
Date
❑It'Ae 14
175 N. Industrial Blvd, Calhoun, GA 30701 • Toll Free: 1-800-724-2969 • Website: http://www.fieldturf.com
RESOLUTION NO. 2022-192
A RESOLUTION OF THE LODI CITY COUNCIL
ACCEPTING PROJECT UNDER CONTRACT FOR THE
GRAPE BOWL TURF REPLACEMENT PROJECT
WHEREAS, the previous turf at the Grape Bowl was installed in April 2010 and routine
analysis of the existing field playability and safety requirements of the surface showed the turf
had met its life span of 10 to 12 years; and
WHEREAS, Field Turf USA, Inc., of Montreal, Quebec, was selected through a California
Multiple Award Schedule Contract No. 4-06-78-0031A in the amount of $759,686.38, with a final
contract amount of $764,024.78, which included a time -and -material change order to address
raising existing utility concrete aprons on the south sideline areas; and
WHEREAS, the scope of work included the removal and replacement of 93,714 square
feet of synthetic turf, inlaid soccer and football game line markings, silica sand and true blend
coated cork infill mixture, drain rock and quarry placement and grading, along with new field
grooming equipment, painting of the existing football goals and replacement of brock drainage
panels; and
WHEREAS, the scope of work also included six G -Max tests of the field, taking place on
alternating years with reporting to be provided to the Parks, Recreation and Cultural Services
Department.
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby accept
the improvements under the contract for the Grape Bowl Turf Replacement Project; and
BE IT FURTHER RESOLVED, pursuant to Section 6.3q of the City Council Protocol
Manual (Res. No. 2019-223), the City Attorney is hereby authorized to make minor revisions to
the above -referenced document(s) that do not alter the compensation or term, and to make
clerical corrections as necessary.
Dated: August 3, 2022
I hereby certify that Resolution No. 2022-192 was passed and adopted by the City Council
of the City of Lodi in a regular meeting held August 3, 2022, by the following vote:
AYES: COUNCIL MEMBERS — Hothi, Khan, Kuehne, Nakanishi, and
Mayor Chandler
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — None
ABSTAIN: COUNCIL MEMBERS — None
OLIVIA NASHED