HomeMy WebLinkAboutAgenda Report - July 20, 2022 C-08CITY OF %_ ocit CALIFORNIA AGENDA ITEM i1c an COUNCIL COMMUNICATION AGENDA TITLE: Adopt Resolution Awarding Contract for Garfield Street Safe Routes to School to TBS Contractors, of Merced ($554,667) and Authorizing City Manager to Execute Change Orders ($110,000) MEETING DATE: July 20, 2022 PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt resolution awarding contract for Garfield Street Safe Routes to School to TBS Contractors, of Merced, in the amount of $554,667 and authorizing City Manager to execute change orders in an amount not to exceed $110,000. BACKGROUND INFORMATION: In September of 2020 the City applied for the Regional Active Transportation Program (ATP) Cycle 5 State Grant for this project. The project was awarded the grant in the amount of $705,000. On January 5, 2022 the City Council authorize the City Manager to execute the agreement with the San Joaquin County Council of Governments (SJCOG) allocating the funding. The project is located on Garfield Street from Harold Street to Poplar Street. The project consists of installing missing sidewalk at various locations along the corridor, constructing 20 accessible curb ramps, accessible alley approaches, and other incidental and related work. Plans and specifications for this project were approved on April 6, 2022. The City received the following seven bids for this project on June 15, 2022: Bidder Location Bid Above/(Below) Estimate Engineer's Estimate TBS Contractors George Reed United Pavement Maintenance B&M Builders FBD Vanguard Construction A.M. Stephens Sposeto Engineering * Corrected Figure Merced Modesto Hughson Rancho Cordova Livermore Lodi Livermore $ 712,825.00 $ 554,666.50 $ 555,915.00 $ 596,576.00 $ 654,357.00 $ 662,216.10 $ 709,701.03 $ 721,154.20 $ (158,158.50) $ (156, 910.00) $ (116,249.00) $ ( 58,468.00) $ ( 50,608.90) $ ( 3,123.97) $ 8,329.20 FISCAL IMPACT. The project will have a minimal impact on total maintenance costs and improve accessibility along Garfield Street which serves as a route to Heritage School. APPROVED: Steve Schwabauer Stephen Schwabauer, City Manager \\CVCFILV02\PubWks$\WP\PROJECTS\STREETS\Garfield ADA Improvements\CAward.doc 7/512022 Adopt Resolution Awarding Contract for Garfield Street Safe Routes to School to TBS Contractors, of Merced ($554,667) and Authorizing City Manager to Execute Change Orders ($110,000) July 20, 2022 Page 2 FUNDING AVAILABLE: Fiscal Year 2022/23 Budget: Measure K — 303 Fund (30399000.77020): $ 95,000 State Bike Lane — 309 Fund (30999000.77020) $ 705,000 Total: $ 800,000 Andrew Keys Andrew Keys Deputy City Manager/Internal Services Director Prepared by Sean Nathan, Senior Civil Engineer CES/SN/cd Attachments Signature: Q m:6 v a�rp Email: akeys@lodi.gov CJL'� Charles E. Swimley, Jr. Public Works Director Signature: Email: sschwabauer@lodi.gov GARFIELD STREET SAFE ROUTES TO SCHOOL Harold Street to Poplar Street CONTRACT CITY OF LODI, CALIFORNIA THIS CONTRACT made by and between the CITY OF LODI, State of California, herein referred to as the "City," TAYLOR BACKHOE SERVICE, INC. dba TBS CONTRACTORS, a California corporation, herein referred to as the "Contractor." WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other, as follows: The complete Contract consists of the following documents which are incorporated herein by this reference, to -wit: Notice Inviting Bids Information to Bidders Certifications and Forms General Provisions Federal Requirements Special Provisions Bid Proposal Contract Contract Bonds Federal Minimum Wage Rates Plans Addenda The 2018 Edition, Standard Specifications, State of California, Business and Transportation Agency, Department of Transportation City of Lodi Construction Specifications All of the above documents, sometimes hereinafter referred to as the "Contract Documents," are intended to cooperate so that any work called for in one and not mentioned in the other is to be executed the same as if mentioned in all said documents. ARTICLE I - That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the City and under the condition expressed in the two bonds bearing even date with these presents and hereunto annexed, the Contractor agrees with the City, at Contractor's cost and expense, to do all the work and furnish all the materials except such as are mentioned in the specifications to be furnished by the City, necessary to construct and complete in a good workmanlike and substantial manner and to the satisfaction of the City the proposed improvements as shown and described in the Contract Documents which are hereby made a part of the Contract. ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does hereby employ, the Contractor to provide all materials and services not supplied by the City and to do the work according to the terms and conditions for the price herein, and hereby contracts to pay the same as set forth in Section 5.600, "Measurement, Acceptance and Payment," of the General Provisions, in the manner and upon the conditions above set forth; and the said parties for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree to the full performance of the covenants herein contained. CONTRACT 4.1 06/15/22 ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division 2 of the Labor Code. The Contractor and any Subcontractor will pay the general prevailing wage rate and other employer payments for health and welfare, pension, vacation, travel time, and subsistence pay, apprenticeship or other training programs. The responsibility for compliance with these Labor Code requirements is on the prime contractor. ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for doing all the work contemplated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City, and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Plans and Contract Documents and the requirements of the Engineer under them, to -wit: The work consists of constructing 20 curb ramps, curb and gutter, sidewalk, alley approaches, and other incidental and related work, all as described in the specifications for the above project. For additional bid item descriptions refer to Section 6-07 "Description of Bid Items". CONTRACT ITEMS Item Description Qty Unit Unit Price $ 45,918.00 $ 3.60 $ ; $ Total 45,918.00 43,732.80 1 Mobilization, Clearing & Grubbing, Traffic Control, Temporary Facilities 1 LS SF 2 Remove Concrete and Asphalt 12,148 3 Construct Concrete Sidewalk / Ram / Res. Dwy 8,964 SF $ 18.60 $166,730.40 4 Construct Curb and Gutter 1,350 LF $ 85.80 $115,830.00 5 Construct Alley Approach 948 SF $ 25.60 $ 24,268.80 6 Install Truncated Domes 353 SF $ 56.30 $ 19,873.90 7 Install Asphalt Concrete Patch 6,311 SF $ 10.20 $ 64,372.20 8 Install 12" SD Lateral and Connections. Remove Ex. 40 LF $ 307.30 $ 12,292.00 9 Install Side Inlet Catch Basin SICB 2 EA $ 5,910.90 $ 1 1,821.80 10 Install SICB Assembly 2 EA $ 5,910.90 $ 1 1,821.80 11 Install 24" SD Riser 2 EA $ 6,237.50 $ 12,475.00 12 Install Root Barriers 11 EA $ 999.80 $ 10,997.80 13 Striping Repair 1 LS EA $ $ 3,750.00 718.80 $ $ 3,750.00 10,782.00 14 Monument Perpetuation 15 ARTICLE V - By my signature hereunder, as provisions of Section 3700 of the Labor Code, against liability for workers' compensation or to TOTAL $ 554 667.30 Contractor, I certify that I am aware of the which requires every employer to be insured undertake self-insurance in accordance with CONTRACT 4.2 06/15/22 the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should there be any conflict between the terms of this instrument and the Bid Proposal of the Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to establish lines and grades for the work as specified under the Special Provisions. All labor or materials not mentioned specifically as being done by the City will be supplied by the Contractor to accomplish the work as outlined in the specifications. ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract within 15 calendar days after the City Manager has executed the contract and to diligently prosecute to completion within 60 CALENDAR DAYS. ARTICLE IX - State of California Senate Bill 854 requires the following No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6-04.03 OF THE SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT. CONTRACT 4.3 06/15/22 IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year and date written below. CONTRACTOR: By: Title (CORPORATE SEAL) CITY OF LODI, a municipal corporation By: STEPHEN SCHWABAUER City Manager Date: Attest: OLIVIA NASHED City Clerk Approved As To Form: JANICE D. MAGDICH City Attorney CONTRACT 4.4 06/15/22 RESOLUTION NO. 2022-170 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE CONTRACT FOR GARFIELD STREET SAFE ROUTES TO SCHOOL TO TBS CONTRACTORS, OF MERCED, AND AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDERS WHEREAS, in September 2020, the City applied for the Regional Active Transportation Program (ATP) Cycle 5 State Grant for the Garfield Street Safe Route to School Project; and WHEREAS, the project was awarded the grant in the amount of $705,000 and on January 5, 2022, the City Council authorized the City Manager to execute the agreement with the San Joaquin Council of Governments (SJCOG) allocating the funding; and WHEREAS, City Council approved the plans and specifications for this project on April 6, 2022. The project is located on Garfield Street, from Harold Street to Poplar Street, and consists of installing missing sidewalk at various locations along the corridor, constructing 20 accessible curb ramps, accessible alley approaches, and other incidental and related work; and WHEREAS, the City received the following seven bids on June 15, 2022: WHEREAS, staff recommends awarding the contract for Garfield Street Safe Routes to School to TBS Contractors, of Merced, in the amount of $554,667; and WHEREAS, staff further recommends authorizing the City Manager to execute change orders in an amount not to exceed $110,000. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award the contract for Garfield Street Safe Routes to School to TBS Contractors, of Merced, California, in the amount of $554,667; and BE IT FURTHER RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute the contract and change orders in an amount not to exceed $110,000; and BE IT FURTHER RESOLVED, pursuant to Section 6.3q of the City Council Protocol Manual (adopted 11/6/19, Resolution No. 2019-223), the City Attorney is hereby authorized to make minor revisions to the above -referenced document(s) that do not alter the compensation or term, and to make clerical corrections as necessary. Dated: July 20, 2022 Above/(Below) Bidder Location Bid Engineer's Estimate TBS Contractors Merced $ 554,666.50 * $ (158,158.50) George Reed Modesto $ 555,915.00 $ (156,910.00) United Pavement Maintenance Hughson $ 596,576.00 $ (116,249.00) B&M Builders Rancho Cordova $ 654,357.00 $ ( 58,468.00) FBD Vanguard Construction Livermore $ 662,216.10 $ ( 50,608.90) A.M. Stephens Lodi $ 709,701.03 $ ( 3,123.97) Sposeto Engineering Livermore $ 721,154.20 $ 8,329.20 " Corrected Figure WHEREAS, staff recommends awarding the contract for Garfield Street Safe Routes to School to TBS Contractors, of Merced, in the amount of $554,667; and WHEREAS, staff further recommends authorizing the City Manager to execute change orders in an amount not to exceed $110,000. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award the contract for Garfield Street Safe Routes to School to TBS Contractors, of Merced, California, in the amount of $554,667; and BE IT FURTHER RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute the contract and change orders in an amount not to exceed $110,000; and BE IT FURTHER RESOLVED, pursuant to Section 6.3q of the City Council Protocol Manual (adopted 11/6/19, Resolution No. 2019-223), the City Attorney is hereby authorized to make minor revisions to the above -referenced document(s) that do not alter the compensation or term, and to make clerical corrections as necessary. Dated: July 20, 2022 I hereby certify that Resolution No. 2022-170 was passed and adopted by the City Council of the City of Lodi in a regular meeting held July 20, 2022 by the following votes: AYES: COUNCIL MEMBERS — Khan, Kuehne, Nakanishi, and Mayor Chandler NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — Hothi ABSTAIN: COUNCIL MEMBERS — None I OLIVIA NASHED City Clerk 2022-170