HomeMy WebLinkAboutAgenda Report - May 4, 2022 C-04CITY OF ro 0 zt�w CALIFORNIA COUNCIL COMMUNICATION AGENDA ITEM Cm4 AGENDA TITLE: Adopt Resolution Awarding Contract for 2021/2022 Pavement Resurfacing Project, Various Locations, to American Pavement Systems, Inc., of Modesto ($1,198,240), Authorizing City Manager to Execute Change Orders ($100,000), and Appropriating Funds ($178,240) MEETING DATE: PREPARED BY: May 4, 2022 Public Works Director RECOMMENDED ACTION: Adopt resolution awarding contract for 2021/22 Pavement Resurfacing Project, Various Locations, to American Paving Systems, Inc., of Modesto, in the amount of $1,198,240, authorizing City Manager to execute change orders in an amount not -to -exceed $100,000, and appropriating funds in the amount of $178,240. BACKGROUND INFORMATION: This pavement resurfacing project includes the application of rubberized asphalt cape seal and fiberized slurry seal. The project limits will include various streets throughout the City, as shown on Exhibit A. The rubberized asphalt cape seal is a two -layer system of a rubberized chip seal on the bottom, with a fiberized slurry seal (slurry seal with strands of glass fiber added) on top. The rubberized cape seal will be applied to streets with more surface defects, while only one layer of fiberized slurry seal will be applied to those streets with fewer surface defects. Specifications for this project were approved on March 2, 2022. The City received the following three bids for this project on April 6, 2022: Bidder Engineer's Estimate American Pavement Systems VSS International Doolittle Construction., LLC Location Modesto West Sacramento Snoqualie, WA Bid $ 1,196,050.00 $ 1,198,240.00 $ 1,288,120.00 $ 1,390,323.00 Above/(Below) Estimate $ 2,190.00 $ 92,070.00 $ 194,273.00 Staff recommends awarding contract for 2021/22 Pavement Resurfacing Project, Various Locations, to American Paving Systems, Inc., of Modesto, in the amount of $1,198,240.00, authorizing City Manager to execute change orders in an amount not -to -exceed $100,000, and appropriating funds in the amount of $178,240. APPROVED: Steve SchWabaUer Stephen Schwabauer, City Manager KAWP\PROJECTS\STREETS\2021 Pavement Resurfacing\CAward doc 4/11/2022 Adopt Resolution Awarding Contract for 2021/2022 Pavement Resurfacing Project, Various Locations, to American Pavement Systems, Inc., of Modesto ($1,198,240), Authorizing City Manager to Execute Change Orders ($100,000), and Appropriating Funds ($178,240) May 4, 2022 Page 2 FISCAL IMPACT: By investing in the recommended maintenance project, significant capital dollars will be saved by extending the useful life of the pavement and foregoing costlier pavement reconstruction. This project does not impact the General Fund. FUNDING AVAILABLE: Budgeted Fiscal Year 2021/22: PWST-22002 $1,220,000 Requested Appropriation: Senate Bill 1 Gas Tax (30499000.77020) $ 178,240 Andrew Keys Andrew Keys Deputy City Manager/Internal Services Director Charles E. Swimley, Jr. Public Works Director Prepared by Sean Nathan, Senior Civil Engineer CES/AB/CD Attachments cc: Utility Superintendent K:\WP\PROJECTS\STREETS\2021 Pavement Resurfacing\CAward.doc 4/11/2022 '1= =ate 111"U1110111 "�� 11IIINII_. =? `i°°� �Illll1011. 0 :9 1il��iiiiIi��riM ..i 2021/2022 PAVEMENT RESURFACING PROJECT VARIOUS LOCATIONS CONTRACT CITY OF LODI, CALIFORNIA THIS CONTRACT made by and between the CITY OF LODI, State of California, herein referred to as the "City," AMERICAN PAVEMENT SYSTEMS, INC., a California corporation, herein referred to as the "Contractor." WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other, as follows: The complete Contract consists of the following documents which are incorporated herein by this reference, to -wit: Notice Inviting Bids Information to Bidders Certifications and Forms General Provisions Federal Requirements Special Provisions Bid Proposal Contract Contract Bonds Federal Minimum Wage Rates Plans Addenda The 2018 Edition, Standard Specifications, State of California, Business and Transportation Agency, Department of Transportation City of Lodi Construction Specifications All of the above documents, sometimes hereinafter referred to as the "Contract Documents," are intended to cooperate so that any work called for in one and not mentioned in the other is to be executed the same as if mentioned in all said documents. ARTICLE I - That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the City and under the condition expressed in the two bonds bearing even date with these presents and hereunto annexed, the Contractor agrees with the City, at Contractor's cost and expense, to do all the work and furnish all the materials except such as are mentioned in the specifications to be furnished by the City, necessary to construct and complete in a good workmanlike and substantial manner and to the satisfaction of the City the proposed improvements as shown and described in the Contract Documents which are hereby made a part of the Contract. ARTICLE 11 - The City hereby promises and agrees with the Contractor to employ, and does hereby employ, the Contractor to provide all materials and services not supplied by the City and to do the work according to the terms and conditions for the price herein, and hereby contracts to pay the same as set forth in Section 5.600, "Measurement, Acceptance and Payment," of the General Provisions, in the manner and upon the conditions above set forth; and the said parties for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree to the full performance of the covenants herein contained. ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division 2 of the Labor Code. The Contractor and any Subcontractor will pay the general prevailing CONTRACT 4.1 04/11/22 wage rate and other employer payments for health and welfare, pension, vacation, travel time, and subsistence pay, apprenticeship or other training programs. The responsibility for compliance with these Labor Code requirements is on the prime contractor. ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for doing all the work contemplated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City, and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Plans and Contract Documents and the requirements of the Engineer under them, to -wit: The work consists of rehabilitating approximately 129,000 square yards of asphalt concrete pavement with fiberized slurry seal, asphalt rubber chip seal, and other incidental and related work, all as described in the specifications for the above project. For additional bid item descriptions refer to Section 6-07 "Description of Bid Items". CONTRACT ITEMS Item Description Qty Unit Unit Price $ 87,000.00 Total $ 87,000.00 1 Mobilization, Traffic Control, 1 LS and Construction Notification _ $ 428,400.00 $ 15,000.00 2 Pavement Repair 68,000 SF $ 6.30 3 Pavement Repair at Manholes 10 EA $ 1,500.00 or Water Valves 4 Rubberized Chip Seal 78,000 SY $ 4.40 $ 343,200.00 5 Fiberized Slurry Seal, Type II 129,000 SY $ 2.16 $ 278,640.00 6 Stripinq 1 LS $ 46,000.00 $ 46,000.00 TOTAL $ 1,198,240.00 ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should there be any conflict between the terms of this instrument and the Bid Proposal of the Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to establish lines and grades for the work as specified under the Special Provisions. All labor or materials not mentioned specifically as being done by the City will be supplied by the Contractor to accomplish the work as outlined in the specifications. CONTRACT 4.2 04/11/22 ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract within 15 calendar days after the City Manager has executed the contract and to diligently prosecute to completion within 60 CALENDAR DAYS. ARTICLE IX - State of California Senate Bill 854 requires the following: No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6-04.03 OF THE SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT. IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year and date written below. CONTRACTOR: CITY OF LODI, a municipal corporation By: Title STEPHEN SCHWABAUER City Manager Date: Attest: OLIVIA NASHED City Clerk (CORPORATE SEAL) Approved As To Form: JANICE D. MAGDICH City Attorney CONTRACT 4.3 04/11/22 Capital Improvement Plan FY 2021-2022 Project Title: 2022 Pavement Resurfacing Project I Munis Project Code: PWST-22002 #176 Section I: Description District Nos: Citywide Project Length Priority Resurfacing streets with rubberized cape seal and slurry seal on various street throughout the City. The project also include some pavement repair. Justification/factor driving project This project will prolong existing pavement life for 5 to 10 years. Additional Information Section II: Estimated Project Costs Expenditure Prior Years FY 20121 FY 21122 FY 22123 FY 23124 FY 24125 FY 25126 Future Yrs Total Estimate Budget Internal Staff $ - $ 20,000 $ 20,000 Contracts $ - $ 1,378,240 $ 1,378,240 Total Capital Costs $ - $ - $ 1,398,240 $ - $ - $ - $ - $ - $ 1,398,240 Section III: Funding Sources/Methods of Financing Funding Source(s) Prior Years FY 20121 FY 21122 FY 22123 FY 23124 FY 24125 FY 25126 Future Yrs Total Estimate Budget 304 - Gas Tax 2031 $ - $ 1,398,240 $ 1,398,240 Total Project Financing $ - $ - $ 1,398,240 $ - $ - $ - $ - $ - $ 1,398,240 Section IV Operating Budget Impact Operating Cost or (savings) Prior Years FY 20121 FY 21122 FY 22123 FY 23124 FY 24125 FY 25126 Future Yrs Total Estimate Budget Personnel $ - $ - Other Operating Costs $ - $ - Total Operating Impact $ - $ - $ - $ - $ - $ - $ - $ - $ - RESOLUTION NO. 2022-107 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING A CONTRACT FOR THE 2021/22 PAVEMENT RESURFACING PROJECT, VARIOUS LOCATIONS, TO AMERICAN PAVEMENT SYSTEMS, INC., OF MODESTO; AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDERS; AND FURTHER APPROPRIATING FUNDS WHEREAS, on March 2, 2022, the Council approved plans and specifications for the 2021/22 Pavement Resurfacing Project, Various Locations; and WHEREAS, the City received the following three bids on April 6, 2022: Above/(Below) Bidder Location Bid Engineer's Estimate American Pavement Systems Modesto $ 1,198,240 $ 2,190 VSS International West Sacramento $ 1,288,120 $ 92,070 Doolittle Construction., LLC Snoqualie, WA $ 1,390,323 $ 194,273 WHEREAS, staff recommends awarding the contract for the 2021/22 Pavement Resurfacing Project, Various Locations, to American Paving Systems, Inc., of Modesto, in the amount of $1,198,240; and WHEREAS, staff further recommends authorizing the City Manager to execute change orders in an amount not to exceed $100,000; and WHEREAS, staff further recommends appropriating funds in the amount of $178,240 from Senate Bill 1 Gas Tax (30499000.77020). NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award the contract for the 2021/22 Pavement Resurfacing Project, Various Locations, to American Paving Systems, Inc., of Modesto, California, in the amount of $1,198,240; and BE IT FURTHER RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute the contract and change orders in an amount not to exceed $100,000; and BE IT FURTHER RESOLVED that the Lodi City Council does hereby appropriate funds in the amount of $178,240 as set forth above; and BE IT FURTHER RESOLVED, pursuant to Section 6.3q of the City Council Protocol Manual (adopted 11/6/19, Resolution No. 2019-223), the City Attorney is hereby authorized to make minor revisions to the above -referenced document(s) that do not alter the compensation or term, and to make clerical corrections as necessary. Dated: May 4, 2022 I hereby certify that Resolution No. 2022-107 was passed and adopted by the City Council of the City of Lodi in a regular meeting held May 4, 2022 by the following votes: AYES: COUNCIL MEMBERS — Khan, Kuehne, Nakanishi, and Mayor Chandler NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — Hothi ABSTAIN: COUNCIL MEMBERS — None PAMELA M. FARRIS Assistant City Clerk 2022-107