AGENDA TITLE: Adopt Resolution Approving the Use of One Time General Fund Surplus Funds Accrued
as a Result of Conservative Pandemic Budgeting, Strong Economic Activity, and Federal
Reimbursements for Pandemic Related Spending, and Appropriating Funds ($9,580,000)
MEETING DATE: April 20, 2022
PREPARED BY: Deputy City Manager
RECOMMENDED ACTION: Adopt resolution approving the use of one time General Fund surplus funds
accrued as a result of Conservative pandemic budgeting, strong economic
activity, and federal reimbursements for pandemic related spending, and
appropriating funds ($9,580,000).
BACKGROUND INFORMATION: At the outset of the COVID-19 pandemic, the City froze positions within
the general fund and reverted projected revenues to the last full fiscal year
prior to the pandemic (FY 2018-19) to project revenue for the first full fiscal
year of the pandemic (FY 2020-21). A similarly conservative growth approach was taken going into the FY 2021-
22 budget year. Actual revenues have exceeded those estimates and even the pre -pandemic trends the City
was forecasting.
On a cash flow basis, this revenue was spent to fund pandemic related activities, including responding directly
to the emergency to ensure employee and public health and safety. The primary spending was on the Great
Plates Delivered program which delivered meals to senior and individuals at high risk of severe COVID
complications. All these activities were fully reimbursed by the federal government. Those reimbursements have
been received by the City, freeing up additional General resources above and beyond the City's required 16%
General Fund reserve set by Council policy and those created by the City's normal operating budget surpluses.
The City's Pension Stabilization Policy (PSP) requires all reserves in excess of 16% in the General Fund to be
sent to a Pension Stabilization Fund (PSF) to provide resources to reduce the City's Unfunded Accrued Liability
(UAL) with CalPERS in the future. The City has taken significant strides to address the UAL and this historic,
one time infusion of funds due to pandemic related budgeting practices and available resources presents a
unique opportunity to provide substantial community benefit while not ignoring the long term UAL liability.
Per the PSP, staff took all reserves in excess of 16% and invested those in the PSF based on the closing fund
balance at the end of FY 2020-21. However, in preforming the calculation, staff netted out all pandemic related
spending and reimbursements. This resulted in a total General Fund contribution to the PSF of $1,669,145 and
Adopt Resolution Approving the Use of One Time General Fund Surplus Funds Accrued as a Result of Conservative Pandemic
Budgeting, Strong Economic Activity and Federal Reimbursements for Pandemic Related Spending and Appropriating Funds
($9,580,000)
April 20, 2022
Page 2 of 2
a total PSF contribution of $2,230,107 with the difference being contributed by other operating funds based on
their share of pension costs. The result is $10,280,000 in un -programmed General Fund reserves for Council to
allocate. $9,580,000 is addressed in this staff report. Another $700,000 will be allocated separately. Staff is
recommending considering using this one-time money outside the PSP and programming these funds for various
projects.
City staff created a wish list of items for funding based on requests from City Council, the public, and
departmental needs. The list totaled over $250 million in deserving projects and is non-inclusive of all needs or
community desires. In review, only the highest priority projects with a public health and safety benefit, future
cost reduction, brand or image enhancement, no alternative readily available funding source, or ability to
increase revenue generating capacity were recommended for funding.
At the April 12, 2022 shirtsleeve meeting, City Council provided input on the proposed projects for funding. The
attached resolution incorporates input from that discussion.
FISCAL IMPACT: There is no fiscal impact from this action. The source of the $9,580,000 is General Fund
reserves above the targeted policy.
FUNDING: Reserve funds that are the subject of this action are in excess of the 16% target reserve
policy.
OTC—
A nd r'6 W-_ K
Deputy City Manager/Internal Services Director
BLUE SHEET T _ I
1
RESOLUTION NO. 2022-
A RESOLUTION OF THE LODI CITY COUNCIL APPROVING THE USE OF ONE TIME
GENERAL FUND SURPLUS FUNDS ACCRUED AS A RESULT OF CONSERVATIVE
PANDEMIC BUDGETING, STRONG ECONOMIC ACTIVITY, AND FEDERAL
REIMBURSEMENTS FOR PANDEMIC RELATED SPENDING; AND FURTHER
APPROPRIATING FUNDS ($9,580,000)
-------------------------------------------------------------------
-------------------------------------------------------------------
WHEREAS, the City Council has taken significant action to improve the City's
financial position through enacting sound financial policy,, addressing long term liabilities,
limiting spending, and built substantial reserves; and
WHEREAS, as a result of these forward thinking financial decisions, the City of
Lodi was able to enter the COVID-19 pandemic in a sound financial position and approach
budgeting cautiously without drastic cutbacks; and
WHEREAS, even without substantial cuts, the City did freeze positions and reduce
spending on general operations during the pandemic; and
WHEREAS, despite public health restrictions on economic activity, the City's
revenues continued to increase during the pandemic at a rate that exceeded pre -
pandemic estimates; and
WHEREAS, the City was able to fund pandemic related public health and safety
measures, including those to protect employees and minimize the spread of COVID-19 to
vulnerable populations through meal delivery (Great Plates Delivered program) out of
general revenue that otherwise would have been available for programming; and
WHEREAS, the federal government has reimbursed the City in full for all pandemic
related spending at 100%; and
WHEREAS, the City Treasurer is required by the City Council adopted Pension
Stabilization Policy to invest reserves in excess of 16% of General Fund revenues to be
invested in a Pension Stabilization Fund to be used to help offset future Unfunded Accrued
Liability (UAL) payments to CalPERS or to buy down the City's UAL; and
WHEREAS, given the historic nature of the pandemic reimbursements, the amount
available in excess of 16% far exceeded expectations; and
WHEREAS, the Treasurer has calculated the Fiscal Year 2020-21 year end fund
balance and fund balance requirement net of all pandemic related spending and
reimbursements and invested the $1,669,145 in excess of 16% using this calculation into
the PSF already, bringing the PSF balance to over $23 million; and
WHEREAS, the pandemic related reimbursements that still remain in the General
Fund balance total $10,280,000 and per policy, the Treasurer is required to invest those
funds in the PSF; and
WHEREAS, the one-time resources available present a unique opportunity for City
Council to address substantial community needs in addition to the continued focus on long
term liabilities and stay in compliance with the City's fund balance reserve policy; and
WHEREAS, $700,000 of this funding will be allocated by separate Council
resolution.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Lodi
approves the use of one-time General Fund surplus funds and appropriates funds in the
amount of $9,580,000 as outlined in Exhibit A, attached hereto and made a part hereof;
and
BE IT FURTHER RESOLVED that the Lodi City Council does hereby authorize
the a_ppropr_iations and Expenditures authorized in this resolution to be carried
forward into subsequent fiscal years until fully spent.
Dated: April 20, 2022
-----------------------------
I hereby certify that Resolution No. 2022- was passed and adopted by the
City Council of the City of Lodi in a regular meeting held April 20, 2022 by the following
vote:
AYES:
COUNCIL MEMBERS —
NOES:
COUNCIL MEMBERS —
ABSENT:
COUNCIL MEMBERS —
ABSTAIN:
COUNCIL MEMBERS —
OLIVIA NASHED
City Clerk
2022-
EXHIBIT A -
One Time General Fund Surplus Funds Proposed Uses
Recommended
Department Request Cost Funding
Transfer remainder of funds from GF to fully fund
Fire purchase of new fire truck 1,406,700 500,OOC
PD
AC Units _(2)
DeBenedetti Park - Cricket Sports Lighting
1,000,000
500,000 '
600,000
80,000
PRCS
600,000
PRCS
John Deere 4066R compact utility tractor with backhoe
and 4 in 1 bucket to replace parks' 2003 tractor
80,000
PRCS
Playground Renovations at five (5) locations: English Oaks
Structure, Hale Park tot Lot Structure, Peterson East
Structure, Legion Structure, Katzakian Structure
1,630,000
1,630,000
PW
Grape stake fence replacement at Hutchins St. south of
Century
1-5 / Flag City — Art Installation
150,000
150,000
PRCS
500,000
500,000
PRCS
PRCS
EDD
Highway 99 — Art Installation
Lodi Lake Southside Renovation Improvements
Fund small business matching loans or loan guarantees
500,000
500,000
2,400,000 .
2,400,000
500,000
470,000
PRCS
Hutchins Street Square Climate Control System
425,000
425,000
PRCS
Salas Park Parking Lot Overlay Improvements
1,300,000
1,300,000
PRCS
Legion Park Community Building Renovation
275,0002
75,000
Demolition of Park Structures : Lawrence Park Restroom,
PRCS Softball Complex Concession, Lodi Look Building 250,000 250,000
Total
Funding $ 9,580,000
RESOLUTION NO. 2022-102
A RESOLUTION OF THE LODI CITY COUNCIL APPROVING THE USE OF ONE TIME
GENERAL FUND SURPLUS FUNDS ACCRUED AS A RESULT OF CONSERVATIVE
PANDEMIC BUDGETING, STRONG ECONOMIC ACTIVITY, AND FEDERAL
REIMBURSEMENTS FOR PANDEMIC RELATED SPENDING; AND FURTHER
APPROPRIATING FUNDS ($9,580,000)
WHEREAS, the City Council has taken significant action to improve the City's
financial position through enacting sound financial policy, addressing long term liabilities,
limiting spending, and built substantial reserves; and
WHEREAS, as a result of these forward thinking financial decisions, the City of
Lodi was able to enter the COVID-19 pandemic in a sound financial position and approach
budgeting cautiously without drastic cutbacks; and
WHEREAS, even without substantial cuts, the City did freeze positions and reduce
spending on general operations during the pandemic; and
WHEREAS, despite public health restrictions on economic activity, the City's
revenues continued to increase during the pandemic at a rate that exceeded pre -
pandemic estimates; and
WHEREAS, the City was able to fund pandemic related public health and safety
measures, including those to protect employees and minimize the spread of COVID-19 to
vulnerable populations through meal delivery (Great Plates Delivered program) out of
general revenue that otherwise would have been available for programming; and
WHEREAS, the federal government has reimbursed the City in full for all pandemic
related spending at 100%; and
WHEREAS, the City Treasurer is required by the City Council adopted Pension
Stabilization Policy to invest reserves in excess of 16% of General Fund revenues to be
invested in a Pension Stabilization Fund to be used to help offset future Unfunded Accrued
Liability (UAL) payments to CalPERS or to buy down the City's UAL; and
WHEREAS, given the historic nature of the pandemic reimbursements, the amount
available in excess of 16% far exceeded expectations; and
WHEREAS, the Treasurer has calculated the Fiscal Year 2020-21 year end fund
balance and fund balance requirement net of all pandemic related spending and
reimbursements and invested the $1,669,145 in excess of 16% using this calculation into
the PSF already, bringing the PSF balance to over $23 million; and
WHEREAS, the pandemic related reimbursements that still remain in the General
Fund balance total $10,280,000 and per policy, the Treasurer is required to invest those
funds in the PSF; and
WHEREAS, the one-time resources available present a unique opportunity for City
Council to address substantial community needs in addition to the continued focus on long
term liabilities and stay in compliance with the City's fund balance reserve policy; and
WHEREAS, $700,000 of this funding will be allocated by separate Council
resolution.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Lodi
approves the use of one-time General Fund surplus funds and appropriates funds in the
amount of $9,580,000 as outlined in Exhibit A, attached hereto and made a part hereof;
and
BE IT FURTHER RESOLVED that the Lodi City Council does hereby authorize the
appropriations and expenditures authorized in this resolution to be carried forward into
subsequent fiscal years until fully spent.
Dated: April 20, 2022
I hereby certify that Resolution No. 2022-102 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held April 20, 2022 by the following vote:
AYES: COUNCIL MEMBERS — Hothi, Khan, Kuehne, Nakanishi, and
Mayor Chandler
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — None
ABSTAIN: COUNCIL MEMBERS — None
OLIVIA NASHED
City Clerk
2022-102
EXHIBIT A -
One Time General Fund Surplus Funds Proposed Uses
Department Request
Recommended
Cost Funding
Fire
Transfer remainder of funds from GF to fully fund
purchase of new fire truck
AC Units (2)
DeBenedetti Park - Cricket Sports Lighting
John Deere 4066R compact utility tractor with backhoe
and 4 in 1 bucket to replace parks' 2003 tractor
1,406,700
1,000,000
500,000
PD
500,000
PRCS
600,000
600,000
PRCS
80,000
80,000
PRCS
Playground Renovations at five (5) locations: English Oaks
Structure, Hale Park tot Lot Structure, Peterson East
Structure, Legion Structure, Katzakian Structure
Grape stake fence replacement at Hutchins St. south of
Century
1,630,000
1,630,000
PW
150,000
500,000
150,000
500,000
PRCS
1-5 / Flag City — Art Installation
PRCS
Highway 99 — Art Installation
500,000
500,000
PRCS
Lodi Lake Southside Renovation Improvements
2,400,000
500,000
425,000
2,400,000
470,000
EDD
PRCS
Fund small business matching loans or loan guarantees
Hutchins Street Square Climate Control System
Salas Park Parking Lot Overlay Improvements
425,000
PRCS
1,300,000
1,300,000
PRCS
PRCS
Legion Park Community Building Renovation
Demolition of Park Structures : Lawrence Park Restroom,
Softball Complex Concession, Lodi Look Building
275,000
275,000
250,000
1 250,000
Total
Funding $ 9,580,000
NJl.,_ -,i
,ISO low:
sillwig
i. dim
f.. ►.wr
_
ane -Time R
I!
Department
Request
Recommended
Cost Funding
Fire
Transfer remainder of funds from GF tofu I lyfund purchase of new fire truck
1,406,700
5001000
PD
AC Units (2)
1,000,000
500,000
PRCS
De Benedetti Park - Cricket Sports Lighting
600,000
600,000
PRCS
John Deere 4066R compact utility tractor with backhoe and 4 in 1 bucket to replace
parks' 2003 tractor
80,000
80,000
PRCS
Playground Renovations at five (5) locations: English Oaks Structure, Hale Park tot Lot
Structure, Peterson East Structure, Legion Structure, Katzakian Structure
1,630,000
1,630,000
PW
Grape stake fence replacement at Hutchins St. south of Centruy
150,000
1501000
PRCS
1-5/ Flag City—Art Installation
500,000
500,000
PRCS
Highway 99—Art Installation
500,000
500,000
PRCS
Lodi Lake Southside Renovation Improvements
2,400,000
2,400,000
EDD
Fund small business matching loans or loan guarantees
500,000
470,000
PRCS
Hutchins Street Square Climate Control System
425,000
425,000
PRCS
Salas Park Parking Lot Overlay Improvements
1,300,000
1,300,000
PRCS
Legion Park Community Building Renovation
275,000
275,000
PRCS
Demolition of Park Structures : Lawrence Park Restroom, Softball Complex Concession,
250,000
250,000
;04
CITY OF 40
Sac.pO
CALIFORNIA
Flo nartmcnt Rcrimar-t f'r%rt Psrulinu
PD
Motor Units for front & back gates (4 units)
40,000
-
PD
Property Lobby Security Upgrades
40,000
-
PU
Evidence Freezer
50,000
-
PW
Fire Station 4 Exterior Stucco Repair
150,000
-
CM
Long Term Liability Reduction - PERS ADP, PARS Contribution, OPER Payment, Vehicle,
Equipment, Facility, Parks Capital, Roof or Building Repair Fund Contributions
225,000,000
-
CM
Office Expansion - Remodel 2nd Floor of 315 W. Elm St. 2nd Floor
1,250,000
-
Fire
,SLS Plan - OT Backfill for Paramedic School, Paramedic School, Cardiac Monitors
1,138,924
-
Library
Clean carpets (estimate)
3,443
-
Library
Self Check-OutAutomation
55,711
-
Library
Add -Savvy Touch Screen Solution (hardware, software service -platform configuration
and cloud based content management/software license for one year
8,508
-
CITY
Library
Complete LED lighting project for remainder of Library (estimate)
120.000
-
1110-WelozLibrary
/':)%-',r
Library Sloped Roof Repair
300000
-
C
Department
Request
Recommended
Cost Funding
Library Replace/update Community Room furniture (estimate) 37,056 -
PD New carpet for entire building 150,000 -
P RCS P k E t R I t 200 000
CITY OF
s:sr i
O
CALIFORNIA
ar s quipmen ep acemen
,
PRCS
Softball Complex Parking Lot Overlay Improvements
880,000
PRCS
Peterson Park Improvements
60,000
-
PRCS/PW
Bridge Over Lodi Lake (Connect Westside)
5,000,000
-
PRCS/PW
Water Park
1,000,000
-
PRCS/PW
HSS Sloped Roof Repair (finish the rest of the sloped roof)
1,000,000
-
PRCS/PW
HSS Flat Roof Repair (The flat floor coating we installed 5 years ago is a temporary
fixed and the roof should be rebuild)
1,200,000
-
PD/PW
PD Gun Range improvement (Remodel afterthe completion of HVAC improvement)
300,000
-
PW
Reduce Impact Fee Remaining Contributions
4,015,000
-
Totals
253,015,242
9,580,000
CITY OF
s:sr i
O
CALIFORNIA
Rails to Trails Project — $500,000
Initial planning work and study for developing a portion of unused Union Pacific Railroad tracks into a
Greenline Trail that would connect Downtown Lodi to Woodbridge.
Long Term Liability Reduction — $225,000,000
Despite significant progress, the City carries a large list of long term liabilities.
The following is not all inclusive but shows the definite need for additional funding to address long term
liabilities: PERS UAL; OPEB UAL; Vehicle replacements; equipment replacements; facility repairs and
maintenance; Parks Capital
230 W. Elm Street 2nd Floor Renovation - $1,250,000
Current space for administrative and police staff is limited.
Additional employees may not have dedicated space within existing facilities and the need to secure new
office space or explore alternative workspace models is necessary.
This facility is currently uninhabitable and needs repairs to its elevator for ADA compliance and general
remodeling into usable office space.
I
C�
CITY OF
�O Z
CALIFORNIA
Small Business matching Loan or Loan Guarantee Programs - $500,000 requested/$470,000 funded
y Loan purposes could range from equipment and working capital, to life/safety/fire safety building
improvements and acquisition of real estate in special geographic areas including Downtown, Heritage
District, Opportunity Zone and other aging commercial corridors.
y One-time budget request that could create a recurring program based upon loan activity and payments.
I
C�
-+ CITY OF
�O Z
CALIFORNIA
Purchase of a New Fire Truck. TOTAL $1,406,700 requested/$500,000 funded
Replacement for 2001 American LaFrance Tiller Truck that is past its useful life.
Full replacement cost of a new fully outfitted is currently $2,438,000 with a price increase May 2022.
This request locks in current pricing using the $500,000 recommended funding amount and existing fund
balance and puts the vehicle replacement program on a sustainable path forward.
Advanced Life Support Plan — TOTAL $1,138,824
➢ Request includes overtime backfill for existing employees attending paramedic school,
paramedic school tuition, and equipment purchase of cardiac monitors for a full program.
➢ Program is scalable to allow for ALS deployment at only one or any number of stations in the
City.
➢ At this time, the ongoing cost burden of the ALS program is prohibitive to implementing the
service and it is not recommended to advance this request.
I
C�
CITY OF
vczoz�
CALIFORNIA
NOTE: ALL PROJECTES RECOMMEDNED FOR FUNDING ROM LIBRARY FUND BALANCE BUILT UP
DUE TO EXCESS PANDEMIC ERA TRANSFERS FOR OPERATING SUPPORT.
Library carpets cleaned: Comprehensive cleaning is well past due and has not been undertaken in years.
Total $3,442.88
Self -Check Out Automation: 2 Bibliotheca selfCheck 1000 kiosks, 1 selfCheck 1000 desktop including 2 -5 -
year service and maintenance agreement. Total $55,711.45
Add -Savvy Touch screen solution: 35" touch screen solution and cart that allows patrons to access the
catalog, programs and library services. Our quote includes hardware, service- platform configuration and
cloud -based content management and software license for a year. Total $8,508
LED lighting project completed for the remainder of the library Estimated Total $120,000
Replace and update Community Room furniture: The current community room chairs are heavy and
stained (cloth). The tables are dated, very heavy and cumbersome for staff to nest. Total from both
vendors $37,055.52
Sloped Roof Repair: The roof is past its useful life and in need of repair to maintain the facility to the
standard required. Total $300,000
Total one-time funding requested by the Library: $524,717.85
I
C�
CITY OF
�O Z
CALIFORNIA
Air Conditioning Units — Two HVAC units operating the facility are both due for
replacement. The units have failed during high heat events in the past causing significant
discomfort to staff operating a 24/7 emergency service operation. Long term failure
during high heat would impact the ability to deliver public safety services. Total Request
$170007000 ($500,000 per unit)/$500,000 funded(1 unit)
Motor Units for the Front and Back Gates — Aging motors have failed in the past
causing delays in response as staff needs to manually open gates.
Estimated Cost $40,000.
Property Lobby Security Upgrades — The property room and lobby are managed by
Civilian employees in the police department. The glass between customer and staff is
not security glass and to transfer large property requires person to person contact,
possibly exposing staff to dangerous and upset individuals. Estimated Cost $40,000.
New Carpet for the Entire Building — The police building is around 25 years old, and
so is the carpet in the facility. Cost Estimate $150,000
Evidence Freezer — The evidence freezer is over twenty years old. The age of the unit
makes it hard to find parts, and if it fails, sensitive and critical evidence will be lost. Cost
Estimate $50,000.
•
C�
CITY OF
IV�r O i
I no
CALIFORNIA
Lodi Lake Southside Renovation Improvements -
$2.4 Million
Installed in late 1940s/early 1950s and not
repaired/repaved since.
Over 45,000 vehicles enter the park
annually. Countless more park offsite, walk or bike
in to the park.
v This project reduce safety risks to the public, reduce
maintenance costs and beautify the park.
v Restore damaged roads, trails and picnic areas and
will protect these from further damage, enhancing
visitor experience and safety.
v Scope includes the reconstruction of the paved
parking lot area, along with underground utility up-
grades, new concrete paths of travel, trash
enclosures, picnic tables, park benches, playground
equipment, turf and irrigation improvements.
Salas Park Parking Lot Overlay Improvements - $1.3
Million
r
r
Existing parking lot is in very poor condition with
numerous pot holes and failing asphalt pavement duel
to weather and normal wear and tear. A
The Lodi Boosters of Boy/Girls Sports who use the 1
facilities regularly for youth and adult programming
recently striped the parking lot to help identify spaces.
y Rehabilitate the parking lot and protect areas from
further damage enhancing the visitor experience and
safety.
y Scope includes re -pavement of the parking lot and
overhead lighting.
C�
CITY OF
�O Z
CALIFORNIA
Playground Renovations at five (5) locations — $1.63 Million
Replacement of existing or previously removed structures
installed between 1997 — 2001.
Playground safety regulations state these need to be updated
to meet equipment safety requirements.
Replacement parts for the existing structures are difficult to
obtain due to the age of the structures and often times repairs
are not timely.
r English Oaks Structure— $363,000 — Installed in 1997. Currently
there is no playground structure,
Hale Park Tot Lot Structure - $298,000 — Installed in 2006.
➢ Peterson East Structure - $348,000 — Playground installed in 1997.
➢ Legion Structure — $378,000 — Playground installed in 1998.
➢ Katzakian Structure — $348,000 — Playground installed in 2001.
Demolition of Abandoned Park Structures - $250,000
Lawrence Park Restroom — the restroom is unusable and has
become an attractive nuisance within the property. The
restroom has been out of service since 2015.
Softball Complex Concession — the concession stand and I
storage has not been in use since 2005 due to dilapidation. It
has been challenging for PRCS staff to keep the building
secure from vandalism.
Lodi Look Building — this building is located between the North
parking lot of the Grape Bowl and Lawrence Elementary
School. The building has been abandoned since 2007 after the
After School Program moved to Lodi Unified campuses.
C�
CITY OF
�O Z
CALIFORNIA
Legion Park Community Building Renovation -
$275,000
Potential revenue generating community asset
currently off-line due to poor conditions.
Scope includes renovating interior to include new
windows, doors, flooring, cabinetry work, electrical
upgrades, restroom fixtures and sewer line
improvements.
Prime, central location creates high facility demand.
No improvements to this space have been
conducted in over 30 years.
$140,000 was previously approved to help improve
this condition of this facility but PRCS recommended
and Council approved reallocating that funding cover
construction overages for Blakely Park Sports and
Irrigation Improvements Project.
Hutchins Street Square Climate Control System -
$425,000
The indoor pool at Hutchins Street Square operates
year-round. V
High winter humidity causes moisture to accumulate
on walls/structures throughout HSS buildings, creating
corrosive environment leading to increased need for
maintenance and repair throughout the facility.
y In summer, the heat is intolerable due to lack of air
conditioning.
y This pool is the city's only indoor pool and is in high -
demand and heavily programmed.
y The project will replace the non-functioning climate
control system for the pool, thereby preserving the
asset that is the pool and Hutchins Street square and
reducing future maintenance and repair costs.
CITY OF
�O Z
CALIFORNIA
John Deere 4066R compact utility tractor with
backhoe and 4 in 1 bucket to replace parks' 2003
tractor - $80,000
➢ The aged, current tractor is out of commission with
repair estimates over 50% the cost of a replacement
➢ Without the tractor, maintenance is done manually,
resulting in double the manpower.
➢ The tractor is used for smaller construction projects,
leaf removal, irrigation work, homeless cleanups,
loading and hauling debris, etc.
Replacement will lead to efficiencies in the
department and an improvement in the existing
staff's ability to provide service.
➢ There is currently no funding in PRCS equipment
replacement accounts.
DeBenedetti Park - Cricket Sports Lighting - $600,000
➢ Provide a (4) new 70' galvanized steel poles, LED
sports lighting and Musco Lighting Controls.
➢ Construction of a 12'x80' concrete pad (cricket pitch)
with synthetic turf covering for "tape -ball" play, in the
southwest basin of DeBenedetti Park.
➢ Provide sports lighting for safe night play along with
energy saving with the LED lighting fixtures.
i
Parks Equipment Replacement Fund Transfer — TOTAL
$200,000
CITY OF 101
IRZ
I
O
CALIFORNIA
1-5 / Flag City — Art Installation - $500,000
Lodi's cultural history will be celebrated through an
art installation for citizens and visitors as they enter
the city.
Benefits to an art installation are many including its
location in a public atmosphere (not confined to a
museum or building), its enrichment to the city's
streetscapes, lends itself to civic engagement,
provides artists with professional opportunities, may
boost local economy by creating an attraction to
visitors, shows an investment to the city by
celebrating Lodi's livability and love -ability boosting
community pride, and will connect neighbors through
a shared history.
A current main idea for the art installation is a cluster
of grapes sculpture.
The Arts Commission would engage artists to
commission the work.
Highway 99 — Art Installation - $500,000
Lodi's cultural history will be celebrated through an art
installation for citizens and visitors as they enter the
city. A
Benefits to an art installation are many including its
location in a public atmosphere (not confined to a
museum or building), its enrichment to the city's
streetscapes, lends itself to civic engagement,
provides artists with professional opportunities, may
boost local economy by creating an attraction to
visitors, shows an investment to the city by celebrating
Lodi's livability and love -ability boosting community
pride, and will connect neighbors through a shared
history.
A current main idea for the art installation would be
similar to the existing Celebrate the Harvest sculpture.
The Arts Commission would engage artists to
commission the work.
CI
-+
CITY OF
�O Z
CALIFORNIA
Softball Complex Parking Lot Overlay Improvements
-$880,000
The Softball Complex is a heavily used athletic field for
both youth and adult softball programming. The existing
parking lot is in very poor condition with numerous pot
holes and failing quality of asphalt pavement due to
weather and lack of maintenance. Scope of work shall
also include interior overhead parking lot lighting.
Bridge Over Lodi Lake (Connect Westside) $5M
This community enhancement project would connect the
Lodi Lake Boat ramp area with the walking path along
the west side of the lake, expanding the walkability of
the park.
Peterson Park Improvements - $135,000
This project will replace park sign that was damaged by a
vehicular accident in 2019. The new sign will be
fabricated with 10 gauge sheet steel, aged metal finish
and with frames. The proposed sign will have a similar
look to the Candy Cane Park sign. The tennis courts at
Peterson Park are approximately 25 years old and in need
of repair. The colored asphalt surfacing has faded and has
numerous cracks along with portions that have chipped
away. The surface also has some offset construction
joints that create potential tripping hazards and settlement
has caused small localized ponding.
Water Park - $1 M
This community enhancement project would provide
additional recreation opportunities at DeBenedetti Park
during the summer months.
CITY OF 101
IRZ
I
O
CALIFORNIA
Fire Station 4 Exterior Stucco Repair -
$150k
➢ 20 year old building with cracked exterior
stucco around windows causing water
intrusion and water damage
HSS Sloped Roof Repair - $1M
➢ Roof is 25 yeas old and is past its useful
life. This would complete the second of
three phases of sloped roof repairs at HSS
HSS Flat Roof Repair - $1.2M
➢ Reconditioning efforts during lean times
were insufficient to address the need for
roof replacement long term. Existing
repairs are again showing wear and full
replacement is needed
Impact Fees (City Contributions):
Reduce Impact Fee Remaining
Contributions $4.15M
➢ Impact fee subsidies to spur development
during the Great Recession leave the impa
fee programs with an "existing deficiency".
0
•
Existing Deficiencies cannot be cured by
charging future development and must be
cured through grants or other City revenues.
PD Gun Range improvement
➢ Second phase of the remodel including
updating shooting partitions, new counters
and cabinetry and a more effective bullet
trap
ig