Loading...
HomeMy WebLinkAboutAgenda Report - April 20, 2022 C-09CITY OF D L CALIFORNIA COUNCIL COMMUNICATION AGENDA ITEM C R '? AGENDA TITLE: Accept Project Under Contract for Lodi Lake Riverbank Stabilization Project MEETING DATE: April 20, 2022 PREPARED BY: Public Works Director RECOMMENDED ACTION: Accept improvements for Lodi Lake Riverbank Stabilization Project. BACKGROUND INFORMATION: A portion of the riverbank on the Mokelumne River that runs along the northern boundary of Lodi Lake Park, had become severely eroded in past years and was threatening adjacent park facilities. The erosion had exposed irrigation lines, tree roots, and caused the collapse of concrete retaining wall structures. The project included clearing, grubbing, selective tree removal and trimming, concrete slope protection removal and replacement, sod installation, tree planting, and other miscellaneous and related work as shown on the plans and specifications for the project. The project was award to ASTA Construction Company, Inc. of Rio Vista on December 1, 2021, in the amount of $541,013.00 and the final contract price is $595,580.86. The cost increase was due to two change orders and the final bid item quantity difference. Change Order No. 1 ($33,046.57) was to accelerate the rock slope protection placement in the river below the normal highwater level in February so the work in the river could be completed before Woodbridge Irrigation District (WID) raised their dam on the river in March. WID agreed to delay the dam raising for one week to accommodate the City's schedule. Change Order No. 2 ($14,067.50) was to remove a large fallen tree in the work area after the rock slope protection was installed. Additional top soil and rock protection was required to fill the large void the fallen tree left behind. In addition to Change Orders No. 1 and No. 2, minor differences in contract line item quantities amounted to an additional $7,453.79. Overall the project was successful in reinforcing the riverbank erosion protection and new native trees were planted along the riverbank. This will provide years of erosion protection and the trees will provide habitat for the birds and fish along the river. Following acceptance by the City Council, as required by law, the City Engineer will file a Notice of Completion with the County Recorder's office. The notice serves to notify vendors and subcontractors that the project is complete and begins their 30 -day period to file a stop notice requiring the City to withhold payments from the prime contractor in the event of a payment dispute. APPROVED: Steve Schwabauer Stephen Schwabauer, City Manager \\cvcfilv02\pubwks$\WP\PROJECTS\PARKS\LODILAKE\Riverbank Stabilization Project\CAccept_Lodi Ake Riverbank doc 4/6/2022 Accept Project Under Contract for Lodi Lake Riverbank Stabilization Project April 20, 2022 Page 2 FISCAL IMPACT: This project will reduce the maintenance cost for the riverbank area at Lodi Lake Park. FUNDING AVAILABLE: N/A ('(� ILQ C arles E. Swimley, Jr. Public Works Director Prepared by Lyman Chang, Deputy Public Works Director/City Engineer CES/LC/cd cc: Public Works Management Analyst Parks/Recreation and Cultural Services Director Senior Civil Engineer KSN Consulting Engineer Asta Construction \\cvcfllv02\pubwks$\WP\PROJECTS\PARKS\LODILAKE\Riverbank Stabilization Project\CAccept_Lodi Ake Riverbank.doc 4/6/2022 • ;,. -w� Alli CITY OF 00, r , rrI O t r Y CALIFORNIA BLUE SHEET AGENDA ITEM Cme? COUNCIL COMMUNICATION AGENDA TITLE: Accept Project Under Contract for Lodi Lake Riverbank Stabilization Project and Adopt Resolution Authorizing City Manager to Execute Change Order in the amount of $4,568 MEETING DATE: April 20, 2022 PREPARED BY: Public Works Director RECOMMENDED ACTION. Accept improvements for Lodi Lake Riverbank Stabilization Project and adopt resolution authorizing the City Manager to execute change order in the amount of $4,567.86. T� BACKGROUND INFORMATION: A portion of the riverbank on the Mokelumne River that runs along the northern boundary of Lodi Lake Park, had become severely eroded in past years and was threatening adjacent park facilities. The erosion had exposed irrigation lines, tree roots, and caused the collapse of concrete retaining wall structures. The project included clearing, grubbing, selective tree removal and trimming, concrete slope protection removal and replacement, sod installation, tree planting, and other miscellaneous and related work as shown on the plans and specifications for the project. The project was award to ASTA Construction Company, Inc. of Rio Vista on December 1, 2021, in the amount of $541,013.00 and the final contract price is $595,580.86. The cost increase was due to two change orders and the final bid item quantity difference. Change Order No. 1 ($33,046.57) was to accelerate the rock slope protection placement in the river below the normal highwater level in February so the work in the river could be completed before Woodbridge Irrigation District (WID) raised their dam on the river in March. WID agreed to delay the dam raising for one week to accommodate the City's schedule. Change Order No. 2 ($14,067.50) was to remove a large fallen tree in the work area after the rock slope protection was installed. Additional top soil and rock protection was required to fill the large void the fallen tree left behind. In addition to Change Orders No. 1 and No. 2, minor differences in contract line item quantities amounted to an additional $7,453.79, which exceeds the originally approved City Manager's change order authority of $50,040 by $4,567.86. Staff is recommending adopting a resolution authorizing Citv Manager to execute chancre order in the amount of $4.567.86 to cover the contract item quantities adjustment. APPROVED Steve SchwabaUer Stephen Schwabauer, City Manager \\cvcfilv02\pubwks$\WP\PROJECTS\PARKS\LODILAKE\Riverbank Stabilization Project\CAccept_Lodi Ake Riverbank—V2 (002).doc 4/18/2022 Accept Project Under Contract for Lodi Lake Riverbank Stabilization Project April 20, 2022 Page 2 Overall the project was successful in reinforcing the riverbank erosion protection and new native trees were planted along the riverbank. This will provide years of erosion protection and the trees will provide habitat for the birds and fish along the river. Following acceptance by the City Council, as required by law, the City Engineer will file a Notice of Completion with the County Recorder's office. The notice serves to notify vendors and subcontractors that the project is complete and begins their 30 -day period to file a stop notice requiring the City to withhold payments from the prime contractor in the event of a payment dispute. FISCAL IMPACT This project will reduce the maintenance cost for the riverbank area at Lodi Lake Park. FUNDING AVAILABLE: N/A CL -LA.(:? Charles E. Swimley, Jr. Public Works Director Prepared by Lyman Chang, Deputy Public Works Director/City Engineer CES/LC/cd cc: Public Works Management Analyst Parks/Recreation and Cultural Services Director Senior Civil Engineer KSN Consulting Engineer Asta Construction \\cvcfilv02\pubwks$\WP\PROJECTS\PARKS\LODILAKE\Riverbank Stabilization Project\CAccept_Lodi Ake Riverbank—V2 (002) doc 4/18/2022 RESOLUTION NO. 2022-90 A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING THE CITY MANAGER TO EXECUTE A CHANGE ORDER WITH ASTA CONSTRUCTION COMPANY, INC., OF RIO VISTA, FOR LODI LAKE RIVERBANK STABILIZATION PROJECT WHEREAS, the Lodi Lake Riverbank Stabilization Project included clearing, grubbing, selective tree removal and trimming, concrete slope protection removal and replacement, sod installation, tree planting, and other miscellaneous and related work, as shown on the plans and specifications for the project; and WHEREAS, the project was awarded to ASTA Construction Company, Inc., of Rio Vista on December 1, 2021, in the amount of $541,013.00 and the final contract price is $595,580.86; and WHEREAS, Change Order No. 1 ($33,046.57) was to accelerate the rock slope protection placement in the river below the normal high-water level in February so the work in the river could be completed before Woodbridge Irrigation District raised their dam on the river in March; and WHEREAS, Change Order No. 2 ($14,067.50) was to remove a large fallen tree in the work area after the rock slope protection was installed. Additional top soil and rock protection was required to fill the large void the fallen tree left behind; and WHEREAS, in addition to Change Orders No. 1 and No. 2, minor differences in contract line item quantities amounted to an additional $7,453.79, which exceeds the originally -approved City Manager's change order authority of $50,000 by $4,567.86; and WHEREAS, staff recommends authorizing the City Manager to execute a change order in the amount of $4,567.86 to cover the contract item quantities adjustment. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute a change order with ASTA Construction Company, Inc., of Rio Vista, California, for the Lodi Lake Riverbank Stabilization Project, in the amount of $4,567.86, to cover the contract item quantities adjustment; and BE IT FURTHER RESOLVED, pursuant to Section 6.3q of the City Council Protocol Manual (adopted 11/6/19, Resolution No. 2019-223), the City Attorney is hereby authorized to make minor revisions to the above -referenced document(s) that do not alter the compensation or term, and to make clerical corrections as necessary. Dated: April 20, 2022 I hereby certify that Resolution No. 2022-90 was passed and adopted by the City Council of the City of Lodi in a regular meeting held April 20, 2022 by the following votes: AYES: COUNCIL MEMBERS — Hothi, Khan, Kuehne, Nakanishi, and Mayor Chandler NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN. COUNCIL MEMBERS — None OLIVIA NASHED City Clerk 2022-90