Loading...
HomeMy WebLinkAboutAgenda Report - April 6, 2022 C-08CITY OF zt�o CALIFORNIA AGENDA ITEM 'm 0 COUNCIL COMMUNICATION AGENDA TITLE: Adopt Resolution Authorizing City Manager to Execute Additional Change Orders for Lodi Electric Utility Office Remodel Project with Diede Construction, Inc., of Woodbridge ($500,000) and Appropriating Funds ($500,000) MEETING DATE: April 6, 2022 PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt resolution authorizing the City Manager to execute additional change orders for the Lodi Electric Utility Office Remodel Project with Diede Construction, Inc., of Woodbridge in an amount not to exceed $500,000 and appropriating funds in the amount of $500,000. BACKGROUND INFORMATION: On May 19, 2021, City Council awarded the contract for the Electric Utility Office Remodel Project to Diede Construction, Inc., of Woodbridge in the amount of $2,922,000 and authorized the City Manager to execute change orders in an amount not to exceed $520,000. To date there have been five (5) change orders totaling $499,076. Various major items of work in the approved change orders include a new fire alarm system, new data communications cabling, a new roof on the main building and new office systems furniture for the Electric Utility (EU) remodel area staff. While it was originally anticipated existing office furniture would be re -used in the newly remodeled work space, once the furniture was dismantled, moved into temporary office areas and re -assembled, it became apparent most of the furniture was in disrepair and incompatible with new furniture systems making it impossible to locate and match replacement pieces. At this time, staff have identified additional, final needs as it relates to the project including security improvements to ensure the safety of EU personnel as well as improvements to control access to employee only designated areas. In addition, already included as part of the Fiscal Year (FY) 2021/22 Capital Improvement Program (CIP) is funding for replacement of the EU warehouse roof. The EU warehouse is a pre-engineered metal building and the current remodel project includes three (3) pre- engineered metal storage buildings. With Diede already on site, a proposal was requested to have them replace the warehouse roof. The proposal includes all necessary engineering and documentation to submit the Building Permit application package and perform the roof replacement and was less costly and more appropriate in terms of scope for a metal building than a prior proposal received for the proposed roof replacement project. Therefore, at this time, staff are requesting authorization for the City Manager to execute additional change orders for the remodel project and appropriate funds to pay the costs associated with these additional change orders. EU anticipates having unspent funding from a variety of completed and/or APPROVED: Steve Schwabauer Stephen Schwabauer, City Manager \\cvcfilv02\pubwks$\WP\PROJECTS\MISC\Electric Utility\EUD Remodel 2020\CC EUD CO Increase Warehouse Roof.docx 2/24/2022 Adopt Resolution Authorizing City Manager to Execute Additional Change Orders for Lodi Electric Utility Office Remodel Project with Diede Construction, Inc., of Woodbridge ($500,000) and Appropriating Funds ($500,000) April 6, 2022 Page 2 closed FY 2021/22 projects to offset the needed appropriation. It is anticipated that the remodel project will be complete and staff will move back into the newly renovated building by the end of the current FY. FISCAL IMPACT: This project will not impact the City's General Fund. Including design, engineering, permitting, inspection, construction and the costs associated with temporary facilities during the remodel, the revised project budget for FY 2021/22 will total $4,021,642. Any unused funds will roll to FY 2022/23 as needed. FUNDING AVAILABLE: It is requested that funds in the amount of $500,000 be appropriated to 50199000.77020 (Project EUCP-21007). Andrew Keys Andrew Keys Deputy City Manager/Internal Services Director CL -p D Q) Charles E. Swimley, JT Public Works Director Jc,fl Reirkhtminer (Mar 23, 2022 16:07 PDT) Jeff Berkheimer Electric Utility Director Prepared by Gary Wiman, Construction Project Manager CES/GW/cd Attachments COMMERCIAL • INDUSTRIAL - DESIGN - BUILD CA License No. 632667 NV License No 00-12319 P.O. Box 1007 - Woodbridge, CA 95258 �� Accredited Quality onstruction, nc. Lodi (209) 369-8255 ' Stockton (209) 464-3352 • Fax (209) 368-0600 Contractor i Proposal Submitted To: Email Date: City of Lodi gwiman@loclL ov 02/25/22 Street: Job Name: 221 W. Pine Street Lodi Electric Utility Office Remodel City, State, Zip: Job Location: Lodi, CA 95240 1331 S. Ham Lane, Lodi, CA 95240 Attention, Job #: Reference: PC#: Gary Wiman 21012 76 We hereby submit specifications and estimates for: Reroof existing building as follows: 1. Along Line 2 a reveal cut will be required to be cut into the screen wall to allow for the panels to pass under during install and for final install of roof to be complete. We will minimize the cut made into this screen wall but essentially the wall sits on the existing roof and the screen clearance needs to be increased to allow for the new panels to pass through and not create a water dam. 2. Remove and reinstall all existing screen wall steel kickers. The screen wall itself will remain intact the entire time during our work at the roof level. 3. Provide New Metal Roof, approx. 13,800 sqft of roof panel. New roof panels to be 26ga Metal Sales PBR (Or Similar) Exposed Fastener White Painted panels, as close to match the existing panels as possible. Final color to be selected from manufacturers standard Colorfast45 Color chart. 4. Remove and replace (2) ea dek-tites at East end of roof around MEP penetrations. 5. Remove and replace all ridge vents. QEC to remove existing then install 8ea ridge vents 10' in length and non -continuously installed. These will be stand alone units as these have the best chance of not leaking. Linked units like currently installed are notorious for leaks. 6. Install New drip edge at Rake of building and into existing gutters. To keep bugs and animals from getting into the space between the new panels and the old all new flashing will be provided at roof level to account for closing off the edges of the roof. Subtotal $ 261,464.31 Bonds & Insurance 2% $ 5,229.29 Total: $ 266,693.60 Exclusions: This proposal does not include General Conditions costs beyond the current contract completion date in addition to the items noted below; 1. Anything not specifically mentioned above. 2. Reinforcing the existing bldg. or engineering associated with this roof system 3. Removal of existing roof panels or skylights 4. Removal of any existing material, besides the old ridge vents 5. New roof insulation 6. New gutters or downspouts 7. New bird netting (All material will be reused) 8. New lower roofs at the Southeast corner of the building. These can be added if desired, but it was conveyed the upper roof was the reason for the inquiry Two Hundred Sixty Six Thousand Six Hundred Ninety Four Dollars and No Cents dollars $ 266,694.00 NOTICE: "Under the Mechanic's Lien Law ( California Code of Civil Procedure, Section 1181 et seq.) any contractor, subcontractor, laborer, supplier or other person who helps to improve your property but is not paid for his/her work or supplies, has a right to enforce a claim against your property. This means that after a court hearing your property could be sold by a court officer and the proceeds of the sale used to satisfy the indebtedness. This can happen even if you have paid Authorized your own contractor in full, if the subcontractor, laborer or supplier remains unpaid." i'I`ltilf�L �%!/`tGGfid Signature iCY All material is guaranteed to be as specified. All work to be completed in a workman like manner Mike Azevedo, ProjecWanager according to standard practices. Any alteration or deviation from the above specifications involving extra costs will be executed only upon written orders and will become an extra charge over and NOTE: This proposal may be withdrawn if not above the estimate. All agreements contingent upon strikes, accidents or delays beyond our accepted within S days. control. owner to carry fire, tornado and other necessary insurance. Acceptance of Proposal -- The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as Signature specified. Payment will be made accordinging to contract terms or as noted above. Date of Acceptance: Signature Job Name: Lodi Electric Utility Office Remodel Work D- Supervision Job #: 21012 Day TTL Hours 1 Man 200 1 PC #: 76 Rate Item Total $ 96.18 $ 19,236.00 Field Measure Roof 2 Men 16 $ 74.90 $ 1,198.40 DDC LABOR TOTAL $ 20,434.40 Permit Allowance $ 10,000.00 Dumpster $ 1,500.00 Truck & Fuel $ 1,000.00 MATERIAL TOTAL $ 12,500.00 Lift Rental $ 1,550.00 EQUIPMENT TOTAL $ 1,550.00 DDC Labor, Material & Equipment Subtotal $ 34,484.40 Markup 15% DDC Labor, Material & Equipment Total $ 5,172.66 $ 39,657.06 $ 2,550.00 Engineering Install 26 ga. Painted Roof $ 208,695.00 SUBCONTRACTOR SUBTOTAL $ 211,245.00 Markup 5% Subcontractor •221,807.25 TOTAL4.4 $ 10,562.25 I- 3130 Bayshore Road • Benicia, CA 94510 (707) 746-1233 • FAX (707) 751-3962 Quality Erectors & License #502736 Construction, Inc. To: Diede Construction Date: 2.10.21 Attn: Dave Lagorio Proposal # : 121826019 Phone: 209.993.1437 Email: dlagorio(a)diedeconstruction.com Base Bid: $ 208,695.00 Project: Lodi Electric Reroof —14K SF Spec: None. Quote based on site inspection by Ethan Law and Mario Sousa. Quality Erectors & Construction Inc. is pleased to offer this proposal to furnish and install new roof, and roof accessories at the mentioned project per the details listed below. Re -Roof Scope Included: 1) Along Line 2 a reveal cut will be required to be cut into the screen wall to allow for the panels to pass under during install and for final install of roof to be complete. QEC will minimize the cut matte into this screen wall .but essentially the wall sits on the existing roof and the screen clearance needs to be increased to allow for the new panels to pass through and not create a water dam. 2) Remove and reinstall all existing screen wall steel kickers. The screen wall itself will remain intact the entire time during our work at the roof level. 3) Provide New Metal Roof, approx. 13,800 sgft of roof panel. New roof panels to be 26ga Metal wales PBR (Or Similar) Exposed Fastener White Painted panels, as close to match the existing panels as possible. Final color to be selected from manufacturers standard Colorfast45 Color chart. 4) Remove and replace (2) ea dek-tites at East end of roof around MEP penetrations. 5) Remove and replace all ridge vents. QEC to remove existing then install 8ea ridge vents 10' in length and non -continuously installed. These will be stand alone units as these have the best chance of not leaking. Linked units like currently installed are notorious for leaks. 6) Install New drip edge at Rake of building and into existing gutters. To keep bugs and animals from getting into the space between the new panels and the old all new flashing will be provided at roof level to account for closing off the edges of the roof. Excluded: 1) Anything not specifically mentioned above. 2) Reinforcing the existing bldg. or engineering associated with this roof system. 3) Removal of existing roof panels or skylights. 4) Removal of any existing material, besides the old ridge vents. 2) New roof insulation 3) New gutters or downspouts 4) New bird netting (All material will be reused) 3130 Bayshore Road • Benicia, CA 94510 (707) 746-1233 • FAX (707) 751-3962 Quality Erectors & Construction, Inc. License #502736 5) New lower roofs at the Southeast corner of the building. These can be added if desired, but it was conveyed the hire roof was the reason for the inquiry. Payment Terms: 1) Material deposit TBD 2) Balance due Net 30 If you have any questions regarding this quote call 707-746-1233. PROPOSAL IS GOOD FOR (30) THIRTY DAYS CQ i By: Ethan B. Law Estimator Capital Improvement Plan FY 2021-2022 Project Title: LEU Facility Renovation I Munis Project Code: EUCP-21007 #49 Section I: Description District Nos: 3 Project Length 7/17-6/22 Priority High Renovation of Lodi Electric Utility (LEU) facilities, including but not limited to, ADA, security, and other upgrades to improve functionality of existing spaces to accommodate existing staff. Renovation activities will also include needed repairs to flooring and roof systems. Justification/factor driving project Renovation of Lodi Electric Utility (LEU) facilities, including but not limited to, ADA, security, and other upgrades to improve functionality of existing spaces to accommodate existing staff. Renovation activities will also include needed repairs to flooring and roof systems. Additional Information This project will improve customer service, employee safety/security and addressing operational and workforce needs. Project construction will likely commence toward the end of FY 21 - any unused funds will carry forward to FY 22. $500K added to project in FY 22 for additional change order authority for warehouse roof (budgeted via separate CIP but scheduled to close Section II: Estimated Project Costs Expenditure Prior Years FY 20121 FY 21122 FY 22123 FY 23124 FY 24125 FY 25126 Future Yrs Total Estimate Budget Contracts $ 108,125 $ 136,859 $ 4,021,642 $ 4,266,626 - Total Capital Costs $ 108,125 $ 136,859 $ 4,021,642 $ - $ $ $ $ $ 4,266,626 Section III: Funding Sources/Methods of Financing Funding Source(s) Prior Years FY 20121 FY 21122 FY 22123 FY 23124 FY 24125 FY 25126 Future Yrs Total Estimate Budget 501 - EU Outlay Capital Reserve Fund $ 108,125 $ 136,859 $ 4,021,642 $ 4,266,626 Total Project Financing $ 108,125 $ 136,859 $ 4,021,642 $ - $ - $ - $ - $ - $ 4,266,626 Section IV Operating Budget Impact Operating Cost or (savings) Prior Years FY 20121 FY 21122 FY 22123 FY 23124 FY 24125 FY 25126 Future Yrs Total Estimate Budget + Personnel $ - $ - Other Operating Costs $ J $ - Total Operating Impact $ - $ I $ - $ - $ - $ - $ - $ - $ - RESOLUTION NO. 2022-74 A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING THE CITY MANAGER TO EXECUTE ADDITIONAL CHANGE ORDERS FOR THE LODI ELECTRIC UTILITY OFFICE REMODEL PROJECT WITH DIEDE CONSTRUCTION, INC., OF WOODBRIDGE; AND FURTHER APPROPRIATING FUNDS ------------------------------------------------------------------------ ------------------------------------------------------------------------ WHEREAS, on May 19, 2021, City Council awarded the contract for the Electric Utility Office Remodel Project to Diede Construction, Inc. (Diede), of Woodbridge in the amount of $2,922,000 and authorized the City Manager to execute change orders in an amount not to exceed $520,000; and WHEREAS, to date there have been five (5) change orders totaling $499,076 addressing major items of work including a new fire alarm system, new data communications cabling, a new roof on the main building, and new office systems furniture for the Electric Utility (EU) remodel area staff; and WHEREAS, staff have identified additional, final needs as it relates to the project, including security improvements to ensure the safety of EU personnel, as well as improvements to control access to employee -only designated areas; and WHEREAS, staff also requested a proposal from Diede to replace the EU warehouse roof, a project already included in the Fiscal Year 2021/22 Capital Improvement Program; and WHEREAS, the proposal provided by Diede includes all necessary engineering and documentation to submit the Building Permit application package and perform the roof replacement and was less costly and more appropriate in terms of scope for a metal building than a prior proposal received by the City for the proposed roof replacement project; and WHEREAS, staff recommend authorizing the City Manager to execute additional change orders for the remodel project and appropriate funds to pay the costs associated with these additional change orders with the additional appropriation to be offset by unspent funding from a variety of completed and/or closed FY 2021/22 projects. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute additional change orders for the Lodi Electric Utility Office Remodel Project with Diede Construction, Inc., of Woodbridge, in an amount not to exceed $500,000; and BE IT FURTHER RESOLVED that funds in the amount of $500,000 be appropriated to Account No. 50199000.77020 (Project EUCP-21007). Dated: April 6, 2022 ------------------------------------------------------------------------ ------------------------------------------------------------------------ I hereby certify that Resolution No. 2022-74 was passed and adopted by the City Council of the City of Lodi in a regular meeting held on April 6, 2022 by the following vote: AYES: COUNCIL MEMBERS — Hothi, Khan, Kuehne, and Nakanishi NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — Mayor Chandler ABSTAIN: COUNCIL MEMBERS — None 7// 0 PAMELA M. FARRIS Assistant City Clerk 2022-74