Loading...
HomeMy WebLinkAboutAgenda Report - April 6, 2022 C-06CITY OF kite CALIFORNIA AGENDA ITEM Cm16 COUNCIL COMMUNICATION AGENDA TITLE: Adopt Resolution Awarding Contract for 2022 Pavement Crack Seal Project to Global Road Sealing, Inc., of Garden Grove ($72,573.38) and Appropriating Funds ($22,574) MEETING DATE: April 6, 2022 PREPARED BY: Public Works Director RECOMMENDED ACTION. Adopt resolution awarding Contract for 2022 Pavement Crack Sealing Project to Global Road Sealing, Inc., of Garden Grove, in the amount of $72,573.38 and appropriating $22,574. BACKGROUND INFORMATION: The primary cause of asphalt failure is water infiltration into the street subgrade. Crack sealing is one of the most basic, and important, preventive street maintenance practices. This project consists of thoroughly cleaning and sealing the existing transverse and longitudinal cracks in pavement surfaces and includes other incidental and related work. This contract is intended to supplement work performed by Street Division crews to maximize the street area sealed each year. The 2022 locations are shown on Exhibit A and listed on Exhibit B. The plans and specifications for this project were approved on February 05, 2022. The City received the following three bids for this project on March 09, 2022: Staff recommends awarding Contract for 2022 Pavement Crack Sealing Project to Global Road Sealing, Inc., of Garden Grove, in the amount of $72,573.38 and appropriating $22,574. The difference between the Engineer's Estimate and low bid is primarily due to historic inflation, material shortages and the construction market forces. FISCAL IMPACT: By increasing the crack sealing effort, the useful life of City streets will be extended. This project does not impact the General Fund. APPROVED: Steve Schwabauer Stephen Schwabauer, City Manager \\cvcfilv02\pubwks$\WP\PROJECTS\STREETS\2022 Crack Seal\CAward.docx 3/22/2022 Above/(Below) Bidder Location Bid Engineer's Estimate Engineer's Estimate $50,000 Global Road Sealing, Inc. Garden Grove $72,573.38 $22,573.38 Bond Blacktop, Inc. Union City $80,230.26 $30,230.26 Pavement Coatings, Co. Sacramento $103,269.76 $53,269.76 Graham Contractors, Inc. San Jose $108,534.04 $58,534.04 Staff recommends awarding Contract for 2022 Pavement Crack Sealing Project to Global Road Sealing, Inc., of Garden Grove, in the amount of $72,573.38 and appropriating $22,574. The difference between the Engineer's Estimate and low bid is primarily due to historic inflation, material shortages and the construction market forces. FISCAL IMPACT: By increasing the crack sealing effort, the useful life of City streets will be extended. This project does not impact the General Fund. APPROVED: Steve Schwabauer Stephen Schwabauer, City Manager \\cvcfilv02\pubwks$\WP\PROJECTS\STREETS\2022 Crack Seal\CAward.docx 3/22/2022 Adopt Resolution Awarding Contract for 2022 Pavement Crack Seal Project to Global Road Sealing, Inc., of Garden Grove ($72,573.38) and Appropriating Funds ($22,574) April 6, 2022 Page 2 FUNDING AVAILABLE: Budgeted Fiscal Year 2021/22 - TDA Streets (30599000.77020): $50,000 Requested Appropriation: TDA Streets (30599000.77020) $22,574 Andrew Keys Andrew Keys Deputy City Manager/Internal Services Director CJ-gQ Charles E. Swimley, Jr. Public Works Director Prepared by Alice Bernardino, Associate Civil Engineer CES/AB/cd Attachments cc: Utility Superintendent OF GSI Q', 2022 Crack Seal Project Location Exhbit B Road Name From To Street Length (ft) Width (ft) Area (sf) Cherokee Ln. Delores St. Hale Rd. 1750 31 54250 Cherokee Ln. Pine St. Lodi Ave. 1075 31 33325 Cherokee Ln. Lockeford St. Victor Rd. 420 27 11340 Cherokee Ln. Lodi Ave. Pine St. 1075 31 33325 Cherokee Ln. Hale Rd. Lodi Ave. 1950 31 60450 Cherokee Ln. Murray St. Lockeford St. 796 27 21492 Cherokee Ln. Tokay St. Vine St. 1350 31 41850 Cherokee Ln. Victor Rd. Elm St. 750 31 23250 Cherokee Ln. Elm St. Pine St. 425 31 13175 Cherokee Ln. Lodi Ave. Tokay St. 1450 31 44950 Cherokee Ln. Pine St. Victor Rd. 1200 31 37200 Cherokee Ln. Lockeford St. Murray St. 796 27 21492 Cherokee Ln. Victor Rd. RR 136 27 3672 Cherokee Ln. Pioneer Dr. Murray St. 743 27 20061 Cherokee Ln. Murray St. Pioneer Dr. 743 27 20061 Cherokee Ln. Vine St. Kettleman Ln.1 25751 311 79825 Cherokee Ln. I Kettleman Ln. Delores St. 1 16701 311 51770 Cherokee Ln. SUBTOTAL 571,488 Lodi Ave. Central Av. Garfield St. 655 30 19650 Lodi Ave. Washington St. Central Av. 660 25 16500 Lodi Ave. Stockton St. Washington St. 655 25 16375 Lodi Ave. Main St. Stockton St. 295 25 7375 Lodi Ave. Washington St. Stockton St. 400 30 12000 Lodi Ave. Garfield St. Central Av. 560 30 16800 Lodi Ave. Central Av. Washington St. 850 30 25500 Lodi Ave. Stockton St. Main St. 400 30 12000 Lodi Ave. Main St. R. R. 205 31 6355 Lodi Ave. R. R. Main St. 295 25 7375 Lodi Ave. Cherokee Ln. Garfield St. 810 30 24300 Lodi Ave. Garfield St. Cherokee Ln. 620 25 15500 Lodi Ave. SUBTOTAL 179,730 Mills Ave. Holly Dr. Turner Rd. 249 45 11205 Mills Ave. Short Av. Holly Dr. 921 45 41445 Mills Ave. Lake St. Short Av. 197 45 8865 Mills Ave. Ayers Av. Lake St. 224 45 10080 Mills Ave. Robert St. Ayers Av. 273 45 12285 Mills Ave. Yosemite Dr. Robert St. 122 45 5490 Mills Ave. Yosemite Dr. Colette St. 122 45 5490 Mills Ave. Lockeford St. Colette St. 342 45 15390 Mills Ave. Mariposa Wy. Lockeford St. 1 2951 451 13275 Mills Ave. Locust St. Mariposa Wy. 1 2701 451 12150 Mills Ave. Elm St. Locust St. 265 24 6360 Mills Ave. Pine St. Jerry Ln. 412 43 17716 Mills Ave. Walnut St. Kenway Ct. 139 43 5977 Mills Ave. Kenway Ct. Capell Dr. 116 43 4988 Mills Ave. Jerry Ln. Debbie Ln. 255 43 10965 Mills Ave. Debbie Ln. Elm St. 268 43 11524 Mills Ave. Santa Ynez Dr. Pine St. 255 43 10965 Mills Ave. Capell Dr. Santa Ynez Dr. 276 43 11868 Mills Ave. Jackson St. Walnut St. 1 2761 431 11868 Mills Ave. Lodi Av. Jackson St. 1 2681 431 11524 Mills Ave. SUBTOTAL 239,430 Pine St. Stockton St. Washington St. 400 48 19200 Pine St. Central Av. Washington St. 751 48 36048 Pine St. Central Av. Garfield St. 561 48 26928 Pine St. Main St. Stockton St. 380 48 18240 Pine St. Garfield St. Cherokee Ln. 1 7941 481 38112 Pine St. SUBTOTAL 138,528 Turner Rd. Roper Av. Grant Av. 560 31 17360 Turner Rd. Mills Av. Loma Dr. 2749 31 85219 Turner Rd. California St. Lincoln Av. 593 31 18383 Turner Rd. Ham Ln. Laurel Av. 1180 31 36580 Turner Rd. Grant Av. California St. 595 63 37485 Turner Rd. Lincoln Av. Pleasant Av. 589 31 18259 Turner Rd. Lincoln Av. Edgewood Dr. 595 31 18445 Turner Rd. Ham Ln. Roper Av. 1150 30 34500 Turner Rd. Pleasant Av. Church St. 458 31 14198 Turner Rd. Rivergate Dr. Lincoln Av. 1060 31 32860 Turner Rd. Edgewood Dr. Lakewood Av. 1490 31 46190 Turner Rd. Laurel Av. Ham Ln. 1100 31 34100 Turner Rd. Parkview Av. Laurel Av. 620 31 19220 Turner Rd. Lakewood Dr. Ham Ln. 826 31 25606 Turner Rd. Mills Av. Lower Sacramento Rd. 1435 31 44485 Turner Rd. Laurel Av. Loma Dr. 865 31 26815 Turner Rd. Sacramento Rd. Woodhaven Wy. 1180 31 36580 Turner Rd. Rutledge Dr. Mills Av. 2030 30 60900 Turner Rd. Loma Dr. Parkview Av. 290 31 8990 Turner Rd. Loma Dr. Parkview Av. 290 31 8990 Turner Rd. Mills Av. Loma Dr 2749 31 85219 Turner Rd. SUBTOTAL 710,384 TOTAL 1,839,560 2022 PAVEMENT CRACK SEALING Various Locations CITY OF LODI, CALIFORNIA THIS CONTRACT made by and between the CITY OF LODI, the "City," and GLOBAL ROAD SEALING, INC., a California "Contractor." WITNESSETH CONTRACT State of California, herein referred to as corporation, herein referred to as the That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other, as follows: The complete Contract consists of the following documents which are incorporated herein by this reference, to -wit: Notice Inviting Bids Information to Bidders General Provisions Special Provisions Bid Proposal Contract Contract Bonds Plans The 2018 Edition, Standard Specifications, State of California, Business and Transportation Agency, Department of Transportation City of Lodi Construction Specifications All of the above documents, sometimes hereinafter referred to as the "Contract Documents," are intended to cooperate so that any work called for in one and not mentioned in the other is to be executed the same as if mentioned in all said documents. ARTICLE I - That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the City and under the condition expressed in the two bonds bearing even date with these presents and hereunto annexed, the Contractor agrees with the City, at Contractor's cost and expense, to do all the work and furnish all the materials except such as are mentioned in the specifications to be furnished by the City, necessary to construct and complete in a good workmanlike and substantial manner and to the satisfaction of the City the proposed improvements as shown and described in the Contract Documents which are hereby made a part of the Contract. ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does hereby employ, the Contractor to provide all materials and services not supplied by the City and to do the work according to the terms and conditions for the price herein, and hereby contracts to pay the same as set forth in Section 5.600, "Measurement, Acceptance and Payment," of the General Provisions, in the manner and upon the conditions above set forth; and the said parties for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree to the full performance of the covenants herein contained. ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division 2 of the Labor Code. The Contractor and any Subcontractor will pay the general prevailing wage rate and other employer payments for health and welfare, pension, vacation, travel time, and subsistence pay, CONTRACT 4.1 3/10/2022 apprenticeship or other training programs. The responsibility for compliance with these Labor Code requirements is on the prime contractor. ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for doing all the work contemplated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City, and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Plans and Contract Documents and the requirements of the Engineer under them, to -wit: Perform the work necessary for thoroughly cleaning and sealing the existing transverse and longitudinal cracks and joints and random cracks in bituminous pavement surfaces and includes other incidental and related work as described in the specifications. See Section 6-07 "Description of Bid Items" and Exhibits A and B for additional information. CONTRACT ITEMS Item Description Approx. Area (SF) Price / SF Total Cost 1 Cherokee Ln. 571,488 $ 0.04 $ 22,859.52 2 Lodi Av. 179,730 $ 0.04 $ 7,189.20 3 Mills Av. 239,430 $ 0.03 $ 7,182.90 4 Pine St. 138,528 $ 0.05 $ 6,926.40 5 Turner Rd. 710,384 $ 0.04 $ 28,415.36 TOTAL BID: $ 72,573.38 ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should there be any conflict between the terms of this instrument and the Bid Proposal of the Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to establish lines and grades for the work as specified under the Special Provisions. All labor or materials not mentioned specifically as being done by the City will be supplied by the Contractor to accomplish the work as outlined in the specifications. CONTRACT 4.2 3/10/2022 ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract within 15 calendar days after the City Manager has executed the contract and to diligently prosecute to completion within 14 CALENDAR DAYS. ARTICLE IX - State of California Senate Bill 854 requires the following No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6-04.03 OF THE SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT. CONTRACT 4.3 3/10/2022 IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year and date written below. CONTRACTOR: 0 Title (CORPORATE SEAL) CITY OF LODI, a municipal corporation By: STEPHEN SCHWABAUER City Manager Date. Attest: Pamela M. Farris Assistant City Clerk Approved As To Form JANICE D. MAGDICH City Attorney CONTRACT 4.4 3/10/2022 Capital Improvement Program - Maintenance FY 2021-2022 Maintenance Project Title: Annual Pavement Crack Seal Program Munis Project Code: PWST-0018 #40 Section I:Description District Nos: Citywide Project Length 7/20-6/21 Priority Normal This project is to perform pavement crack seals on various streets in the City. Justification/factor driving project This project is to perform pavement crack seals on various streets in the City. Additional Information This is an annual contract. Section II Estimated Project Costs Expenditure Contracts Total Capital Costs Prior Years FY 20121 Estimate $ 50,000 $ 50,000 $ $ 50,000 $ 50,000 $ FY 21122 Budget 72,574 72,574 FY 22123 FY 23124 FY 24125 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ $ FY 25126 50,000 50,000 Future Yrs N/A NIA $ $ Total 372,574 372,574 Section III Funding Sources/Methods of Financing Funding Source(s) 302 - Gas Tax 2103 305 - TDA - Streets Total Project Financing Prior Years FY 20121 FY 21122 Estimate I Budget $ 50,000 $ 50,000 $ 72,574 1 $ 50,000 $ 50,000 $ 72,574 FY 22123 FY 23124 FY 24125 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ $ FY 25126 50,000 50,000 Future Yrs N/A N/A NIA $ $ $ Total 250,000 122,574 372,574 Section IV Operating Budget Impact Operating Cost or (savings) Personnel Other Operating Costs Total Operating Impact Prior Years $ - $ - $ - FY 20121 Estimate FY 21122 Budget FY 22123 FY 23124 FY 24125 FY 25126 Future Yrs $ - $ $ $ Total - - - $ - $ - $ - $ - $ - $ - RESOLUTION NO. 2022-72 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE CONTRACT FOR THE 2022 PAVEMENT CRACK SEAL PROJECT TO GLOBAL ROAD SEALING, INC., OF GARDEN GROVE; AND FURTHER APPROPRIATING FUNDS WHEREAS, this project consists of thoroughly cleaning and sealing the existing transverse and longitudinal cracks in pavement surfaces and includes other incidental and related work; and WHEREAS, the plans and specifications for the project were approved on February 5, 2022, and the City received the following four bids for this project on March 9, 2022: Above/(Below) Bidder Location Bid Engineer's Estimate Global Road Sealing, Inc. Garden Grove $72,573.38 $22,573.38 Bond Blacktop, Inc. Union City $80,230.26 $30,230.26 Pavement Coatings Co. Sacramento $103,269.76 $53,269.76 Graham Contractors, Inc. San Jose $108,534.04 $58,534.04 WHEREAS, staff recommends awarding the contract for the 2022 Crack Sealing Project to Global Road Sealing, Inc., of Garden Grove, in the amount of $72,573.38 ; and WHEREAS, staff also recommends appropriating funds in the amount of $22,574 from the TDA Streets Fund (30599000.77020). NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award the contract for the 2022 Pavement Crack Sealing Project to the low bidder, Global Road Sealing, Inc., of Garden Grove, California, in the amount of $72,573.38; and BE IT FURTHER RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute the contract; and BE IT FURTHER RESOLVED that funds in the amount of $22,574 be appropriated as set forth above; and BE IT FURTHER RESOLVED, pursuant to Section 6.3q of the City Council Protocol Manual (adopted 11/6/19, Resolution No. 2019-223), the City Attorney is hereby authorized to make minor revisions to the above -referenced document(s) that do not alter the compensation or term, and to make clerical corrections as necessary. Dated: April 6, 2022 I hereby certify that Resolution No. 2022-72 was passed and adopted by the City Council of the City of Lodi in a regular meeting held April 6, 2022 by the following vote: AYES: COUNCIL MEMBERS — Hothi, Khan, Kuehne, and Nakanishi NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — Mayor Chandler ABSTAIN: COUNCIL MEMBERS — None PAMELA M. FARRIS Assistant City Clerk 2022-72