AGENDA TITLE: Approve Plans and Specifications and Authorize Advertisement for Bids for
Wastewater Main Rehabilitation Program (Project No. 9)
MEETING DATE: April 6, 2022
PREPARED BY: Public Works Director
RECOMMENDED ACTION Approve plans and specifications and authorize advertisement for bids
for Wastewater Main Rehabilitation Program (Project No. 9).
BACKGROUND INFORMATION: The Wastewater Main Rehabilitation Program is intended to
systematically replace and repair existing wastewater infrastructure
that has reached its useful life. This is the ninth project scheduled in
this program.
In 2016, the City hired a consultant to perform a wastewater pipeline condition assessment. The
assessment included the inspection of the City's larger wastewater pipelines and identified pipe segments
in need of repair due to deteriorating pipe conditions. Staff uses the condition assessment results to
prioritize rehabilitation of wastewater pipelines. Project No. 9 focuses on the 24 -inch and 30 -inch diameter
wastewater trunk lines running south from Ham Lane and Park Street, continuing along the east side of
the WID Canal, ending at Century Boulevard.
Once completed, the project will improve the level of service associated with the wastewater system by
increasing reliability, reducing risk of pipeline failures, and decreasing maintenance costs. As with
previous phases of the project, staff is again recommending the use of trenchless methods of
rehabilitation to minimize both surface disruption and costs.
Project No. 9 includes in-place (trenchless) rehabilitation of approximately 3,100 linear feet of 24 -inch and
30 -inch diameter wastewater main, and the rehabilitation of approximately 18 manholes.
The plans and specifications are on file in the Public Works Department. The planned bid opening date is
April 27, 2022. The project estimate is $2,400,000.
FISCAL IMPACT: Completing this project will reduce future maintenance costs and increase
the performance and reliability of the wastewater system.
FUNDING AVAILABLE: Funding will be identified at project award.
APPROVED: Steve Schwabauer
Stephen Schwabauer, City Manager
\\cvcfilv02\pubwks$\WP\PROJECTS\SEWER\WastewaterRehabProject9\CPSA.docx 2/24/2022
Approve Plans and Specifications and Authorize Advertisement for Bids for Wastewater Main Rehabilitation Program (Project No. 9)
April 6, 2022
Page 2
Ck J-�O
Charles E. Swimley, Jr.
Public Works Director
Prepared by Jimi Billigmeier, Associate Civil Engineer
CES/JB/cd
Attachment
cc: Deputy Public Works Director /City Engineer
Utility Manger