AGENDA TITLE: First and Second Quarters Fiscal Year 2021/22 Water, Wastewater and Electric Utility
Department Financial Reports
MEETING DATE: March 16, 2022
PREPARED BY: Deputy City Manager
RECOMMENDED ACTION: Receive utility financial reports for the first and second quarters of Fiscal
Year 2021/22.
BACKGROUND INFORMATION: In accordance with the Lodi Municipal Code, quarterly financial reports are
to be prepared for the Water, Wastewater, and Electric Utilities.
Quarterly update presentations have been included in this report and a highlight of activities and progress is
outlined below for each utility.
Electric Utility Financial Highlights
REVENUE is stable tracking at nearly 60 percent of budget.
✓ Energy sales are tracking at 57 percent of budget. Energy sales tend to track higher during the
early, warmer months of the fiscal year.
✓ In addition, the utility is tracking higher than estimated revenue overall primarily due to the Cap
and Trade Program with auction prices clearing higher than anticipated.
EXPENSES are tracking at nearly 50 percent of budget halfway through the year.
✓ Non -power operating expenses are tracking at 40 percent of budget.
✓ Power supply costs are tracking at 56 percent of budget. Adjustments to forecasted power
supply costs are addressed each year as part of the midyear budget review. Should the dry
weather continue, less than ideal hydro conditions will contribute to power supply costs tracking
higher than original estimates.
✓ Capital outlay expenses are tracking at close to 20 percent of budget. Progress continues to be
made on the utility's building renovation project anticipated to be completed in April. Most
vehicle and equipment purchases have been submitted to vendors; however, due to longer lead
times, actual expenses may not be realized for these budgeted expenses until later this fiscal
year or early next fiscal year.
RESERVES as of December 31, 2021 totaled approximately $41 million. These reserves are used to
fund pay-as-you-go capital improvement and system maintenance projects as well as provide funding,
when needed, for business related areas of risk such as market power volatility and the cost of
`T
APPROVED: 5t , ����` (Wr8.202. fR59P5T)
Stephen Schwabauer, City Manager
replacement power during dry year conditions for which costs cannot reasonably be forecasted and
budgeted.
CAPITAL IMPROVEMENT PROJECTS includes over $20 million over 5 years for capital improvement
efforts. The projects listed are included in the City's current Capital Improvement Program included in
the adopted budget.
5 -YEAR FINANCIAL FORECAST indicates sufficient reserves through Fiscal Year 2025. However,
based on a variety of assumptions, a CPI level rate adjustment of approximately 2 percent is projected
in Fiscal Year 2026 in order to meet Council approved reserve targets.
Wastewater Utility Highlights
• REVENUE is stable and tracking at 51 percent of budget.
✓ Wastewater sales are tracking on target at 50 percent of budget.
• EXPENSES are as a total tracking well below the budget at 23 percent.
✓ Operating expenses are tracking lower than budget at 36 percent.
✓ Capital expenses for the first two quarters are tracking below budget at 2.5 percent. Included in the
capital budget is $2 million for the Main Replacement project which has yet to be bid out. Also
included in the budget is $1 million for the Fan Press Replacement, $3 million for the Aeration
Diffuser Replacement and $500,000 for the Digester #2 Cleaning projects at White Slough. Capital
expense is tracking far lower than budget due to many of the projects either not bid or awarded yet.
• RESERVES as of December 3, 2021 totaled $15.9 million which is 413 percent of the 180 days cash
target. These reserves are used to fund pay-as-you-go capital improvement projects planned over the
next several fiscal years.
• CAPITAL IMPROVEMENT PROJECTS include over $36 million in planned projects through fiscal year
26/27. The major projects include main replacement projects, construction of the electrical building, fan
press replacement, aeration diffuser replacement and the storm drain trash handling systems to comply
with state regulations. The projects listed are all in the fiscal year 20-25 Capital Improvement Program
that was included in the adopted budget.
• 5 -YEAR FINANCIAL FORECAST indicates a decline in reserves through fiscal year 2027.
Water Utility Highlights
• REVENUE is stable and tracking at 54 percent of budget.
✓ Water sales tracking slightly above target at 55 percent of budget.
✓ Other revenue is tracking low due to timing of the annual DBCP settlement funds.
• EXPENSES are as a total tracking well below the budget at 27 percent.
✓ Operating expenses are tracking slightly lower than budget at 40 percent.
✓ Capital expenses are tracking well below budget at 12 percent. Included in the capital budget is
almost 615,000 for the Well 28 GAC Treatment, almost 300,000 for the Meter Shop construction
and 300,000 for the 2020 Well Rehab project in which the contract had been awarded in a prior
fiscal year but with significant delays the expense had yet to be incurred.
• RESERVES as of December 31, 2021 totaled $11 million which is 276 percent of the 180 days cash
target. These reserves are used to fund pay-as-you-go capital improvement projects.
• CAPITAL IMPROVEMENT PROJECTS include almost $19 million in planned projects through fiscal
year 2027. The major projects include the multi -family phase of the meter program as well as the
Surface Water Treatment Plant membrane replacement and transmission line. The projects listed are
all in the fiscal year 20-25 Capital Improvement Program that was included in the adopted budget
• 5 -YEAR FINANCIAL FORECAST indicates a decline in reserves through fiscal year 2026.
FISCAL IMPACT: There is no fiscal impact from the preparation of this report.
FUNDING AVAILABLE: Adequate funding is available in the Fiscal Year 2021/22 budget, as amended by
Council action from time to time, for the items in this report. All data is presented
as current as of the date(s) obtained from the City's financial reporting system.
Final year-end audited data will be provided in the City's Annual Comprehensive
Financial Report (ACFR).
a x,�Obj
Andrew Keys
Deputy City Manager/Internal Services Director
�44aLlAL; fz asee2
Jeff 13 A lio im ed i rely 28.707810: kL PST] Charlie Swimley(Mar 8, 202214:05 PST)
[Department Signature]
CITY OF
egg046 zt� zo
CALIFORNIA
ELECTRIC./ UTILITY
Electric Utility Department
FY 22 Quarterly Update
(Ending December 31, 2021)
City Council Meeting
March 16, 2022
CITY OF
lsr �
O Z
CALIFORNIA
ELECTRIC ,UTILITY
Electric Utility Fund
Cash Flow Summary
(December 31, 2021)
Revenue
Budget
Actual
% of Budget
Sales Revenues
77,197,350
44,338,696
57%
Development Impact Fees
596,910
184,606
31%
Other Revenues (interest, misc)
4,197,130
3,815,052
91%
Total Revenues
81,991,390
48,338,354
59%
Purchase Power
46,200,000
26,013,637
56%
Non Power
17,417,080
6,894,075
40%
Capital Projects
13,106,431
2,228,000
17%
Debt Service
4,428,640
2,910,370
66%
Cost of Service
2,542,630
1,271,315
50%
In -lieu Transfer to General Fund
7,432,690
3,716,345
50%
Total Expenses
91,127,471
43,033,742
47%
Beginning Cash Balance (7/1/21)
42,164,766
Ending Cash Balance (12/31/21)
40,960,605
Reserve Policy Target
% of Target
24,906,890
164%
2
CITY OF
A r
Z
CALIFORNIA
ELECTRIC UTILITY
Electric Utility Funds
Cash Balances
(December 31, 2021)
Operating Funds
$
26,5131609
Utility Outlay Reserve Fund
$
1,000,000
Low Carbon Fuel Standard Fund
$
864
Public Benefits Fund
$
47129,712
Impact Fee Fund
$
1,366,814
Solar Surcharge Fund
$
341,088
Greenhouse Gas Fund
$
7,608,518
Total
$
40,9607605
3
CITY OF
A r
Z
CALIFORNIA
ELECTRIC UTILITY
Electric Utility Reserve Policy
(December 31, 2021)
*Includes cash held locally and at NCPA
$45,000
$40,000
$35,000
$30,000
c $25,000
0
�. $20,000
cry $15,000
$10,000
$5,000
Actual Reserves vs. Target
FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22
■Actual
p Target
Cash balances
support City Council
approved reserve
requirements and
provide funds for pay
as you go Capital
Improvement
Projects.
0
C Ir Y o f
is •� a �r
CALIFORNIA
ELECTRIC UTILITY
Capital Improvement Project
5 -Year Spending Plan
*Includes approved FY 22 budget as revised including prior year rollover and staff estimates
**Includes planning and design costs only — construction costs estimated at —$30M and will be debt financed
5
•recast
Forecast
•
Forecast
$0
Project
Budget*•
$1,100,000
Distribution Capacity Program
$0
$0
$0
Underground / Overhead Maint
$1,515,776
$1,081,000
$937,000
$922,000
$422,000
Streetlight Maintenance / Repair
$74,250
$50,000
$50,000
$50,000
$50,000
LED Streetlight Improvements
$250,000
$250,000
$250,000
$250,000
$0
230 kV Interconnection Project**
$163,410
$20,000
$20,000
$25,000
$25,000
Substation Maint/ Improvements
$1,392,795
$500,000
$500,000
$0
$0
Building/Security Improvements
$4,024,142
$0
$0
$0
$0
Work for Others
$673,927
$550,000
$550,000
$550,000
$550,000
Vehicles & Equipment
$2,200,120
$845,000
$1,010,000
$1,063,000
$170,000
Total Projects
$11,394,420
$3,296,000
$3,317,000
$2,860,000
$1,217,000
*Includes approved FY 22 budget as revised including prior year rollover and staff estimates
**Includes planning and design costs only — construction costs estimated at —$30M and will be debt financed
5
CITY OF
qtwilb,�, r 5 -Year Financial Forecast
CALIFORNIA Looking Ahead
ELECTRIC UTILITY
Forecast assumes funding of all budgeted full-time positions in future years
FY 26 includes CPI level rate adjustment of -2% to meet Council approved reserve target
0
FY 21-22
FY 22-23
FY i
FY 24-25
•Forecast
Budget
Forecast•
Available Cash
$36,622,336
$35,884,948
$34,453,628
$32,652,972
$32,047,674
Days Cash
164
158
149
138
134
Reserve Target
$24,906,890
$26,208,081
$26,578,289
$27,021,930
$27,388,776
of Target
147%
137%
130%
121 %
117%
Forecast assumes funding of all budgeted full-time positions in future years
FY 26 includes CPI level rate adjustment of -2% to meet Council approved reserve target
0
C Ir Y Q F
is •� a �r
CALIFORNIA
ELECTRIC UTILITY
Power Sales
(December 31, 2021)
Power Sales
CustomerBudget
Residential
(kWh)
168,667,005
95,084,131
Small Commercial
156,990,285
90,914,433
Large Commercial/Small Industrial
44,466,148
24,115,574
Industrial
63,886,577
36,535,075
Total
434,010,015
246,649,213
Customer••-
Residential
$
33,340,988
$
18,584,363
-
.• Rate
$ 0.1954
Small Commercial
$
28,017,519
$
16,696,038
$ 0.1836
Large Commercial/Small Industrial
$
7,534,122
$
4,233,640
$ 0.1755
Industrial
$
8,304,721
$
4,824,655
$ 0.1320
Total
$
77,197,350
$
44,338,696
$ 0.1798
7
CITY OF
A r
Z
CALIFORNIA
ELECTRIC UTILITY
ECA Revenue
(December 31, 2021)
Customer•
Residential
$
1,780,096
Small Commercial
$
1,605,075
Large Commercial / Small Industrial
$
435,847
Industrial
$
684,139
Total Revenue
$
4,505,157
CITY OF
A r
Z
CALIFORNIA
ELECTRIC UTILITY
Electric Utility Fund
Operating Results
(December 31, 2021)
9
$
BudgetBudget
9,362,490
$
5,235,359
56%
Supplies, Materials, Services
$
5,596,722
$
892,992
16%
Other Payments
$
2,370,668
$
735,902
31%
Utilities
$
87,200
$
29,822
34%
Total Operating Expenses
$
17,417,080
$
6,894,075
40%
9
G I'YY or
r 4 dt
CALIFORNIA
ELECTRIC %UTILITY
Power Supply Costs
(December 31, 2021)
10
Budget
Actua,
of • • -
58%
Generation
$ 31,986,580
$ 18,547,560
Transmission
$
12,836,020
$
6,664,516
52%
Management Services
$
1,377,400
$
801,561
58%
Total Power Supply Costs
$
46,200,000
$
26,013,637
56%
10
CITY OF
A r
Z
CALIFORNIA
ELECTRIC UTILITY
Q2 — 2022
Q3 — 2022
Q4 — 2022
Ql — 2023
160,000
140,000
120,000
100,000
L
80,000
60,000
40,000
20,000
Load Coverage
MINK Load
ROC Matrix
Target
Load Coverage
(Including Purchases)
118.089
80.0%
85.2%
148.324
76.7%
81.3%
108,967
66,7%
72.6%
114.067
60.0%
65.7%
Q2-2022 Q3-2022 Q4-2022 QI — 2023
Coverage
M Target
—Load
LEU continues to meet or exceed Risk Management targets
11
VeI ry OF
a Risk Oversight Committee (ROC)
CALIFORNIA
ELECTRIC UTILITY Report Highlights
0 6 ROC meetings held July— December 2021
— Completed 3 -Year review of Energy Risk Management Policy
— Forward gas/energy purchases approved to cover open positions through 2024
— Approved short-term renewable energy and capacity purchases
— Discussed confidential Cap and Trade strategy and activities
— Discussed confidential renewable energy procurement activities
— Approved Annual Power Source Disclosure/Power Content Label Reports
— Approved Annual GHG Use of Allowance Proceeds Report
— Recommended approval of WAPA Base Resource Assignment and NCPA
Assignment Administration Agreement
— Approved agreements associated with two confidential pilot projects
— Discussed summer energy hedging activities
— Recommended Council approval to use reserve funds to reduce energy cost
adjustment for customers
— Discussed RPS long-term procurement requirements
12
C Ir Y Q F
is •� a �r
CALIFORNIA
Strategic Areas of Focus
ELECTRIC UTILITY Project Highlights
• Customer
— Expanded new jobs discount program
— Approved contract for replacement/installation of public EV charging
stations
• Technology
— Authorized design and project management contract with Magellan
for Phase I Broadband Infrastructure Project
• Financial
— Approved new LED dusk to dawn tariff
— Authorized use of operating reserves to reduce energy cost
adjustment for customers
— Approved long-term renewable energy purchase for additional
hydroelectric resource from South Feather Water & Power Agency
— Expanded purchasing authority to address supply chain challenges 13
C Ir Y Q F
is •� a �r
CALIFORNIA
Strategic Areas of Focus
ELECTRIC UTILITY Project Highlights (cont'd)
• Reliability
— Removed hazardous trees under power lines along Lower
Sacramento Road
— Approved updated Wildfire Mitigation Plan
— Approved purchase of asset data and management solution software
— Continued work related to replacement of overhead #6 copper
conductor
• Workforce Planning
— Field Services Supervisor promoted to Electric Materials Technician
— Lineman hired
— Part-time Administrative Clerk hired
— Electric Distribution Operator hired
14
,. Public Works Department
Water/Wastewater
IFY 22 Quarterly Update
(Ending December 31, 2021)
Wastewater Fund
Cash Flow Summary
(Ending December 31, 2021)
*Of the remaining capital budget, $4,890,939 or 51% of the total budget was rolled to the next FY in either encumbered contracts or 2
for projects that were not started in fiscal year 20/21.
Budget
Actuals
% of Budget
Revenue
Sales
16,399,030
8,135,126
50%
Development Impact Mitigation Fees
1,618,970
914,975
57%
Other (interest, septic, misc.)
427,630
330,928
77%
Total Revenues
18,445,630
9,381,028
51%
Expenses
Operating
8,471,104
3,069,925
36%
Capital
12,813,887
316,826
2.5%
Debt Service
3,346,260
1,903,848
57%
Cost of Services Payment To General Fund
1,130,720
565,360
50%
Total Expenses
25,761,971
5,855,959
23%
Beginning Cash (Operations Only)
15,965,505
Ending Cash (Operations Only)
15,982,416
Days Cash (Excluding Capital)
744
% of Target — 180 Days Cash on Hand
413%
*Of the remaining capital budget, $4,890,939 or 51% of the total budget was rolled to the next FY in either encumbered contracts or 2
for projects that were not started in fiscal year 20/21.
Wastewater
Operating Results
(Ending December 31, 2021)
3
Budget
Actuals
% of Budget
Personnel
$
3,952,380
$
1,712,140
43%
Supplies, Materials, Services
$
2,888,380
$
557,600
19%
Equipment, Land, Structures
$
336,054
$
47,648
14%
Other Payments
$
435,000
$
243,104
56%
Utilities
$
830,900
$
509,433
61%
Work for Others
$
28,390
$
-
0%
Total Operating Expenses
$
8,471,104
$
3,069,925
36%
3
Wastewater Funds
Cash Balances
(Ending December 31, 2021)
Amounts above
reserve target are
Ta,,e: held for scheduled
capital maintenance
HClla
Ell
Operating (530)
15,982,416
Utility Capital / Infrastructure Replacement (531)
5,835,607
Capital Reserve (532) (Fund used to pay White Slough COP Debt Service)
(1,504,076)
Wastewater IMF (533)
4,055,891
Rate Stabilization Reserve (534)
500,000
Storm Drain IMF (535)
2,392,388
Total
29,214,487
Amounts above
reserve target are
Ta,,e: held for scheduled
capital maintenance
HClla
Ell
Actual Reserves vs. Target
18,000,000
0
267/0
273% 279% 258%
413%
16,000,000
14,000,000
12,000,000
10,000,000
8,000, 000
6,000, 000
4,000, 000
2,000,000
0
17/18
18/19 19/20 20121
21122
Amounts above
reserve target are
Ta,,e: held for scheduled
capital maintenance
HClla
Ell
5 -Year Financial Forecast
FY 21-22
FY 22-23
FY 23-24
FY 24-25
FY 25-26
FY 26-27
Budget
Forecast
Forecast
Forecast
Forecast
Forecast
Available Cash $15,185,508 $10,902,900 $7,891,200 $11,268,400 $12,120,700 $5,747,400
Days Cash 414 291 206 323 292
(180 day target)
135
Minimum $3,345,500 $3,420,500 $3,497,500 $3,176,500 $3,786,500 $3,872,000
Reserve Target
(25%)
Reserve Target $6,691,000 $6,841,000 $6,995,000 $6,353,000 7,573,000
(50%)
% of Days Cash
Target
230% 162% 114% 180% 162%
7,744,000
75%
Storm Drain Trash Handling
MUS PW Admin Building Remodel
Misc. System Relocations
Misc. Wastewater Taps
Main Replacement Project
Sewer Lift Station Wet Well Rehab
Kofu Storm Water Pump Rehab
Salas Storm Water Pump Rehab
Henry Glaves Storm Water Pump Rehab
Peterson Storm Water Pump Rehab
Laurel Storm Relocation
Cluff Storm Water Pump Rehab
Beckman Storm Water Pump Rehab
Project Planning/Misc. Projects
Vehicles/Equipment
Irrigation Improvements
Digester #3 Cleaning
Digester #4 Lib Rehab
Electrical Room Reroof
Plant Maintenance Improvements
Compliance Studies and Reports
Dredge Pond 1 and EQ Pond 1
Fan Press Replacement
Aeration Difusser Replacement
Primary Treatment Rehab
NCPA Maintenance Generator
Pump & Equipment Upgrades
Electrical/Screen/SCADA Design
Electrical Upgrades/SCADA Construction
UV Design/Replacement
Mosquito Pond
Wastewater
Planned Capital Projects
FY 21-22
FY 22-23
FY 23-24
FY 24-25
FY 25-26
FY 26-27
350,000
350,000
350,000
350,000
750,000
150,000
35,000
35,000
35,000
35,000
35,000
35,000
40,000
40,000
40,000
40,000
40,000
40,000
2,000,000
1,000,000
250,000
200,000
200,000
200,000
200,000
100,000
200,000
200,000
125,000
125,000
125,000
25,000
75,000
75,000
75,000
450,000
75,000
75,000
750,000
1,000,000
500,000
100,000
100,000
110,000
100,000
75,000
100,000
60,000
200,000
200,000
200,000
200,000
200,000
200,000
200,000
1,000,000
3,000,000
500,000
150,000
150,000
150,000
150,000
150,000
150,000
320,000
1,000,000
7,000,000
5,500,000
450,000
4,000,000
112,000
Totals $10,007,000 $7,935,000 $6,775,000 $2,775,000 $1,600,000 7,510,000
0
Water Fund
Cash Flow Summary
(Ending December 31, 2021)
7
Budget
Actuals
% of Budget
Revenue
Sales
13,338,910
7,271,177
55%
Development Impact Mitigation Fees
1,113,050
571,933
51%
Other (interest, tap fees, water meters, misc.)
605,600
234,597
39%
Total Revenues
15,057,560
8,077,707
54%
Expenses
Operating
7,936,029
3,198,738
40%
Capital
7,983,327
977,237
12%
Debt Service
1,927,250
418,021
22%
Cost of Services Payment To General Fund
959,910
479,955
50%
Total Expenses
18,806,516
5,073,951
27%
Beginning Cash (Operations Only)
8,135,692
Ending Cash (Operations Only)
11,063,546
Days Cash (Excluding Capital)
496
% of Target — 180 Days Cash on Hand
276%
7
Water
Operating Results
(Ending December 31, 2021)
Budget
Actuals
% of Budget
Personnel
$
3,295,870
$
1,160,291
35%
Supplies, Materials, Services
$
1,710,760
$
383,977
22%
Equipment, Land, Structures
$
112,039
$
9,646
9%
Other Payments
$
1,718,710
$
785,304
46%
Utilities
$
989,800
$
859,519
87%
Work for Others
$
108,850
$
-
0%
Total Operating Expenses
$
7,936,029
$
3,198,738
40%
Water Funds
Cash Balances
(Ending December 31, 2021)
Actual Reserves vs. Target
12,000,000
10,000,000 � -
8,000,000
6,000,000
4,000,000 67%
2,000,000 -
0
137%
17/18 18/19
165%
0
19/20 20121
276%
21122
Amounts above
■Target reserve target are
held for scheduled
Actual capital maintenance
0
Operating (560)
1170637546
Utility Capital / Infrastructure Replacement (561)
405,489
IMF (562)
4,634,823
PCE/TCE Settlements
8,312,918
PCE/TCE Rates (565)
3,820,359
Total
28,237,135
Actual Reserves vs. Target
12,000,000
10,000,000 � -
8,000,000
6,000,000
4,000,000 67%
2,000,000 -
0
137%
17/18 18/19
165%
0
19/20 20121
276%
21122
Amounts above
■Target reserve target are
held for scheduled
Actual capital maintenance
0
Available Cash
Days Cash
(180 day target)
Minimum
Reserve Target
(25%)
Reserve Target
(50%)
% of Days Cash
Target
5 -Year Financial Forecast
FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 FY 26-27
Budget Forecast Forecast Forecast Forecast Forecast
$9,655,222
$8,014,050
$7,911,050
$5,649,450
$4,953,750
$5,648,950
326312
264
254
177
152
168
$2,701,500
$2,769,500
$2,838,000
$2,910,000
$2,983,500
$3,059,500
$5,403,000
181%
$5,539,000 $5,676,000 $5,820,000 $5,967,000 $6,119,000
147% 141% 98% 84% 94%
10
Water Meter Program
MUS PW Admin Building Remodel
Water Taps
Misc. Water Mains
Water Meter Replacement Program
GAC Replacement
Meter Shop Design/Construction
Water Plant Generator
Surface Water Treatment Plant Membrane Repl.
Surface Water Treatment Plant Transmission Line
2020 Well Rehab
Water Well Rehab
Well 5 Pump Rehab
Well 6R GAC
Well 7 Pump Rehab
Well 9 Pump Rehab
Well 14 Pump Rehab
Well 16 Pump Rehab
Well 16 GAC
Well 17 Pump Rehab
Well 18 Pump Rehab
Well 21 Pump Rehab
Well 22 Pump Rehab
Well 23 Pump Rehab
Well 25 Pump Rehab
Well 3R Pump Rehab
Well 15 Pump Rehab
Well 28 GAC Treatment
Project Planning
Vehicles/Equipment
Water
Planned Capital Projects
FY 21-22
FY 22-23
FY 23-24
FY 24-25
FY 25-26
FY 26-27
1,500,000
1,500,000
200,000
75,000
75,000
75,000
75,000
75,000
75,000
50,000
50,000
50,000
250,000
250,000
500,000
75,000
75,000
75,000
75,000
75,000
150,000
157,000
300,000
300,000
300,000
300,000
300,000
282,778
1,000,000
2,500,000
500,000
1,500,000
303,750
400,000
400,000
400,000
400,000
400,000
200,000
143,000
154,920
200,000
170,000
165,000
250,000
200,000
200,000
250,000
250,000
250,000
250,000
615,000
25,000
25,000
25,000
25,000
25,000
25,000
50,000
50,000
50,000
100,000
100,000
100,000
Totals $2,916,450 $4,225,000 $2,725,000 $4,425,000 $2,925,000 $1,750,000