Loading...
HomeMy WebLinkAboutAgenda Report - March 2, 2022 C-07AGENDA ITEM Cos7 AQ% CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Approve Specifications and Authorize Advertisement for Bids for 2021/2022 Pavement Resurfacing Project MEETING DATE: March 2, 2022 PREPARED BY: Public Works Director RECOMMENDED ACTION Approve specifications and authorize advertisement for bids for 2021/2022 Pavement Resurfacing Project. BACKGROUND INFORMATION: On May 19, 2021 Council adopted a resolution approving this project as the recipient of the Road Repair and Accountability Act of 2017, Senate Bill 1 (SB1) funding for the 2021/2022 Fiscal Year. This pavement resurfacing includes the application of rubberized asphalt cape seal and fiberized slurry seal. The project limits will include various streets throughout the City, as shown on Exhibit A. The rubberized asphalt cape seal is a two -layer system of a rubberized chip seal on the bottom, with a fiberized slurry seal (slurry seal with strands of glass fiber added) on top. The rubberized cape seal will be applied to streets with more surface defects, while only one layer of fiberized slurry seal will be applied to those streets with fewer surface defects. The specifications are on file in the Public Works Department. The planned bid opening date is March 30, 2022. The contract estimate is $1,330,000. FISCAL IMPACT. By investing in the recommended maintenance project, significant capital dollars will be saved by extending the useful life of the pavement and foregoing more costly pavement reconstruction. FUNDING AVAILABLE: Funding will be identified at project award. The project funding will come from SB1. C�J�LQ Charles E. Swimley. Jr. Public Works Director Prepared by Alice Bernardino, Associate Civil Engineer CES/AB/cd Attachment cc: Utility Manager APPROVED: Steve Schwabauer Stephen Schwabauer, City Manager K:\WP\PR0JECTS\STREETS\2021 Pavement Resurfacing\CSA doc 2/14/2022 '1= =ate 111"U1110111 "�� 11IIINII_. =? `i°°� �Illll1011. 0 :9 1il��iiiiIi��riM ..i