AGENDA TITLE: Accept Improvements Under Contract for Old City Hall Tower Demolition Project
MEETING DATE: January 5, 2022
PREPARED BY: Public Works Director
RECOMMENDED ACTION: Accept improvements under contract for Old City Hall Tower
Demolition Project.
BACKGROUND INFORMATION: The project is located at the former City Hall site at 114 North Main
Street. The existing tower was constructed as an add-on structure
to the old fire house which was part of the original City Hall
building. The tower was a 2 -story wood structure located on top of a 2 -story un -reinforced concrete
structure. The building has been unoccupied for many years.
In December of 2020, staff noticed that the wood tower had shifted from the foundation and was leaning
toward the alley north of Elm Street, between Main Street and Stockton Street. Staff immediately closed
off the area and engaged Siegfried Engineering, Inc., to perform a structural analysis. The analysis
determined the wood structure was unsafe and should be demolish as soon as possible to minimize risk
of collapse and causing more damage to the remaining building and surrounding area.
This project included removing the wood portion of the structure (3rd and 4th stories) and installing a
temporary roof to protect the remaining concrete structure below.
The contract was awarded to Diede Construction, Inc., of Woodbridge, in the amount of $49,630.00 in
August of 2021. The contract has been completed in substantial conformance with the plans and
specifications approved by City Council on June 6, 2021. The final contract amount is $57,629.63. This
was due to a change order ($7,999.63) to install water proofing material to seal the exposed brick wall
after the wood tower was demolished.
The original contract completion date was November 8, 2021 and the actual contract completion date
was November 9, 2021.
Following acceptance by the City Council, as required by law, the City Engineer will file a Notice of
Completion with the County Recorder's office. The notice serves to inform vendors and subcontractors
that the project is complete and to initiate the 30 -day period to file a stop notice requiring the City to
withhold payments from the prime contractor in the event of a payment dispute.
FISCAL IMPACT: The demolition of the unsafe structure will eliminate further damage to the
remaining building and avoid potential hazardous conditions to the
surrounding area. This project does impact the General Fund.
APPROVED: Steve SchwabaUef
Stephen Schwabauer, City Manager
K MP\PROJECTS\MISC\City Hall Annex 1st Floor Remodel 2013\CAccept CHARP2.doc
12/15/2021
Accept Improvements Under Contract for Old City Hall Tower Demolition Project
January 5, 2022
Page 2
FUNDING AVAILABLE: This project was funded by General Fund Capital.
Charles E. Swimley, Jr.
Public Works Director
Prepared by Lyman Chang, City Engineer/Deputy Public Works Director
CES/LC/cd
Attachment
cc: Facilities Superintendent
Public Management Analyst
Diede Construction