HomeMy WebLinkAboutAgenda Report - November 3, 2021 C-04AGENDA ITEM (! d04
�Q CITY OF LODI
COUNCIL COMMUNICATION
TM
AGENDA TITLE: Adopt Resolution Approving Final Budget Adjustments for Fiscal Year 2021 and
Appropriating Funds ($142,075.19)
MEETING DATE: November 3, 2021
PREPARED BY:
Budget Manager
RECOMMENDED ACTION: Adopt resolution approving final budget adjustments for Fiscal Year
2021 appropriating funds ($142,075.19).
BACKGROUND INFORMATION The year-end closing process for each fiscal year takes many
months to finalize all expenditures and journal postings. During the
closing process for FY 21, additional budget was needed in both
Transit and Risk Management funds and adjustments to three
Electric Utility capital improvement projects were needed.
Transit received a grant the State of California to offer students free bus fares. The program has been
expended for two years fiscal years without budget appropriations. An appropriation of $67,579.70 is
needed to expense the cost of the free ride shares. Revenue was received in FY 19 to operate the
program.
The Risk Management fund includes Worker's Compensation. This fund is budgeted using historical and
projected claims for the upcoming year. For Fiscal Year 2020/21, the overall expenses exceeded budget
by $74,495.49. This overage occurred in the temporary and permanent disability accounts.
Lastly, two capital improvement projects in Electric Utility needed final budget adjustments. The LED
Streetlight Improvement Project expended an additional $45,924.43 in material costs as part of the multi-
year effort to convert the remaining non -LED decorative fixtures to LED technology. In addition,
underground maintenance expenses associated with unplanned repairs expended an additional
$279,496.62 to close the fiscal year. The overhead maintenance program had sufficient budget to shift
funding to the two aforementioned projects resulting in a net increase of $0 to the overall Electric Utility
CIP budget.
FISCAL IMPACT: Transit: Revenue for the bus fares was received in FY19. No FY 21 impact
Risk Management: Workers Compensation funds are collected annually
from departments based on historical utilization of the program. Increased
costs will be spread over a three year period. Departments will see some
year over year increase.
Electric Utility: No net fiscal impact
FUNDING AVAILABLE: Fund balance is available in both Transit and Risk Management to cover
the budgetary adjustments.
Andrew Keys, Deputy City Manager
1:a��''i
APPROVED:
PR. hAi
Stephen Schwabauer, City Manager
Capital Improvement Program - Maintenance
Fiscal Year 2020/21 Program
Maintenance Project Title:
12 kV Overhead Maintenance
Munis Project Code: EUCP-21002
#43
Section I:Description
District Nos:
Project Length Ongoing Priority
High
Maintenance and improvements associated with the 12 kV overhead distribution system.
Justification/factor driving project
These ongoing efforts are primarily focused on the replacement of annealed copper conductors with aluminum conductor steel reinforced (ACSR). Whereas copper is notoriously
brittle and prone to breakage with age, ACSR offers optimal strength for overhead line design. Additional activities may include replacement of poles, transformers and/or switches as
needed.
Additional Information
These ongoing maintenance efforts support the City Council adopted Lodi Electric Utility Strategic Plan goal of designing, operating and maintaining a distribution system to ensure
safe, reliable electric service. Of the $300,878 FY 19/20 total, $878.30(Materials.Other) was carried forward.
Section II
Estimated Project Costs
Expenditure Prior Years
FY 19120 FY 20121 FY 21122
FY 22123 FY 23124 FY 24125 Future Yrs
Total
Estimate Budget
Internal Staff $ -
$ 510,000 $ 410,000 $ 460,000
$ 308,200 $ 308,200 $ 200,000 $
2,196,400
Miscellaneous $ -
$ 390,898 $ 291,000 $ 350,000
$ 234,500 $ 234,500 $ 200,000 $
1,700,898
Contracts $ -
$ 324,579
$
324,579
Total Capital Costs $ -
$ 900,898 $ 19025,579 $ 810,000
$ 542,700 $ 542,700 $ 400,000 $ - $
49221,877
Section III
Funding Sources/Methods of Financing
Funding Source(s) Prior Years
FY 19120 FY 20121 FY 21122
FY 22123 FY 23124 FY 24125 Future Yrs
Total
Budget
501 - EU Outlay Capital ResE $ -
$ 900,878 $ 1,351,000 $ 810,000
$ 542,700 $ 542,700 $ 400,000 I $
4,547,278
Total Project Financing $ -
$ 900,878 $ 1,351,000 $ 810,000
$ 542,700 $ 542,700 $ 400,000 $�$
4,547,278
Section IV
Operating Budget Impact
Operating Cost or Prior Years
FY 19120 FY 20121 FY 21122
FY 22123 FY 23124
FY 24125 Future Yrs
Total
(savings)
Budget
Personnel $ -
$
-
Other Operating Costs $ -
$
-
$ - $ - $
-
Total Operating Impact $ - $ - $ - $ - $ - $ -
Capital Improvement Program - Maintenance
Fiscal Year 2020/21 Program
Maintenance Project Title:
12 W Underground Maintenanc
Munis Project Code:
EUCP-21006
#44
Section (:Description
District Nos: Project Length Ongoing Priority
High
Replacement of 12 kV underground infrastructure and other underground electric infrastructure maintenance as needed.
Justification/factor driving project
These ongoing maintenance efforts include, but are not limited to, replacement of failed/end-of-life cable; replacement of cable due to engineering study of predictive failure;
installation/replacement of subsurface equipment with pad -mounted equipment to increase operability and reliability and other underground electric infrastructure
maintenance as
needed.
Additional Information
These ongoing maintenance efforts support the City Council adopted Lodi Electric Utility Strategic Plan goal of designing, operating and maintaining a distribution
system to ensure
safe, reliable electric service. Of the $1,102,900 FY 19/20 total, $1200 and $1700 (both Materials. Other) were carried forward.
Section II
Estimated Project Costs
Expenditure Prior Years
FY 19120 FY 20121 FY 21122 FY 22123 FY 23124
FY 24125 Future Yrs
Total
Estimate Budget
Internal Staff $ -
$ 172,500 $ 115,000 $ 115,000 $ 115,000 $ 115,000 $
115,000
$
747,500
Miscellaneous $ -
$ 252,900 $ 464,497 $ 185,000 $ 185,000 $ 185,000 $
185,000
$
1,457,397
Contracts $ -
$ 700,000 $ 750,000 $ 500,000 $ 500,000 $ 500,000 $
500,000
$
3,450,000
Total Capital Costs $ -
$ 1,125,400 $ 1,329,497 $ 800',000$ 800,000 $ 800,000 $
800,000 $ -
$
5,654,897
Section III
Funding Sources/Methods of Financing
Funding Source(s) Prior Years
FY 19120 FY 20121 FY 21122 FY 22123 FY 23124
FY 24125
Future Yrs
Total
Budget
501 - EU Outlay Capital ResE $ -
$ 1,125,400 $ 1,050,000 $ 800,0001 $ 800,000 I $ 800,000 I $
800,000
$
5,375,400
Total Project Financing $ -
$ 1,125,400 $ 1,050,000 $ 800,000 $ 800,000 $ 800,000 $
800,000
$ -
$
5,375,400
Section IV
Operating Budget Impact
Operating Cost or Prior Years
FY 19120 FY 20121 FY 21122 FY 22123 FY 23124
FY 24125
Future Yrs
Total
(savings)
Budget
Personnel $ -
$
-
Other Operating Costs $ -
$
-
Total Operating Impact $
Capital Improvement Plan
Fiscal Year 2020/21 Program
Project Title: LED Streetlight Improvements
Munis Project Code: EUCP-15008
#58
Section I: Description District Nos: Project Length 07/15 to 06/23 Priority
High
Replacement of post top luminaires with LED luminaires. Approximately 200 to 300 replacements are scheduled to take place annually through 2023.
Justification/factor driving project
LED Luminaires consume approximately 30% of the power of a High Pressure Sodium Luminaire for comparable illumination. They also last approximately 3 times as long
without
burning out. Consequently, this initiative will save energy and maintenance costs. A return on investment calculation was done at the outset of this project and it was estimated
this
project would pay provide a simple payback in approximately 10 years.
Additional Information
As part of the LED Streetlight Retrofit Program, approximately 5,400 cobra head fixtures have been replaced throughout the City. This project was completed in 2016.
In addition,
approximately 640 decorative fixtures have been replaced to date with an additional 300 scheduled for completion this year. Decorative fixtures will be replaced over a period of 5
years with a goal to replace approximately 200 to 300 per year. This project supports the City Council adopted Lodi Electric Utility Strategic Plan goal of deploying cost effective
technology to improve reliability, customer service, and safety.
Section II Estimated Project Costs
Expenditure Prior Years FY 19120 FY 20121 FY 21122 FY 22123 FY 23124 FY 24125
Future Yrs
Total
Estimate Budget
Internal Staff $ - $ 25,000 $ - $ 37,500 $ 37,500 $ 37,500 $ 37,500
$ - $
175,000
Miscellaneous $ 165,533 $ 75,000 $ 120,924 $ 112,500 $ 112,500 $ 112,500 $ 112,500
$ - $
811,457
Contracts $ 1,485,974
$
1,485,974
Total Capital Costs $ 1,651,507 $ 100,000 $ 120,924 $ 150,000 $ 150,000 $ 150,000 $ 150,000
$ - $
2,472,431
Section III Funding Sources/Methods of Financing
Funding Source(s) Prior Years FY 19120 FY 20121 FY 21122 FY 22123 FY 23124 FY 24125 Future Yrs
Total
Estimate Budget
501 - EU Outlay Capital ResE $ 1,651,507 $ 100,000 $ 120,924 $ 150,0001$ 150,000 1 $ 150,000 1 $ 150,000 $ - $
2,472,431
Total Project Financing $ 1,651,507 $ 100,000 $ 120,9241 $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ - $
2,472,431
Section IV Operating Budget Impact
Operating Cost or Prior Years FY 19120 FY 20121 FY 21122 FY 22123 FY 23124 FY 24125 Future Yrs
Total
(savings) Estimate Budget
Personnel $ - $
-
Other Operating Costs $ - $
-
Total Operating Impact $ - $ - $ - $ - $ - $ - $ - $ - $
-
RESOLUTION NO. 2021-286
A RESOLUTION OF THE LODI CITY COUNCIL
APPROVING FINAL BUDGET ADJUSTMENTS FOR FISCAL
YEAR 2021; AND FURTHER APPROPRIATING FUNDS
WHEREAS, the Lodi City Council adopted the Fiscal Year 2020/21 Financial Plan and
Budget on June 3, 2020; and
WHEREAS, the year-end reporting period for Fiscal Year 2020/21 has been completed;
and
WHEREAS, additional budgets for both Transit and Risk Management are necessary to
address unbudgeted expenditure needs for Fiscal Year 2020/21; and
WHEREAS, staff recommends the additional Fiscal Year 2020/21 appropriations in the
Transit Fund of $67,579.70 (60454108.72399) for the student bus ride program and $74,495.49
in the Risk Management Fund for increased costs in temporary disability claims ($61,094.24 to
66525100.74032) and permanent disability claims ($13,401.25 to 66525100.74033); and
WHEREAS, staff also recommends capital project budget adjustments in Electric Utility
for the LED Streetlight Improvement Project ($45,924.43), the Underground Maintenance
($279,496.62) and Overhead Maintenance (reduce by $325,421.05) for a net zero budgetary
increase.
NOW, THEREFORE BE IT RESOLVED that the Lodi City Council does hereby authorize
the additional Fiscal Year 2020/21 appropriations and adjustments totaling $142,075.19, as set
forth above.
Dated: November 3, 2021
--------------------
--------------------
I hereby certify that Resolution No. 2021-286 was passed and adopted by the City Council
of the City of Lodi in a regular meeting held November 3, 2021, by the following vote:
AYES: COUNCIL MEMBERS — Chandler, Hothi, Khan, Kuehne, and
Mayor Nakanishi
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — None
ABSTAIN: COUNCIL MEMBERS — None
Yi'
J� IFE US M I R
City Clerk
2021-286