Loading...
HomeMy WebLinkAboutAgenda Report - October 20, 2021 C-13AGENDA ITEM (2.43 CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Adopt Resolution Authorizing Public Works Director to Execute Cooperative Agreement with State of California for Proposed State Route 99/Turner Road Interchange Improvements MEETING DATE: October 20, 2021 PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt resolution authorizing Public Works Director to execute Cooperative Agreement with State of California for proposed State Route 99/Turner Road Interchange Improvements. BACKGROUND INFORMATION: Since 2018, San Joaquin Council of Governments (SJCOG), in partnership with California Department of Transportation (Caltrans), the City of Lodi, and the design consultant, Drake Haglan & Associates, Inc. have collaborated to prepare the necessary environmental clearance and design documents for constructing the State Route 99 (SR99)/Turner Road Interchange Improvements (Project). The contract between SJCOG and Drake Haglan and Associates has been expanded to provide the construction management services through Project completion. The project improvements include the construction of a round -a -bout located near the southerly end of the southbound Turner Road freeway off -ramp, widening Cherokee Lane (currently a one-way southbound roadway segment) into a two-way facility between Pioneer Drive and Turner Road, including Class II bike lanes in both directions and sidewalk on the westerly side of the roadway. The project also includes lengthening the SR99/Turner Road Southbound on-ramp by 400 feet to provide longer acceleration distance to merge with mainline traffic. The Project design is nearing completion with construction anticipated to begin in Spring 2022. As a condition of project approval, Caltrans is requiring the City of Lodi to enter into a Cooperative Agreement with the State of California. The Cooperative Agreement is specific to the Project and outlines the terms and conditions for constructing improvements within the State right of way. The proposed Cooperative Agreement (between the City of Lodi and Caltrans) generally identifies the obligations of the State and City with respect to funding the construction work and conducting the construction management services. FISCAL IMPACT: The Project construction and construction management services outlined in the Cooperative Agreement will be funded through a combination of State and local funding sources managed through SJCOG. FUNDING AVAILABLE: Funding availability is dependent on California Transportation Commission (CTC) allocation. The allocation is expected to be considered at the December 2021 CTC meeting. To qualify for consideration, the Cooperative Agreement must be executed prior to this date. CES/CES/cd Attachment 3:QW Charles E. Swimley, Jr. Public Works Director APPROVED: Steve Schwabauer Stephen Schwabauer, City Manager \\cvcfilv02\pubwks$\WP\PROJECTS\STREETS\Turner_SR99 interchange improvements\CC_SR99_Turner_10_20 2021 coop_agreement doc 10/5/2021 RESOLUTION NO. 2021-282 A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING THE PUBLIC WORKS DIRECTOR TO EXECUTE A COOPERATIVE AGREEMENT WITH THE STATE OF CALIFORNIA FOR THE PROPOSED STATE ROUTE 99 / TURNER ROAD INTERCHANGE IMPROVEMENTS WHEREAS, since 2018, San Joaquin Council of Governments (SJCOG), in partnership with California Department of Transportation (Caltrans), the City of Lodi, and the design consultait, Drake Haglan & Associates, Inc., have collaborated to prepare the necessary environmental clearance and design documents for constructing the State Route 99 (SR99)/Turner Road Interchange Improvements; and WHEREAS, the project improvements include the construction of a round -about located near the southerly end of the southbound Turner Road freeway off -ramp, widening Cherokee Lane (currently a one-way southbound roadway segment) into a two-way facility between Pioneer Drive and Turner Road, including Class II bike lanes in both directions and sidewalk on the westerly side of the roadway; and WHEREAS, the project also includes lengthening the SR99/Turner Road southbound on-ramp by 400 feet to provide a longer acceleration distance to merge with mainline traffic; and WHEREAS, Caltrans is requiring the City of Lodi to enter into a Cooperative Agreement with the State of California, which is specific to the Project and outlines the terms and conditions for conEtructing improvements within the State right of way and generally identifies the obligatio-is of the State and City with respect to funding the construction work and conducting the construction management services; and WHEREAS, staff recommends authorizing the Public Works Director to execute a Cooperative Agreement with the State of California for the proposed SR99/Turner Road Interchange Improvements. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby authorize the Public Works Director to execute a Cooperative Agreement with the State of California for the proposed State Route 99/Turner Road Interchange Improvements; and EE IT FURTHER RESOLVED, pursuant to Section 6.3q of the City Council Protocol Manual IRes. No. 2019-223), the City Attorney is hereby authorized to make minor revisions to the above -referenced document(s) that do not alter the compensation or term, and to make clerical corrections as necessary. Dated: October 20, 2021 I hereby certify that Resolution No. 2021-282 was passed and adopted by the City Council of the City of Lodi in a regular meeting held October 20, 2021, by the following vote: AYES: COUNCIL MEMBERS — Chandler, Hothi, Khan, Kuehne, and Mayor Nakanishi NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None E NIFE�fUSMIR City Clerk 2021-28