HomeMy WebLinkAboutAgenda Report - September 15, 2021 C-14AGENDA ITEM a-/4
CITY OF LODI
COUNCIL COMMUNICATION
TM
AGENDA TITLE: Adopt Resolution Authorizing Reimbursement for Lower Sacramento Road
Public Improvements and Appropriate Funds ($151,870)
MEETING DATE: September 15, 2021
PREPARED BY: Public Works Director
RECOMMENDED ACTION: Adopt Resolution authorizing reimbursement for Lower
Sacramento Road public improvements and appropriate funds in
the amount of $151,870.
BACKGROUND INFORMATION: Vineyard Terrace Subdivision is located east of Lower
Sacramento Road and north of Century Boulevard, as shown on
Exhibit A. It consists of 235 single-family residential lots and the
last phase of the project was accepted on December 16, 2020 by the City Council.
At the request of the City, the Developer, K. Hovnanian CA Land Holdings, LLC (Developer),
constructed certain off-site street improvements on the east side of Lower Sacramento Road to
complete the curb, gutter, sidewalk, and pavement improvements, from the north project boundary to
the Sunwest Plaza intersection (Food 4 Less shopping center). The request also includes the
acquisition of additional street easements and other miscellaneous improvements along the properties
at 1606, 1610, and 1626 South Lower Sacramento Road. It should be noted the Developer invested
considerable funding and effort in obtaining the necessary easements. This effort facilitated the
completion of a 415 LF gap that has lingered for over 15 years and finally provides a safe pedestrian
and bicycle path along the east side of Lower Sacramento between Kettleman Lane and Debenedetti
Park south of Century Boulevard.
Per Lodi Municipal Code Chapter 17.62 "Reimbursement for Construction", these off-site public
improvements qualified for reimbursement. Developer prepared an engineering report for the
reimbursement and the establishment of the area of benefit from the properties as shown on Exhibit B.
The State of California, in Government Code Sections 66485 through 66489, requires that the City
either pay for or enter into an agreement to reimburse the installing party, including an amount
attributable to interest for such installations. To pay the costs as required by the reimbursement
agreement, the City may collect funds from the other properties which benefit from such installations.
In this case however, the frontage improvements along Lower Sacramento Road will be paid by the
City since the City had plans to make the improvements in the past but were not successful in acquiring
the necessary easements. Typically, the City's practice is to exchange frontage improvements for
street easement dedication from the fronting properties.
The Developer constructed a sound wall and other improvements along these properties at the
Developer's own expense in exchange for acquiring the necessary street easements; and is not
seeking reimbursement from the benefiting properties. In total, Developer absorbed more than
$115,000 towards completing the off-site Lower Sacramento Road improvements. The completed work
is shown on Exhibit C.
%VevcfilvOZpubwks$%WP)DEV_SERVIDevelopments%Residentiai PETERSON PROPERTY - VINEYARD TERRACE\Improvement Agreement\Unit
2\C_Lwr_Sac_Reimbursement.doc 9/212021
Adopt Resolution Authorize Reimbursement for Lower Sacramento Road Public Improvements and Appropriate Fund ($151,669)
September 15, 2020
Page 2
Staff estimates the reimbursable costs to construct the street improvements and obtain the easement
dedications would be less than what it would have cost the City to accomplish the same end product.
Providing a safe pedestrian and bicycle path of travel between the development of 235 medium density
homes and the commercial center to the north is a substantial benefit to the community.
Staff recommends the Council authorize the reimbursement for the Lower Sacramento Road public
improvements in the amount of $151,869.39 and appropriate the funds.
FISCAL IMPACT: The completed improvement provides a much needed safe route for the
pedestrian and bicyclists. There will be a slight increase in street
maintenance for the new improvements.
FUNDING AVAILABLE: Requested appropriation:
Street Fund (30099000.77020) $140,991
Wastewater Capital (53199000.77020) 10,879
Total $151,870
Andrew Keys
Andrew Keys
Deputy City Manager/Internal Services Director
a, -0 L- QQ
Charles E. Swimley, Jr.
Public Works Director
Prepared by Lyman Chang City Engineer/Deputy Public Works Director
CES/LC/cd
Attachments
W Public Works Management Analyst
Assistant Engineer, Kidu
Senior Civil Engineer, Nathan
K. Hovnanian CA Land Holdings, LLC
NorthStar Engineering Group, Inc.
\\cvcfilv02\pubwks$WVP\DEV_SERV1Developmerds\Residemial\PETERSON PROPERTY - VINEYARD TERRACE\Improvement Agreement\Unit
m
2\C_Lwr_Sac_Reimburseerd.doc 912/2021
VINEYARDS TERRACE
AREA OF BENEFIT
EXHIBIT
JUNE 18, 2021
Engineering Group, Inc.
CIVIL ENGINEERING • SURVEYING • PLANNING •
520 lZtn Street Modesto, L;A 'JJ.5,74
(209) 524-3525 Phone (209) 524-3526 Fax
Parcel
Number
Acreage
'
1.
058-14-004
1.04
f
2.
058-14-011
0.65
3.
058-14-006
0.90
200
100 0
4.
058-14-007
1"
0.71
AREA OF BEJFIT
5.
058-14-005
1.49
6.
058-14-008
0.71
7.
058-14-009
0.36
8.
058-14-010
0.36
0
I+1
tJ
4
7
I 8
200
100 0
200
1"
= 200'
Capital Improvement Plan
FY 2021-2022
Project Title: Lower Sacramento Road Public Improvemel
Munis Project Code:
CIP List Proj #
Section I: Description
District Nos:
1 Project Length
Priority
Developer reimbursement of off-site public improvements completed by developer for the Vineyard Terrace subdivision.
Justification/factor driving project
Per Lodi Municipal Code Chapter 17.62, these off-site improvements are qualified for rembursement.
Additional Information
Section II: Estimated Proje
Expenditure Prior Years
Miscellaneous $
$
Total Capital Costs $ $
FY 20121 FY 21122 FY 22123
Estimate Budget
$ 151,870
$ 151,870 $
FY 23124
$ -
FY 24125
FY 25126
$ -
Future Yrs
$
$
$
$
Total
151,870
-
151,870
$ -
Section III: Funding Source
Funding Source(s) Prior Years
300 - Street Fund $
531 - Wastewater Capital Ou $
Total Project Financing $ - $
FY 20121 FY 21122 FY 22123
Estimate Budget
$ 140,991
$ 10,879
- $ 151,870 $
FY 23124
FY 24125 FY 25126
Future Yrs
$ -
$
$
$
Total
140,991
10,879
151,870
$ -
$ - $ -
Section IV
Operating Budget Impact
Operating Cost or Prior Years
(savings)
Personnel $
Other Operating Costs $
Total Operating Impact $ $
FY 20121
Estimate
-
FY 21122 FY 22123
Budget
FY 23124 FY 24125 FY 25126
Future Yrs
$ -
$
$
$
Total
-
$ - $ - $ - $ - $ -
RESOLUTION NO. 2021-262
A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING
REIMBURSEMENT FOR LOWER SACRAMENTO ROAD PUBLIC
IMPROVEMENTS; AND FURTHER APPROPRIATING FUNDS
WHEREAS, Vineyard Terrace Subdivision is located east of Lower Sacramento Road
and north of Century Boulevard, consists of 235 single-family residential lots, and the last phase
of the project was accepted on December 16, 2020 by the City Council; and
WHEREAS, at the request of the City, the Developer, K. Hovnanian CA Land Holdings,
LLC (Developer), constructed certain off-site street improvements on the east side of Lower
Sacramento Road to complete the curb, gutter, sidewalk, and pavement improvements, from
the north project boundary to the Sunwest Plaza intersection and included the acquisition of
additional street easements and other miscellaneous improvements along the properties at
1606, 1610, and 1626 South Lower Sacramento Road; and
WHEREAS, the Developer constructed a sound wall and other improvements along
these properties at the Developer's own expense in exchange for acquiring the necessary street
easements, and absorbed more than $115,000 towards completing the off-site Lower
Sacramento Road improvements; and
WHEREAS, staff estimates the reimbursable costs to construct the street improvements
and obtain the easement dedications would be less than what it would have cost the City to
accomplish the same end product, and providing a safe pedestrian and bicycle path of travel is
a substantial benefit to the community; and
WHEREAS, staff recommends the Council authorize the reimbursement for the Lower
Sacramento Road public improvements in the amount of $151,869.39; and
WHEREAS, staff recommends appropriating funds in the amount of $140,991 from the
Street Fund (30099000.77020) and $10,879 from the Wastewater Capital account
(53199000.77020).
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby
authorize the reimbursement for the Lower Sacramento Road public improvements in the
amount of $151,869.39; and
BE IT FURTHER RESOLVED that the Lodi City Council does hereby authorize the
appropriation of funds as set forth above.
Dated: September 15, 2021
------------------------------------------------------------------------
------------------------------------------------------------------------
I hereby certify that Resolution No. 2021-262 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held September 15, 2021, by the following vote:
AYES: COUNCIL MEMBERS — Chandler, Hothi, Khan, Kuehne, and
Mayor Nakanishi
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — None
ABSTAIN- COUNCIL MEMBERS — None
/ �wli
NNIFER USMIR
+' City Clerk
2021-262