HomeMy WebLinkAboutAgenda Report - September 15, 2021 C-14AGENDA ITEM a-/4 CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Adopt Resolution Authorizing Reimbursement for Lower Sacramento Road Public Improvements and Appropriate Funds ($151,870) MEETING DATE: September 15, 2021 PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt Resolution authorizing reimbursement for Lower Sacramento Road public improvements and appropriate funds in the amount of $151,870. BACKGROUND INFORMATION: Vineyard Terrace Subdivision is located east of Lower Sacramento Road and north of Century Boulevard, as shown on Exhibit A. It consists of 235 single-family residential lots and the last phase of the project was accepted on December 16, 2020 by the City Council. At the request of the City, the Developer, K. Hovnanian CA Land Holdings, LLC (Developer), constructed certain off-site street improvements on the east side of Lower Sacramento Road to complete the curb, gutter, sidewalk, and pavement improvements, from the north project boundary to the Sunwest Plaza intersection (Food 4 Less shopping center). The request also includes the acquisition of additional street easements and other miscellaneous improvements along the properties at 1606, 1610, and 1626 South Lower Sacramento Road. It should be noted the Developer invested considerable funding and effort in obtaining the necessary easements. This effort facilitated the completion of a 415 LF gap that has lingered for over 15 years and finally provides a safe pedestrian and bicycle path along the east side of Lower Sacramento between Kettleman Lane and Debenedetti Park south of Century Boulevard. Per Lodi Municipal Code Chapter 17.62 "Reimbursement for Construction", these off-site public improvements qualified for reimbursement. Developer prepared an engineering report for the reimbursement and the establishment of the area of benefit from the properties as shown on Exhibit B. The State of California, in Government Code Sections 66485 through 66489, requires that the City either pay for or enter into an agreement to reimburse the installing party, including an amount attributable to interest for such installations. To pay the costs as required by the reimbursement agreement, the City may collect funds from the other properties which benefit from such installations. In this case however, the frontage improvements along Lower Sacramento Road will be paid by the City since the City had plans to make the improvements in the past but were not successful in acquiring the necessary easements. Typically, the City's practice is to exchange frontage improvements for street easement dedication from the fronting properties. The Developer constructed a sound wall and other improvements along these properties at the Developer's own expense in exchange for acquiring the necessary street easements; and is not seeking reimbursement from the benefiting properties. In total, Developer absorbed more than $115,000 towards completing the off-site Lower Sacramento Road improvements. The completed work is shown on Exhibit C. %VevcfilvOZpubwks$%WP)DEV_SERVIDevelopments%Residentiai PETERSON PROPERTY - VINEYARD TERRACE\Improvement Agreement\Unit 2\C_Lwr_Sac_Reimbursement.doc 9/212021 Adopt Resolution Authorize Reimbursement for Lower Sacramento Road Public Improvements and Appropriate Fund ($151,669) September 15, 2020 Page 2 Staff estimates the reimbursable costs to construct the street improvements and obtain the easement dedications would be less than what it would have cost the City to accomplish the same end product. Providing a safe pedestrian and bicycle path of travel between the development of 235 medium density homes and the commercial center to the north is a substantial benefit to the community. Staff recommends the Council authorize the reimbursement for the Lower Sacramento Road public improvements in the amount of $151,869.39 and appropriate the funds. FISCAL IMPACT: The completed improvement provides a much needed safe route for the pedestrian and bicyclists. There will be a slight increase in street maintenance for the new improvements. FUNDING AVAILABLE: Requested appropriation: Street Fund (30099000.77020) $140,991 Wastewater Capital (53199000.77020) 10,879 Total $151,870 Andrew Keys Andrew Keys Deputy City Manager/Internal Services Director a, -0 L- QQ Charles E. Swimley, Jr. Public Works Director Prepared by Lyman Chang City Engineer/Deputy Public Works Director CES/LC/cd Attachments W Public Works Management Analyst Assistant Engineer, Kidu Senior Civil Engineer, Nathan K. Hovnanian CA Land Holdings, LLC NorthStar Engineering Group, Inc. \\cvcfilv02\pubwks$WVP\DEV_SERV1Developmerds\Residemial\PETERSON PROPERTY - VINEYARD TERRACE\Improvement Agreement\Unit m 2\C_Lwr_Sac_Reimburseerd.doc 912/2021 VINEYARDS TERRACE AREA OF BENEFIT EXHIBIT JUNE 18, 2021 Engineering Group, Inc. CIVIL ENGINEERING • SURVEYING • PLANNING • 520 lZtn Street Modesto, L;A 'JJ.5,74 (209) 524-3525 Phone (209) 524-3526 Fax Parcel Number Acreage ' 1. 058-14-004 1.04 f 2. 058-14-011 0.65 3. 058-14-006 0.90 200 100 0 4. 058-14-007 1" 0.71 AREA OF BEJFIT 5. 058-14-005 1.49 6. 058-14-008 0.71 7. 058-14-009 0.36 8. 058-14-010 0.36 0 I+1 tJ 4 7 I 8 200 100 0 200 1" = 200' Capital Improvement Plan FY 2021-2022 Project Title: Lower Sacramento Road Public Improvemel Munis Project Code: CIP List Proj # Section I: Description District Nos: 1 Project Length Priority Developer reimbursement of off-site public improvements completed by developer for the Vineyard Terrace subdivision. Justification/factor driving project Per Lodi Municipal Code Chapter 17.62, these off-site improvements are qualified for rembursement. Additional Information Section II: Estimated Proje Expenditure Prior Years Miscellaneous $ $ Total Capital Costs $ $ FY 20121 FY 21122 FY 22123 Estimate Budget $ 151,870 $ 151,870 $ FY 23124 $ - FY 24125 FY 25126 $ - Future Yrs $ $ $ $ Total 151,870 - 151,870 $ - Section III: Funding Source Funding Source(s) Prior Years 300 - Street Fund $ 531 - Wastewater Capital Ou $ Total Project Financing $ - $ FY 20121 FY 21122 FY 22123 Estimate Budget $ 140,991 $ 10,879 - $ 151,870 $ FY 23124 FY 24125 FY 25126 Future Yrs $ - $ $ $ Total 140,991 10,879 151,870 $ - $ - $ - Section IV Operating Budget Impact Operating Cost or Prior Years (savings) Personnel $ Other Operating Costs $ Total Operating Impact $ $ FY 20121 Estimate - FY 21122 FY 22123 Budget FY 23124 FY 24125 FY 25126 Future Yrs $ - $ $ $ Total - $ - $ - $ - $ - $ - RESOLUTION NO. 2021-262 A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING REIMBURSEMENT FOR LOWER SACRAMENTO ROAD PUBLIC IMPROVEMENTS; AND FURTHER APPROPRIATING FUNDS WHEREAS, Vineyard Terrace Subdivision is located east of Lower Sacramento Road and north of Century Boulevard, consists of 235 single-family residential lots, and the last phase of the project was accepted on December 16, 2020 by the City Council; and WHEREAS, at the request of the City, the Developer, K. Hovnanian CA Land Holdings, LLC (Developer), constructed certain off-site street improvements on the east side of Lower Sacramento Road to complete the curb, gutter, sidewalk, and pavement improvements, from the north project boundary to the Sunwest Plaza intersection and included the acquisition of additional street easements and other miscellaneous improvements along the properties at 1606, 1610, and 1626 South Lower Sacramento Road; and WHEREAS, the Developer constructed a sound wall and other improvements along these properties at the Developer's own expense in exchange for acquiring the necessary street easements, and absorbed more than $115,000 towards completing the off-site Lower Sacramento Road improvements; and WHEREAS, staff estimates the reimbursable costs to construct the street improvements and obtain the easement dedications would be less than what it would have cost the City to accomplish the same end product, and providing a safe pedestrian and bicycle path of travel is a substantial benefit to the community; and WHEREAS, staff recommends the Council authorize the reimbursement for the Lower Sacramento Road public improvements in the amount of $151,869.39; and WHEREAS, staff recommends appropriating funds in the amount of $140,991 from the Street Fund (30099000.77020) and $10,879 from the Wastewater Capital account (53199000.77020). NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby authorize the reimbursement for the Lower Sacramento Road public improvements in the amount of $151,869.39; and BE IT FURTHER RESOLVED that the Lodi City Council does hereby authorize the appropriation of funds as set forth above. Dated: September 15, 2021 ------------------------------------------------------------------------ ------------------------------------------------------------------------ I hereby certify that Resolution No. 2021-262 was passed and adopted by the City Council of the City of Lodi in a regular meeting held September 15, 2021, by the following vote: AYES: COUNCIL MEMBERS — Chandler, Hothi, Khan, Kuehne, and Mayor Nakanishi NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN- COUNCIL MEMBERS — None / �wli NNIFER USMIR +' City Clerk 2021-262