AGENDA TITLE: Adopt Resolution Awarding the Contract for Installation of Utility Conduits under the
Woodbridge Irrigation District's Canal ($42,587.00)
MEETING DATE: January 17, 2001
SUBMITTED BY: Electric Utility Director
RECOMMENDED ACTION: That the City Council adopt the attached resolution awarding the contract for
installation of utility conduits under the Woodbridge Irrigation District's canal
to the low bidder, Clayborn Contracting Group, Inc., Auburn CA, in the
amount of $42,587.00
BACKGROUND INFORMATION: On January 2, 2001, three bids were received and opened for this project.
The bid results are shown below:
Bidder
Amount
Clayborn Contracting Group, Inc., Auburn CA
$42,587.00
Applegate Johnston, Inc., Modesto CA
43,040.00
Tim Paxin's Pacific Excavation, Elk Grove CA
49,682.00
This project will install utility conduits (electric, telephone and cable TV) under the Woodbridge Irrigation District's
canal northwest of Lower Sacramento Road and Lodi Avenue. The conduit systems will provide interconnections
between existing utilities and future systems in the area west of Lower Sacramento Road as this area develops. The
Electric Utility Department is the lead agency for the project. PacBell and AT&T Broadband are the other utilities
participating in the project. These utilities will reimburse the City for their appropriate share of the cost of the project,
approximately 1/3 each.
Plans and Specifications for this project were approved by the City Council at the meeting of December 6, 2000.
The Engineer's estimate was $60,000.
FUNDING: Included in the Department's 2000-01 Financial Plan and Budget, Distribution System
Improvement (page E-27).
Funding Approval: N.
�
Vicky cAthie, Finance Director
Alan N. Vallow, Electric Utility Director
PREPARED BY:
ANWHHlist
c: City Attorney
Purchasing Officer
APPROVED:
Hans Hansen, Manager, Engineering and Operations
H. Dixon Flynn --'City Manager
RESOLUTION NO. 2001-04
A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE
CONTRACT FOR INSTALLATION OF UTILITY CONDUITS UNDER
THE WOODBRIDGE IRRIGATION DISTRICT'S CANAL
WHEREAS, in answer to notice duly published in accordance with law and the
order of this City Council, sealed bids were received and publicly opened on January 2,
2001 at 11:00 a.m. for Installation of Utility Conduits under the Woodbridge Irrigation
District's Canal, described in the specifications therefore approved by the City Council
on December 6, 2000; and
WHEREAS, said bids have been compared, checked, and tabulated and a report
thereof filed with the City Manager as follows:
Bidder Location Bid
Clayborn Contracting Group, Inc., Auburn, CA $ 42,587.00
Applegate Johnston, Inc. Modesto, CA $ 43,040.00
Tim Paxin's Pacific Excavation Elk Grove, CA $ 49,682.00
NOW, THEREFORE,.BE IT RESOLVED by the Lodi City Council that the award
of the Bid for Installation of Utility Conduits under the Woodbridge Irrigation District's
Canal, be made to the low bidder, Clayborn Contracting Group, Inc., of Auburn,
California, in the amount of $42,587.00; and
BE IT FURTHER RESOLVED, that the City Manager is hereby authorized to
execute a Work Order for the design consultant, Mark Thomas and Company, to
provide construction management services.
Dated: January 17, 2001
------------------------------------------------------------------
------------------------------------------------------------------
I hereby certify that Resolution No. 2001-04 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held January 17, 2001, by the following
vote:
AYES: COUNCIL MEMBERS — Hitchcock, Howard, Land, Pennino and
Mayor Nakanishi
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — None
ABSTAIN: COUNCIL MEMBERS — None
SUSAN J. BLA TON
City Clerk
2001-04
CITY COUNCIL
ALAN S. NAKANISHI, Mayor
PHILLIP A. PENNINO
Mayor Pro Tempore
SUSAN HITCHCOCK
EMILY HOWARD
KEITH LAND
CITY OF LODI
ELECTRIC UTILITY DEPARTMENT
ALAN N. VALLOW, DIRECTOR
1331 S HAM LANE
LODI, CALIFORNIA 95242-3995
(209)333-6762
FAX (209) 339-6839
January 18, 2001
Mr. David Gove, President
Clayborn Contracting Group, Inc.
10556 Combie Road
Auburn, CA 95602-8906
H. DIXON FLYNN
City Manager
RANDALL A. HAYS
City Attorney
;SUSAN J. BLACKSTON
City Clerk
C I TY Jt- 1,.
601
Re: Installation of Utility Conduits Under the Woodbridge Irrigation District's Canal
At the City Council meeting of January 17, 2001, your firm was awarded the contract for
Installation of Utility Conduits Under the Woodbridge Irrigation District's Canal in the amount of
$42,587.00. The bids received for the project are tabulated below:
Bidder
Amount $
Cla born Contracting, Auburn, CA
42,587.00
Applegate Johnston Inc., Modesto, CA
43,040.00
Tim Paxin's Pacific Excavation, Elk Grove, CA
49,682.00
At this time various documents need to be completed and/or provided by you in order to finalize
the Contract for this project. Therefore, enclosed with this letter you will find:
Contract, 2 copies.
Please execute each copy on page 4.3 under CONTRACTOR and return both copies to
the City for execution. The effective date of this contract will be the date the City
executes the Contract.
Mr. David Gove, President
Clayborn Contracting Group Inc.
10556 Combie Road
Auburn, CA 95602-8906
Contract Surety Bonds (Labor and Materials, Faithful Performance) 1 copy of each.
Please have these bonds completed and submitted with the Contract. See section
2.900 of "Information to Bidders". The bonds must be executed on the forms enclosed
with this letter in addition to any other documents your Surety Company may wish to
supply. The "California All -Purpose Acknowledgment" must also be completed for each
Bond.
Insurance Certificate
Please provide and include the insurance certificates with the Contract, as required per
section 2.1100 and 2.1200 of "Information to Bidders". The "Certificate Holder's"
address should be City of Lodi, 221 West Pine, Lodi, California, 95240.
Please return all documents to:
Hans Hansen, Manager, Engineering and Operations
City of Lodi, Electric Utility Department
1331 South Ham Lane
Lodi CA 95242-3995
Upon execution of the contract a pre construction meeting will be scheduled at the Electric
Utility Service Center, 1331 S. Ham Lane, Lodi CA. Please indicate the name or names of the
individual(s) in your organization we should contact regarding the specific date and time of the
pre construction meeting.
A copy of the "Specifications" for this project has been enclosed for your reference.
Upon execution of the contract by the City your Bid Bond will be returned.
Should you have any questions, please do not hesitate to contact me at (209) 333-6769.
Hans Hansen
Manager, Engineering and Operations
Enclosures
c: Electric Utility Director
City Clerk
Purchasing Officer
Award Notice.doc
CITY COUNCIL CITY OF LOD I H. DIXON FLYNN
City Manager
ALAN S. NAKANISHI, Mayor
PHILLIP A. PENNINO
Mayor Pro Tempore
SUSAN HITCHCOCK
EMILY HOWARD
KEITH LAND
Mr. Tim Johnston
Applegate Johnston Inc.
P.O. Box 5295
Modesto, CA 95352
ELECTRIC UTILITY DEPARTMENT
ALAN N. VALLOW, DIRECTOR •- -)
1331 S HAM LANE n.
LODI, CALIFORNIA 95242-3995
(209) 333-6762-1—
(. .
FAX (209) 339-6839 V 1 E Oil
January 18, 2001
Re: Installation of Utility Conduits Under the Woodbridge Irrigation District's Canal
RANDALL A. HAYS
City Attorney
SUSAN J. BLACKSTON
City Clerk
At the City Council meeting of January 17, 2001, the City Council awarded the bid referenced
above to Clayborn Contracting, Auburn, CA, the lowest responsible bidder. The bids received
for this project are tabulated below:
Bidder
Amount $
Cla born Contracting, Auburn, CA
42,587.00
Applegate Johnston Inc., Modesto, CA
43,040.00
Tim Paxin's Pacific Excavation, Elk Grove, CA
49,682.00
The bid bond you submitted with your bid proposal will be returned to you once the contract for
this project has been executed, expected within 30 days.
The City of Lodi wishes to thank you for your interest in this project, and assures you that we
welcome proposals from you in the future.
Hans Hansen
Manager, Engineering and Operations
c: Electric Utility Director
City Clerk
Purchasing Officer
Award Notice 1.doc
CITY COUNCIL CITY OF LOD
ALAN S. NAKANISHI, Mayor
PHILLIP A. PENNINO ELECTRIC UTILITY DEPARTMENT
Mayor Pro Tempore ALAN N. VALLOW, DIRECTOR
SUSAN HITCHCOCK 1
EMILY HOWARD 1331 S HAM LANE
KEITH LAND LODI, CALIFORNIA 95242-3995 ~'
(209)333-6762
FAX (209) 339-6839
I Ci T Y 4� `.iiv LC,J1
January 18, 2001
Precilla Gastelum
Tim Paxin's Pacific Excavation
9701 Dino Drive, Suite 110
Elk Grove, CA 95624
Re: Installation of Utility Conduits Under the Woodbridge Irrigation District's Canal
H. DIXON FLYNN
City Manager
RANDALL A. HAYS
City Attorney
SUSAN J.BLACKSTON
City Clerk
At the City Council meeting of January 17, 2001, the City Council awarded the bid referenced
above to Clayborn Contracting, Auburn, CA, the lowest responsible bidder. The bids received
for this project are tabulated below:
Bidder
Amount $
Cla born Contracting, Auburn, CA
42,587.00
Applegate Johnston Inc., Modesto, CA
43,040.00
Tim Paxin's Pacific Excavation, Elk Grove, CA
49,682.00
The bid bond you submitted with your bid is herewith returned to you.
The City of Lodi wishes to thank you for your interest in this project, and assures you that we
welcome proposals from you in the future.
Hans Hansen
Manager, Engineering and Operations
c: Electric Utility Director
City Clerk
Purchasing Officer
Award Notice 1.doc