Loading...
HomeMy WebLinkAboutAgenda Report - June 16, 2021 C-09AGENDA ITEM Ll ,, C1 CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Accept Improvements Under Contract for 2020 Crack Sealing Project MEETING DATE: June 16, 2021 PREPARED BY: Public Works Director RECOMMENDED ACTION: Accept improvements under contract for 2020 Crack Sealing Project. BACKGROUND INFORMATION: The primary cause of asphalt failure is water infiltration into the subgrade. Crack sealing is one of the most basic and important preventative street maintenance practices. This project consists of thoroughly cleaning and sealing the existing transverse and longitudinal cracks in pavement surfaces and includes other incidental and related work. This contract is intended to supplement work performed by Street Division crews to maximize the street area sealed each year. The locations are shown on Exhibit A and listed on Exhibit B. The contract was awarded to Pavement Coating Co, of Sacramento, in the amount of $40,560, on February 3, 2021. All work was completed in substantial conformance with the plans and specifications approved by City Council. The final contract price was $40,560 and the project was completed prior to the contract completion date. Following acceptance by the City Council, as required by law, the City Engineer will file a Notice of Completion with the County Recorder's office. The notice serves to notify vendors and subcontractors that the project is complete and begins their 30 -day period to file a stop notice requiring the City to withhold payments from the prime contractor in the event of a payment dispute. FISCAL IMPACT: By increasing the crack sealing effort, the useful life of City streets will be extended. This project does not impact the General Fund. FUNDING AVAILABLE: This project was funded using Gas Tax funds. aQ1LQ Charles E. Swimley,Jr. Public Works Director Prepared by Alice Bernardino, Assistant Engineer CES/AB/cd Attachment APPROVED: `—'S'fepf7en SSs�vabAer, City Manager \\cvcfilv02\pubwks$\WP\PROJECTS\STREETS\2020 Crack Seal\CAccept.doc 5/2812021 OF CSI U, Exhbit B Site Desciption Road Name From To Street Length (ft) Width (ft) Area (sf) Academy St. Valley Av. End 105 30 3,150 Academy St. Elgin Av. Kettleman Ln. 558 30 16,740 Academy St. Valley Av.1 Elgin Av.1 22013016,600 Academy St. SUBTOTAL 26,490 Century Blvd Lower Sacramento F Sage Wy. 1628 61 99,308 Century Blvd Sage Wy. Mills Av. 925 61 56,425 Century Blvd Ham Ln. Dartmoor Cir 816 63 51,408 Century Blvd Dartmoor Cir Dartmoor Cir 244 63 15,372 Century Blvd Dartmoor Cir Scarborough Dr. 8721 631 54,936 Century Blvd Scarborough Dr. Hutchins St.1 7471 63 47,061 Century Blvd Hutchins St. Church St 7351 631 46,305 Century Blvd. SUBTOTAL 370,815 Crescent Av. Lodi Av. Kimberly Dr. 573 45 25,785 Crescent Av. Perry Wy. Kimberly Dr. 235 45 10,575 Crescent Av. Tokay St. Perry Wy. 542 45 24,390 Crescent Av. Tokay St. Sylvia Dr. 250 45 11,250 Crescent Av. Sylvia Dr. Dianna Dr. 578 45 26,010 Crescent Av. Dianna Dr. Ehrhardt Dr. 241 45 10,845 Crescent Av. Vine St. Ehrhardt Dr. 242 45 10,890 Crescent Av. SUBTOTAL 119,745 Tienda Dr. Tienda (Target) Heidelberg Wy. 748 41 30,668 Tienda Dr. Heidelberg Wy. Salzburg Ln. 333 41 13,653 Tienda Dr. Vienna Dr. Salzburg Ln. 336 41 13,776 Tienda Dr. Mills Av. Vienna Dr. 296 41 12,136 Tienda Dr. Millsbridge P1.1 Mills Av.1 4011 411 16,441 Tienda Dr. Lakeshore Dr. Millsbridge P1.1 4681 411 19,188 Tienda Dr. SUBTOTAL 105,862 Vine St. Mills Av. Stephans Wy. 865 42 36,330 Vine St. Stephans Wy. Cortez Wy. 1364 42 57,288 Vine St. Cortez Wy. Ham Ln. 260 42 10,920 Vine St. Ham Ln. Fairmont Av. 687 42 28,854 Vine St. Fairmont Av. Crescent Av. 821 42 34,482 Vine St. Rose St. Crescent Av. 308 34 10,472 Vine St. California St. Rose St. 250 34 8,500 Vine St. Hutchins St. California St. 596 34 20,264 Vine St. IHutchins St.1 S. Lee Avel 3371 301 10,110 Vine St. I S. Lee Avel Pleasant Av.1 2881 301 8,640 Vine St. I Pleasant Av.1 Church St. 3161 301 9,480 Vine St. SUBTOTAL 235,340 TOTAL 858,252