Loading...
HomeMy WebLinkAboutAgenda Report - May 19, 2021 C-082 AGENDA ITEM 00 JA' CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Accept Improvements Under Contract for Well 16 Granular Activated Carbon Replacement MEETING DATE: May 19, 2021 PREPARED BY: Public Works Director RECOMMENDED ACTION: Accept improvements under contract for Well 16 Granular Activated Carbon Replacement. BACKGROUND INFORMATION: Granular activated carbon (GAC) is utilized at certain well sites to adsorb dibromochloropropane (DBCP) and other contaminants in the drinking water in order to maintain levels within the State and Federal limits. Over time, the carbon loses its adsorptive capacity and must be replaced. This project consisted of removing the spent granular activated carbon (GAC) from Well Site 16 and inspecting the vessels. After minor repairs were made (by City forces), the contractor furnished and installed domestic virgin GAC into the vessels. The plans and specifications for this project were approved on October 21, 2020 and, in the same Council action, City Manager was authorized to award the contract to the lowest responsive bidder in an amount not to exceed $180,000. The City received the following two bids for this project on November 18, 2020: Abovel(Below) Bidder Location Bid Engineer's Base Est. Engineer's Estimate $180,100.00 Calgon Carbon Corporation Moon Township, PA $134,704.00* ($45,396.00) Diede Construction, Inc. Woodbridge $187,030.00 $ 6,930.00 *Corrected Amount Based on the bids received, the contract was awarded to Calgon Carbon Corporation, of Moon Township, Pennsylvania, in the amount of $134,704, and a Notice to Proceed was issued on January 22, 2021. The contract has been completed in substantial conformance with the specifications approved by City Council. The contract completion date was April 13, 2021. The actual completion date was April 15, 2021. The additional days were required to allow the City to make necessary repairs prior to refilling. The final contract price was $134,704. Following acceptance by the City Council, as required by law, the City Engineer will file a Notice of Completion with the County Recorder's office. The notice serves to notify vendors and subcontractors that the project is complete and begins their 30 -day period to file a stop notice requiring the City to withhold payments from the prime contractor in the event of a payment dispute. APPROVED: Step en Sch—Wabauafl, City Manager \\cvcfilv02\pubwks$\WP\PROJECTS\WATER\Well 16\GAC Replacement\CAccept 5/5/2021 Accept Improvements Under Contract for Well 16 Granular Activated Carbon Replacement May 19, 2021 Page 2 FISCAL IMPACT: This project was necessary to comply with the maximum contaminant levels at these well sites. The project does not create any additional maintenance costs. FUNDING AVAILABLE: This project was funded through DBCP settlement funds. Charles E. Swimley, Jr. Public Works Director Prepared by Jimi Billigmeier, Associate Civil Engineer CES/JB/tc Cc: Utility Superintendent \\cvcfilv02%pubwks$\WP\PROJECTSkWATERkWelI 16\GAC Replacement\CAccept 5/5/2021