HomeMy WebLinkAboutAgenda Report - May 19, 2021 C-05AGENDA ITEM (!,=5 CITY OF LODI COUNCIL COMM LAICATION TM AGENDA TITLE: Adopt Resolution Authorizing City Manager to Execute Change Orders No. 3 and No. 4 with West Coast Arborists, Inc. of Stockton for Power Line Clearing and Vegetation Management Services through June 30, 2027 ($8,850,000) MEETING DATE: May 19, 2021 PREPARED BY: Electric Utility Director RECOMMENDED ACTION: Adopt a resolution authorizing the City Manager to execute Change Orders No. 3 and No. 4 with West Coast Arborists, Inc. of Stockton for Power Line Clearing and Vegetation Management Services through June 30, 2027 for a total not -to -exceed amount of $8,850,000. BACKGROUND INFORMATION: In July 2017, the City Council awarded a multi-year contract with West Coast Arborists, Inc. (WCA) for power line clearing and vegetation management services in the amount of $750,000 annually for a three-year term with the option to renew two additional years. In 2019, City Council approved Change Order No. 1 in the amount of $655,087 for additional crews to address a backlog of vegetation management activities that resulted from a delay associated with failed contract negotiations with a previous contractor. In 2020, the City Council approved Change Order No. 2 for a two-year extension option through June 30, 2022 based on current market conditions in the amount of $1.25 million annually. Lodi Electric Utility (LEU) is now proposing to execute two change orders with WCA as follows: Change Order No. 3 This proposed change order will add $100,000 to the existing contract for Fiscal Year 2021/22 in order to fund the removal of two large groups of trees growing near electric utility lines in the public right of way and which recently caused a large outage to approximately 10,000 LEU customers during the severe wind storm last January. This work was not anticipated as part of LEU's regular tree trimming and line clearing efforts and is thus an added cost to the existing contract. ' Change Order No. 4 WCA's current contract with the City, including extensions, is set to end June 30, 2022. WCA has agreed to offer a five-year contract extension which includes a 10 percent savings relative to a recently awarded and competitively bid project from a neighboring public power agency, as well as holds labor rates stable for the final two years of the proposed contract extension. This will allow the City to lock in price certainty and continuity of service through June 2027 at rates which will be among the lowest in the industry. LEU is proposing a total five-year not -to -exceed amount of $8,750,000 for this proposed change order, or approximately $1.75 million annually. While annual expenditures will depend on actual vegetation management activities completed and some years may require more work than others, this proposed change order will not exceed $8,750,000 over the five-year term July 1, 2022 through June 30, 2027. APPROVED: Stephen Sch au , City Manager Adopt Resolution Authorizing City Manager to Execute Change Orders No. 3 and No. 4 with West Coast Arbodsts, Inc. of Stockton for Power Line Clearing and Vegetation Management Servbw through June 30, 2027 ($8,050,000) May 19, 2021 Page 2 WCA has been performing well for the City and Lodi Electric Utility (LEU) continues to receive positive feedback regarding their completed work. Pursuant to State of California General Order 95, LEU must routinely patrol, clear and remove vegetation that encroaches into its overhead power lines. In addition, as part of the recently adopted Wildfire Mitigation Plan and subsequent annual review and updated requirements under existing legislative and regulatory requirements, LEU is committed to meeting or exceeding the minimum industry standard vegetation management practices as it relates to clearing vegetation from power lines. LEU is also committed to responding to customer -initiated requests in a timely manner. FISCAL IMPACT: $100,000 for Change Order No. 3 and $8,750,000 for Change Order No. 4. FUNDING AVAILABLE: Funds will be budgeted for as part of the annual budget process in account number 50064500.72499. Andrew Keys Andrew Keys Deputy City Manager/Internal Services Director Jeff Berkheimer Electric Utility Director Signature: JWWAIT X2jj'" Email: akeys@lodi.gov CITY OF LODI PROPOSED CHANGE ORDER PROJECT CO No.: 3 Power Line Clearing / Vegetation Management CONTRACTOR: PCO No.: West Coast Arborists, Inc. RFI No.: ARCHITECT/ENGINEER: FI No.: City of Lodi Submit Proposal Within 15 Days Upon Receipt of This Request Brief Description Of Work Power Line Clearing / Vegetation Management Services Change Order #3: Funds for additional unanticipated power line clearing activities per Contractor proposal dated April 20, 2021. Not -to -exceed amount of $100,000 - FY 2021/22 (July 1, 2021 - June 30, 2022) Request, Proposal, Recommendation And Approval Requesting Official: Jeff Berkheimer Request Date: N/A Schedule Impact: 0 Days Contractor Proposal Date: 4/20/2021 Add Amount: $100,000 Deduct Amount $0.00 Reason For Change: Additional work requested by City Account: 50064500.72499 CONTRACTOR AGREES TO FURNISH ALL LABOR AND MATERIALS AND PERFORM ALL WORK REQUIRED TO COMPLETE THE ABOVE DESCRIBED WORK CHANGE IN ACCORDANCE WITH THE REQUIREMENTS FOR SIMILAR WORK COVERED BY THE CONTRACT EXCEPT AS OTHERWISE STIPULATED HEREIN FOR THE STATED CONSIDERATION. TO PERFORM THE CHANGES FOR THE AMOUNT INDICATED WHICH INCLUDES ANY EXTENDED OR JOBSITE OVERHEAD, DISRUPTION, RIPPLE EFFECT AND OTHER IMPACT COSTS. NO WORK WILL BE STARTED UNTIL THIS PROPOSAL IS ACCEPTED. IF THE CONTRACTOR DOES NOT SIGN ACCEPTANCE OF THIS ORDER, THE CONTRACTOR SHOULD REFER TO SECTION 4- 1.03A OF THE STANDARD SPECIFICATIONS REGARDING FILING A WRITTEN PROTEST WITHIN THE SPECIFIED TIME. Represents 3 years ORIGINAL CONTRACT: (FY 17/18 -FY 19/20) $2 250,000.00 at a not -to -exceed of $750K/year PREVIOUS ADDS: Change Orders No. 1 $3,155,087.00 and No. 2 Contractor Date PREVIOUS DEDUCTS: $0.00 THIS CHANGE ORDER: $100,000.00 Electric Utility Director Date TOTAL CONTRACT AMOUNT $5,505,087.00 INCLUDING ALL CHANGE ORDERS: City Manager Date ORIGINAL COMPLETION DATE: 6/30/2020 ADJUSTED CONTRACT No Change 6/30/2022 COMPLETION DATE: 5-19-21 West Coast Contract Change Order 3 4/20/2021 WEST COAST ARBORISTS, INC. vsochl�e 3625 E. Stevenson Avenue Stockton, CA 95205 209.547.0297 Phone 209.547.0385 Fax WCAINC.COM PROPOSAL FDR TREE MAINTENANCE SERVICES CUSTOMER INFORMATION Main Contact Billing Contact TIM COMBS TIM COMBS CITY OF LODI - ELECTRIC UTILITY CITY OF LODI - ELECTRIC UTILITY 1331 SOUTH HAM LANE 1331 SOUTH HAM LANE LODI, CA 95242 LODI, CA 95242 209.333.6800 tcombsilodi.gov 209.333.6800 tcombs9lodi.gov Yes JOB LOCATION I. East side of Lower Sacramento Rd. North of Lodi Ave. 2.1211 W. Elm St. 3.845 S. Ham Ln. SCOPE OF WORK 1.30 Pine tree and stump removals. 2. Large Deodar Cedar removal. 3. Large Oak removal. 700.00 Aerial Crew Man Hour $95.00 0,500.00 352.DO Foreman/Supervisor Man Hour $95.00 $33,440.00 COMMENTS These are all large jobs that will require special equipment. Crane, roll off, loader etc. This work is not to exceed $100,000.00 CA Contractors License 366764 Federal Tax ID: 95-3250682 CA DIR Registration 1000000956 ESTIMATED BY ACCEPTED BY AR—EA MANfFC,ER TITLE TITLE 0-4/20/21 DATE DATE Printed on: 4120120211:13:21 PM Page 1 of 1 CITY OF LODI PROPOSED CHANGE ORDER PROJECT CO No.: 4 Power Line Clearing / Vegetation Management CONTRACTOR: PCO No.: West Coast Arborists, Inc. RFI No.: ARCHITECT/ENGINEER: FI No.: City of Lodi Submit Proposal Within 15 Days Upon Receipt of This Request Brief Description Of Work Power Line Clearing / Vegetation Management Services Change Order #4: Contract Extension to continue performing power line clearing and vegetation management services through June 30, 2027 per pricing in attached contractor proposal dated February 11, 2021 for an additional total not -to -exceed cost of $8,750,000. Request, Proposal, Recommendation And Approval Requesting Official: Jeff Berkheimer Request Date: N/A Schedule Impact: see Below Days Contractor Proposal Date: 2/11/2021 Add Amount: $8,750,000 Deduct Amount $0.00 Reason For Change: Contract extension mutually agreed upon by City and Contractor Account: 50064500.72499 CONTRACTOR AGREES TO FURNISH ALL LABOR AND MATERIALS AND PERFORM ALL WORK REQUIRED TO COMPLETE THE ABOVE DESCRIBED WORK CHANGE IN ACCORDANCE WITH THE REQUIREMENTS FOR SIMILAR WORK COVERED BY THE CONTRACT EXCEPT AS OTHERWISE STIPULATED HEREIN FOR THE STATED CONSIDERATION. TO PERFORM THE CHANGES FOR THE AMOUNT INDICATED WHICH INCLUDES ANY EXTENDED OR JOBSITE OVERHEAD, DISRUPTION, RIPPLE EFFECT AND OTHER IMPACT COSTS. NO WORK WILL BE STARTED UNTIL THIS PROPOSAL IS ACCEPTED. IF THE CONTRACTOR DOES NOT SIGN ACCEPTANCE OF THIS ORDER, THE CONTRACTOR SHOULD REFER TO SECTION 4- 1.03A OF THE STANDARD SPECIFICATIONS REGARDING FILING A WRITTEN PROTEST WITHIN THE SPECIFIED TIME. Represents 3 years ORIGINAL CONTRACT: (FY 17/18 -FY 19/20) $2 250,000.00 at a not -to -exceed of $750K/year PREVIOUS ADDS: Change Orders No. 1, $3,255,087.00 No. 2 and No. 3 Contractor Date PREVIOUS DEDUCTS: $0.00 THIS CHANGE ORDER: $8,750,000.00 Electric Utility Director Date TOTAL CONTRACT AMOUNT $14,255,087.00 INCLUDING ALL CHANGE ORDERS: City Manager Date ORIGINAL COMPLETION DATE: 6/30/2022 ADJUSTED CONTRACT 6/30/2027 COMPLETION DATE: 5-19-21 West Coast Contract Change Order 4 4/20/2021 Tree Care Professionals Serving Communities Who Care About Trees February 11, 2021 Lodi Electric Utility ATTN: Jeff Berkheimer, Director 1331 S. Ham Lane Lodi, CA 95242 RE: UTILITY LINE CLEARANCE SERVICES AGREEMENT Dear Mr. Berkheimer, www.WCAINC.com I hope 2021 is off to a good start for you and your team. As you know, our current contract is set to expire on June 30, 2022. West Coast Arborists, Inc. would like to take this opportunity to express our gratitude to you and your staff for making the partnership successful. Together we have worked diligently to ensure that the City's urban forest continues to thrive. The purpose of this letter is to begin early discussions on a possible 5 -year extension to our current agreement for utility line clearing services. The additional 5 -year term would begin on July 1, 2022 and extend through June 30, 2027. Attached to this letter please find our proposed rates for the entire term. Please note that these proposed rates for years 1, 2 and 3 of the proposed 5 -year extension reflect an approximate 10.0% discount (10.4% in FY22-23, 10.1% in FY23-24 and 10.5% in FY24-25) off our current contract rates with Roseville Electric. • The proposed rates for FY22-23 reflect an average increase of 14.2% (23.5% & 4.9% respectively) from FY21-22 • The proposed rates for FY23-24 reflect a 4.25% increase from FY22-23 • The proposed rates for FY24-25 reflect a 3.25% increase from FY24-25 These pre -determined increases will help to offset the increases in prevailing wage as established by the Department of Industrial Relations and our other operating costs. In the spirit of mutual benefit, WCA agrees to hold the rates the same for FY25-26 and FY26-27. Upon your review, we would be glad to meet to discuss this proposal in further detail. We appreciate your ongoing efforts to make this Agreement a success for both the City and WCA and look forward to continuing a successful business relationship. Should you have any questions, please do not hesitate to contact me at (800) 521-3714. Sincerely, Patrick Mahoney, President Cc: Tim Combs, Electric Utility Superintendent Melissa C. Price, Rates & Resources Manager CITY OF LODI - ELECTRIC UTILITY Proposed 5 -Year Extension Pricing for Utility Line Clearance Trimming Services performed by WCA, Inc. Date submitted: February 11, 2021 FY23-24 FY24-25 FY25-26 FY26-27 Unit Prices Unit Prices Current 2- Year Unit Prices Unit Prices Extension Unit Prices $121.00 2017-2020 FY20-21 FY21-22 Item Description Unit Bid Prices Unit Prices Unit Prices 1 Aerial Crew Man Hour $89.00 $95.00 $98.00 2 Foreman/Supervisor Man Hour $89.00 $95.00 $98.00 3 ISA Certified Arborist Man Hour $89.00 $95.00 $98.00 4 Stump Grinding Crew Man Hour $89.00 $95.00 $98.00 5 Emergency Aerial Crew Man Hour $129.00 $139.00 $144.00 6 Emergency Foreman/Supervisor Man Hour $129.00 $139.00 $144.00 7 Emergency ISA Certified Arborist Man Hour $129.00 $139.00 $144.00 8 Emergency Groundman Man Hour $129.00 $139.00 $144.00 9 Emergency Stump Grinding Crew Man Hour $129.00 $139.00 $144.00 $162.00 OPTIONAL SERVICES $162.00 $162.00 1 GPS Tree Inventory Data Collection Tree Site N/A $4.00 $4.00 $4.00 $4.00 $4.00 $4.00 $4.00 The rates for years 1, 2 and 3 of the proposed 5 -year extension reflect an approx. 10.0% discount (10.4% in FY22-23, 10.1% in FY23-24 and 10.5% in FY24-25) off our current contract rates with Roseville Electric. Rates for FY22-23 reflect an average increase of 14.2% (23.5% & 4.9% respectively) from FY21-22 Rates for FY23-24 reflect a 4.25% increase from FY22-23 Rates for FY24-25 reflect a 3.25% increase from FY24-25 WCA agrees to hold the rates the same for FY25-26 and 26-27. Proposed 5 -Year Extension FY22-23 FY23-24 FY24-25 FY25-26 FY26-27 Unit Prices Unit Prices Unit Prices Unit Prices Unit Prices $121.00 $126.00 $130.00 $130.00 $130.00 $121.00 $126.00 $130.00 $130.00 $130.00 $121.00 $126.00 $130.00 $130.00 $130.00 $121.00 $126.00 $130.00 $130.00 $130.00 $151.00 $157.00 $162.00 $162.00 $162.00 $151.00 $157.00 $162.00 $162.00 $162.00 $151.00 $157.00 $162.00 $162.00 $162.00 $151.00 $157.00 $162.00 $162.00 $162.00 $151.00 $157.00 $162.00 $162.00 $162.00 $4.00 $4.00 $4.00 $4.00 $4.00 The rates for years 1, 2 and 3 of the proposed 5 -year extension reflect an approx. 10.0% discount (10.4% in FY22-23, 10.1% in FY23-24 and 10.5% in FY24-25) off our current contract rates with Roseville Electric. Rates for FY22-23 reflect an average increase of 14.2% (23.5% & 4.9% respectively) from FY21-22 Rates for FY23-24 reflect a 4.25% increase from FY22-23 Rates for FY24-25 reflect a 3.25% increase from FY24-25 WCA agrees to hold the rates the same for FY25-26 and 26-27. RESOLUTION NO. 2021-133 A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDERS NO. 3 AND NO. 4 TO CONTRACT WITH WEST COAST ARBORISTS, INC., OF STOCKTON, FOR POWER LINE CLEARING AND VEGETATION MANAGEMENT SERVICES THROUGH JUNE 30, 2027 WHEREAS, in July 2017, the City Council awarded a multi-year contract to West Coast Arborists, Inc. (WCA) for power line clearing and vegetation management services in the amount of $750,000 annually for a three-year term with the option to renew for two additional years; and WHEREAS, in 2019, City Council approved Change Order No. 1 in the amount of $655,087 for additional crews to address a backlog of vegetation management activities that resulted from a delay associated with failed contract negotiations with a previous contractor; and WHEREAS, in 2020, the City Council approved Change Order No. 2 for a two-year extension option through June 30, 2022, based on current market conditions in the amount of $1.25 million annually; and WHEREAS, Lodi Electric Utility (LEU) is now proposing to execute Change Orders No. 3 and No. 4; and WHEREAS, Change Order No. 3 will add $100,000 to the existing contract for Fiscal Year 2021/22 in order to fund the removal of two large groups of trees growing near electric utility lines in the public right of way and which recently caused a large outage to approximately 10,000 LEU customers during the severe wind storm last January; and WHEREAS, Change Order No. 4 will extend WCA's existing contract to June 30, 2027 and add an additional not -to -exceed amount of $8,750,000 over five years (July 1, 2022 through June 30, 2027); and WHEREAS, WCA has been performing well for the City and LEU continues to receive positive feedback regarding their completed work; and WHEREAS, the proposed extension includes a 10 percent savings relative to a recently -awarded and competitively -bid project from a neighboring public power agency, as well as holds labor rates stable for the final two years of the proposed contract extension; and WHEREAS, pursuant to State of California General Order 95, LEU must routinely patrol, clear, and remove vegetation that encroaches into its overhead power lines; and as part of the recently -adopted Wildfire Mitigation Plan and subsequent annual review and updated requirements under existing legislative and regulatory requirements, LEU is committed to meeting or exceeding the minimum industry standard vegetation management practices as it relates to clearing vegetation from power lines. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute Change Orders No. 3 and No. 4 with West Coast Arborists, Inc., of Stockton, California, for power line clearing and vegetation management services through June 30, 2027 for a total not -to -exceed amount of $8,850,000; and BE IT FURTHER RESOLVED, pursuant to Section 6.3q of the City Council Protocol Manual (adopted 11/6/19, Resolution No. 2019-223), the City Attorney is hereby authorized to make minor revisions to the above -referenced document(s) that do not alter the compensation or term, and to make clerical corrections as necessary. Dated: May 19, 2021 I hereby certify that Resolution No. 2021-133 was passed and adopted by the City Council of the City of Lodi in a regular meeting held May 19, 2021 by the following votes: AYES: COUNCIL MEMBERS — Chandler, Hothi, Khan, Kuehne, and Mayor Nakanishi NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None /JENNIF�,;,,kR'CUSMIR l 2021-133