AGENDA TITLE: Adopt Resolution Authorizing City Manager to Execute Additional Change Orders to
Water Meter Program - Phase 8 with DSS Company dba Knife River Construction, of
Stockton ($100,000) and Appropriating Funds ($40,000)
MEETING DATE: June 2, 2021
PREPARED BY: Public Works Director
RECOMMENDED ACTION: Adopt resolution authorizing City Manager to execute additional change
orders to Water Meter Program - Phase 8 with DSS Company dba Knife
River Construction, of Stockton, in an amount not to exceed $100,000
and appropriating funds in the amount of $40,000.
BACKGROUND INFORMATION: On August 21, 2019, Council awarded the contract for Water Meter
Program — Phase 8 to DSS Company dba Knife River Construction, of
Stockton (Knife River).
On April 7, 2021, Council authorized the City Manager to execute a change order to Knife River in the amount
not -to -exceed $500,000. The change order was intended to initiate and expedite construction of the proposed
Harmony Homes site (301 East Lodi Avenue) utilizing Emergency Aid Program (HEAP) grant funds
administered by San Joaquin Continuum of Care (SJCoC). This expedited course of action was
recommended because the City risks losing any HEAP funds that are not expended by June 30, 2021.
In order to meet the timeline, the initial change order amount was based on project renderings and not
engineered drawings. As the site design evolved, Knife River updated their time and materials based estimate.
The updated estimate for the site work is now $520,000 excluding landscape and irrigation improvements
and a concrete ramp required for accessibility. The additional cost of the landscape and ramp improvements
is estimated to be $50,000 for a total estimated project cost of $570,000. Today, work is progressing and
Knife River is on track to complete the site work by June 30, 2021.
In order to accommodate the additional costs noted above and any additional unforeseen changes, staff is
requesting Council increase the City Manager's change order authority by an additional $100,000 for a total
not -to -exceed change order authority amount of $600,000.
This action will also appropriate $40,000 in order to accommodate the final plumbing costs and payments
associated with the water meter housing connection modifications.
FISCAL IMPACT: All construction related costs will be funded by the Water Capital Fund (the
appropriation) and the California Department of Housing and Community
Development Permanent Local Housing Allocation (PLHA) grant previously
appropriated (for the additional Harmony Homes costs). This project will not
impact the City's General Fund.
APPROVED:
en S waba r, City Manager
\\cvcfilv02\pubwks$\WP\PROJECTS\WATER\Meters\Water Meter Program Phase =Cha rdar HH2 doc 5/19/2021
Adopt Resolution Authorizing City Manager to Execute Additional Change Orders to Water Meter Program - Phase 8 with DSS Company dba Knife River Construction, of
Stockton ($100,000)
June 2, 2021
Page 2
FUNDING AVAILABLE: PLHA Grant (35585000.77020): $100,000
Requested Appropriation:
Water Capital Fund (56199000.77020): $40,000
Andrew Keys
Andrew Keys
Deputy City Manager/Internal Services Director
QLag-(2
Charles E. Swimley, Jr.
Public Works Director
Prepared by Sean Nathan, Senior Civil Engineer
CES/SN/cd
Cc Community Development Director
Neighborhood Services Manager
Signature: aM,dr� /lip
Email: akeys@lodi.gov
\\cvcfilv02\pubwks$\WP\PROJECTS\WATER\Meters\Water Meter Program Phase 8\CChange Order HH2.doc 5/19/2021
CITY OF LODI
PROPOSED CHANGE ORDER
PROJECT: Water Meter program Phase 8 Meter Installation CO No.: 10
& Main Replacement
CONTRACTOR: KRC PCO No:
Knife River Construction RF1 No.: 2003
ARCHITECT/ENGINEER: FI No..
RMC Isubmit Proposal Within 15 Days Upon Receipt of This Request
Brief Description Of Work
Item 1: Additional work authorized by City Council at the April 7, 2021 meeting related to the Harmony Homes utility and site $500,000.00
work. Work to be perfomed via a combination of Time and Materials and Unit Price Items.
RFI 2003 contains documents related to this Change Order
Total: $500,000.00
Request, Proposal, Recommendation And Approval
Requesting Official: Gary Wlman Request Date: 4/7/2021 Schedule Impact: 60 Days
Contractor Proposal Date: NA Add Amount: $500,000.00 Deduct Amount $0.00
Reason For Change: Unknown Conditions/Changed Condition ACCT: PWWA-0061.Const.ExtLabor 56199000.7702
CONTRACTOR AGREES TO FURNISH ALL LABOR AND MATERIALS AND PERFORM ALL WORK REQUIRED TO COMPLETE THE ABOVE DESCRIBED
WORK CHANGE IN ACCORDANCE WITH THE REQUIREMENTS FOR SIMILAR WORK COVERED BY THE CONTRACT EXCEPT AS OTHERWISE
;STIPULATED HEREIN FOR THE STATED CONSIDERATION. TO PERFORM THE CHANGES FOR THE AMOUNT INDICATED WHICH INCLUDES ANY
EXTENDED OR JOBSITE OVERHEAD, DISRUPTION, RIPPLE EFFECT AND OTHER IMPACT COSTS. NO WORK WILL BE STARTED UNTIL THIS
PROPOSAL. IS ACCEPTED. 1F THE CONTRACTOR DOES NOT SIGN ACCEPTANCE OF THIS ORDER, THE CONTRACTOR SHOULD REFER TO SECTION 4-
1,03A OF THE STANDARD SPECIFICATIONS REGARDING FILING A WRITTEN PROTEST WITHIN THE SPECIFIED TIME.
ORIGINAL CONTRACT: $4,441,635.00
`�. It. 2/
PREVIOUS ADDS: $1,124,892.19
Contractor Date
PREVIOUS DEDUCTS: $0.00
L 12 Z
THIS CHANGE ORDER: $500,000.00
1
Co structi Proj t r r Date
TOTAL CONTRACT AMOUNT
$6,066,527.19
Charlie Swimley May 11 2021
INCLUDING ALL CHANGE ORDERS:
Public Works Director Date
CONTRACT TIME ADJUSTMENT 60 Calendar Days
Steve Schwabauer May 11, 2021
ORIGINAL COMPLETION DATE: 284 Calendar Days
City Manager Date
ADJUSTED CONTRACT 404 Calendar Days
COMPLETION DATE:
W WRP8 PCO 10 4/19/2021
RESOLUTION NO. 2021-80
A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING
THE CITY MANAGER TO EXECUTE CHANGE ORDERS TO
WATER METER PROGRAM — PHASE 8 WITH DSS COMPANY
DBA KNIFE RIVER CONSTRUCTION, OF STOCKTON
WHEREAS, on August 21, 2019, Council awarded the contract for Water Meter Program
— Phase 8 to DSS Company dba Knife River Construction, of Stockton (Knife River); and
WHEREAS, meanwhile, the City has been awarded Homeless Emergency Aid Program
(HEAP) grant funds in the amount of $1,250,000 from San Joaquin Continuum of Care (SJCoC)
for the Harmony Homes transitional housing project; and
WHEREAS, in order to expedite construction of the Harmony Homes site and minimize
the risk of losing any residual HEAP funding not expended by the deadline, staff is
recommending to perform the site design services for this project by City engineering staff and
to execute a change order with Knife River for the construction of the Harmony Home site
improvements; and
WHEREAS, staff recommends authorizing the City Manager to execute change orders
to Water Meter Program - Phase 8 with DSS Company dba Knife River Construction, of
Stockton, in an amount not to exceed $500,000.
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby
authorize the City Manager to execute change orders to Water Meter Program - Phase 8 with
DSS Company dba Knife River Construction, of Stockton, California, in an amount not to
exceed $500,000, for construction of Harmony Homes site improvements; and
BE IT FURTHER RESOLVED, pursuant to Section 6.3q of the City Council Protocol
Manual (adopted 11/6/19, Resolution No, 2019-223), the City Attorney is hereby authorized to
make minor revisions to the above -referenced document(s) that do not alter the compensation
or term, and to make clerical corrections as necessary.
Dated: April 7, 2021
------------------------------------------------------------------------
I hereby certify that Resolution No. 2021-80 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held April 7, 2021 by the following vote:
AYES: COUNCIL MEMBERS — Chandler, Hothi, Khan, Kuehne, and
Mayor Nakanishi
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — None
ABSTAIN: COUNCIL MEMBERS — None
4
6�JENNIFF CUSMIR
City Clerk
2021-80
CITY OF LODI
Request For Information
Water Meter Program Phase 8 Meter Installation and Main Replacement RFI 2003
Contractor
Transmittal
Attn/Firm
Date Sent
Date
Date Due
Knife River Construction
Record
Recv'd
Information Requested By
Contractor to City
Gary Wiman
Public Works Department
City of Lodi
Subject: Harmony Homes Utility & Site Work
City to Engineer
Drawing Ref.
A/E ❑ City ❑
Attached
to Consultanl(s)
Spec Ref.
Consultant(s) to
A/E
A/E to City
Gary Wiman
City of Lodi
City to Contractor
Donald Lowe
Knife River Const.
4/19/21
Information:
At the April 7, 2021 City Council Meeting City Council authorized the execution of a "Not to Exceed"
$500,000.00 change order for Utility and Site Improvements for the Harmony Homes project located at 301 E.
Lodi Avenue.
The contractor will be required to provide all labor, materials, traffic control, etc. to complete the work. The work
must be phased as shown on the drawings and coordination with other City work related to the project; including
the delivery of the housing units (by others).
Complete Landscape drawings are being completed and will be incorporated as soon as they are ready.
Work is to be performed on a Time and Materials basis AND Unit Pricing, where feasible. Detailed
documentation of labor and materials must be provided along with daily reports of field reports.
Please provide a proposed schedule showing working days necessary to complete the work.
Page l of 10
Date: 4/19/21
Signature: _Gary Wiman
You are authorized to proceed with the work identified in the reply to this RFI on the assumption that no change in the contract amount or completion
date is required, If the RFI reply involves a change in the work affecting your contract amount or completion date. notify the Project Manager
immediately.
WIVIPPH RFI 2003 - Harmony Homes 04/19/21
RESOLUTION NO. 2021-80
A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING
THE CITY MANAGER TO EXECUTE CHANGE ORDERS TO
WATER METER PROGRAM — PHASE 8 WITH DSS COMPANY
DBA KNIFE RIVER CONSTRUCTION, OF STOCKTON
WHEREAS, on August 21, 2019, Council awarded the contract for Water Meter Program
— Phase 8 to DSS Company dba Knife River Construction, of Stockton (Knife River); and
WHEREAS, meanwhile, the City has been awarded Homeless Emergency Aid Program
(HEAP) grant funds in the amount of $1,250,000 from San Joaquin Continuum of Care (SJCoC)
for the Harmony Homes transitional housing project; and
WHEREAS, in order to expedite construction of the Harmony Homes site and minimize
the risk of losing any residual HEAP funding not expended by the deadline, staff is
recommending to perform the site design services for this project by City engineering staff and
to execute a change order with Knife River for the construction of the Harmony Home site
improvements; and
WHEREAS, staff recommends authorizing the City Manager to execute change orders
to Water Meter Program - Phase 8 with DSS Company dba Knife River Construction, of
Stockton, in an amount not to exceed $500,000.
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby
authorize the City Manager to execute change orders to Water Meter Program - Phase 8 with
DSS Company dba Knife River Construction, of Stockton, California, in an amount not to
exceed $500,000, for construction of Harmony Homes site improvements; and
BE IT FURTHER RESOLVED, pursuant to Section 6.3q of the City Council Protocol
Manual (adopted 11/6/19, Resolution No. 2019-223), the City Attorney is hereby authorized to
make minor revisions to the above -referenced document(s) that do not alter the compensation
or term, and to make clerical corrections as necessary.
Dated: April 7, 2021
I hereby certify that Resolution No. 2021-80 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held April 7, 2021 by the following vote:
AYES: COUNCIL MEMBERS — Chandler, Hothi, Khan, Kuehne, and
Mayor Nakanishi
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — None
ABSTAIN: COUNCIL MEMBERS — None
JENNIF CUSMIR
( City Clerk
2021-80
Harmony Homes Site Improvements Estimate
4/12/2021
Item Description
Total Qty
Unit
1
Mobilization, Temporary Facilities, Bonds, Etc,
1
LS
2
Demolition
1
LS
3
Clearing, Grubbing & Grading
1
LS
4
Aggregate Base Building Pads
2,660
SF
5
Alley Asphalt Concrete(including ad 'ustln utilities to rade)
7,700
SF
6
Concrete Alley Valley Gutter
405
LF
7
Concrete Alley Approach 6" Reinforced
440
SF
8
Concrete Curb and Gutter
100
LF
9
Concrete Curb
144
LF
10
Concrete Sidewalk & Flatwork 4")
1,820
SF
11
Concrete Parking Lot (6" Reinforced)
1,800
SF
12
Truncated Domes
25
SF
13
4' Tall Wrought Iron Fence
185
LF
14
6' Tall Wrought Iron Fence
232
LF
15
4' Tall Pedestrian Gate
1
LS
16
6' Tall Vehicle Gate all Necessary Components)
1
LS
17
Parking Lot Light and Footing
1
LS
18
Earth Swale
1
LS
19
Parkin Bum er
1
EA
20
Si na e and Striping
1
LS
21
Mailbox on Pedestal
1
LS
22
Water Improvements and Connections
1
LS
23
Sewer Improvements and Connections
1
LS
24
Sidewalk/Curb Drain and Rock
1
LS
25
Electrical and Communication Conduits/Boxes/Conductors
1
LS
26
Landscaping and Irrigation(Including Sleeves, Controller, Valves, Gravel
1
LS
27
Concrete ADA Ramp to Building w/ Railing
1
LS
Note
Excludes, electrical meters, buildings, stairs, permits, fees, etc
Q
O
W W
Z
J
0O Q
W
LLz0O
2
Hall
O
o iq . F ....
ii
I
O
Q
2
M
LU
f—
r
V
U)
133HS N3n0O
S1N3W3AOHdWl KIS
S3WOH .WOINUVH
zx �
f
g€
G
ii p,
i s
Hall
gn
o iq . F ....
ii
I
5
f
\
F\
–
1001 o
NYIdmmmz _ee
SIN3MAOMM13119
_ m,aa
_a am_\.
�G
-
d
f
\
F\
d
z
}k
� k �
- •� K
011
IS No SgHs »
RIOo),Llo
_d»S
s _AOU _ 9119
_ m,a a
_aam_
[
...
I
o
011
IS No SgHs »
•
--
YY 'S} ,n«•r:„+
f-' ,,,n.s=+i .ua
1001j0 /J.10
NVld unun
S1N3W3AO*ddW1311S
3AV 10013 toe
S3WOH ANOW2IVH
i
—' —
L1
dad � � '�q� w � � a ,.,• --; a
Z
� a orj
F;f F
9 p smm €F S m 6 W y O
}; z U W m
�y� a ffLLy 0 98 pig �y
11.1 QQ yq& „�i$ '�C $ o pZ_g� W'S
py{y yZ R �c
W �p U° ZF 2Q *S m 1 7 �
U' 6ffl t z° w W GG�'n � � O � a � � l�1ti
U g �Z LL rrr 8 ov fid i \
� ��
z
� �a
uF7 k
W
�ra
UE kn J
W
O
z
1 ,
1`I o
1 '� sz3 v
za a
'+,Ufn x m rc
i 8mI Z ��
eNl og F F dmf” u
'_��. .... .. IIJmcg 0u"i6u 33
0 32
Q a �
�s T� N
�' 1ij' �'{��'�+ • ley � 'i � �d z zW y�J' g �¢�y ° � F� �.
F
zz
o W aa ii
2.0
yz qZ8 w�
$ g zomd
p a f3 u oOn
Y 0u mo�ss��8 � Z gig
°
— —� 1SINOlJNIHSVAA 5 ��
@ 8 �F
tri•• _ _ a
O
88888 ^000 0
�3 �
w
0
T jkt.
NVId QNIOVH9
Z:
SIN2IN3AONdVYI 3119
ICIC)l JO ,k
3AV ICIOI 3 toe
S3V40HkNOV48VH
�3 �
w
0
T jkt.
SSF
G*
01
nryjl
U)
Un
z
All Mll g
SINWBAOUdiAll 3115
> tLpig
Wg
m^
ite`ia
MH
(10
OLI ; 1 30 A113
3AV 10013 1 OC
S3NOH ANOVMVH
0
SSF
G*
01
nryjl
U)
Un
z
All Mll g
z
0
> tLpig
Wg
m^
ite`ia
MH
z
;i4rddgka
MIS i
tR
IN
Mal
4
A
G*
UMU
nryjl
U)
Un
z
All Mll g
z
0
> tLpig
Wg
m^
ite`ia
MH
EO
f/1
;i4rddgka
MIS i
IN
Mal
A
o
UMU
nryjl
U)
Un
z
All Mll g
z
0
> tLpig
Wg
m^
ite`ia
MH
EO
f/1
;i4rddgka
A
o
z
0
Q7
s
m
1
Ug�
G7
D
0
Z
0
m
P�
r
g
g
m
1
O
I
m
WASHINGTON ST
� y Y ell.
IVA
�41
i
Jql }
I s g t0• ' m•
f_
S F
O rA,(vivo AV
g V
F$a 2o�a= E�E 171 �gl@7 b tl� p: 101
� �' Y • gg3 n � P rif
A
£ s j ji
d
'•
it z
F3R��F a 'j g+iE i• i ap' *1 v0",r,
D �t
L1 is s
HARMONY HOMES
301 E. LODI AVE
SITE IMPROVEMENTS
LANDSCAPE PLAN
CITY OF LODI
05
p i}
i
LEDA
m
1
G7
D
0
Z
0
m
P�
r
O
I
m
WASHINGTON ST
� y Y ell.
IVA
�41
i
Jql }
I s g t0• ' m•
f_
S F
O rA,(vivo AV
g V
F$a 2o�a= E�E 171 �gl@7 b tl� p: 101
� �' Y • gg3 n � P rif
A
£ s j ji
d
'•
it z
F3R��F a 'j g+iE i• i ap' *1 v0",r,
D �t
L1 is s
HARMONY HOMES
301 E. LODI AVE
SITE IMPROVEMENTS
LANDSCAPE PLAN
CITY OF LODI
05
p i}
i
LEDA
Capital Improvement Plan
Project Title:
Water Meter Program Phase 8
Munis Project Code:
PWWA-0061
#74
Section I: Description
District Nos:
Project Length
Priority
Includes water installation on approximately 1,130 residential homes and the replacement of approximately 18,000 feet of undersized and/or aged pipe.
Justification/factor driving project
Additional Information
Water meter program phase 8 is expected to bid in late spring of 2019 and likely to begin at the start of FY 19/20. Completion of phase 8 would occur in FY 19/20. Of the FY19/20
total, $14,995.56(Meters) is carried forward; the balance are FY19/20 budgeted items.
Section II
Estimated Project Costs
Expenditure
Miscellaneous
Internal Staff
Contracts
Total Capital Costs
Prior Years
$ -
$ -
$ -
$ -
FY 19120
Estimate
$ 134,596
$ 179,400
$ 5,951,000
$ 6,264,996
FY 20121
Budget
FY 21122
4
FY 22123 FY 23124
FY 24125
Future Yrs
$
Total
134,596
$
179,400
$ 65,000
$ -
$ - $ - $ -
$ -
$
$
6,016,000
6,329,996
$ 65,000
Section III
Funding Sources/Methods of Financing
Funding Source(s)
561 - Water Capital Outlay
Total Project Financing
Prior Years
$ -
$ -
FY 19120
Estimate
$ 6,264,996
$ 6,264,996
FY 20121
Budget
$ 65,000
$ 65,000
FY 21122 FY 22123 FY 23124
1
$ - $ - $ - $
FY 24125
-
Future Yrs
$ -
$
$
Total
6,329,996
6,329,996
Section IV
Operating Budget Impact
Operating Cost or
(savings)
Personnel
Other Operating Costs
Total Operating Impact
Prior Years
$ -
$ -
$ -
FY 19120
Estimate
$ -
FY 20121
Budget
$ -
FY 21122 FY 22123 FY 23124
�
$
FY 24125 Future Yrs
$
$
$
Total
-
-
-
RESOLUTION NO. 2021-151
A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING
THE CITY MANAGER TO EXECUTE CHANGE ORDERS TO
WATER METER PROGRAM - PHASE 8 CONTRACT WITH
DSS COMPANY DBA KNIFE RIVER CONSTRUCTION, OF
STOCKTON; AND FURTHER APPROPRIATING FUNDS
WHEREAS, on August 21, 2019, Council awarded the contract for Water Meter Program
— Phase 8 to DSS Company dba Knife River Construction, of Stockton (Knife River); and
WHEREAS, on August 7,2021, Council authorized the City Manager to execute a
change order to the contract with Knife River in an amount not to exceed $500,000 to initiate
and expedite construction for the proposed Harmony Homes transitional housing project site
which utilized Homeless Emergency Aid Program grant funds from San Joaquin Continuum of
Care; and
WHEREAS, Knife River updated their time -and -materials -based estimate to $520,000,
excluding landscape and irrigation improvements and a concrete ramp required for accessibility.
The additional cost of the landscape and ramp improvements is estimated to be $50,000, for a
total estimated project cost of $570,000; and
WHEREAS, staff recommends authorizing an increase to the City Manager's change
order authority by an additional $100,000 for the Water Meter Program - Phase 8 contract with
DSS Company dba Knife River Construction, of Stockton, for a total amount not to exceed
$600,000; and
WHEREAS, staff also recommends an appropriation in the amount of $40,000 from the
Water Capital Fund (56199000.77020) for final plumbing costs and payments associated with
the water meter housing connection modifications.
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby
authorize an increase to the City Manager's change order authority by an additional $100,000
for a total not -to -exceed change order authority amount of $600,000 for the Water Meter
Program - Phase 8 contract with DSS Company dba Knife River Construction, of Stockton,
California; and
BE IT FURTHER RESOLVED that funds in the amount of $40,000 be appropriated as
set forth above; and
BE IT FURTHER RESOLVED, pursuant to Section 6.3q of the City Council Protocol
Manual (adopted 11/6/19, Resolution No. 2019-223), the City Attorney is hereby authorized to
make minor revisions to the above -referenced document(s) that do not alter the compensation
or term, and to make clerical corrections as necessary.
Dated: June 2, 2021
------------------------------------------------------------------------
------------------------------------------------------------------------
I hereby certify that Resolution No. 2021-151 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held June 2, 2021 by the following vote:
AYES: COUNCIL MEMBERS — Chandler, Hothi, Khan, Kuehne, and
Mayor Nakanishi
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — None
ABSTAIN: COUNCIL MEMBERS — None_
�r�,Gt/�rr•�
JENNIFER OUSMIR
City Clerk
2021-151