HomeMy WebLinkAboutAgenda Report - May 5, 2021 C-04AGENDA ITEM Caw4 CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Adopt Resolution Awarding Contract for 2021 Paver Maintenance Project to Earth Shelter Developers, Inc., of Lodi ($117,898), Authorizing City Manager to Execute Change Orders ($10,000), and Appropriating Funds ($67,898) MEETING DATE: May 5, 2021 PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt resolution awarding contract for 2021 Paver Maintenance Project to Earth Shelter Developers, Inc., of Lodi, in the amount of $117,898, authorizing City Manager to execute change orders in amount not to exceed $10,000, and appropriating funds in the amount of $67,898. BACKGROUND INFORMATION: In 1998, the City's Central City Revitalization Improvement Project installed brick pavers on School Street from Lodi Avenue to Locust Street. The pavers were installed in the street and in the middle of the sidewalk (with concrete bands on both sides). Over time, the pavers sink, and/or in many places, the adjacent concrete, or tree roots, lift the pavers. The uneven pavers at these locations create potential tripping hazards all along the corridor, exposing the City to potential liability. In 2015, the City completed its first Downtown Sidewalk Paver Maintenance Project. In February of 2021, Staff conducted a survey of the pavers and identified numerous locations that need to be addressed. This project will be similar in scope and will address paver offsets that have developed in the street and sidewalk areas over the past five years. The project includes removing existing pavers, performing any required root surgery, re -compacting the base below the pavers, and re -installing the pavers at those locations identified in the survey. The City received the following three bids for this project on April 7, 2021: Staff recommends awarding contract for 2021 Paver Maintenance Project to Earth Shelter Developers Inc., of Lodi, in the amount of $117,898, authorizing City Manager to execute change orders in an amount not to exceed $10,000, and appropriating funds in the amount of $67,898. APPROVED: en Sch au,9f, City Manager \\cvcfilv02\pubwks$\WP\PROJECTS\STREETS\Downtown Paver Maintenance Project%20211 ward.doc 4126/2021 Above/(Below) Bidder (Location) Base Bid Alt. Bid* Engineer's Base Est. Engineer's Estimate $101,805.00 $41,827.50 Earth Shelter Developers (Lodi) $ 72,189.00 $45,709.00 ($29,616.00) Emert Construction (Stockton) $107,358.00 $43,244.00 $ 5,553.00 Soracco (Lodi) $148,080.00 $45,709.00 $46,275.00 *reflects the sum of the bid alternates which includes additional street segments and the Transit Station. Staff included alternate bid items to address isolated areas along Elm Street, Sacramento Street, and locations within the Transit facility, as shown on Exhibit A. Since unit bid prices were favorable, Staff is recommending Council award the project including the alternate bid items. Staff recommends awarding contract for 2021 Paver Maintenance Project to Earth Shelter Developers Inc., of Lodi, in the amount of $117,898, authorizing City Manager to execute change orders in an amount not to exceed $10,000, and appropriating funds in the amount of $67,898. APPROVED: en Sch au,9f, City Manager \\cvcfilv02\pubwks$\WP\PROJECTS\STREETS\Downtown Paver Maintenance Project%20211 ward.doc 4126/2021 Adopt Resolution Awarding Contract for 2021 Paver Maintenance Project to Earth Shelter Developers, Inc., of Lodi ($117,898), Authorizing City Manager to Execute Change Orders ($10,000), and Appropriating Funds ($67,898) May 5, 2021 Page 2 FISCAL IMPACT: This contract will improve walkability and minimize tripping hazards and associated liability in the downtown area. FUNDING AVAILABLE: Fiscal Year 2020/21 Budget: Gas Tax (30299000.77020): $ 60,000 Requested Appropriation: Gas Tax (30299000.77020): $ 56,356 TDA/LTF Capital (60199000.77020)1$ 1,542 Total Appropriation: $ 67,898 TOTAL: $127,898 Andrew Keys Andrew Keys Deputy City Manager/Internal Services Director ctf)T�'--u Charles E. Swimley, Jr - Public Works Director Prepared by Alice Bernardino, Assistant Engineer CES/AB/tc Attachments cc: Sean Nathan, Senior Civil Engineer Andrew Richle, Utilities Superintendent Signature: 0,ft� xvighj Email: akeys@lodi.gov 11cvcfrlv021pttbwks$1WPIPROJECTSISTREETSU7owntown Paver Maintenance Prcjecll20211CAward.doc 4/21/2021 Legend o Bid Alternates Repairs o Base Bid Repairs Exhibit A 2021 Paver Maintenace Locations � Z 0 70 140 280 Feet J -JLJ EA [ j Church St. LL L LI r 0 a a School St. 21 221 220 2 Sacramento St. 5 ILIM O 14w 102 959 g 81 1 •110 8t 61U1 974�-� 91 001' 760 4 I j 40 37 6CAD 35 O 10 1 — 38 6 8 8� 2`�f Sacramento St. 8 19 DOWNTOWN PAVER MAINTENANCE PROJECT VARIOUS LOCATIONS CITY OF LODI, CALIFORNIA CONTRACT THIS CONTRACT made by and between the CITY OF LODI, State of California, herein referred to as the "City," and EARTH SHELTER DEVELOPERS, a California corporation, herein referred to as the "Contractor." WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other, as follows: The complete Contract consists of the following documents which are incorporated herein by this reference, to -wit: Notice Inviting Bids Information to Bidders General Provisions Special Provisions Bid Proposal Contract Contract Bonds Plans The July 1992 Edition, Standard Specifications, State of California, Business and Transportation Agency, Department of Transportation All of the above documents, sometimes hereinafter referred to as the "Contract Documents," are intended to cooperate so that any work called for in one and not mentioned in the other is to be executed the same as if mentioned in all said documents. ARTICLE I - That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the City and under the condition expressed in the two bonds bearing even date with these presents and hereunto annexed, the Contractor agrees with the City, at Contractor's cost and expense, to do all the work and furnish all the materials except such as are mentioned in the specifications to be furnished by the City, necessary to construct and complete in a good workmanlike and substantial manner and to the satisfaction of the City the proposed improvements as shown and described in the Contract Documents which are hereby made a part of the Contract. ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does hereby employ, the Contractor to provide all materials and services not supplied by the City and to do the work according to the terms and conditions for the price herein, and hereby contracts to pay the same as set forth in Section 5.600, "Measurement, Acceptance and Payment," of the General Provisions, in the manner and upon the conditions above set forth; and the said parties for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree to the full performance of the covenants herein contained. ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division 2 of the Labor Code. The Contractor and any Subcontractor will pay the CONTRACT 4.1 04/12/21 general prevailing wage rate and other employer payments for health and welfare, pension, vacation, travel time, and subsistence pay, apprenticeship or other training programs. The responsibility for compliance with these Labor Code requirements is on the prime contractor. ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for doing all the work contemplated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City, and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Plans and Contract Documents and the requirements of the Engineer under them, to -wit: Perform the work necessary to remove pavers that have settled or been raised, clean them, adjust the base elevations, reinstall the pavers, and perform other incidental and related work, all as shown on the plans and specifications for the above project. For additional bid item descriptions refer to Section 6-07 "Description of Bid Items" and Exhibits A, B, C, and D. Base Bid Items Item Description School Street "Sidewalk and 1 Street Paver" Replacement (Lodi — Elm) CONTRACT ITEMS Qty Unit Unit Price Total 3702 SF $19.50 $72,189.00 TOTAL BASE BID $72,189.00 Additive Alternate Bid Items (all items must be completed) Item Al A2 A3 A4 Description I Qty Elm Street "Sidewalk and Street 250 Paver" Replacement School Street "Sidewalk and Street Paver" Replacement (Elm- 600 Locust) Transit Station Paver 502 Replacement Sacramento Street "Sidewalk and Street Paver" Replacement 169 Unit I Unit Price SF $42.00 SF $29.00 f Total I $10,500.00 $17,400.00 I SF , $21.00 $10,542.00 SF 1 $43.00 1 $7,267.00 TOTAL ALTERNATE BID $45,709.00 TOTAL BID $117,$9$.00 CONTRACT 4.2 04/12/21 ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should there be any conflict between the terms of this instrument and the Bid Proposal of the Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to establish lines and grades for the work as specified under the Special Provisions. All labor or materials not mentioned specifically as being done by the City will be supplied by the Contractor to accomplish the work as outlined in the specifications. ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract within 15 calendar days after the City Manager has executed the contract and to diligently prosecute to completion within 21 WORKING DAYS. ARTICLE IX - State of California Senate Bill 854 requires the following: No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. ARTICLE X - Counterparts and Electronic Signatures This Agreement and other documents to be delivered pursuant to this Agreement may be executed in one or more counterparts, each of which will be deemed to be an original copy and all of which, when taken together, will be deemed to constitute one and the same agreement or document, and will be effective when counterparts have been signed by each of the parties and delivered to the other parties. Each party agrees that the electronic signatures, whether digital or encrypted, of the parties included in this Agreement are intended to authenticate this writing and to have the same force and effect as manual signatures. Delivery of a copy of this Agreement or any other document contemplated hereby, bearing an original manual or electronic signature by facsimile transmission (including a facsimile delivered via the Internet), by electronic mail in "portable document format" (".pdf") or similar format intended to preserve the original graphic and pictorial appearance of a document, or through the use of electronic signature software will have the same effect as physical delivery of the paper document bearing an original signature. WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES TO PAY THE CITY LIQUIDATED DAMAGES AS SET CONTRACT 4.3 04/12/21 FORTH IN SECTION 6-04.03 OF THE SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT. IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year and date written below. CONTRACTOR: la Title (CORPORATE SEAL) CITY OF LODI, a municipal corporation STEPHEN SCHWABAUER City Manager Date: Attest: JENNIFER CUSMIR City Clerk Approved As To Form: JANICE D. MAGDICH City Attorney CONTRACT 4.4 04/12/21 Capital Improvement Program - Maintenance Maintenance Project Title: Concrete Paver Maint Prog Munis Project Code: PWST-21003 #125 Section (:Description District Nos: Project Length 07/20 to 06/25 Priority Annual contract for sidewalk paver repairs in the City. Justification/factor driving project Annual sidewalk paver maintenance work to prevent trips and falls accidents. Additional Information Section II Estimated Project Costs Expenditure Prior Years Contracts $ - Internal Staff $ - Total Capital Costs $ - FY 19120 Estimate $ FY 20121 Budget 125,898 $ FY 21122 28,000 FY 22123 FY 23124 $ 28,000 $ 28,000 $ FY 24125 28,000 Future Yrs $ Total 237,898 $ 2,000 $ 2,000 $ 2,000 $ 2,000 $ 2,000 $ 10,000 $ - $ 127,898 $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ - $ 247,898 Section III M Funding Sources/Methods of Financing Funding Source(s) Prior Years 302 - Gas Tax 2103 $ - 601 - Transit - Capital Total Project Financing $ - FY 19120 Budget $ - $ $ $ FY 20121 116,356 11,542 127,898 $ $ FY 21122 30,000 30,000 FY 22123 FY 23124 $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ $ FY 24125 30,000 30,000 Future Yrs $ - I $ $ Total 236,356 236,356 Section IV Operating Budget Impact Operating Cost or Prior Years (savings) Personnel $ - Other Operating Costs $ - Total Operating Impact $ - FY 19120 Budget FY 20121 FY 21122 FY 22123 FY 23124 $ - $ FY 24125 - Future Yrs $ $ Total - - $ - $ - $ - $ - $ - $ - RESOLUTION NO. 2021-113 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE CONTRACT FOR THE 2021 PAVER MAINTENANCE PROJECT TO EARTH SHELTER DEVELOPERS, INC., OF LODI; AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDERS; AND FURTHER APPROPRIATING FUNDS WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on April 7, 2021, at 11:00 a.m., for the 2021 Paver Maintenance Project, described in the plans and specifications therefore approved by the City Council on March 17, 2021; and WHEREAS, said bids have been checked and tabulated and a report thereof filed with the City Manager as follows: Bidder (Location) Base Bid Alt. Bid* Earth Shelter Developers (Lodi) $ 72,189.00 $45,709.00 Emert Construction (Stockton) $107,358.00 $43,244.00 Soracco (Lodi) $148,080.00 $45,709.00 "reflects the sum of the bid alternates which includes additional street segments and the Transit Station. Above/(Below) Engineer's Base Est. ($29,616.00) $ 5,553.00 $46,275.00 WHEREAS, staff included alternate bid items to address isolated areas along Elm Street, Sacramento Street, and locations within the Transit facility; and WHEREAS, staff recommends awarding the contract for the 2021 Paver Maintenance Project to Earth Shelter Developers, Inc., of Lodi, in the amount of $117,898; and WHEREAS, staff also recommends authorizing the City Manager to execute change orders in an amount not to exceed $10,000; and WHEREAS, staff also recommends that the City Council appropriate funds in the amount of $56,356, from the fund balance of Gas Tax (30299000.77020) and $11,542 from the fund balance of TDA/LTF Capital (60199000.77020) for Fiscal Year 2020/21. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award the contract for the 2021 Paver Maintenance Project to Earth Shelter Developers, Inc., of Lodi, California, in the amount of $117,898; and BE IT FURTHER RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute the contract and change orders in an amount not to exceed $10,000; and BE IT FURTHER RESOLVED that the Lodi City Council does hereby appropriate funds for the project, in the amount of $67,898, as set forth above; and BE IT FURTHER RESOLVED, pursuant to Section 6.3q of the City Council Protocol Manual (adopted 11/6/19, Resolution No. 2019-223), the City Attorney is hereby authorized to make minor revisions to the above -referenced document(s) that do not alter the compensation or term, and to make clerical corrections as necessary. Dated: May 5, 2021 I hereby certify that Resolution No. 2021-113 was passed and adopted by the City Council of the City of Lodi in a regular meeting held May 5, 2021 by the following vote: AYES: COUNCIL MEMBERS — Chandler, Hothi, Khan, Kuehne, and Mayor Nakanishi NOES COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None 671ENNIF CUSMIR City Clerk 2021-113