Loading...
HomeMy WebLinkAboutAgenda Report - April 7, 2021 C-10AGENDA ITEM CMIC) CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Adopt Resolution Authorizing City Manager to Execute Change Orders to Water Meter Program - Phase 8 with DSS Company dba Knife River Construction, of Stockton ($500,000) MEETING DATE: April 7, 2021 PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt resolution authorizing City Manager to execute change orders to Water Meter Program - Phase 8 with DSS Company dba Knife River Construction, of Stockton, in an amount not to exceed $500,000. BACKGROUND INFORMATION: On August 21, 2019, Council awarded the contract for Water Meter Program — Phase 8 to DSS Company dba Knife River Construction, of Stockton (Knife River). While this project is nearing completion, the Knife River work force and equipment largely remains mobilized in the project area and available to perform general site work. Meanwhile, the City has been awarded Homeless Emergency Aid Program (HEAP) grant funds in the amount of $1,250,000 from San Joaquin Continuum of Care (SJCoC) for the Harmony Homes transitional housing project. To avoid the risk of losing this funding source, the City is required to expense the grant proceeds by June 30, 2021. The original HEAP expenditure plan involved the Housing Authority of San Joaquin (HACSJ) that was to prepare the construction documents and procure a contractor to perform the site work construction along with the procurement and installation of the prefabricated structures on City owned property, located at 301 East Lodi Avenue. Unfortunately, at this time, HACSJ has no contracts in place for any of these elements of work making it impossible to completely expense the funds needed to prepare a design, perform the site work, and procure and install the structures by the June 30, 2021 deadline. In order to expedite construction of the Harmony Homes site and minimize the risk of losing any residual HEAP funding not expended by the deadline, Staff is recommending to perform the site design services for this project by City engineering staff and to execute a change order with Knife River for the construction of the Harmony Home site improvements. The proposed change order amount is not to exceed $500,000, and since the contractor is already engaged and on-site, work can commence immediately once the design is complete and a building permit is issued. Based on this plan, the site work is expected to be completed by the funding deadline. Staff recommends authorizing City Manager to execute change orders to Water Meter Program - Phase 8 with DSS Company dba Knife River Construction, of Stockton, in an amount not to exceed $500,000. FISCAL IMPACT- All construction related costs will be funded by the HEAP grant. This project will not impact the City's General Fund. APPROVED: Step en chwabauer, City Manager \\cvcfilv02\pubwks$\WP\PROJECTS\WATER\Meters\Water Meter Program Phase 8\CChange Order HH doc 3/25/2021 Adopt Resolution Authorizing City Manager to Execute Change Orders to Water Meter Program - Phase 8 with DSS Company dba Knife River Construction, of Stockton ($500,000) April 7, 2021 Page 2 FUNDING AVAILABLE San Joaquin Continuum of Care Homeless Emergency Aid Program (HEAP) Grant (HEAP -20001): $500,000 Andrew Keys Andrew Keys Deputy City Manager/Internal Services Director Charles E. Swimley, Jr. Public Works Director CES/CES/tc Signature: 00v ,, xwigbj Email: akeys@lodi.gov \\cvcfilv02\pubwks$\WP\PROJECTS\WATER\Meters\Water Meter Program Phase 8\CChange Order HH doc 3/25/2021 RESOLUTION NO. 2021-80 A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDERS TO WATER METER PROGRAM — PHASE 8 WITH DSS COMPANY DBA KNIFE RIVER CONSTRUCTION, OF STOCKTON WHEREAS, on August 21, 2019, Council awarded the contract for Water Meter Program — Phase 8 to DSS Company dba Knife River Construction, of Stockton (Knife River); and WHEREAS, meanwhile, the City has been awarded Homeless Emergency Aid Program (HEAP) grant funds in the amount of $1,250,000 from San Joaquin Continuum of Care (SJCoC) for the Harmony Homes transitional housing project; and WHEREAS, in order to expedite construction of the Harmony Homes site and minimize the risk of losing any residual HEAP funding not expended by the deadline, staff is recommending to perform the site design services for this project by City engineering staff and to execute a change order with Knife River for the construction of the Harmony Home site improvements; and WHEREAS, staff recommends authorizing the City Manager to execute change orders to Water Meter Program - Phase 8 with DSS Company dba Knife River Construction, of Stockton, in an amount not to exceed $500,000. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute change orders to Water Meter Program - Phase 8 with DSS Company dba Knife River Construction, of Stockton, California, in an amount not to exceed $500,000, for construction of Harmony Homes site improvements; and BE IT FURTHER RESOLVED, pursuant to Section 6.3q of the City Council Protocol Manual (adopted 11/6/19, Resolution No. 2019-223), the City Attorney is hereby authorized to make minor revisions to the above -referenced document(s) that do not alter the compensation or term, and to make clerical corrections as necessary. Dated: April 7, 2021 I hereby certify that Resolution No. 2021-80 was passed and adopted by the City Council of the City of Lodi in a regular meeting held April 7, 2021 by the following vote: AYES: COUNCIL MEMBERS — Chandler, Hothi, Khan, Kuehne, and Mayor Nakanishi NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None JENNIF CUSMIR City Clerk 2021-80