HomeMy WebLinkAboutAgenda Report - March 3, 2021 C-133 AGENDA ITEM Cm I �-�^ CITY OF LODI r ti e COUNCIL COMMUNICATION TM AGENDA TITLE: Adopt Resolution Authorizing Payment to A.M. Stephens Construction Co., Inc., of Lodi, for Repair of White Slough Water Pollution Control Facility Recycled Water Storage Pond Water Transfer Pumps ($24,024) MEETING DATE: March 3, 2021 PREPARED BY: Public Works Director RECOMMENDED ACTION Adopt resolution authorizing payment to A.M. Stephens Construction Co., Inc., of Lodi, for repair of White Slough Water Pollution Control Facility recycled water storage pond water transfer pumps, in the amount of $24,024. BACKGROUND INFORMATION: The White Slough Water Pollution Control Facility (WSWPCF) Recycled Water Storage Pond Project was accepted by Council on November 20, 2019. Since commencing operations, the pumps, that are designed to transfer water back and forth between the treatment facility and storage ponds, failed at different times for unknown reasons. Staff requested A.M. Stephens Construction Co., Inc., of Lodi, facilitate the two pump repairs since the company was the prime contractor for the initial project and the work was anticipated to be under contract warranty. The pumps have been repaired and are ready to be installed. Staff, the design consultant, and the pump supplier determined the cause of the pump failures resulted from sand, small snails, and other debris that came from the newly constructed pond. This combination of material caused the pumps to seize and fail during start up conditions. Failures of this nature do not fall under pump manufacture or contractor responsibility; therefore, not covered under warranty. The debris has been cleared and minor improvements have been made to the pump intake which are anticipated to mitigate further issues. Staff recommends authorizing payment to A.M. Stephens Construction Co., Inc., of Lodi, for repair of White Slough Water Pollution Control Facility recycled water storage pond water transfer pumps, in the amount of $24,024. FISCAL IMPACT: The cost for the repairs is necessary to restore full operation of the recycled water storage pond facility. This repair cost does not impact the General Fund. APPROVED: Manager LNDvcfiivo2rpubwksS�WP1COUNCIL120211CC Auth Payment for WSWPCF Storage Pond Pump T:MP96-dor 2/24/2021 Adopt Resolution Authorizing Payment to A.M Stephens Construction Co., Inc., of Lodi, for Repair of White Slough Water Pollution Control Facility Recycled Water Storage Pond Water Transfer Pumps ($24,024) March 3, 2021 Page 2 FUNDING AVAILABLE: Fiscal Year 2020/21 Budget: Wastewater Operations (53053003): $24,024 Andrew Keys Andrew Keys Deputy City Manager/Internal Services Director �U_SeQ Charles E. Swimley, Jr. Public Works Director Prepared by Gary Wiman, Construction Project Manager CES/GW/tc Attachment %%cv liv021oubwks$IWPICOt1NCIL120211CG Auth Payment for WSWPCF Storage Pond Pump Repairs.doc 2/24/2021 � C•n.ra Enpin..rinq Conlnctor P.O. BOX 1867 LODI, CA 95241 ~� CONSTRUCTION CO., INC. California Contractors License# 404723 City of Lodi Atm: Gary Wiman P.O. Box 3006 Lodi, California 95240 TERMS WIII E. ti4.0LlC'II - Lodi. C'aIiforni;t Remove/Repair and Reinstall Pumps TOTAL AMOUNT DUE: PHONE: (209) 333-0136 FAX: (209) 333-0993 INVOICE NO. 7987 17-110 PURCHASE ORDER NO, 23 -Sep -20 $24,024.00 A FINANCE CHARGE OF 1'/201. PER MONTH WHICH IS AN ANUUAL RATE OF 18% WILL BE CHARGED TO OVERDUE ACCOUNTS. MOZINGO CONSTRUCTION, INC. LIC. NO. 702625-A 751 Wakefield Court Oakdale, CA 95361 Phone: (209) 848-0160 - Fax (209) 848-0161 CHANGE ORDER REQUEST TO: ANT Stevens Construction Co P.O. Box 1867 Lodi, CA 95241 PROJECT: White Slough DATE JOB NO: 09/10/20 1832 RE: Remove, replace, and repair pump MOZINGO CHANGE ORDER # P006 CONTRACT CHANGE ORDER # UNIT TOTAL ITEM DESCRIPTION QTY UNIT _ PRICE AMOUNT 1 Remove, replace, and repair pump 1 LS $ 20,891.24 $ 20,891.24 Daily Extra Work 3/6/2020 & 8/14/2020 $ - $ - TOTAL CHANGE ORDER REQUEST $ 20,891.24 CONTRACT TIME EXTENSION REQUEST I WORK i NG DAYS CONDITIONS/SCOPE; See attached cost breakdown SIGNED: SIGNED: MOZING ONSTRUCTION, N 1 DATE: 09/10/20 DATE: Owner/Contractor " Project Management " Accounting ' File OWNER/CONTRACTOR 7 ao0o Q.000 m O O O 3 0 0 0 0 0 0 0 0 0 ca r r- c- CU r 2 m � O � N� IIn d: r0 coIm N TCD I O c7 V CV O 00 —_ M M It r a) V' LO C" _ N w 7 fll T m N Cl) CD ao0o Q.000 m O O O 3 0 0 0 0 0 0 0 0 0 ca r r- c- CU r 2 m � O N � de H O a CD � O 0 M ALL rn 0 0 0 F- 0 O N Cl) CD °3 cr m w F- O 0 N N V) O 7 O Q � a O N I 61 m_0 C) d) cts00 O W N [gyp a O y N = 0 0 0 = 0 0 0 M 00 00 00 — 00 CL E a � L m a U T G o O U m m C-6 E m E C C m oo U- N Cl) m o R C C U7 W C~ m m o.2 0- a. r Q > cv"? U) LL LL n CaQ E Iu L O vUi0l-M OLLOO Y DUJ J ool-oo In'� (Da) LO (DON Ili O N O CD Cl) y(p T r r C O T E Q m a .E a O 0.00000000 300000000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C N O O T O O N O arnooc,00rnln cflofvvOi"q- M C0 M O CO c7 N N � O CO r lc i CO LL7 u7 .000 0000 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 cc CA co co O O M cel "cr�}� L > > 7 t ? N N CE (0 :� CE m N m =15 t N N�> N N N N � � a x * � a� m °o m a� > a� C C C C C a�mm0mmm aNi m E E o E E m E clIZQQCOQQILQ 1 { i m m 2 CD N U')00 N Y O O N H O O � O u RA 0 a N O u _o 2 0 0 0 d 7. 0 ao 7 en O R O O LO N N 0 I� rn iJ r N I'D U o N O 0 U ori IC M C7 y, O m cM co d 00 Eo a(o Q' W c0 e C d co E CD � O 0 C O CO cc ALL rr-oa a) _3 UJ� wo 0o ool-oo In'� (Da) LO (DON Ili O N O CD Cl) y(p T r r C O T E Q m a .E a O 0.00000000 300000000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C N O O T O O N O arnooc,00rnln cflofvvOi"q- M C0 M O CO c7 N N � O CO r lc i CO LL7 u7 .000 0000 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 cc CA co co O O M cel "cr�}� L > > 7 t ? N N CE (0 :� CE m N m =15 t N N�> N N N N � � a x * � a� m °o m a� > a� C C C C C a�mm0mmm aNi m E E o E E m E clIZQQCOQQILQ 1 { i m m 2 CD N U')00 N Y O O N H O O � O u RA 0 a N O u _o 2 0 0 0 d 7. 0 ao 7 en O R O O LO N N 0 I� rn iJ r N I'D U o N O 0 U ori IC M C7 y, O m cM co d 00 Eo a(o Q' W c0 e r- 0 CL 4) 08 F- CD r - v C c C; O C O U N Q� C CSO c7 C C Q d n C in LL 2 0 Q L O 00 00 00 cr CL N O C N � Q Q U� z cz O L C. (n Q yr 'a O w -0 O —_ =3 C: E� O U O s- U N C U (Q Q U O a c: N O Q E O Co = _C: = O C77 C/5 a cn Co E U O a � L � L CL ECU 08 LO CL m CU C CZ 2 CZ a► O � � O C: E = O O O L -0 m 0 Q E E .L Qi F Cn C C:N H O 0E4- Q± =E OL 4) co C co CD fA 0 U O +' N U 0 Z a J 00 m N L U_ 0 m M m ai E O 0 M r LO O Ch U- C) C � O U LL N I �CO (D 0 0 LUOo v N M C i co N = O a X O LU O ` O H LL V r ❑S Z FO- O H m m a) *' O o o d L M � M �L C� G f.. v i ' = O O H H Z FO- 2 H m m +• O *' O o o L M � M Z � I � o O � o a o C) C N rh - Z - O � O T W CL a1 E d co CL a) w 06 a) 0 aJ Q w iy- O E a) I C m E 2 0 LL 0 co � CD O c o a) J 0 <n Q Pacific Water Resources 1304 Lincoln Avenue Burlingame, CA 94010 Bill To { Mozingo Construction, Inc. 751 Wakefield Court Oakdale, CA 95361 Attention: Accounts Payable Invoice Date Invoice # 8/18/2020 20221 Ship To Mozingo Construction, Inc. CIO City of Lodi WWTP 12751 N. Thornton Road Lodi, CA 95242s^st P. umber Terms Rep Ship Via F.O.B. Project 1832•il 0002 Net 30 AB 2/14/2020 Factory Freight FOB Jobsite Quantity Item Code Description Price Each Amount Flowserve 10 EBL Job #SC 00 223 Repair Work I Field Work Pacific Water Resources travels to Jobsite, removes previously, 550.00 550.00 motor shaft, hardwood to pull pump. Pull pump and deliver to Fresno, CA. 5 Hours at $110 per hour. I Crane American Rental Crane to pull pump and motor. Deliver to 0.00 0.00 Fresno, CA. By Others. I Shop Labor Shop Labor - Dissemble, Clean and Inspect Pump. 1,000.00 1,000.00 8 Hours at $125 per hour. P IC Pump Parts: [ •� , u I Stuffing Box Bearing Stuffing Box Bearing. i Bowl Bearings Bowl Bearing. 5 Rubber Line Shaft... Rubber Lineshaft Bearings. 1 Suction Bell Bearing Suction Bell Bearing. I Set Screw Set Screw for Sand Collar. l Top Case Bearing Top Case Bearing. Thank you for your business. Tota 1 41.25 62.21 74.25 68.50 7.81 126.10 41.25T 62.21 T 371.25T 68.50T 7.81 T 126.10T _• 1 7c,"C'rE"TML P.O. Box 308 Escalon, CA 95320 Bill To Mozingo Construction Inc. 751 Wakefield Court Oakdale, CA 95361 Service Date 8/13/2020 Qty Terms Rep PO # Net 30 Ca Description White Slough Pump Repair Delivery to Flow Sery 23.49_ South Orange Ave Fresno, CA 8/13/2020 6 Flatbed w/Truck, Job Tag # 82236 Fuel / Emissions Compliance Surcharge 8/14/2020 Fuel / Emissions Compliance Surcharge Pick Up Pump in Fresno and Deliver to Lodi Job # M45405 Total Charges are due Net 30 after which a 1.5% per month late Total i payment may apply. Phone # —� Fax # E-mail Invoice Date Invoice # 8/21/2020 , 53743 nr•Jb 2 �# .iE• Rate 145.00 43.50 29.00 r Project Amount 870.00 43.50 , 29.00 $1,522.50 ----�-- - --- -- - - - — - -- -- Balance Due $1,522.50 � -X09-8s3 �? --- •-- ?'i9-33 6 --pamraamericancr•anerental.net — "CMMJVC ")7z1VTM'L P.O. Box 308 Escalon, CA 95320 In voice Date Invoice # 2/20/2020 51098 Bill To Mozingo Construction Inc. i 751 Wakefield Court Oakdale, CA 95361 Service Date Terms Rep PO # Job # Project i 2/10/2020 Net 30 cc, y142803 T Qty Description Rate Amount White Slough WWTP Pond Pump Placement 12751_T_horton_Rd Lodi, CA 4 18 -Ton Boom Truck, Job Tag # 86122 Travel Permit Fuel / Emissions Compliance Surcharge Hoist as Directed Total Charges are due Net 30 after which a 1.5% per month late Total payment may apply. -.._i-- E-mail - - -- Phone # Fax # 195.00 70.00 39.00 - - - Balance Due 204-8i8-,8811 209-838-8816 pam(aamer icaTic ran ere ntal.net 780.00 70.00 39.00 $889.00 $889.00 A ' i CR IV., REIV TRL P.O. Box 308 Es•calorr. CA 95320 Bill To j Mozingo Construction Inc. 751 Wakefield Court I Oakdale, CA 95361 i Service Date Terms Rep PO # 2/10/2020 Net 30 CG Qty Description White Slough Pump Repair Delivery 2349 South Orange Ave Fresno, CA 81 Pick up with Trailer, Job Tag # 89285 Fuel/ Emissions Compliance Surcharge Load Pump in Fresno, and Deliver to Lodi In voice Date Invoice # 2/20/2020 51099 E Job # Project i M42802 Rate Amount 135.00 54.00 I � Total Charges are due Net 30 after which a 1. i 1,a per Month lule - - Total pg1-ment may gpply. Phone # i Fax # A E-mail Balance Due �iPi-5 �:`i-88 i � 7i1�)-a;:`{-SSS lr, p;�nra amcricancrancrcntul.net 1,080.00 54.00 $1,134.00 I $1,134.00 Mriwww'Em fTP"TM1— P.D. Box 308 Escalon, CA 95320 Bill To Mozingo Construction Inc. 751 Wakefield Court Oakdale, CA 95361 I - - Invoice voice i Date Invoice # 3/17/2020, 51493 Service Date Terms Rep PO # Job # X14318'-) Project 3/6/2020 Net 30 Qty Description Rate Amount White Slough WWTP Pond Pump Placement 12751 Thorton Rd Lodi,CA 4 18 -Ton Boom Truck, Job Tag # 88584 195.00 780.00 Travel Permit 70.00 70.00 Fuel/ Emissions Compliance Surcharge 39.00 38.00 Hoist as Directed Total Charges are due :Yet 30 after which a 1.5% per inonth late Total pf yment may apply. LPhone # Fax # E-mail Balance Due 1 -Silo ��1��-�..>-;i��'i pam'aameric:uiertnerental.net i $889.00 5889.00 rCMMJV I �'Irevoice � f"/VTnL Date Invoice # P.D. Box 308 - Escalon, CA 95320 13/17/20201 51494 Bill To Mozingo Construction Inc. 751 Wakefield Court I Oakdale, CA 95361 ! k Service Date Terms Rep PO # Job # Project 3/6/2020 Net 30 M431 93 Qty Description 700 Lo Rate Amount White Slough Pump Repair Deliver to Flow Serve 2349 South Orange Ave Fresno, CA 8 Pick Up with Big Tex Trailer, Job Tag # 83752 135.00 1,080.00 Fuel / Emissions Compliance Surcharge 54.00 54.00 Haul as Directed I Total Charges are due Net 30 after which a 1.5% per month lute Total payment may apply. Phone # Fax # E-mail - - — - -- ~— - - Balance Due $1,134.00 ?uv-�3fi-n"fi � � ?���+->;2?-2;a Ih �r.�m a.umericancranerental.n<< V OC"ON w PO BOX 1018 U&MIX OD. W. STOCKTON, CA 95201.1018 stog�htcncg- PH 209-464-4878 FAX 209-464-2615 Sc1d Ir c: Job Location: Description 7 Is S EA -)S. CONDITIONS - INVOICE Invoice Number Invoice Date: Terms: Customer Code: Reference #1: Sales Cat/Slamn:: Job Number: Job Description: Reference #2: Subtotal To a'I invoice Contractor License No, C-10 588308 Amount TERMS: NET 30 DAYS. All pttSI,1l—' aCC0ur,!5'N1l! Sk? z;ha !.W,, a FINANCE CHARGE 01 1 s ;an ANNUAL PERCENTAGE RATE of 118",apPfieri!r. (r,,p pn-Victi.N balance caner -r!"301 p' -Iyclkif'rs—inneon (! Rockmer & 'Nooc-, Elvdnr Cr, -AliorT--,,/ sit aw !o collect the puruiv-se crico of any cart lhereol ourchaser agrees'o pdyco'e -c;, ri tecl:om of aid debt .11 ,is dfm ii)(PefIS's ndoongrokiri zo,31s ncwrerl t)v2oc-�.ninx P '�Njo('wy Elri�;i, . u Inc - 4 OCKIdON "I & ftoekbm. QL tc?cw; Sold To 77- V Job Location: Description P O. BOX 1018 STOCKTON CA 95201-1018 PH 209-464-4878 FAX 209-464-2615 W. TO LT A,'- C 0 Y. ?. L'-i'T 7 D F, -S. INVOICE Invoice Number: Invoice Date; Terms: Customer Code: Reference #1: Sales Cat/Slsmn: Job Number: Job Description: Reference #2: Contractor License No. C-10 588308 202C .10" 1 MOZT.',11GO-T&M W=' -y Amount - CONDITIONS -Subtotal Total Invoice TERMS NET 30 DAYS, Ad casi (1.je nt- FINANCE CHARGE rd I i.nO' ,, -3r-, ANNUAL PERCENTAGE RATE of 10' T applied t,) W, creviouz baiance alter dCOuctwq curmil payments ahr c,ecnl it Bcw kiror 3 djoouli E ecir;( Co mc 3rg,1rje..s i attofnt.-j dl !a.jv Ir cojjecj jre pi,r--,huse prIepot part Q1rj4!t-'f 13kircriiiner aglogs of-, ljv"!'Q "(1,911 Uy 9,w,r- -,, &'j)k)cdy E!ecirlc Co 11!c lockmon k Wood ELECTRIC CO., INC. 1523 E Prom Olive . PO 30A 10!tl , 31u k!op CA 36201-1]!U PHONE 17081/64 4a78 FAA 120tH 4C,4 -@�5 ce I:c '10 -n 9an:1Un - :�IfMr=•4Ci77PL7'.tW Proposed Change Order TO: Mozingo Const. FAX: TEL: 209-417-4679 ATTN.: Brad McIntosh R&R Motor leads at White Slough SCOPE OF WORK: DATE: 02/21/20 ELEC PCO #: 1 ELEC JOB #: 2020-0013 GC PCO # GC ASI #: GC RFI # r to dls"nnect and reconnect motor leads at the White Slough protect. T are attached. MATERIAL COSTS W/MARKUP LABOR COSTS EQUIPMENT COSTS HOUR EQUIPMENT COSTS DA EQUIPMENT COSTS WEEK PERMITS WARRANTY JOBSITE TRAILER -STORAGE PLANS - BLUEPRINTS-ASBUILTS MATERIAL TAX EQUIPIDIRECT JOB EXPENSE MU SUBCON COSTS (INCLUDES MU) 900% 5 - 5lJ9TOTAL S 3 ]TOTAL S 504.3 BOND 000% S - TOTAL PROPOSED CO $ 504.34 NUMBER OF ADDITIONAL WORKING DAYS TIME EXTENSION REQUEST 0 WORK TO START _ APPROVED BY GC SIGNED DATE Th s prouosal is valid for 30 Jays Name Company Total pages of proposal 1 S - S 504 34 5 - 5 - SUBTOTAL $ 504.34 FIAT RATE S - 0.00% 0.00% @S $ 0.00% s - SU9TOTAL S 7_1 900% 5 - 5lJ9TOTAL S 3 ]TOTAL S 504.3 BOND 000% S - TOTAL PROPOSED CO $ 504.34 NUMBER OF ADDITIONAL WORKING DAYS TIME EXTENSION REQUEST 0 WORK TO START _ APPROVED BY GC SIGNED DATE Th s prouosal is valid for 30 Jays Name Company Total pages of proposal 1 Rockmon & Woody ELECTRIC CO,, INC. 1526 EI Final Drlva • PC. Box 1010 - StacNton, CA 85201.1018 PHONE: (209) 464-4878 - FAX: (209) 464.2615 CA Uc. No. 010.506300 - oIR No. 1000002789 PROJECT: R&R Motor leads at White Slough - LABOR LABOR COSTSUMMARY General Foreman labor Charge ST Foreman Labor Charge ST Journeyman Labor Charge S1 General Foreman labor ChargeTl- Foreman Labor Charge TH Journeyman Labor Charge TF General Foreman labor Charge DT Foreman Labor Charge DT Journeyman Labor Charge DT LABOR FACTORS MARK-UP SUBSISTENCE HOTEL PER DAY FOOD PER DAY MARKUP B&W PCO: 1 TOTAL HOURS RATE COST 0:00 $115.91 $ - 4.00 $109.64, $ 438.56 0.00, $97.08 $ - 0.00 $156.70 $ - 0.00 $147.29 $ - 0.00 $128.46 $ - 0,00 $197.48 $ - 0.00 $184.93 $ - 0.00 $159.83 $ - SUBTOTAL 4.00 $ 438.36 1916670 0.00% $ - 100% $ - - 6.00% $ - 0.00% $ - 0.00% $ - 0.00% $ - # OF DAYS Unit Cost 1 $ - $ - 1 $ $ 15% $ TOTAL COST OF LABOR $ 504.34 yJ AV ZY y..�L�i LS �y Y7S & Y 1r VY VY • 5+ ELECT MC (GO., INC. 1 1 S28 EI Plnal Drive • P. O. Box 1018 Stockton, Callfornla 95201 -1018 - Phone 5201-1016Phone (209).464-4878 FAX (209) 464-2515 Callfornlo CoMmotors Llcanse No. CIO -388300 OWNER / CONTRACTORS JOB 9 /WORK ORDER # DATE: -• 2D D TIME AND MATERIAL - EXTRA WORK ORDER WHITE - OFFICE YELLOW' FIELD PINK- CUSTOMER DESCRIPTION OF WORK L_mto n r.(w, n lnnr fr . S a -cr6vlo _ _-- —_ -- -- _1AS01�-REP�RL�.. �- _ -�� ___ _-.. �. _ _ ._=--•�A?ESI.ALREPOR]'� - �._ EMPLOYEE F/J/A ST TH DT QTY DESCRIPTION UNIT @ EXT. 1�? Intim+,d A A., r11 c 5 !� TOTAL LABOR �! TOTAL MATI PREPARED BY. ITi�'1'r7r►n [,1,1 EQUIPMENT REPORT APPROVED BY-' (PRINT NAME) / QTY DESCRIPTION HRS COST APPROVED BY: (SIGNATURE) J I bLjn Irle. 4-r REMARKS: TOTAL EQUIPMENT EXT Bockalmoll & Woody TIME -AND. MAT. ERIAL - EXTRA WORK ORDER WHITE - OFFICE ELECTMC CO.,INC. YELLOW -FIELD 1528 EI Pinal Drl;je - P. O. Box 1018 • Stockton, Ceiltarnia 95201-1018 PINK-rUSTWER Phono (209) 464-4679 - FAX (200) A64-2GiS Calllomia Onnuaesam Cunni- No. G10.0003a0 OWNER / CONTRAC•FOR- JOB # / WORK ORDER # DATE: 2 " 1, 'y 2LJ2.L! DESCRIPTION OF WORK heam�LABOR.REP_ORT- AIVIATERIAL-REF0RT EMPLOYEE F/J/A ST TH DT QTY DESCRIPTION UNIT @ ,EXT TOTAL LABOR �;(J TOTAL MATERIAL PREPARED BY L EQUIPMENT REPORT APPROVED BY. (PRINT NAME) QTY DESCRIPTION HRS COST E)(T APPROVED BY (SIGNATURE) REMARKS: TOTAL EQUIPMENT Pacific Water Resources 1304 Lincoln Avenue Burlingame, CA 94010 Bill To Mozingo Construction, Inc. 751 Wakefield Court Oakdale, CA 95361 Attention: Accounts Payable Invoice Date Invoice # 2/1a12020 20122 Ship To Mozingo Construction, Inc. C/O City of Lodi WW'1'P 12751 N. T homton Road Lodi, CA 95242 P.O. Number Terms Rep Ship Via t832 M(M2 Net 30 AB 11412020 Factory freight Quantity Item Code Description F.0.8. FOB lobsite Ptice Each Total at4P-:"V- e-sai'� "J 550,00 l ,510.00 1,(x10.00 41.25 62.21 74.25 68.50 7.81 126.10 Project Amount 55000 1,510.00 1,000.(x3 41.257 62.2 IT 371.25T 68.501 7.8 IT 126.101' Flowserve 10 EBI, Job #SC 00 223 Repair Work t Field Work Pacific Water Resources travels to lobsite, removes previously, motor shad, hardwood to pull pump. Pull pump and deliver to Fresno. CA. 5 1 tours at S I 10 per hour. I Crane American [cental {Trane to pull pump and motor. Deliver to Fresno, CA. Paid by P W R. I Shop Labor Shop Labor- Dissemble, Clean and Inspect Pump. 8 1 tours at 5125 per hour. i Pump Parts: I Stuffing Box Bearing Stuffing Box Bearing. 1 Bowl %arings Bowl Bearing, 5 Rubber fine Shaft .. Ruhber Lineshalt Bearinis { }� t!� Suction Dell Bearing Suction Bell Bearing. I Set Screw yet Screw for Swid Collar k 'Tup Case Rearing Top Case. Rearing Thank you fur your business. Total at4P-:"V- e-sai'� "J 550,00 l ,510.00 1,(x10.00 41.25 62.21 74.25 68.50 7.81 126.10 Project Amount 55000 1,510.00 1,000.(x3 41.257 62.2 IT 371.25T 68.501 7.8 IT 126.101' Pacific Water Resources 1304 Lincoln Avenue Burlingame, CA 94010 Bill To Mozingo Construction, Inc. 731 Wakefield Court Oakdale, CA 95361 Attention: Accounts Payable I Ship To Mozingo Construction, Inc C/O City of Lodi WV rP 12751 N. Thornton Road Lodi, CA 95242 Invoice Date Invoice # 2/1412020 20122 P.O, Number Terms Rep Ship Via F.O.B. Project 1832-0000002 Net 30 AB 2114/2020 Factory Freight FOB Jobsite Quantity Item Code Description Price Each Amount I Bowl Bearings Bowl, Second, Bearing. 47.21 47.211' I Touch Up Paint Touch Up Paint. 185.00 185.0OT i Lineshaf2 Lineshaft, Through Stuffing Box_ 376.10 376.10T I Packing Set Pecking Set, 32.74 32.74T I Resassemble Reassemble and Touch -Up Pump. 1,000,00 1,000.00 8 Hours at S 125 per hour. Jobsite, Set Up with Crane, - By Others. I Field Work Pacific Water Resources travels to Jobsite, install motor shaft, 550.00 550.00 coupling, set impeller, clears m run and test pump Pertbrmed on February 13, 2020. 5 Hours at S 110 per hour, Sales Tax 8.25% 108.75 fhank you for your business. Total sblr36.92 I Page 2 Pacific Water Resources 1304 Lincoln Avenue Burlingame, CA 94010 Bill To Mozingo Construction, Inc. 751 Wakefield Court Oakdale, CA 95361 Attention: Accounts Payable • 1'1,_1' .__:.tiyt''. Invoice Date Invoice # 8/18/2020 20221 Ship To Mozingo Construction, Inc. C/O City ofLodi WWTP 12751 N. Thornton Road Lodi, CA 95242 ' i - 1. "_'�T.• � P.O-Number Terms Rep Ship Via F.O.B. Project 1832tll ))002 Net 30 Ala 2114/2020 Factory Freight FOB Jobsite Quantity Item Code Description Price Each Amount Flowserve 10 EBL Job USC 00 223 Repair Work I Field Work Pacific Water Resources travels to Jobsite, removes previously, motor shaft, hardwood to pull pump. Pull pump and deliver to Fresno, CA. 5 Flours at $110 per hour. 1 Cranc American Rental Crane to pull pump and motor. Deliver to Fresno, CA. By Others. 550 -00 1.t�1 Shop Labor Shop Labor - Dissemble, Clean and Inspect Pump. 1,000.00 8 Hours at $125 per hour. �^ Pump Putin:+ �A 1 Shifting Box Rearing Stuffing Box Bearing. I Bowl Bearings Bowl Bearing. 5 Rubber Line Shaft— Rubber Lineshaft Bearings. I Suction Bell Bearing Suction Bell Bearing. 1 Set Screw Set Screw for Sand Collar. 1 Top Case Flearino 'Fop Case Bearing - Chunk you for your business. Page 1 Total 41,25 62.21 74.25 68.50 7.81 126.10 550.00 0-00 1,000.00 41.25T 62.2 i,r 371.25 1 68,50T 781T 126.1 OT Pacific Water Resources 1304 Lincoln Avenue Burlingame, CA 94010 Bill To Mozingo Construction, Inc. 751 Wakefield Court Oakdale, CA 95361 Attention: Accounts Payable Invoice Date Invoice # 8/18/2020 20221 I Ship To 1 Mozingo Construction, Inc. C/O City of Lodi WWTP 12751 N. Thornton Road Lodi, CA 95242 Jobsite, set Up with Crane_ - By Others. I Field Work Pacific Water Resources travels to Jobsite, install motor shaft coupling, set impeller, clearance, run and test putnp. Please advise time for PWR [o start-up unit. Sales Tax [ bank YOU Por your business. Page 2 Total 550.00 8.25% 550.00 108.75 P.O_ Number Terms Rep Ship Via F.O.B. Project 1832-0000002 Net 30 AB 2/14/2020 Factory Freight FOR Jobsite Quantity Item Code Description Price Each Amount I Bowl Bearings Bowl, Second, Bearing. 47.21 47.2 IT I Touch Up Paint Touch Up Paint. 185.00 185.00T 1 Lineshaft Lineshaft, Through Stuffing Box. 376.10 376.1OT l Packing Set Packing Set. 32.74 32.74T I Resassemble Reassemble and Touch -Up Pump. 1,000.00 1,000.00 8 Hours at $125 per hour. Jobsite, set Up with Crane_ - By Others. I Field Work Pacific Water Resources travels to Jobsite, install motor shaft coupling, set impeller, clearance, run and test putnp. Please advise time for PWR [o start-up unit. Sales Tax [ bank YOU Por your business. Page 2 Total 550.00 8.25% 550.00 108.75 RESOLUTION NO. 2021-56 A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING PAYMENT TO A.M. STEPHENS CONSTRUCTION CO., INC., OF LODI, FOR REPAIR OF WHITE SLOUGH WATER POLLUTION CONTROL FACILITY RECYCLED WATER STORAGE POND WATER TRANSFER PUMPS WHEREAS, the White Slough Water Pollution Control Facility (WSWPCF) Recycled Water Storage Pond Project was accepted by Council on November 20, 2019; and WHEREAS, since commencing operations, the pumps, that are designed to transfer water back and forth between the treatment facility and storage ponds, failed at different times for unknown reasons; and WHEREAS, staff requested A.M. Stephens Construction Co., Inc., of Lodi, facilitate the two pump repairs since the company was the prime contractor for the initial project and the work was anticipated to be under contract warranty; and WHEREAS, staff, the design consultant, and the pump supplier have collaborated to discern why the pumps failed and determined it was a combination of factors outside of the contract warranty, which would prove difficult to assign responsibility for the repairs; and WHEREAS, staff recommends authorizing payment to A.M. Stephens Construction Co., Inc., for repair of White Slough Water Pollution Control Facility recycled water storage pond water transfer pumps, in the amount of $24,024. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby authorize payment to A.M. Stephens Construction Co., Inc., of Lodi, for repair of White Slough Water Pollution Control Facility recycled water storage pond water transfer pumps, in the amount of $24,024; and BE IT FURTHER RESOLVED, pursuant to Section 6.3q of the City Council Protocol Manual (adopted 11/6/19, Resolution No. 2019-223), the City Attorney is hereby authorized to make minor revisions to the above -referenced document(s) that do not alter the compensation or term, and to make clerical corrections as necessary. Dated: March 3, 2021 ------------------------------------------------------------------------ ------------------------------------------------------------------------ I hereby certify that Resolution No. 2021-56 was passed and adopted by the City Council of the City of Lodi in a regular meeting held March 3, 2021, by the following vote: AYES: COUNCIL MEMBERS — Chandler, Hothi, Khan, Kuehne, and Mayor Nakanishi NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None ]ENNIFE CUSMIR City Clerk 2021-56